Rev D
PS Core Audit for Vodafone Egypt
Table of Contents
1 Ericsson PS Core Network Performance Audit ....................................3
1.1 Introduction................................................................................................ 3
1.2 Nodes Included in the Audit ...................................................................... 3
1.3 Methodology .............................................................................................. 3
1.4 Summary of Main Findings and Observations ......................................... 4
2 SGSN1A Performance Audit ...................................................................7
2.1 General Info – SGSN1A............................................................................ 7
2.2 Capacity and Dimensioning ...................................................................... 8
2.2.1 SAU and PDP Utilization (Network Level) ................................................ 8
2.2.2 Compact Traffic Profile (BH) for SGSN1A ................................................ 9
2.2.2.1 SGSN1A Compact Traffic Profile @ Signaling BH................................... 9
2.2.2.2 SGSN1A Compact Traffic Profile @ Payload BH..................................... 9
2.2.3 SAU (SGSN1A) ....................................................................................... 10
2.2.4 Active PDP Context (SGSN1A) .............................................................. 10
2.2.5 Throughput (SGSN1A) ............................................................................ 11
2.2.6 CPU / Memory Load (SGSN1A) ............................................................. 11
2.3 KPIs Performance Analysis and Benchmarking ..................................... 14
2.3.1 KPIs Overview and Benchmarking with NetQB...................................... 14
2.3.2 Attach Success Ratio .............................................................................. 14
2.3.2.1 Attach Success Ratio (2G) – SGSN1A................................................... 14
2.3.2.2 2G Attach Failure Cause Codes – SGSN1A .......................................... 15
2.3.2.3 Attach Success Ratio (3G) – SGSN1A................................................... 16
2.3.2.4 Mobility Management Log Analysis ........................................................ 16
2.3.3 Service Request Success Ratio 3G – SGSN1A..................................... 18
2.3.4 PDP Context Activation Success Ratio .................................................. 19
2.3.4.1 PDP Context Activation Success Ratio 2G –SGSN1A .......................... 19
2.3.4.2 PDP Context Activation Success Ratio 3G –SGSN1A .......................... 19
2.3.4.3 Session Management Log Analysis........................................................ 20
2.3.5 PDP Context Cutoff Ratio ....................................................................... 22
2.3.5.1 PDP Context Cutoff Ratio 2G –SGSN1A ............................................... 22
2.3.5.2 PDP Context Cutoff Ratio 3G –SGSN1A ............................................... 22
2.3.5.3 PDP Context Cutoff Ratio Cause Code Analysis ................................... 23
2.3.6 RAB Establishment Success Ratio 3G – SGSN1A ................................ 23
2.3.7 Intra SGSN RAU ..................................................................................... 24
2.3.7.1 Intra SGSN RAU (2G) – SGSN1A .......................................................... 24
2.3.7.2 Intra SGSN RAU (3G) – SGSN1A .......................................................... 26
2.3.8 Inter SGSN RAU ..................................................................................... 27
2.3.8.1 Inter SGSN RAU (2G) – SGSN1A .......................................................... 27
2.3.8.2 Inter SGSN RAU (3G) – SGSN1A .......................................................... 27
2.3.9 Paging Success Rate.............................................................................. 28
2.3.9.1 Paging Success Rate (2G) –SGSN1A.................................................... 28
2.3.9.2 Paging Success Rate (3G) –SGSN1A.................................................... 29
2.4 Parameter/Configuration/Hardware Audit............................................... 30
2.4.1 Node Parameters/Properties .................................................................. 30
2.4.2 Configuration Audit.................................................................................. 30
2.4.3 Hardware Audit........................................................................................ 30
Rev D 2 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The delivery of the PS Core Network Performance Audit follows the sequence
below:
1.3 Methodology
The KPI evaluation and performance audit for Vodafone Egypt PS Core
Network (GSM/WCDMA) was done according to the following:
• PDC logs for the period from 9th till 23rd of May 2013, in which the
reported Busy Hours (BH) were:
Rev D 3 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
• Node Level Parameter and Feature Audit were done for consistency
check.
1- Most of the standard SGSN KPIs have healthy trends with respect to
Ericsson Network Quality Benchmarking (NetQB) regional/global reference
figures of Q1-2013. However, some KPIs are below average and need
deeper investigations to find out appropriate corrective actions for
improving their trends. More details are included in the different sections
within this report.
a. Major Degradation:
Rev D 4 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
b. Minor Degradation:
Available sample logs for Cause Code #17 show that 99%
of records are due to Roamers.
