Вы находитесь на странице: 1из 418

GOVERNMENT OF

TELANGANA

ROADS & BUILDINGS


DEPARTMENT

Periodical Renewals to Kodad-Revoor road


from Km 1/4 to 28/140 (Working reach
from Km 1/4 to 21/2) in Suryapet District.

AMOUNT OF ESTIMATE
Rs ### Lakh

(R&B) Circle :: NALGONDA


R&B) Division :: SURYAPET
SPECIFICATION REPORT
Specification Report accompanying the estimate for the balance work of "Periodical Renewals
to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet
District.

Amount of Estimate Rs : 1400.00 Lakh

Ref :
Necessity :
Kodad-Revoor road is an improtant MDR road connecting to NH-65 road and Huzurnagar-Medlacheruvu,
kandibanda,thogarai, and Hemlathanda.There is a cement manufacturing Comapny (Maha Cements) has
located in this region.Due to heavy loads trucks and heavy traffic plying on this road and heavy rains road
was damaged badly. There is a dilapidated low level causeway vened span minor bridge a km 13\0-2 it is
very essential to construct a HLB n this locaion .As per the instructions of ENC P.RAVINDER RAO Sir
SR&CRN during inspecton on dated 22.8.2018.
Hence, the estimate has been prepared for the above road with the following provisions

1 ROAD PART
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth
8 Routine Maintenance of Jungle Clearance
9 Routine Maintenance Comprising of B.T Pot hole Filling

II Box Culvert
1 Dismantling the existing Cause ways
2 Earthwirk excation up to SDR
3 Plain cement Concrete (1:3:6)
4 VCC M 15 for levelling course
5 VRCC M 20 for wing walls
6 VRCC M 25 for Foundations
7 VRCC M 20 for side walls
8 VRCC M 25 for super structure
9 Providing Fe 500 HYSD bars for Foundations
10 Providing Fe 500 HYSD bars for substructure
11 Providing Fe 500 HYSD bars for superstrcture
12 VRCC M 40 for crash barrier
13 VRCC M 30 for approach slabs
14 VRCC M 30 for waering course
15 VCC M 15 for Curtain walls
16 Providing Weep holes
17 Providing Drainage spouts
18 Providing Dry rough stone pitching of 300 mm
19 Providing and laying filter materal undernerth
20 Back filling behing abutments
21 Providing 25.4 mm thick mastic pads
22 Providing and laying filter media
23 Providing and Laying of flecible apron
24 Forming embankment with borrowed earth
25 Forming gravel base

Box approach
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth

III Bridge
1 Dismantling the existing Cause ways
2 Earthwirk excation up to SDR
3 Plain cement Concrete (1:3:6)
4 VCC M 15 for levelling course
5 VRCC M 20 for wing walls
6 VRCC M 25 for Foundations
7 VRCC M 20 for side walls
8 VRCC M 25 for super structure
9 Providing Fe 500 HYSD bars for Foundations
10 Providing Fe 500 HYSD bars for substructure
11 Providing Fe 500 HYSD bars for superstrcture
12 VRCC M 40 for crash barrier
13 VRCC M 30 for approach slabs
14 VRCC M 30 for waering course
15 VCC M 15 for Curtain walls
16 Providing Weep holes
17 Providing Drainage spouts
18 Providing Dry rough stone pitching of 300 mm
19 Providing and laying filter materal undernerth
20 Back filling behing abutments
21 Providing 25.4 mm thick mastic pads
22 Providing and laying filter media
23 Providing and Laying of flecible apron
24 Forming embankment with borrowed earth
25 Forming gravel base

Bridge approach
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth

10 GST @ 12.00 %
11 Seigniorage Charges
12 Q.C Charges @ 1%
13 NAC @ 0.1%
14 L S for Roundings.

The Rates are worked out as per the Common SSR for the Year 2018-19.

Assistant Engineer (R&B) Dy Executive Engineer (R&B) Executive Engineer (R&B)


Section:Kodad. Sub-division,Kodad Division,Suryapet
ork of "Periodical Renewals
Km 1/4 to 21/2) in Suryapet

Lakh

d Huzurnagar-Medlacheruvu,
apny (Maha Cements) has
s road and heavy rains road
inor bridge a km 13\0-2 it is
C P.RAVINDER RAO Sir

ing provisions

sing Emulsion
g Emulsion
sing Emulsion
g Emulsion
sing Emulsion
g Emulsion

018-19.

utive Engineer (R&B)


Division,Suryapet
Periodical Renewals to Kodad-Revoor road from Km 1/4 to
28/140 (Working reach from Km 1/4 to 21/2) in Suryapet
NAME OF WORK :-
District.

