Вы находитесь на странице: 1из 68

PMT OPRN

SAUDI ARABIAN OIL COMPANY


S1
AAS
ENG’G CERT

RMK

ANALYSIS AND DESIGN CALCULATION OF SS-452


ISSUED FOR REVIEW
DESCRIPTION

SUBSTATION BUILDING
JO/EWO

10-01525-0004

JAZAN REFINERY EMERGENCY DIESEL


10-APR-2018

GENERATOR SS-452
DATE
REV.

J95-A-DOC-VE-028210
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS
Issued for
00 10-APR-2018 SS RMK AAS RAM
Construction
DATE
Rev Date Description Prep Chk App Proj SAPMT
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 1 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
DESIGN PACKAGE CHECK LIST
ENG’G CERT

Item Yes No Item Description


1 Yes Review Schedule: Does the design package allow adequate time for review as
required by Para. 3.3.1 of SAEP-303?
Project Proposal – 10 work days Detailed Design – 15 work days
RMK

2 Yes Design Package % Completion: Is the design package percentage completion in


accordance with Attachment 1 of SAEP-303?
Geotechnical @ 30% Completion Civil @ 60% Completion Structural @ 90%
Completion

3 Yes Review Documentation: Is the number of submitted hard copies (unless


ISSUED FOR REVIEW

electronic review is agreed upon) in accordance with Para. 3.4.1 of SAEP-303?


DESCRIPTION

Project Proposal – one hard copy of all documents per reviewing Division Detailed
Design – one complete design package per reviewing Division

4 Yes Scope of Work: Is Scope of Work included in the package as required in


Attachment 1 of SAEP-303?
5 Yes Review Documents: Are all the required documents included in the design
package as required in Attachment 1 of SAEP-303?
Civil Documents Geotechnical Documents Structural Documents*
*Structural steel shop drawings and material take-off are not required for review
and should not be submitted.
JO/EWO

10-01525-0004

6 Yes Drawings Index: Are drawings index in accordance with S. Aramco Standard
Drawing AE- 036411?
Index A – Plot Plans Index M – Structural Steel Index Q – Concrete
Index R – Architectural Index S – Civil Works
10-APR-2018
DATE

7 Yes Structural Calculations: Are calculations performed in accordance with S.


Aramco Engineering Standard SAES-A-204 "Preparation of Structural
Calculations"?
8 Yes Complete Design Package: Is the design package complete? Plot Plan drawings
REV.

(Index A)
NO.
00

Complete structural steel drawings (Index M)


DISCIPLINE
Complete concrete drawings including foundations (Index Q) Complete
ENGINEER civil/drainage drawings (Index S)
BY:-
Complete Architectural drawings for reference & use (Index R) Complete
DATE
structural steel calculations
Complete concrete calculations including foundation design Block wall design if
applicable
PROJECT
ENGINEER
BY:-

DATE
9 Yes Units: Are the calculations done using SI metric or Imperial units as required by
CERTIFIED Para. 5 of SAES-A-204?
10 NA Symbols: Does structural steel design have the same annotations or
nomenclature? as in the AISC Steel Manual and the Concrete per ACI Code as
DATE

required by Para. 6 of SAES-A- 204?


CONSTRUCTION
AGENCY
11 Yes Equations: Are all equations used in the design calculations clear and in
DATE
accordance with Para. 7 o f SAES-A-204?

12 Yes Assumptions: Are assumptions used in the calculations listed in an orderly


OPERATIONS manner and based on sound basis as required by Para. 8 of SAES-A-204?

13 Yes Parameters: Are the parameters used in the calculations justified as required by
DATE Para. 9 of SAES-A-204? This applies in particular to the following:
 Temperature differentials
 Allowable soil bearing pressure
 Wind load calculations
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 2 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1 Item Yes No Item Description
14 Yes General Presentation: Does the calculation presentations include the following
as per Para. 10 of SAES-A-204?
AAS
ENG’G CERT

 Name of the Originator


 Name of the Checker
 Title which describes the contents of the calculations
 Date of the calculations
RMK

 Table of contents
 Listing of codes and references
 General description of the structural design methodology
 Design criteria
 Load derivation for all loads
 Calculations accompanied by sketches
 Calculations for special connections including beam/column moment
ISSUED FOR REVIEW
DESCRIPTION

connections (for structural steel)


