37 Soot bLowing Pressure/temp Control In Auto Logic ready Mechanical work in progress.
38 HFO Pr/Flow Control In Auto In Auto
39 LDO Pr/Flow Control In Auto In Auto
40 Atomizing Steam Pr Control In Auto In Auto
41 Mill#10 Grind Pr Control In Auto Logic ready
42 Mill#20 Grind Pr Control In Auto Logic ready
43 Mill#30 Grind Pr Control In Auto Logic ready
44 Mill#40 Grind Pr Control In Auto Logic ready Right side mills 10,40,50 and
80 are available.Remaining
45 Mill#50 Grind Pr Control In Auto Logic ready under erection.
46 Mill#60 Grind Pr Control In Auto Logic ready
47 Mill#70 Grind Pr Control In Auto Logic ready
48 Mill#80 Grind Pr Control In Auto Logic ready
49 AUX PRDS (CRH) Control In Auto Logic ready
50 AUX PRDS (MS ) Control In Auto Logic ready
under erection
51 AUX PRDS (CRH) Spray Control In Auto Logic ready
52 AUX PRDS (MS ) Spray Control In Auto Logic ready
53 Boiler Drain Vessel Level Control In Auto Logic ready Completed
54 Condenser HW level Control In Auto In Auto In Auto
Will be done after GSC in
55 Condenser water mIn Flow(GSC) Control In Auto Logic ready service.
56 CEP-A/B/C R/C Valve In Auto In Auto In Auto
Completed shall be kept in @
57 Drip Pump Min flow Control In Auto Logic ready synchronisation
58 LP Htr no:3 Level control In Auto Logic ready Completed .can be kept in
59 LP Htr no:4 Level control In Auto Logic ready Auto.
60 HPH 8A Level Control(Normal/Emer) In Auto Logic ready
61 HPH 8B Level Control (Normal/Emer) In Auto Logic ready
62 HPH 7A Level Control (Normal/Emer) In Auto Logic ready
63 HPH 7B Level Control (Normal/Emer) In Auto Logic ready
64 HPH 6A Level Control (Normal/Emer) In Auto Logic ready
65 HPH 6B Level Control (Normal/Emer) In Auto Logic ready Under progress
66 DEA& FW Inlet CRH Pr control_Pegging In Auto Logic ready Shall be done after steam
67 DEA& FW Inlet AUX Pr control-Pegging In Auto Logic ready blowing
68 Feedwater FCV 30% control In Auto In Auto
69 Feedwater DP across FCV control In Auto Logic ready Required inputs available
70 Feed water Flow control In Auto Logic ready Required inputs available
71 BFPT HDR INL CRH PR CONTROL In Auto Logic ready under erection
72 GLAND STM Admission PR CONTROL In Auto Logic ready
73 GLAND STM Exhaust Pr CONTROL In Auto Logic ready under erection
74 GEN H2 GAS TEMP CONTROL In Auto Logic ready
75 GEN Stator Water TEMP CONTROL In Auto Logic ready
76 GEN Stator Water PR CONTROL In Auto Logic ready in progress
77 HPT BYP PR CONTROL In Auto Logic ready
78 HPT BYP SPRAY CONTROL In Auto Logic ready
79 LPT BYP PRESS CONTROL In Auto Logic ready
80 LPT BYP SPRAY CONTROL In Auto Logic ready
81 LP Dosing available for auto Logic ready under erection
Master Loop
Req for Synch Boiler
Req for Synch Turbine
Efficiency loop
*
*
*
*
Electrical system
BHEL
BHEL
BHEL
GE
EMCO
ABB
ABB
BHEL
Civil/L&T
Schnieder
,GE,L&T