RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
1 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 62+500 62+540 20/Feb/19
2 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 63+500 63+850 1/Feb/19
3 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+180 64+265 1/Feb/19

4 STR R.Wall Eathwork excavation for RCC Retaining wall LHS MCW 63+500 63+850 1/Feb/19

5 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 64+180 64+265 1/Feb/19

6 STR R.Wall Marking and Layout for toe wall LHS MCW 64+680 64+820 1/Feb/19
7 STR R.Wall Eathwork excavation for toe wall LHS MCW 64+680 64+820 1/Feb/19
8 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+180 64+265 2/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

9 STR R.Wall Marking and Layout for RCC Retaining wall LHS MCW 64+450 64+680 2/Feb/19
10 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 77+410 77+480 2/Feb/19

11 STR R.Wall Marking and Layout for RCC Retaining wall LHS MCW 64+000 64+180 2/Feb/19
12 STR R.Wall Eathwork excavation for RCC Retaining wall LHS MCW 64+000 64+180 2/Feb/19

13 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 63+500 63+850 2/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

14 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 64+680 64+820 2/Feb/19
15 STR R.Wall Marking and Layout for toe wall LHS MCW 64+265 64+350 2/Feb/19
16 STR R.Wall Eathwork excavation for toe wall LHS MCW 64+680 64+820 2/Feb/19
17 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+180 64+265 4/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

18 STR R.Wall Eathwork excavation for RCC Retaining wall LHS MCW 64+450 64+680 4/Feb/19

19 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 64+000 64+180 4/Feb/19

20 STR R.Wall Marking and Layout for toe wall LHS MCW 63+850 64+000 4/Feb/19
21 STR R.Wall Marking and Layout for toe wall LHS MCW 64+265 64+350 4/Feb/19
22 STR R.Wall Eathwork excavation for toe wall LHS MCW 63+850 64+000 4/Feb/19
23 STR R.Wall Eathwork excavation for toe wall LHS MCW 64+265 64+350 4/Feb/19
24 STR R.Wall Marking and Layout for toe wall LHS MCW 64+910 65+018 4/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
25 STR R.Wall Eathwork excavation for toe wall LHS MCW 64+910 65+018 4/Feb/19

26 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+180 64+265 5/Feb/19

27 STR R.Wall Marking and Layout for RCC Retaining wall & toe wall LHS MCW 64+820 64+910 5/Feb/19
28 STR R.Wall Eathwork excavation for RCC Retaining wall & toe wall LHS MCW 64+820 64+910 5/Feb/19

29 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 77+410 77+480 5/Feb/19

30 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 63+850 64+000 5/Feb/19
31 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 63+500 63+850 5/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

32 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 64+450 64+680 5/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

33 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 64+680 64+820 5/Feb/19
34 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 64+910 65+018 5/Feb/19

35 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 63+500 63+850 6/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

36 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 63+500 63+850 6/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

37 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 64+265 64+350 6/Feb/19
38 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 64+900 64+910 6/Feb/19
39 STR R.Wall Marking and Layout for toe wall LHS MCW 75+220 75+280 6/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
40 STR R.Wall Eathwork excavation for toe wall LHS MCW 75+220 75+280 6/Feb/19
41 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 75+220 75+280 6/Feb/19
Pouring of M15 PCC levelling course for RCC Retaining wall &
42 STR R.Wall LHS MCW 64+820 64+900 6/Feb/19
toe wall

43 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 64+180 64+265 6/Feb/19

44 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 77+410 77+480 6/Feb/19

45 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 63+500 63+630 7/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

46 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 63+650 63+670 7/Feb/19
47 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 63+850 64+000 7/Feb/19

48 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 64+265 64+350 7/Feb/19
49 STR R.Wall Pouring of M15 PCC levelling course for toe wall LHS MCW 75+220 75+280 7/Feb/19
50 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 63+690 63+830 7/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

51 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 64+820 64+840 7/Feb/19
52 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 64+900 64+910 7/Feb/19
53 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+840 64+872 7/Feb/19

