HP Flare (K-FX-043001)
Distribution List
Contact List
CS - Carbon Steel
UT - Ultrasonic Testing
Page 3 of 16
1. INTRODUCTION .................................................................................................................................... 5
1.1 SUMMARY OF FLARE TIP DESIGN DATA AND INSPECTION HISTORY .............................................................................................5
1.2 INSPECTION AND ASSESSMENT PROCEDURES ........................................................................................................................5
1.3 JOB HAZARDS AND RISK MANAGEMENT ..............................................................................................................................5
2. SCOPE OF WORK .................................................................................................................................. 6
2.1 INSPECTION ACTIVITIES.....................................................................................................................................................6
2.2 DEGRADATION MECHANISMS AND INSPECTIONS ...................................................................................................................6
2.3 GENERAL INSTRUCTIONS FOR INSPECTION ............................................................................................................................7
3. REPORTING ...................................................................................................................................... 7
Page 4 of 16
In Salah Gas (ISG) intends to inspect the HP and LP flare stacks at various fields during their
respective shutdown opportunity.
This work pack details the inspection requirements for the high pressure flare stack (K-FX-
043001) at REG. Section 1.1 summarises the design data and inspection hiistory of the flare
stacks, while section 2.2 gives a brief description of the applicable degradation mechanisms.
The high pressure flare (Zeeco Model UFX flare tip) is designed to dispose off a flammable
waste gas stream during normal or emergency plant operations. The flare is equipped with a
stability tip to provide a low pressure zone, which ensures ignition of the flare gas and flame
stability at high exit velocities.
The type of the flare tip assembly is UFX-20 Sonic - HP flare with stack height of 44m and
stack riser diameter of 20 inches.
The flare tip is fitted with two stainless steel Zeeco model HSLF-A2T/C pilots mounted 1800
apart.
The maximum thermal radiation at the boundary of the restricted access zone (coincident with
parts of the surrounding fence line) is 4.73 kW/m² (1500 Btu/ft²/hr) and includes 1.01 kW/m²
(300 Btu/ft²/hr) solar radiation.
Top half of the flare tip is constructed of stainless steel confirming to the specification 310 while
the bottom half is constructed of carbon steel confirming to the specification A 516-70N.
The HP flare stack has been in service since the plant was commissioned in 2004. Since then,
the HP flare stack has undergone five inspections.The intial three inspections were for the flare
tip with original design while the later two inspections were for the flare tip with a modified
design.
During 2010 inspection, severe cracking was noted on the edge of the flare tip and an
anomaly was raised for the remedial work. (ISG-REG-10-ANOM-009)
During 2014 TAR, the flare tip was replaced with new design flare tip with a deflector unit.
No anomalous findings have been reported since 2014 inspection, post replacement of the
flare tip. Both the inspections post flare tip replacement have been performed remotely utilising
a high performance camera.
The following specific measures shall be observed during the execution of the work:
Hazards covered in HET and site induction are to be taken care during the site activities.
Personnel carrying out inspection shall comply with the ISG permit to work system and
prevailing golden rules at site.
Page 5 of 16
Visual inspection
Internal
Note: Refer to Integrity review section on the WSE document: ISG/IMS/WSE/16-046 attached in the
Appendix 1.
Page 6 of 16
All inspection work shall be conducted in accordance with the relevant procedures that are listed in
Section 1.2. The following however, constitute a series of additional measures that shall be
undertaken as part of the inspection program:
Photographic evidence of corrosion indications, damage, cracks or any other anomalous
observations shall be captured and compiled. Additional photographs showing the general
view of the vessel, vessel internals, nozzles and other areas of interest shall also be captured.
Condition assessments shall be ascertained using appropriate tools, such as measurement
tape, depth gauges, profile gauges etc. These shall be utilised where necessary for the
gauging/assessment of anomalies.
The NDT methods which are recommended herein were based on the assessed integrity
threats and on the findings from previous inspections. However, the use of supplemental
and/or alternative NDT methods may be required dependent on the findings from this latest
planned inspection; the choice of supplemental and/or alternative NDT method(s) shall be
finalised following direct consultation with the site Inspection Engineer / AIE Senior Inspection
Engineer.
3. Reporting
The following steps shall be followed for the completion of the full scope of the work pack:
All accompanying documentation shall be completed in full. A quality check shall also be
performed by site Inspection Engineer prior to the issue of the inspection documentation.
Any changes to the pre-defined work scope shall be fully documented on the accompanying
work scope modification sheet (see Appendix V).
Anomalies observed during the inspections shall be recorded and reported in accordance with
the ISG anomaly management procedure (listed in Section 1.2).
The completed work pack shall be subject to review and sanctioning for issue by the site
Inspection Engineer.
The completed work pack, once formally endorsed, shall thereafter be issued to AIE through
the “iback up” shared folder.
Upon receipt of the workbook a detailed review of the inspection findings shall be completed
by the AIE Senior Integrity Engineer. A review sheet shall be utilized detailing the major
findings from the inspections. Previous inspection results should also be reviewed alongside
recent findings. The inspection data shall thereafter be utilised for the revision and updating of
the risk assessments and risk-based inspection schedules; this shall be conducted in
accordance with the pressure systems FRA procedure (as listed in Section 1.2). The revision
and updating of the risk assessments and risk-based inspection schedules may result in
changes to the scheduling of the future inspections; such changes shall warrant ISG review
and approval.
The AIE review sheet, once completed and authorised for use by the AIE Integrity Team
Leader, shall be issued to the ISG Integrity Team Leader. This shall serve as a formal record
of the inspection and any follow-on and/or additional measures, if any, which may be deemed
necessary going forward.
The work pack shall be stored in a central database which is maintained by AIE on behalf of
ISG.
-------------------------------------------------------
Page 7 of 16
Page 8 of 16
Page 9 of 16
Page 10 of 16
P&ID’s
Page 11 of 16
1. ISG-REG-10-ANOM-007
2. ISG-REG-10-ANOM-008
3. ISG-REG-10-ANOM-009
4. ISG-REG-10-GEN-002
5. ISG-REG-11-GEN-002
6. ISG-REG-12-GEN-009
7. ISG-REG-14-GEN-004
8. ISG-REG-15-GEN-007
Page 12 of 16
Page 13 of 16
MAN HOURS
OVERTIME
DOWN TIME
COMMENTS:
Page 14 of 16
Page 15 of 16
Page 16 of 16