15 Yes Computer Calculations: Are computer calculations performed in accordance with
following as per Para. 11 of SAES-A-204?
 Computer input data initialed to ensure that it is checked
 Computer models accompanied by sketches that show joint and member
numbers, supports conditions and loadings
 Computer output accompanied by the corresponding input
 Computer diskette containing a copy of the input file
 Summary of analysis results are provided or extracted form the computer
output
16 Yes STAAD III Computer Input – Design Parameters:
JO/EWO

 Are column members Kz and Ky (effective column length ratio) inputted in the
10-01525-0004

design parameters?
 Are columns Lz and Ly (unbraced length in local z and y axis) inputted in
order to calculate columns slenderness ratio?
 Are beams UNL (unbraced length) inputted in order to calculate the allowable
10-APR-2018

compressive strength of the beams?


DATE

17 Yes Competent Checker: Are calculation checked by competent checker?)

18 Yes Risk Assessment: Is risk assessment required for this building, and if so, is it
REV.
NO.

included in the submittal as required by SAES-B-014?


00

DISCIPLINE
ENGINEER
BY:-

19 Yes Building Design: Does the scope of work define building type?
DATE

PROJECT
 Regular building per SAES-M-100
BY:-
ENGINEER  Blast Resistant building per SAES-M-009
o Is Blast Design Requirements (BDR) Data Sheet Included?
Pre-Engineered Building per 12-SAMSS-014
DATE

CERTIFIED o Is Building Data Sheet Included?
 Miscellaneous structure per SAES-M-001
DATE
20 Yes Building Material: Is building material established?
 Structural Steel Building
CONSTRUCTION  Concrete Building
AGENCY
 Load Bearing block wall with concrete roof slab
 Combination of Concrete and Block Wall system
DATE
 Precast & Prestressed Concrete
 Other (specify)
OPERATIONS 21 Yes Structural Stability: Is building lateral stability established through-
 Rigid moment connection frames (structural steel)
 Braced Frames (structural steel)
DATE
 Combination rigid and braced frames
 Other systems (to be specified)
22 Yes Longitudinal Stability: Is longitudinal stability of the building considered in the
THIS INDICATES THAT REV. NO. __00 __________

design calculation through –


APPROVAL/CERTIFICATION REQUIREMENTS,

 Rigid moment connection frames (structural steel)


REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Braced Frames (structural steel)


 Combination rigid and braced frames
 Other systems (to be specified)

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 3 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1 Item Yes No Item Description
23 Yes Building Roof/Floor Slab: Type of slab used?
 One-way concrete slab
AAS
ENG’G CERT

 Two-way concrete slab


 Composite decking concrete slab including shear connectors if composite
structural steel beams used
 Non-composite decking concrete slab
RMK

 Slab supported by steel beams


 Slab supported by truss or joist system
 Other (specify)
24 Yes Slab Thickness: Is deflection check performed to ensure that minimum slab
thickness is in accordance with ACI Code requirements?
ISSUED FOR REVIEW
DESCRIPTION

25 Yes Foundation Type: Type of building foundation?


 Spread footings
 Combined footings
 Strip footings
 Mat footing
 Other (specify)
26 Yes Building Details: Are adequate plans, elevations and sections details provided on
the drawings to illustrate the structural details of the building?
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 4 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

Table of Contents
AAS
ENG’G CERT

1 INTRODUCTION .....................................................................................................2
RMK

2 CODES & STANDARDS .........................................................................................2

3 MATERIAL...............................................................................................................2

4 LOAD COMBINATION ...........................................................................................3


ISSUED FOR REVIEW

5 LOADS ......................................................................................................................5
DESCRIPTION

5.1 DEAD LOADS..................................................................................................................5

5.2 ROOF LIVE LOADS ........................................................................................................5

5.3 WIND LOADS ..................................................................................................................5

5.4 SEISMIC .........................................................................................................................13


JO/EWO

10-01525-0004

5.5 BLAST ............................................................................................................................14

5.6 Maximum Lateral Load Summary ..................................................................................17


10-APR-2018

6 STRUCTURE ANALYSIS .....................................................................................18


DATE

7 STRUCTURAL ELEMENTS DESIGN .................................................................19


REV.
NO.
00

7.1 DIAPHRAGM .................................................................................................................19