54 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+888 64+900. 7/Feb/19

55 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 4th lift LHS MCW 63+570 63+590 8/Feb/19
56 STR R.Wall Marking and Layout for RCC Retaining wall LHS MCW 74+920 75+220 8/Feb/19
57 STR R.Wall Eathwork excavation for RCC Retaining wall LHS MCW 74+920 75+220 8/Feb/19

58 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 64+680 64+820 8/Feb/19
59 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+910 65+018 8/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

60 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 4th lift LHS MCW 63+710 63+790 8/Feb/19

61 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 4th lift LHS MCW 63+500 63+550 8/Feb/19

62 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+450 64+680 8/Feb/19

63 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall LHS MCW 74+920 75+220 8/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

64 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 64+265 64+350 8/Feb/19
65 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 5th lift LHS MCW 63+750 63+790 9/Feb/19

66 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 5th lift LHS MCW 63+500 63+530 9/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
67 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 77+410 77+480 9/Feb/19

68 STR R.Wall Pouring of PCC M20 grade concrete for toe wall raft LHS MCW 75+220 75+280 9/Feb/19
69 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+450 64+680 9/Feb/19

70 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 63+850 64+000 9/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
71 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 64+000 64+180 9/Feb/19

72 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 4th lift LHS MCW 64+180 64+240 9/Feb/19

73 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 64+580 64+620 9/Feb/19
74 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+580 64+620 9/Feb/19
75 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+000 64+180 11/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

76 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 64+830 64+872 11/Feb/19
77 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+830 64+872 11/Feb/19
78 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+910 65+018 11/Feb/19

79 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft LHS MCW 74+920 75+220 11/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

80 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+450 64+660 11/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

81 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 6th lift LHS MCW 63+500 63+530 11/Feb/19
82 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 64+820 64+840 11/Feb/19
83 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 64+900 64+910 12/Feb/19
84 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+840 64+872 12/Feb/19

85 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+888 64+900 12/Feb/19
86 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+910 65+018 12/Feb/19

87 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 64+830 64+872 12/Feb/19
88 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+830 64+872 12/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
89 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 74+920 75+220 13/Feb/19

90 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift LHS MCW 64+000 64+180 13/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

91 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 64+830 64+872 13/Feb/19
92 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+830 64+872 13/Feb/19
93 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 74+920 75+220 15/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

94 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 64+910 65+018 15/Feb/19

95 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+000 64+180 15/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9

96 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS MCW 64+830 64+872 15/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
97 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS MCW 64+580 64+620 15/Feb/19

98 STR R.Wall Pouring of PCC M20 grade concrete for toe wall 1st lift LHS MCW 75+220 75+280 15/Feb/19
99 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+840 64+872 15/Feb/19

100 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift LHS MCW 64+888 64+900 15/Feb/19
101 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 64+060 64+140 16/Feb/19

102 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 64+160 64+180 16/Feb/19
103 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft RHS MCW 64+830 64+872 16/Feb/19

104 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 3rd lift LHS MCW 74+940 74+960 16/Feb/19
105 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 4th lift LHS MCW 64+910 65+018 16/Feb/19
106 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft RHS MCW 64+580 64+620 18/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra thro
(EPC) Contract.
Client : Public Works Department, NH Division, Aurangabad
Authority
: M/S Roughton International Ltd, in Association with SATRA Infrastructure Management Services Pvt.Ltd.
Engineer
RFI Summary :
Financial Year : 2018:2019

RFI Departm BOQ Chainage. Submission


Description of work Side Type
No. ent Reference From To Date

1 2 3 4 5 6 7 8 9
107 STR R.Wall Marking and Layout for RCC Retaining wall RHS MCW 64+888 64+910 20/Feb/19
108 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift RHS MCW 64+830 64+872 20/Feb/19

109 STR R.Wall Eathwork excavation for RCC Retaining wall RHS MCW 64+888 64+910 20/Feb/19
110 STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS MCW 64+888 64+910 20/Feb/19
111 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift RHS MCW 64+580 64+620 20/Feb/19

112 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raft RHS MCW 64+888 64+910 21/Feb/19
113 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift RHS MCW 64+580 64+620 23/Feb/19

