Auto Loop Status

Sl no Loop Descripton UNIT#1 UNIT#2 Status


1 CMC Master In Auto Logic ready
1.1 CMC RunBack In Auto- To be tested Logic ready
1.2 Boiler Master In Auto Logic ready
1.3 Turbine Master In Auto Logic ready
2 Coal Flow Control In Auto Logic ready
3 Furnace Draft Control In Auto In Auto
4 PA HDR Pr In Auto Logic ready
5 SA HDR Pressure control In Auto Logic ready
6 Mill#10 PA Control In Auto Logic ready
7 Mill#20 PA Control In Auto Logic ready
8 Mill#30 PA Control In Auto Logic ready
9 Mill#40 PA Control In Auto Logic ready
10 Mill#50 PA Control In Auto Logic ready
11 Mill#60PA Control In Auto Logic ready
12 Mill#70PA Control In Auto Logic ready HAD,CAD ,ducting,associated
13 Mill#80 PA Control In Auto Logic ready actuators under erection.RTD
14 Mill#10 Temp Control In Auto Logic ready is to be fixed after clearance
from ME.
15 Mill#20 Temp Control In Auto Logic ready
16 Mill#30 Temp Control In Auto Logic ready
17 Mill#40 Temp Control In Auto Logic ready
18 Mill#50 Temp Control In Auto Logic ready
19 Mill#60 Temp Control In Auto Logic ready
20 Mill#70 Temp Control In Auto Logic ready
21 Mill#80 Temp Control In Auto Logic ready
22 SH Temp control 2nd ST-Left In Auto Logic ready
23 SH Temp control 2nd ST-Right In Auto Logic ready
24 SH Temp control 1St ST-Left In Auto Logic ready Thermocouple well not
erected,valves are to be made
ready.
Thermocouple well not
erected,valves are to be made
25 SH Temp control 1St ST-Right In Auto Logic ready ready.
26 RH Stm Temp Control-Left In Auto Logic ready
27 RH Stm Temp Control-Right In Auto Logic ready
28 PA-GAH -A Air I/l Temp In Auto Logic ready
29 PA-GAH -B Air I/l Temp In Auto Logic ready
30 SA-GAH -A Air I/l Temp In Auto Logic ready
31 SA-GAH -B Air I/l Temp In Auto Logic ready
32 SAPH/PAPH-A FG temp control available for auto Logic ready
33 SAPH/PAPH-B FG temp control available for auto Logic ready Under erection
34 CombustION AIR CONTROL In Auto In Auto
35 Separator Vessel Level (UG) Control In Auto In Auto
36 SeparatorVesselHigh/Level Drain Control(WR/ZR) In Auto In Auto

37 Soot bLowing Pressure/temp Control In Auto Logic ready Mechanical work in progress.
38 HFO Pr/Flow Control In Auto In Auto
39 LDO Pr/Flow Control In Auto In Auto
40 Atomizing Steam Pr Control In Auto In Auto
41 Mill#10 Grind Pr Control In Auto Logic ready
42 Mill#20 Grind Pr Control In Auto Logic ready
43 Mill#30 Grind Pr Control In Auto Logic ready
44 Mill#40 Grind Pr Control In Auto Logic ready Right side mills 10,40,50 and
80 are available.Remaining
45 Mill#50 Grind Pr Control In Auto Logic ready under erection.
46 Mill#60 Grind Pr Control In Auto Logic ready
47 Mill#70 Grind Pr Control In Auto Logic ready
48 Mill#80 Grind Pr Control In Auto Logic ready
49 AUX PRDS (CRH) Control In Auto Logic ready
50 AUX PRDS (MS ) Control In Auto Logic ready
under erection
51 AUX PRDS (CRH) Spray Control In Auto Logic ready
52 AUX PRDS (MS ) Spray Control In Auto Logic ready
53 Boiler Drain Vessel Level Control In Auto Logic ready Completed
54 Condenser HW level Control In Auto In Auto In Auto
Will be done after GSC in
55 Condenser water mIn Flow(GSC) Control In Auto Logic ready service.
56 CEP-A/B/C R/C Valve In Auto In Auto In Auto
Completed shall be kept in @
57 Drip Pump Min flow Control In Auto Logic ready synchronisation

58 LP Htr no:3 Level control In Auto Logic ready Completed .can be kept in
59 LP Htr no:4 Level control In Auto Logic ready Auto.
60 HPH 8A Level Control(Normal/Emer) In Auto Logic ready
61 HPH 8B Level Control (Normal/Emer) In Auto Logic ready
62 HPH 7A Level Control (Normal/Emer) In Auto Logic ready
63 HPH 7B Level Control (Normal/Emer) In Auto Logic ready
64 HPH 6A Level Control (Normal/Emer) In Auto Logic ready
65 HPH 6B Level Control (Normal/Emer) In Auto Logic ready Under progress
66 DEA& FW Inlet CRH Pr control_Pegging In Auto Logic ready Shall be done after steam
67 DEA& FW Inlet AUX Pr control-Pegging In Auto Logic ready blowing
68 Feedwater FCV 30% control In Auto In Auto
69 Feedwater DP across FCV control In Auto Logic ready Required inputs available
70 Feed water Flow control In Auto Logic ready Required inputs available
71 BFPT HDR INL CRH PR CONTROL In Auto Logic ready under erection
72 GLAND STM Admission PR CONTROL In Auto Logic ready
73 GLAND STM Exhaust Pr CONTROL In Auto Logic ready under erection
74 GEN H2 GAS TEMP CONTROL In Auto Logic ready
75 GEN Stator Water TEMP CONTROL In Auto Logic ready
76 GEN Stator Water PR CONTROL In Auto Logic ready in progress
77 HPT BYP PR CONTROL In Auto Logic ready
78 HPT BYP SPRAY CONTROL In Auto Logic ready
79 LPT BYP PRESS CONTROL In Auto Logic ready
80 LPT BYP SPRAY CONTROL In Auto Logic ready
81 LP Dosing available for auto Logic ready under erection
Master Loop
Req for Synch Boiler
Req for Synch Turbine
Efficiency loop
*
*

*
*
Electrical system

S.No Area Status


1 Generator 1.Bus dusct flexible silver coating and termination
2.IPBD HV Test and earthing
3.Generator CT to CT MB cabling work.

4.IPBD dry air pressursation unit to be made ready.


5.LAVT flexible connection pending
2.Excitation Xmer flexible connection(22KV side)

6.Excitation AC DC cable connection pending.


1.Generator Xmers ,Control and protection MB cable in
2 Power Xmers pending

2.UT A & B CT cables laying and termination pending

3.Generator Xmer to Overhead conductor connection


3 Switchyad Bay 413 (GT#2 bay)Relay issue

4 ESP Pass D,E F available with H xmer


A and F xmers not erected.

5 2A ID ,FD & PA Motors cable termination and testing pending

Xmers and switchgear erected ,Testing in progress.


6 Ash Extraction Switchgear
Agency
BHEL
BHEL
BHEL

BHEL
BHEL
BHEL

GE

EMCO

ABB
ABB

BHEL

Civil/L&T

Schnieder
,GE,L&T