2- Analysis showed that both CPU and memory loads are within satisfactory
levels and that proper balancing exists among Application Processors and
Device Processors which indicates healthy dimensioning.
Rev D 5 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
3- The SAU Licensed Capacity on Network level is 2.6M Subs. The SAU
License Utilization on Network level is currently 82.3%, which is still within
the agreed watermark between Vodafone Egypt and Ericsson.
EBM will be of added value in identifying the root / potential causes behind
the observed degradation in 2G Intra SGSN Routing Area Update, PDP
Context Cutoff Ratio and 2G Attach Success Rate within Vodafone Egypt
PS Core Network.
Rev D 6 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Rev D 7 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The SAU Licensed Capacity on Network level is 2.6M Subs. The SAU License
Utilization on Network level is currently 82.3%, which is still within the agreed
watermark between Vodafone Egypt and Ericsson.
On the other hand, the PDP Licensed Capacity on Network level is 1.56M,
which leads to PDP License Utilization on Network level of 37.3%.
Rev D 8 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Rev D 9 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The SAU capacity on the node is 1.5M Subs. The SAU capacity utilization on
SGSN1A node level is around 30%, where the contribution of 3G is around
53% while the contribution of 2G is 47%.
Analysis shows that number of Active PDP Context over SGSN1A crosses
110,000 at the Payload BH, where the contribution of 3G is around 65% while
the contribution of 2G is 35%.
Rev D 10 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The remaining portion of the 3G Traffic (Payload) will be directly routed from
the RNCs towards the GGSNs.
The below chart shows the hourly trends of the uplink (UL) and downlink (DL)
Throughput of the two different radio access technologies between 9th and
22nd of May 2013.
200,0
180,0
160,0
140,0 2G DL Throughput in Mbps
There are several CPUs within the node that handle different aspects of the
signaling traffic and payload traffic:
• Application Processor (AP): These processors handle the Control Plane
Signaling, as well as node management and processing.
• Device Processor (DP): These processors are responsible for protocol
handling, for signaling and payload traffic. There are several types of DPs:
• DP Payload: These processors handle the User Plane traffic
which is the 2G and 3G user payload. They also handle some
aspects of BSSGP signaling to BSCs over Gb, as well as Frame
Relay if they have a Gb link connected.
Rev D 11 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
• SS7 Front End: These processors handle the low layers of SS7
protocol of the SS7 stack, such as MTP-L3 / M3UA / SCTP.
• SS7 Back End: These processors handle the higher level layers
of the SS7 protocol stack.
• Node Controller Board (NCB): The active Node Controller Board (NCB)
provides central support and functions, such as O&M, Hardware and
Software monitoring and distribution, Packet Data (PD) application and
SGSN supervision.
Rev D 12 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
There is correct and healthy balancing among APs and DPs as shown in the
graphs below:
Rev D 13 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Attach Success Ratio Failure 2G 96.68 96.88 97.31 97.50 Slightly Below average
Attach Success Ratio Failure 3G 98.04 98.05 83.57 89.69 Healthy
Intra SGSN Routing Area Update Success Ratio 2G 89.80 87.73 95.98 95.36 Degraded & Needs Further Investigations
Intra SGSN Routing Area Update Success Ratio 3G 99.78 99.68 98.58 99.04 Healthy
Inter SGSN Routing Area Update Success Ratio 2G 99.89 99.78 90.36 90.60 Healthy
Inter SGSN Routing Area Update Success Ratio 3G 98.87 98.94 91.50 96.62 Healthy
PDP Context Activation Success Ratio 2G 99.54 99.61 98.58 98.48 Healthy
PDP Context Activation Success Ratio 3G 98.14 98.07 98.18 98.15 Healthy
PS Paging Success 2G 91.34 84.84 94.21 93.09 Degraded & Needs Further Investigations
PS Paging Success 3G 84.13 78.23 95.72 96.14 Degraded & Needs Further Investigations
RAB Assignment Success 3G 98.83 98.40 Healthy
Service Request Success 3G 99.82 99.77 Healthy
Needs More Investigations, Slightly above observed values
PDP Context Cutoff Ratio 2G 4.57 5.28
from other operators
Needs More Investigations, within the range of observed
PDP Context Cutoff Ratio 3G 3.76 4.40
values from other operators
The trend of 2G Attach Success Ratio for SGSN1A during the period from 10th
till 18th of May 2013 is shown below.