114 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift RHS MCW 64+888 64+910 23/Feb/19
115 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift RHS MCW 64+888 64+910 27/Feb/19
116 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 2nd lift RHS MCW 64+830 64+872 27/Feb/19

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
21/Feb/19 09.00 AM Approved
2/Feb/19 09.30 AM Approved
2/Feb/19 10.00 AM Approved 971.6

2/Feb/19 02.00 PM Approved 4261

2/Feb/19 04.30 PM Approved 41.7

2/Feb/19 11.30 AM Approved


2/Feb/19 03.30 PM Approved 739.2
4/Feb/19 09.00 AM Approved 195

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

4/Feb/19 09.30 AM Approved


4/Feb/19 05.00 PM Approved 77.4

4/Feb/19 11.30 AM Approved


4/Feb/19 02.00 PM Approved 1936.4

4/Feb/19 10.30 AM Approved 155.6

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

4/Feb/19 05.00 PM Approved 18.2


4/Feb/19 09.00 AM Not ready
4/Feb/19 09.30 AM Not ready 831.6
5/Feb/19 05.00 PM Approved 66.2

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

5/Feb/19 03.00 PM Approved 1939

5/Feb/19 02.30 PM Approved 67.6

5/Feb/19 09.00 AM Approved


#NAME? 10.00 AM Approved
5/Feb/19 09.30 AM Approved 891
5/Feb/19 11.30 AM Approved 546.98
5/Feb/19 04.00 PM Approved

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
5/Feb/19 05.00 PM Approved 1071.4

6/Feb/19 09.00 AM Approved 61.73

6/Feb/19 09.00 AM Approved


6/Feb/19 09.30 AM Approved 519.6

6/Feb/19 12.00 PM Approved 75.775

6/Feb/19 10.30 AM Approved 19.5


6/Feb/19 03.30 PM Approved 758.48

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

6/Feb/19 12.00 PM Approved 64.2

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

6/Feb/19 05.00 PM Approved 46.2


6/Feb/19 04.00 PM Approved 47.36

7/Feb/19 09.30 AM Approved 280.91

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

7/Feb/19 11.00 AM Approved 244.375

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

7/Feb/19 02.00 PM Approved 11.5


7/Feb/19 03.30 PM Approved 1.3
7/Feb/19 09.00 AM Approved

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
7/Feb/19 09.30 AM Approved 356.4
7/Feb/19 02.30 PM Not ready 7.8
7/Feb/19 04.30 PM Approved 16.36

7/Feb/19 05.00 PM Approved 48.468

7/Feb/19 12.00 PM Approved 55.012

8/Feb/19 09.00 AM Approved 81.1

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

8/Feb/19 09.30 AM Approved 6.12


8/Feb/19 10.30 AM Approved 46.2

8/Feb/19 11.00 AM Approved 11.05


8/Feb/19 05.00 PM Approved 14.4
8/Feb/19 02.00 PM Approved 103.115

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

8/Feb/19 02.30 PM Approved 6.6


8/Feb/19 03.30 PM Approved 3.3
8/Feb/19 04.00 PM Approved 51.76

8/Feb/19 05.00 PM Approved 9

9/Feb/19 09.00 AM Approved 9.67


9/Feb/19 09.00 AM Approved
9/Feb/19 09.30 AM Approved 3147.6

9/Feb/19 10.00 AM Approved 109.2


9/Feb/19 12.00 PM Approved 218.12

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

9/Feb/19 11.00 AM Approved 56.454

9/Feb/19 02.00 PM Approved 27.402

9/Feb/19 03.00 PM Approved 138

9/Feb/19 04.00 PM Approved 86

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

9/Feb/19 05.00 PM Approved 66.3


11/Feb/19 09.00 AM Approved 25.918

11/Feb/19 09.30 AM Approved 25.36

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
11/Feb/19 04.30 PM Approved 17.937

11/Feb/19 05.00 PM Approved 7.8


11/Feb/19 10.30 AM Approved 361.6

11/Feb/19 11.30 AM Approved 117

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
11/Feb/19 03.30 PM Approved 288