DISCIPLINE

BY:-
ENGINEER
7.2 TT SLAB .........................................................................................................................21
DATE
7.3 BEARING PANEL .........................................................................................................34
PROJECT
ENGINEER
BY:-
7.4 CORBEL DESIGN..........................................................................................................52
DATE

CERTIFIED 7.5 PANEL THERMAL CALCULATION ..........................................................................53

DATE 8 CONNECTIONS .....................................................................................................54


CONSTRUCTION
AGENCY 8.1 PANEL TO PANEL ........................................................................................................54
DATE
8.2 PANEL TO FOOTING ...................................................................................................63
OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 5 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

1 INTRODUCTION
AAS
ENG’G CERT

The scope of this report is to analyze and design the precast super structure of substation
RMK

SS-452, located in Jazan refinery, the super structure is to resist gravity loads such as
dead, roof live, and blast load, along with the lateral loads from seismic, wind, or blast.
The super structure will be composed of precast bearing walls, as main lateral and
gravity force resisting system, and the panel will be design as special reinforced
ISSUED FOR REVIEW
DESCRIPTION

concrete shearwalls.
The building is rectangular shape with length = 63.88m, width = 17.14 m, and height =
9.3 m.

2 CODES & STANDARDS

ASCE7-05
JO/EWO

10-01525-0004

ASCE “Design of Blast Resistant Buildings in Petrochemical Facilities”


PCI MNL-140-12 “Seismic Design of Precast & Prestressed Concrete”
10-APR-2018
DATE

PCI MNL-141-12 “Blast Resistance Design Manual”


PCI 7th Ed
REV.
NO.
00

SAES-M-100
DISCIPLINE
ENGINEER SAES-M-009
BY:-

DATE ACI 318M-08


PROJECT
ENGINEER
BY:-

DATE

CERTIFIED
3 MATERIAL
DATE
Concrete:
CONSTRUCTION
AGENCY Str Screed, Panel & TT Slabs 28 days compressive cylinder strength = 35 Mpa
DATE E = 4700√35 = 27,805 Mpa

OPERATIONS
Reinforcement:
ASTM A706M Gr60 seismic rebars or A615M Gr60 complied with seismic
DATE

requirement as per ACI 318M-08 “Sec 21.1.5.2”


Fy = 420 Mpa
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

E = 200,000 Mpa

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 6 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

4 LOAD COMBINATION
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 7 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 8 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004

5 LOADS

5.1 DEAD LOADS


10-APR-2018
DATE

Roof Treatment Finishing Material = 3.85 kN/m2


100 mm structure Screed = 0.1 x 25 = 2.5 kN/m2
REV.
NO.
00

2% Roof Slope Foam Concrete = 16.34 x 0.02 x 10 = 3.27 kN/m2


DISCIPLINE

BY:-
ENGINEER TT 1000 self-weight = 7.2 kN/m2
DATE
MEP hanging from Roof (cable trays, ducts..etc) = 2.5 kN/m2
PROJECT

BY:-
ENGINEER
5.2 ROOF LIVE LOADS
DATE
L r = 1.5 kN/m2
CERTIFIED

5.3 WIND LOADS


DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 9 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 10 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 11 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 12 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 13 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 14 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 15 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 16 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
5.4 SEISMIC
AAS Jazan
ENG’G CERT

S s = 43.5% SAES-A-112

S 1 = 12.4% SAES-A-112
RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 17 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK

5.5 BLAST
Blast input is taken from risk assessment “Report No. 2995359-R-01, Issue 7 Draft D”
ISSUED FOR REVIEW

using values of substation SS-005.


DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 18 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Overpressure = 2.49 psi
AAS Impulse = 88.3 psi.ms
ENG’G CERT

Time Duration = 70.92 ms


RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 19 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 20 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
5.6 Maximum Lateral Load Summary
BY:-

DATE From above maximum ultimate shear on building due to lateral loads as follow:
PROJECT
ENGINEER 1.6 x Wind = 1.6 x 1,030.77 kN = 1,649.23 kN
BY:-