Rev D 14 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Analysis shows that Cause Code #17 (Network Failure) is the main practical
contributor to 2G Attach Failures. The reason behind these failures is mainly
data Roamers as described in more details in Section 2.3.2.4.
Cause Code #7 (GPRS Services Not Allowed) and Cause Code #14 (GPRS
Services Not Allowed in this PLMN) are present however they are excluded by
default from the KPI calculation, as these are considered ‘correct’ behaviors
from network side.
o Cause Code #14 (GPRS Services Not Allowed in this PLMN) is sent to the
MS which requests GPRS service in a PLMN, but the network does not
offer roaming for GPRS services to that MS. Only IMSIs belonging to
the IMSI series stored in the SGSN will get access, and others will be
rejected.
Rev D 15 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
o Cause Code #14 can also occur when the HLR address for a particular
IMSI series is not configured, or when HLR settings do not allow the
usage of GPRS services when roaming. It is worth mentioning that if
an IMSI series is wrongly configured, it will be a fault with Cause Code
#17 on Ericsson SGSN nodes.
The trend of 3G Attach Success Ratio for SGSN1A during the period from 10th
till 18th of May 2013 is shown below.
It indicates that the KPI is fluctuating around an average value of 98.04%,
which is a very healthy value and is better than Q1_2013 NetQB Regional and
Global reference values.
A Sample Mobility Management log was analysed to figure out the failure
reasons for 2G and 3G Attach Success Ratio. Majority of failures found to be
due to Cause Code #17(Network Failure).
Further going down to the Sub Cause Code Level, it was found that:
Rev D 16 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Rev D 17 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The Service Request Failure Ratio denotes the probability that a Service
Request fails (WCDMA Systems only).
The Service Request (3G) is initiated by the MS when it needs to perform the
following:
• To send uplink payload when no RABs are established to the
SGSN. In this case the SGSN initiates a RAB Assignment back to
the RAN
• To send uplink signalling when no Iu connection is established to
the SGSN, that is when the MS is in the PMM-IDLE state and
wants to activate, modify, or delete a PDP context
• To respond to a paging request from the SGSN
The below figure shows the trend for Service Request Success Ratio 3G for
SGSN1A during the period from 10 May 2013 to 18 May 2013.
The trend shows that the Service Request Success Ratio 3G for SGSN1A has
been around 99.82%, indicating that this KPI has a very healthy trend.
Rev D 18 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The trend of PDP Context Success Rate – GSM for SGSN1A during the
period from 10 May 2013 to 18 May 2013 is shown below.
The average PDP context Success Rate in this period for 2G over SGSN1
was around 99.36%. The KPI is very good and is normally above 99% mark
which is a very healthy value better than Q1_2013 NetQB Regional and
Global reference values.
Degradation occurred on 13th of May 2013 was on network level and affected
all SGSN nodes. As per feedback from Vodafone Operations, this was due to
planned action on router that was extended till noon.
The trend of PDP Context Success Rate – WCDMA for SGSN1A during the
period from 10 May 2013 to 18 May 2013 is shown below.
The average PDP context Success Rate in this period for 3G over SGSN was
around 98.14%. The KPI trend is very good and is on par with Q1_2013
NetQB Regional and Global reference values.
Rev D 19 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Degradation occurred on 13th of May 2013 was on network level and affected
all SGSN nodes. As per feedback from Vodafone Operations, this was due to
planned action on router that was extended till noon.
Majority of failures found out were due to CC#33 (Service Option Not
Subscribed). This is not affecting the overall PDP Activation SR as it is
considered as normal network behaviour; however further analysis was
performed as this is considered from end user perception point of view.
Further going down to the Sub Cause Code Level, it was found that:
Rev D 20 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Rev D 21 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The PDP context cutoff ratio denotes the probability that an active PDP
context is abnormally deactivated by the network
The below figure shows the trend for PDP Context Cutoff Ratio – GSM for
SGSN1A during the period from 10 May 2013 to 18 May 2013.
The Average 2G PDP Context Cutoff Ratio in this period was around 4.57%.
The below figure shows the trend for PDP Context Cutoff Ratio – WCDMA for
SGSN1A during the period from 10 May 2013 to 18 May 2013.
The Average 3G PDP Context Cutoff Ratio in this period was around 3.76%.
Rev D 22 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The major Cause Code that affects 2G and 3G PDP Context Cutoff Ratio is
Cause Code #39, which represents Reactivation Requested as described
below;
Two extra Cause Codes exist but with very limited contribution as follows;
The Radio Access Bearer (RAB) Establishment Failure Ratio denotes the
probability that RAB establishment fails (WCDMA Systems only).