11/Feb/19 04.00 PM Approved 24.61

11/Feb/19 09.00 AM Approved


11/Feb/19 09.30 AM Approved 281.6
12/Feb/19 03.00 PM Not ready

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

12/Feb/19 04.00 PM Not ready


12/Feb/19 05.00 PM Not ready
12/Feb/19 05.00 PM Approved 78.695

12/Feb/19 02.00 PM Approved 307.2

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

12/Feb/19 09.30 AM Approved 216.33

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

12/Feb/19 10.30 AM Approved 14.904


12/Feb/19 11.30 AM Approved 15.6
13/Feb/19 12.00 PM Approved 7.8
13/Feb/19 02.30 PM Approved 49.345

13/Feb/19 03.00 PM Approved 19.35


13/Feb/19 05.00 PM Approved 66.695

13/Feb/19 09.00 AM Not ready


13/Feb/19 09.30 AM Not ready 529.2

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
14/Feb/19 05.00 PM Approved 353.9

14/Feb/19 04.00 PM Approved 124.2

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

14/Feb/19 09.00 AM Approved


14/Feb/19 09.30 AM Approved
16/Feb/19 09.00 AM Approved 213.312

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

16/Feb/19 05.00 PM Approved 49.803

16/Feb/19 12.00 PM Approved 106.16

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13

16/Feb/19 02.30 PM Approved 14.28

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
16/Feb/19 03.30 PM Approved 9.6

16/Feb/19 10.00 AM Approved 46.8


16/Feb/19 04.00 PM Approved 22.27

16/Feb/19 05.00 PM Approved 7.36


18/Feb/19 09.00 AM Approved 30.58

18/Feb/19 10.00 AM Approved 8.514


18/Feb/19 11.00 AM Approved 60.48

18/Feb/19 03.30 PM Approved 4.774


18/Feb/19 05.00 PM Approved 7.28
19/Feb/19 11.00 AM Approved 26.4

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
A SAIBABA JOINT VENTURE
ngth 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction
ct.

Inspection Time for


Status Remarks Quantity
date Inspection

10 11 12 13
21/Feb/19 09.00 AM Approved
21/Feb/19 10.00 AM Approved 28.77

21/Feb/19 09.30 AM Approved 154.88


21/Feb/19 02.30 PM Approved 5.28
21/Feb/19 03.30 PM Approved 64.5

22/Feb/19 11.00 AM Approved 14.52


25/Feb/19 09.00 AM Approved 35.17

25/Feb/19 11.00 AM Approved 35.47


28/Feb/19 09.30 AM Approved 20.59
28/Feb/19 11.00 AM Approved 24.16

Submitted by: EPC Contractor Checked by: Authority Engineer Approved by: Sub Divisional Engineer
0 62500
1 62540 40
2 62580 40
3 62620 40
4 62660 40
5 62700 40
6 62740 40
7 62780 40
8 62820 40
9 62860 40
10 62900 40
11 62940 40
12 62980 40
13 63020 40
14 63040 20

0 63080
1 63120 40
2 63160 40
3 63200 40
4 63240 40
5 63280 40
6 63320 40
7 63360 40
8 63400 40
9 63440 40
10 63460 20
Departme BOQ
RFI No. Description of work
nt Reference

1 STR R.Wall Marking and Layout for RCC Retaining wall


2 STR R.Wall Eathwork excavation for RCC Retaining wall
3 STR R.Wall Marking and Layout for RCC Retaining wall
4 STR R.Wall Eathwork excavation for RCC Retaining wall
5 STR R.Wall Marking and Layout for RCC Retaining wall
6 STR R.Wall Eathwork excavation for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Marking and Layout for RCC Retaining wall
STR R.Wall Eathwork excavation for RCC Retaining wall
STR R.Wall Marking and Layout for RCC Retaining wall
STR R.Wall Eathwork excavation for RCC Retaining wall
STR R.Wall Marking and Layout for RCC Retaining wall
STR R.Wall Eathwork excavation for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall
STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift
STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift
STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall 1st lift
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
STR R.Wall
Chainage. Submission Inspection Time for
Side Type Status
From To Date date Inspection

