Вы находитесь на странице: 1из 2

Office:Plot No.

585,Sector-43,
Golf Course Road,Gurgaon Tel.:0124-2386062 /63
E-mail:info@nbconstructions.com , nirman_bharti@rediffmail.com Website :
www.nbconstructions.com

Ref:NBCPL/15-16/WO28 Dated: 18.06.2015

To
AKS Construction
Plot no.A1/780,Aya Nagar Extn.
Phase-V,New Delhi-110047
E-mail: samalakshya@gmail.com
Dear Sir

Subject:Work Order for Paint at our Site SCO Sec-31,Gugaon.

We are pleased to place the above said work order ofPaint for our site SCO Sec-31,
Gurgaon.

Sr.no Item Description Unit Rate


1 Fixing of G.I pipe C.I pipe, PVC pipe,
Chinaware ,C.P fitting from 1st main hole
to toilet and terrace complete with all
respects.
Master Toilet with Bath Tab/Jakugi Each 12000

Master Toilet with Cut Bash Tab Each 10000


Servant Toilet Each 8000
Powder Toilet Each 8000
Kitchen Each 7000
2 All labour charges for fixing of PVC pipe
for sewerage and drainage including
excavation, PCC and all around covering
in pipes with all respects.
200mm Dia Rft 71
160mm Dia Rft 67
110mm Dia Rft 63
75mm Dia Rft 55
3 All labour charges for fixing of G.I pipes
including change cutting,Painting and
wrapping complete with all respect
16mm Dia Rft 16
20mm dia Rft 17
25mm Dia Rft 24
32mm Dia Rft 30
40mm Dia Rft 33
50mm Dia Rft 39
65mm Dia Rft 63
80mm Dia Rft 78
4 All labour charges for making of brick
masonry main hole including excavation
PCC Brick work claster and top from
cover fixing all respect
600X600X600 Each 1411
450X500X600 Each 1019
300X300X300 Each 549
5 All labour charges for fixing Ball
Valve,Gate Valve including Testing
Complete
15mm Dia Each 47
20mm Dia Each 47
25mm Dia Each 55
32mm Dia Each 59
40mm Dia Each 71
50mm Dia Each 78
65mm Dia Each 94
80mm Dia Each 117
6 All labour charges for fixing of Sluse valve
100mm Dia Each 1176
150mm Dia Each 1411
7 Fixing and joining of t connection with 1960
testing complete at terrace
8 Fixing of water meter box Each 784

Terms & Condition

1). Payment after Submission of RA bill on next month 20-25 date.


2).Only labour rate, material will be supplied by client.
3).10% Security will be deducted on running bill.
4).Consumable material will be scope of vendor.

Thanking You,

For N.B. Constructions

Authorized Signatory