1 Earth work in excavatioin in foundation trenches or drains
including dressing of sides and ramming of bottoms , lif up
to 1.5 m including taking out the excavated soil and
depositing and refilling of jhiries with watering and ramming
and disposal of surplus Soil within lead of 50 m, as directed.
Item no. 2B
HW 1 69.83 10 7 4888.10
WW 1 37.25 5 7 1303.75
1 46 5 7 1610.00
EW 1 32.5 5 7 1137.50
1 13.11 5 7 458.85
APRONE 2 12 2 2 96.00
1 52.5 2 2 210.00
9704.20 9704 Cuf
274.79 Cum 128.34 129.62 35266.5164
2 Providing and laying in position Cement concrete including
curing , compaction etc. complete in specified grade
excluding the cost of centring and shuttering - All Works
upto plinth level ( 1 Cement :4 Coarse Sand : 8 aggregate 40
mm nominal size)
0 Cuf
0.00 Cum 289.8 2676.33 0.00
4 Cement concrete including curing , compaction etc.
complete in specified grade excluding the cost of centring
and shuttering 1 : 1.5 : 3 ( 1 Cement : 1.5 Coarse Sand : 3
Graded Stone aggregate 20 mm nominal size )
Junior Engineer
PS. Pratapgarh
mount
Total
35618.2473
68443.98
0
#REF!
#REF!
#REF!
#REF!
9278.65
23227.00
5606.18
#REF!
#REF!
#REF!
#REF!
#REF!
er
h