RHS MCW 62500 62540 20/Feb/19 21/Feb/19 09.30 AM Approved


RHS MCW 62500 62540 20/Feb/19 21/Feb/19 10.00 AM Approved
RHS MCW 62540 62580 20/Feb/19 21/Feb/19 09.30 AM Approved
RHS MCW 62540 62580 20/Feb/19 21/Feb/19 10.00 AM Approved
RHS MCW 62580 62620 20/Feb/19 21/Feb/19 09.30 AM Approved
RHS MCW 62580 62620 20/Feb/19 21/Feb/19 10.00 AM Approved
RHS MCW 62500 62540 21/Feb/19 22/Feb/19 10.00 AM Approved
RHS MCW 62540 62580 21/Feb/19 22/Feb/19 11.30 AM Approved
RHS MCW 62580 62620 21/Feb/19 22/Feb/19 12.30.PM Approved
RHS MCW 62620 62660 21/Feb/19 22/Feb/19 09.30 AM Approved
RHS MCW 62620 62660 21/Feb/19 22/Feb/19 10.00 AM Approved
RHS MCW 62660 62700 21/Feb/19 22/Feb/19 09.30 AM Approved
RHS MCW 62660 62700 21/Feb/19 22/Feb/19 10.00 AM Approved
RHS MCW 62700 62740 21/Feb/19 22/Feb/19 09.30 AM Approved
RHS MCW 62700 62740 21/Feb/19 22/Feb/19 10.00 AM Approved
RHS MCW 62620 62660 22/Feb/19 23/Feb/19 10.00 AM Approved
RHS MCW 62660 62700 22/Feb/19 23/Feb/19 11.30 AM Approved
RHS MCW 62700 62740 22/Feb/19 23/Feb/19 12.30.PM Approved
RHS MCW 62500 62540 23/Feb/19 24/Feb/19 10.00 AM
RHS MCW 62540 62580 23/Feb/19 24/Feb/19 11.30 AM
RHS MCW 62580 62620 23/Feb/19 24/Feb/19 12.30.PM
Remarks Quantity L W D Qty From To

5.2 1.9 197.6 64180 64200

5.2 1.9 197.6 64180 64200

5.2 1.9 197.6 64180 64200


MADHUCON - SHARDA - SHRI SATYA SAIBA
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms i

Financial Year : 2018:2019

1 STR R.Wall Marking and Layout for RCC Retaining wall RHS
49 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
50 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
51 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
52 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
57 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
58 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
59 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
60 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
69 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
70 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
71 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
72 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
77 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
78 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
79 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
80 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
85 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
86 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
87 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
88 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
93 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
94 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
95 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
96 STR R.Wall Pouring of M25 grade concrete for RCC Retaining wall raf RHS
A - SHRI SATYA SAIBABA JOINT VENTURE
roject length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction (EPC) Contract.