DATE 2.5 x Seismic = 2.5 x 4360.6 kN = 10,901.5 kN


CERTIFIED
1 x Blast = 1 x 22,081.6 kN = 22,081.6 kN  Governs
DATE
from above summary Blast load will govern the design for lateral force resisting
CONSTRUCTION
AGENCY elements.
DATE However elements designed for the blast will be subjected of the same detailing and
design approach as for buildings laying in seismic category D, since blast is a dynamic
OPERATIONS

load too.
DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 21 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1 6 STRUCTURE ANALYSIS

Analysis was conducted using STAAD Pro, bearing panels was modeled using surface
AAS
ENG’G CERT

elements, and the 100 mm non-composite diaphragm was modeled using plate elements,
RMK

connection of wall to footing is hinge in the out of plane bending and fixed in the in-
plane bending.
The bearing walls are going to behave as shearwalls.
The total thickness of the wall is 400 mm, and the wall is composed of 280 mm
ISSUED FOR REVIEW
DESCRIPTION

structural part, 50 mm insulation, & 70 mm non-structural cladding part.


JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 22 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

7 STRUCTURAL ELEMENTS DESIGN


AAS
ENG’G CERT

7.1 DIAPHRAGM
RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018

Figure 7-1: Maximum Shear Stress Due to Blast in Z-direction


DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

Figure 7-2: Maximum Tensile Stress Due to Blast in Z-Direction


OPERATIONS
Blast in z-direction will be the critical value since walls parallel to z-direction are short and non-

DATE
bearing, and the pressure is on the long façade of the building.
Maximum shear stress = 2.56 N/mm2
THIS INDICATES THAT REV. NO. __00 __________

Maximum Tensile Stres = 0.67 N/mm2


APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

As mention in section 5.6 elements resisting blast are going to be subjected to the provision of
SDC “D” in the ACI.

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 23 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 24 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
7.2 TT SLAB
AAS TT slab will be designed statically for static loads, and dynamically for blast load.
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 25 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Static Check:
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 26 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 27 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 28 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 29 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 30 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 31 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Dynamic Check:
AAS TT was analyzed as SDOF element.
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 32 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 33 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 34 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 35 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 36 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE Summary
CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 37 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
7.3 BEARING PANEL
AAS Bearing panels are analyzed and designed as a simple supported beam with axil load,
ENG’G CERT

statically and dynamically as a SDOF system, the slenderness effect is checked as well.
RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 38 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Dynamic Check
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 39 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 40 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 41 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 42 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 43 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 44 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Slenderness Check
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 45 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
In Plane Bending, and special boundary element requirement check.
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 46 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 47 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 48 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 49 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 50 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 51 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 52 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 53 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 54 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
Summary
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 55 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
7.4 CORBEL DESIGN
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 56 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS 7.5 PANEL THERMAL CALCULATION
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 57 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1 8 CONNECTIONS

8.1 PANEL TO PANEL


AAS
ENG’G CERT

Panels will be connected to work together as one piece for the blast load.
RMK

Maximum moment is at surface # 70 = 155.6 kNm


Panel width = 1.936 m  Shear along sides = 155.6/1.936 = 80.37 kN
Shear per panel height = 80.37/9.5 = 8.5 kN/m < (31.8x3) = 95.4 kN/m
Using wet type of connection from PEIKKO (PVL80) @ 300 mm calculation as follow:
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS
PROJECT DOCUMENTS DWG. TYPE
PLANT
PLANT INDEX
INDEX DOC.
DOC. SHT. NO.NO. REV.
SHT. NO.NO.
REV.
DWG. TYPE
ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC
J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 58 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 59 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 60 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 61 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 62 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 63 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 64 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 65 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 66 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
8.2 PANEL TO FOOTING
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 67 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
AAS
ENG’G CERT

RMK
ISSUED FOR REVIEW
DESCRIPTION
JO/EWO

10-01525-0004
10-APR-2018
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER
BY:-

DATE

PROJECT
ENGINEER
BY:-

DATE

CERTIFIED

DATE

CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
THIS INDICATES THAT REV. NO. __00 __________

APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE

(DCC)NO. ____ 10-01525-0004-267_______


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PROJECT DOCUMENTS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

ANALYSIS AND DESIGN CALCULATION OF SS-452 SUBSTATION BUILDING DOC


J95 Q VE-028210
JAZAN REFINERY EMERGENCY DIESEL GENERATOR SS-452 68 of 68 00
JAZAN SAUDI ARABIA JO/EWO:10-01525-0004

Вам также может понравиться