The below figure shows the trend for RAB Establishment Success Ratio 3G
for SGSN1A during the period from 10 May 2013 to 18 May 2013.
The trend shows that the Average RAB Establishment Success Ratio 3G for
SGSN1A has been around 98.83%. The KPI is healthy and normally above
98.5%.
Rev D 23 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Intra SGSN Routing Area Update Failure Ratio is defined as the percentage of
Intra SGSN RAU procedures that are initiated then failed due to a fault or
problem in the signalling procedure. This KPI counts both Periodic and Normal
(change of RAI) Intra SGSN RAU procedures. A procedure fails if an Intra
SGSN RAU Request is received by the SGSN and is not accepted, or rejected
with a cause indicate failure.
The below figure shows the trend for 2G Intra SGSN RAU Success Rate for
SGSN1A during the period from 10 May 2013 to 18 May 2013.
The average Intra SGSN RAU SR for 2G during this period is around 89.8%.
This KPI can be improved.
Rev D 24 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The below chart shows the average 2G Intra RAU Success Rate per Routing
Area;
Rev D 25 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
After the timeout, the procedure will wait until a Normal RAU or a Periodic RAU
attempt occurs, and thereafter detaches the MS by using the SGSN-Initiated
Detach procedure. The related Detach message is: Network Initiated Detach,
Detach Type = "re-attach not required" and NO GPRS Mobility Management
Cause (GMM Cause).
The timer associated with this feature is not at default of 300 Minutes which
can affect the Intra RAU KPI. It is recommended to set the timer back to its
default value followed by close evaluation of its impact on Intra RAU SR and
SAU Capacity. Changes in default value can then be implemented / evaluated
in steps to reach the best possible outcome of the feature while maintaining
acceptable Intra RAU SR & SAU Capacity.
The below figure shows the trend for Intra SGSN RAU Success Rate –
WCDMA for SGSN1A during the period from 10 May 2013 to 18 May 2013.
The average Intra SGSN RAU SR for 3G during this period is around 99.78%.
The Intra SGSN RAU Success rate is very good and is consistently above
99.6% which is a very healthy value better that Q1_2013 NetQB Regional and
Global reference values.
Rev D 26 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The inter-SGSN RAU failure ratio denotes the probability that an inter-SGSN
RAU attempt fails.
The below figure shows the trend for Inter SGSN RAU Success Rate – GSM
for SGSN1A during the period from 10 May 2013 to 18 May 2013.
The average Inter SGSN RAU Success Ratio for 2G during this period is
around 99.89%. The Inter SGSN RAU Success rate is very good and is
consistently above 99.1% which is a very healthy value better that Q1_2013
NetQB Regional and Global reference values.
The below figure shows the trend for Inter SGSN RAU Success Rate –
WCDMA for SGSN1A during the period from 10 May 2013 to 18 May 2013.
The average Inter SGSN RAU SR for 3G during this period is around 98.87%.
The Inter SGSN RAU Success rate is very good and is normally above 99%
which is a very healthy value better that Q1_2013 NetQB Regional and Global
reference values.
The two degradations observed on 10th and 18th of May 2013 seem to be on
network level where all SGSNs were affected. However this needs to be
verified by Vodafone Operations Team.
Rev D 27 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The paging failure ratio denotes the probability that a paging procedure fails.
The below figure shows the trend of GSM Paging Success Rate for SGSN1A
during the period from 10th till 18th of May 2013.
The average Paging SR for 2G during this period is around 91.34%; there is
room for improvement.
Paging Parameters have been checked and they are following the default
values.
Investigating this KPI degradation further can be done through Traces and
Trace analysis.
Rev D 28 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
The below figure shows the trend for 3G Paging Success Rate for SGSN1A
from 10th till 18th of May 2013.
The average 3G Paging Success Rate during this period is around 84.13%
which is relatively low. Paging Parameters on SGSN side have been checked
and they are following the default values.
The healthy trend of 3G Service Request Success Rate KPI indicates that
SGSN1 is behaving properly and that further investigation regarding 3G Paging
Success Rate should take place from radio and transport sides.
Investigating this KPI degradation further can be by Traces and Trace analysis.
Rev D 29 (30)
Amr SAMY Commercial in confidence
PS Core Audit for Vodafone Egypt
Non-Default Node
Properties.xls
HW Audit.doc
Rev D 30 (30)
Amr SAMY Commercial in confidence