MCW 62500 62540 20/Feb/19 21/Feb/19 09.30 AM Approved


MCW 62500 62540 25/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62540 62580 25/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62580 62620 25/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62620 62660 25/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62660 62700 25/Feb/19 26/Feb/19 10.00 AM Approved
MCW 62700 62740 25/Feb/19 26/Feb/19 10.00 AM Approved
MCW 62740 62780 25/Feb/19 26/Feb/19 10.00 AM Approved
MCW 62780 62820 25/Feb/19 26/Feb/19 10.00 AM Approved
MCW 62820 62860 26/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62860 62900 26/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62900 62940 26/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62940 62980 26/Feb/19 27/Feb/19 10.00 AM Approved
MCW 62980 63020 27/Feb/19 28/Feb/19 10.00 AM Approved
MCW 63020 63040 27/Feb/19 28/Feb/19 10.00 AM Approved
MCW 63080 63120 27/Feb/19 28/Feb/19 10.00 AM Approved
MCW 63120 63160 27/Feb/19 28/Feb/19 10.00 AM Approved
MCW 63160 63200 1/Mar/19 2/Mar/19 10.00 AM Approved
MCW 63200 63240 1/Mar/19 2/Mar/19 10.00 AM Approved
MCW 63240 63280 1/Mar/19 2/Mar/19 10.00 AM Approved
MCW 63280 63320 1/Mar/19 2/Mar/19 10.00 AM Approved
MCW 63320 63360 6/Mar/19 7/Mar/19 10.00 AM Approved
MCW 63360 63400 6/Mar/19 7/Mar/19 10.00 AM Approved
MCW 63400 63440 6/Mar/19 7/Mar/19 10.00 AM Approved
MCW 63440 63460 6/Mar/19 7/Mar/19 10.00 AM Approved
40 62500 62540
40 2.2 0.3 26.4 62500 62540
40 2.2 0.3 26.4 62540 62580
40 2.2 0.3 26.4 62580 62620
40 2.2 0.3 26.4 62620 62660
40 2.2 0.3 26.4 62660 62700
40 2.2 0.3 26.4 62700 62740
40 2.2 0.3 26.4 62740 62780
40 2.2 0.3 26.4 62780 62820
40 2.2 0.3 26.4 62820 62860
40 2.2 0.3 26.4 62860 62900
40 2.2 0.3 26.4 62900 62940
40 2.2 0.3 26.4 62940 62980
40 2.2 0.3 26.4 62980 63020
20 2.2 0.3 13.2 63020 63040
40 2.2 0.3 26.4 63080 63120
40 2.2 0.3 26.4 63120 63160
40 2.2 0.3 26.4 63160 63200
40 2.2 0.3 26.4 63200 63240
40 2.2 0.3 26.4 63240 63280
40 2.2 0.3 26.4 63280 63320
40 2.4 0.3 28.8 63320 63360
40 2.4 0.3 28.8 63360 63400
40 2.4 0.3 28.8 63400 63440
20 2.4 0.3 14.4 63440 63460
STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Marking and Layout for RCC Retaining wall RHS

STR R.Wall Eathwork excavation for RCC Retaining wall RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS
STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift RHS

Pouring of RCC M25 grade concreting for Retaining wall 1st lift RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key
STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift


Pouring of RCC M25 grade concreting for Retaining wall final lift

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

STR R.Wall Pouring of M15 PCC levelling course for RCC Retaining wall RHS

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

STR R.Wall Checking of Reinforcement and Pouring of RCC M25 grade RHS
Concreting for Retaining wall Shear key

STR R.Wall Pouring of RCC M25 grade concreting for Retaining wall raft RHS

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift


Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall 1st lift

Pouring of RCC M25 grade concreting for Retaining wall 1st lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall 2nd lift

