Вы находитесь на странице: 1из 3

CURRICULUM VITAE

Ahmed Sayef uddin


Piping QC
Email :ahmedsaif929@gmail.com
Cell No :+966-563347786, (KSA)

OBJECTIVE
To obtain a challenging and responsible position in professionally managed organization active in my field of Piping
(power plant) Projects & Products Category, where I can utilize my skills in contributing effectively to the success of
the organization and also to further enhance my personal skills with Good Communication, Presentation with
demonstrated abilities in training, team building and driving frontliners / executives to achive goals with customer
focused attitude.
CAREER SUMMARY
An astute professional with 04 years of experience in Piping, Welding, having through knowledge of International
Codes & Standard and Quality procedures. Hand on experience in review and approval of Quality documentation,
Method Statements, Inspection & Test Plan.
QUALIFICATION
Bachelor of Technology in Mechanical Engineering B. Tech. Jawaharlal Nehru Technological University (JNTU),
Hyderabad, (INDIA)
TECHNICAL CERTIFICATES
 Piping Design & Engineering from I.P.E.B.S – Hyderabad.
 Diploma in HVAC (Heat Ventilation & Air Conditioning) from I.P.E.BS – Hyderabad.
 Level-II NDT (PT, RT, UT, MPT) Certified from ASNT-TC-1A
PROFESSIONAL EXPERIENCE
Project : Fadhili Combined Heat & Power Plant.
Company : Doosan Heavy Industries (DHI).
Clien : Fadhili Plant Cogeneration Company (FPCC)
Position Held : Piping QC
Duration : Sept 2018 to Nov 2018.

Project : Yanbu Phase-III Power & Desalination Plant.


Company : SEPCO-III Power Consortium Company
Client : Saline Water Conversion Company, Yanbu,KSA
Position Held : Piping QC
Duration : July 2017 to Sept 2018

Project : Ras Al Khair Power & Desalination Plant (RKPP)


Company : SEPCO-III Power Consortium Company
Client : Saline Water Conversion Company, RAK,KSA
Position Held : Piping QC
Duration : Mar 2016 to June 2017

Project : Ibn Sina POM


Company : Dragados Gulf Construction
Position Held : Piping QC
Duration : Apr 2015 to Jan 2016

Project : Ramagundam Super Thermal Power Plant, NTPC India Ltd.


Project ref No : BI- 10-00156.
Client : Ministry of Power and Energy.
Position Held : Piping QC
Duration : Jan 2014 to Feb 2015
KEY RESPONSIBILITIES:
 Review contract scope of work, project quality plan and quality control procedure.

 Review the ITP’S, Method of Statements, and Procedures & Inspection Reports.

 Reviewing Material Test Certificates (MTC) as per the requirement & randomly check receiving materials.

 Inspection of Daily Fit-Up, Weld Visual & Preparation of Documents for review and approval.

 Witness all the Piping, Testing and Mechanical activities during the whole surveillance inspection.

 To witness visual inspection and the Welding Performance during and on completion of the job.

 Inspection of Gasket & Bolt Torqueing.

 Verifying the Testing Limits & Performing Line Check.

 Prepare & verify the punch listing and approve with comments.

 Review the final test packages & documents as per procedures and signed for the client.

 Review the Hydro Test packages & witnessing the Hydro Test.

 Review of Mechanical Tie-In Package.

 Witness Dimensional and Visual Inspection.

 Review of Destructive and Non Destructive Test.

 Review Radiographic Film.

 Ensure all quality control documentation is compiled and completed in a timely matter meeting project
deadlines.

 Prepare regulatory documentation as required and provide to client.

 Timely completion of paper work and piping and mechanical turnover binder.

 Defining the corrective & preventive actions to deliver the work and ensuring the implementation of the same.

 Stage wise inspection, material inspection, review of test certificates, alignment of piping as per drawing
witness of Fit-Up Joints, In-Process Welding Inspection, Weld visual, Hydro Test, Pneumatic Test witness and
its supports, final sign off stage wise inspection reports.

 Final Inspection and issue release certificate.

 Preparation of Inspection and Test Plan, Checklist, Procedures and Review of Construction Drawing.

 Line Flushing, Air Blowing, Pressure Testing, Piping Lay-Up Inspection, Relief Valve Installation, Re-
Instatement and final inspection for mechanical completion.

 Responsible for inspection of pipe spools for shop and fabrication such as fit-up, dimensional and visual
inspection as per International Standards.

 Monitor Piping and Mechanical Operations and Conduct Required Inspections work to resolve quality related
issues with workers , subcontractors and the client.

 Communicate with management , staff and the clients the requirements of quality’s scope of work.

 Verify that all the site activities comply with uality codes and standards.

 Coordinate quality site inspectors with all site sub contractors and vendors, coordinate all Non Destructive
Testing on site and monitor the implementation of the approved site QC plan.
 Inspect / Review product material , weld quality and testing to ensure compliance with codes , standards and
QCM.

 Prepare Request for Inspection (RFI) to Project Management Team (PMT) and Project Inspection Division.

 Close log book entry or surveillance violation.

 Checking and as built revision of isometric drawing and P&ID

 Prepare Non- Conformance Report (NCR), Preventive Action Request (PAR) and initiate corrective Action for
every violation and out of Standard of Construction activities.

 Preparation and selection of Materials, Fittings & Valves quantity take off, Execution of Installation, Testing &
Commissioning of GI Pipeline & CS Pipeline, Sprinkler, Hose reel, Dry Risers, Wet Risers, Foam System,
Halogenated Extinguishing Agent Systems & Fire Pumps (Diesel Pump, Jockey Pump & Electric motor Pump)
as per Civil Defense Regulations & standard ).

Achievements
 Successfully carried out the Piping design, engineering and detail engineering, Analysis, calculations and
100% approval for the petrochemical Co. For ARAMCO through consultant IPEBS.
 Successfully carried out design, engineering for HVAC as per ASHREE standards.
 Standardized material specification with proper classification, which was reduced Inventory with right
specifications, Due to which company was saved 10% on over all inventory items compared with previous and
present situation.

Declaration
I hereby declare that the information given above is true to my knowledge and I am solely responsible for its
accuracy.

Ahmed Sayef uddin

Вам также может понравиться