Detail of Quantity & Abstract of Cost

dk;Z dk uke xzk0i0


A.S. NO. AND DATE 57 AND 14.06.2018 T.S. Amount

S. Rate Amount
Item Quantity Unit
No. Labour Total Labour
1 Earth work in excavatioin in foundation trenches or drains
including dressing of sides and ramming of bottoms , lif up
to 1.5 m including taking out the excavated soil and
depositing and refilling of jhiries with watering and ramming
and disposal of surplus Soil within lead of 50 m, as directed.

Item no. 2B
HW 1 69.83 10 7 4888.10
WW 1 37.25 5 7 1303.75
1 46 5 7 1610.00
EW 1 32.5 5 7 1137.50
1 13.11 5 7 458.85
APRONE 2 12 2 2 96.00
1 52.5 2 2 210.00
9704.20 9704 Cuf
274.79 Cum 128.34 129.62 35266.5164
2 Providing and laying in position Cement concrete including
curing , compaction etc. complete in specified grade
excluding the cost of centring and shuttering - All Works
upto plinth level ( 1 Cement :4 Coarse Sand : 8 aggregate 40
mm nominal size)

Item no. 10A


HW 1.00 69.83 10.00 0.50 349.15
WW 1.00 37.25 5.00 0.50 93.13
1.00 46.00 5.00 0.50 115.00
EW 1.00 32.50 5.00 0.50 81.25
1.00 13.11 5.00 0.50 32.78
APRONE 2.00 12.00 2.00 0.50 24.00
1.00 52.50 2.00 0.50 52.50
747.8 747.8 Cuf
21.18 Cum 440.91 3232.28 9336.33
3 Stone mesonary in 1:6 of mortar ratio with making all joints
& curing .
Item no. 29B
HW 1.00 69.83 10.00 6.50 4538.95
WW 1.00 37.25 5.00 6.50 1210.63
1.00 46.00 5.00 6.50 1495.00
EW 1.00 32.50 5.00 6.50 1056.25
1.00 13.11 5.00 6.50 426.08
APRONE 2.00 12.00 2.00 1.50 72.00
1.00 52.50 2.00 1.50 157.50
PLINTH OR ABOVE
HW 1.00 69.83
WW 1.00 37.25
1.00 46.00
EW 1.00 32.50
1.00 13.11
APRONE 2.00 12.00
1.00 52.50

0 Cuf
0.00 Cum 289.8 2676.33 0.00
4 Cement concrete including curing , compaction etc.
complete in specified grade excluding the cost of centring
and shuttering 1 : 1.5 : 3 ( 1 Cement : 1.5 Coarse Sand : 3
Graded Stone aggregate 20 mm nominal size )

Item no. 13B


fotting
#REF! #REF! 4 0.5 #REF!
#REF! (4+1)/2 4 1 #REF!
coloum #REF! 13.00 1 1 #REF!
LBP 2.00 22.60 1 0.75 33.9
SBP 3.00 10.00 1 0.75 22.5
LBR 2.00 22.60 1 0.75 33.9
SBR 3.00 10.00 1 0.75 22.5
roof 1.00 27.60 12 0.33 109.296
#REF! #REF! Cuf
#REF! Cum 517.5 4852.84 #REF!
5 Supply, fitting & placing of steel bar in R.C.C. work of slab,
lintel & columns etc.
Item no. 61
no. of L of bar D2/16
bar 2
footing1 12.00 9.00 1.23 0.88 116.90
FOOTING2 #REF! 8.00 0.75 0.88 #REF!
UPPER #REF! 1.00 1.20 0.88 #REF!
PORTION
coloum #REF! 6.00 3.96 0.88 #REF!
OF
tiye bar
FOOTING #REF! 27.00 1.20 0.40 #REF!
LB 4.00 6.00 6.70 0.61 98.09
tiye bar 4.00 45.00 1.20 0.40 86.40
SB 6.00 6.00 6.09 0.61 133.74
6.00 41.00 1.20 0.40 118.08
roof 1 55 8.35 0.62 284.735
1 45 4.72 0.88 186.912
#REF!
baiding wire #REF!
#REF! #REF! kg
#REF! kg 2.07 58.66 #REF!
6 Placing & Removing Of Shuttering and centering of R.C.C.
Slab,lintel etc upto the height of 4.5 meter.
Item no. 93A
fotting no. side L W
#REF! 4.00 4.00 0.50 #REF!
#REF! 2.00 (4+1)/2 1.00 #REF!
#REF! 2.00 (4+1)/2 0.75 #REF!
COLOUM #REF! 2 13.00 1 #REF!
#REF! 2 13.00 1 #REF!
PBL 2 2 22.60 0.75 67.8
PBS 3 2 10.00 0.75 45
RBL 2 2 22.60 0.75 67.8
2 1 22.60 0.75 33.9
RBS 3 2 10.00 0.75 45
3 1 10.00 0.75 22.5
ROOF 1 1 27.6 12 331.2
#REF! #REF! Cuf
#REF! Cum 0 297.41 #REF!
7 Plaster on new surface on walls in cement sand mortar 1 : 6
including racking of joints etc. Complete fine finished 20 mm
thick.

Item no. 77C


COLOUM #REF! 4 10 1 #REF!
PBL 2 2 22.60 0.75 67.8
PBS 3 2 10.00 0.75 45
RBL 2 2 22.60 0.75 67.8
2 1 22.60 0.75 33.9
RBS 3 2 10.00 0.75 45
3 1 10.00 0.75 22.5
ROOF 1 1 27.6 12 331.2
#REF! #REF! Sqf
#REF! Sqm 33.12 139.72 #REF!
8 CC in ratio of 1:4:8 under floor
Item no. 10A
Floor 1 25.6 12 0.33 101.376 101.38 Cuf
2.87 Cum 440.91 3232.28 1266
9 Kota Stone Fixed over 20mm thick in cement mortar 1:4
Item no. 68B
Floor 1 25.6 12 307.2 307.20 Sqf
28.55 Sqm 41.4 813.55 1182
10 Bricks mesonary in 1:6 of mortar ratio with making all joints
& curing .
Item no. 20A
perapit wall 2 25.6 1 0.66 33.792
2 10.68 1 0.66 14.0976
47.8896 47.89 Cuf
1.36 Cum 207 4133.55 281
11 White Painting Work.
Item no. 81A
Quantity taken from item no. 8 #REF! Sqm 4.14 18.91 #REF!
Sub total #REF!
Add 2% contengacy
Grand Total #REF!
Say #REF!
labour #REF!
material #REF!
total #REF!

Junior Engineer
PS. Pratapgarh
mount
Total

35618.2473

68443.98
0

#REF!

#REF!
#REF!

#REF!

9278.65

23227.00

5606.18

#REF!
#REF!
#REF!
#REF!
#REF!