Pouring of RCC M25 grade concreting for Retaining wall 2nd lift

Checking of Shuttering and Reinforcement for Retaining wall final lift


Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall final lift

Pouring of RCC M25 grade concreting for Retaining wall final lift

Checking of Shuttering and Reinforcement for Retaining wall 1st lift


MCW 62500 62660 20/Feb/19 21/Feb/19 09.30 AM Approved
160

MCW 62500 62660 20/Feb/19 21/Feb/19 10.00 AM Approved


160

MCW 62660 62820 21/Feb/19 22/Feb/19 09.30 AM Approved


160

MCW 62660 62820 21/Feb/19 22/Feb/19 11.00 AM Approved


160

MCW 62820 62980 22/Feb/19 23/Feb/19 09.30 AM Approved


160

MCW 62820 62980 22/Feb/19 23/Feb/19 10.30 AM Approved


160

62500 62580 22/Feb/19 23/Feb/19


80

MCW 62980 63040 23/Feb/19 25/Feb/19 09.30 AM Approved


60

MCW 62980 63040 23/Feb/19 25/Feb/19 10.00 AM Approved


60

MCW 63080 63160 23/Feb/19 25/Feb/19 09.30 AM Approved


80

MCW 63080 63160 23/Feb/19 25/Feb/19 11.30 AM Approved


80

MCW 62580 62660 23/Feb/19 25/Feb/19


80

MCW 63160 63320 25/Feb/19 26/Feb/19 09.30 AM Approved


160

MCW 63160 63320 25/Feb/19 26/Feb/19 12.00 PM Approved


160

MCW 63320 63460 26/Feb/19 27/Feb/19 09.30 AM Approved


140

MCW 63320 63460 26/Feb/19 27/Feb/19 10.00 AM Approved


140

MCW 26/Feb/19 27/Feb/19


62660 62740 80

MCW 26/Feb/19 27/Feb/19


62500 62600 100

MCW 26/Feb/19 27/Feb/19


62500 62600 100
MCW 27/Feb/19 28/Feb/19
62740 62820 80

MCW 27/Feb/19 28/Feb/19


62600 62720 120

MCW 62600 62720 27/Feb/19 28/Feb/19


120

MCW 28/Feb/19 1/Mar/19


62820 62900 80

MCW 28/Feb/19 1/Mar/19


62500 62600 100

MCW 28/Feb/19 1/Mar/19


62500 62600 100

MCW
62900 62980 3/2/2019 3/4/2019 80

MCW 62720 62860


3/2/2019 3/4/2019 140

MCW 62720 62860


3/2/2019 3/4/2019 140

MCW
62980 63040 3/5/2019 3/6/2019 60

MCW
63080 63100 3/5/2019 3/6/2019 20

62600 62720 3/5/2019 3/6/2019 120

62600 62720 3/5/2019 3/6/2019 120

62500 62600 3/5/2019 3/6/2019 100

62500 62600 3/5/2019 3/6/2019 100

MCW
63100 63160 3/6/2019 3/7/2019 60

MCW
62860 62960 3/6/2019 3/7/2019 100

MCW
62860 62960 3/6/2019 3/7/2019 100

MCW
63160 63240 3/7/2019 3/8/2019 80

MCW
62960 63040 3/7/2019 3/8/2019 80
MCW
62960 63040 3/7/2019 3/8/2019 80

62720 62840 3/7/2019 3/8/2019 120

62720 62840 3/7/2019 3/8/2019 120

62600 62720 3/7/2019 3/8/2019 120

62600 62720 3/7/2019 3/8/2019 120

62500 62600 3/7/2019 3/8/2019

62500 62600 3/7/2019 3/8/2019 100

MCW
63240 63280 3/8/2019 3/9/2019 40

MCW
63080 63160 3/8/2019 3/9/2019 80

MCW
63080 63160 3/8/2019 3/9/2019 80

MCW
63280 63320 3/9/2019 3/11/2019 40

MCW
63160 63240 3/9/2019 3/11/2019 80

MCW
63160 63240 3/9/2019 3/11/2019 80

62840 62960 3/9/2019 3/11/2019 120

62840 62960 3/9/2019 3/11/2019 120

MCW
63320 63370 3/11/2019 3/12/2019 50

62960 63040 3/11/2019 3/12/2019 80

62960 63040 3/11/2019 3/12/2019 80

62720 62840 3/11/2019 3/12/2019 120

62720 62840 3/11/2019 3/12/2019 120

62600 62720 3/11/2019 3/12/2019


62600 62720 3/11/2019 3/12/2019 120
MCW
63370 63430 3/12/2019 3/13/2019 60
MCW
63240 63290 3/12/2019 3/13/2019 50
MCW
63240 63290 3/12/2019 3/13/2019 50

63080 63160 3/12/2019 3/13/2019 80

63080 63160 3/12/2019 3/13/2019 80

62840 62960 3/12/2019 3/13/2019 120

62840 62960 3/12/2019 3/13/2019 120


MCW
63430 63460 3/13/2019 3/14/2019 30
MCW
63290 63350 3/13/2019 3/14/2019 60
MCW
63290 63350 3/13/2019 3/14/2019 60

62960 63040 3/13/2019 3/14/2019 80

62960 63040 3/13/2019 3/14/2019 80

62720 62840 3/13/2019 3/14/2019

62720 62840 3/13/2019 3/14/2019 120


MCW
63350 63400 3/14/2019 3/15/2019 50
MCW
63350 63400 3/14/2019 3/15/2019 50

63160 63250 3/14/2019 3/15/2019 90

63160 63250 3/14/2019 3/15/2019 90


MCW
63400 63460 3/15/2019 3/16/2019 60
MCW
63400 63460 3/15/2019 3/16/2019 60

63080 63160 3/15/2019 3/16/2019 80

63080 63160 3/15/2019 3/16/2019 80

62840 62960 3/15/2019 3/16/2019


62840 62960 3/15/2019 3/16/2019 120

63250 63310 3/16/2019 3/18/2019 60

63250 63310 3/16/2019 3/18/2019 60

62960 63040 3/16/2019 3/18/2019

62960 63040 3/16/2019 3/18/2019 80

63310 63370 3/19/2019 3/20/2019 60

63310 63370 3/19/2019 3/20/2019 60

63160 63250 3/19/2019 3/20/2019 90

63160 63250 3/19/2019 3/20/2019 90

63370 63430 3/20/2019 3/22/2019 60

63370 63430 3/20/2019 3/22/2019 60

63250 63310 3/20/2019 3/22/2019 60

63250 63310 3/20/2019 3/22/2019 60

63430 63460 3/22/2019 3/23/2019 30

63430 63460 3/22/2019 3/23/2019 30

63310 63370 3/22/2019 3/23/2019 60

63310 63370 3/22/2019 3/23/2019 60

63370 63430 3/23/2019 3/25/2019 60

63370 63430 3/23/2019 3/25/2019 60

63080 63160 3/23/2019 3/25/2019

63080 63160 3/23/2019 3/25/2019 80

63430 63460 3/25/2019 3/26/2019 30

63430 63460 3/25/2019 3/26/2019 30

63160 63250 3/26/2019 3/27/2019


63160 63250 3/26/2019 3/27/2019 90

63250 63310 3/31/2019 4/1/2019

63250 63310 3/31/2019 4/1/2019 60

63310 63350 4/1/2019 4/2/2019

63310 63350 4/1/2019 4/2/2019 40

63350 63390 4/7/2019 4/8/2019

63350 63390 4/7/2019 4/8/2019 40

63390 63430 4/9/2019 4/10/2019

63390 63430 4/9/2019 4/10/2019 40

63430 63460 4/10/2019 4/11/2019

63430 63460 4/10/2019 4/11/2019 30


62500 62520 62540 62560 62580 62600 62620 62640 62660 62680 62700 62720 62740 62760 62780 62800
MARKING 2/21/2019 2/22/2019
EXCAVATION 2/21/2019 2/22/2019
pcc m-15 2/23/2019 2/25/2019 2/27/2019 2/28/2019
RAFT 2/27/2019 2/28/2019 3/4/2019
1ST LIFT 3/1/2019 3/6/2019 3/8/2019
2ND LIFT 3/6/2019 8-3.-19 3/12/2019
3RD LIFT 3/8/2019 3/12/2019 3/14/2019
62820 62840 62860 62880 62900 62920 62940 62960 62980 63000 63020 63040 63080 63100 63120 63140
2/23/2019 2/25/2019 2/25/2019
2/23/2019 2/25/2019 2/25/2019
3/1/2019 3/5/2019 3/6/2019 6-319 3/7/2019
019 3/7/2019 3/8/2019 3/9/2019
3/11/2019 3/12/2019 3/13/2019
3/13/2019 3/14/2019 3/16/2019
3/16/2019 3/18/2019 3/24/2019
63160 63180 63200 63220 63240 63250 63260 63270 63280 63290 63300 63310 63320 63330 63340 63350 63360
2/26/2019
2/26/2019
019 3/8/2019 3/9/2019 3/11/2019 3/12/2019
3/11/2019 3/13/2019 3/14/2019
3/15/2019 3/18/2019 3/20/2019
3/20/2019 3/22/2019 3/23/2019
3/25/2019 4/1/2019 4/2/2019
63370 63380 63390 63400 63410 63420 63430 63440 63450 63460
2/27/2019
2/27/2019
3/12/2019 3/13/2019 3/14/2019
3/15/2019 3/16/2019
3/20/2019 3/22/2019 3/23/2019
3/23/2019 3/25/2019 3/26/2019
4/8/2019 4/10/2019 4/11/2019

Вам также может понравиться