GENERAL ABSTRACT

Amount
S.No Description
(Rs.)
PART-I
1 Road work 49808883.50
2 Box culverts 18592588.00
(A) Box Approaches at 3/8-4/0,7/0-2,17/8,19/6-8 6450635.80
3 HLB at K.M 13/0-2 (5 V of 10.00 span) 20874609.00
(A) Bridge Approaches 9226317.10
3 HLB at K.M 15/0-2 (2 V of 10.00 span) 6392569.00
(A) Bridge Approaches 2347667.00
Sub Total 113693269.40
PART-II
4 GST on Part "I". 12.0% 13643192.00
5 Quality control charges on Part "I", 1.00% 1136932.69
6 L.S Price adjustment 600000.00
7 NAC on Part "I". 0.10% 113693.27
8 Segniorage Charges 3354282.36
9 L.S for variations foundation levels for HLB 1000000.00
10 L.S for RSI 3410798.08
11 L.S for unforeseen and rounding off 3047832.19
Total Amount Rs. 140000000.00
s
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working rea
21/2) in Suryapet District.
MEASUREMENTS
Sno Description Quantity
No LENT BRDT DPT
1 2 3 4 5 6 7
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of
1 scarified material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn.
No.305.4.3

At 5/680-700 1 x 1 20.00 7.00 140.00


At 5/820-950 1 x 1 130.00 7.00 910.00
At 6/950-980 1 x 1 30.00 7.00 210.00
At 21/0-2 1 x 1 120.00 7.00 840.00
2100.00
Say 2100.00
Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion ( Rapid setting RSI )
(Bulk) using Emulsion pressure distributor at the rate of 0.70 Kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work as per
2 MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-Charge.

At 5/680-700 1 x 1 20.00 7.00 140.00


At 5/820-950 1 x 1 130.00 7.00 910.00
At 6/950-980 1 x 1 30.00 7.00 210.00
at Km 21/0-130 1 x 1 130.00 7.00 910.00
2170.00
SAY 2170.00
Providing and applying Tack coat with bitumen VG-10 Grade using Emulsion ( Rapid setting RSI )
(Bulk) using Emulsion pressure distributor at the rate of 0.20 Kgs per sqm on the prepared
3 bituminous/granular surface cleaned with mechanical broom for finished item of work as per
MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

Km 3/450-500 1 x 1 50.00 7.00 350.00


Km 5/330-400 1 x 1 70.00 7.00 490.00
Km 5/500-700 1 x 1 200.00 7.00 1400.00
Km 5/820-950 1 x 1 130.00 7.00 910.00
Km 6/350-400 1 x 1 50.00 7.00 350.00
KM 6/550-600 1 x 1 50.00 7.00 350.00
KM 6/930-7/0 1 x 1 70.00 7.00 490.00
at 21/0-130 1 x 1 130.00 7.00 910.00
1/4-21/2 1 x 1 19800.00 7.00 138600.00
Deductions CD 1 x 1 740.00 7.00 -5180.00
works
SAY 138670.00
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadam specification including cost, seigniorage of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
4 Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as
per MoRT&H specification.406 (4th revision) for finished item of work. (Payment will be made based
on levels for finished item of work)

At 5/680-700 1 x 1 20.00 7.00 0.25 35.00


At 5/820-950 1 x 1 130.00 7.00 0.25 227.50
At 6/950-980 1 x 1 30.00 7.00 0.25 52.50
at Km 21/0-120 1 x 1 120.00 7.30 0.250 219.00

534.00
say 534.00
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an
average output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per
table 500-4 of MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30
grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared
surface with mechanical paver finisher to the required grade, level and alignment and rolled as per
Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by
5 the Engineer-in-Charge including hire and operational charges all T&P and all other contingent
charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete
and as per MoRT&H specification No. 504 (5th Revision) (Excluding VAT Charges)

Km 3/450-500 1 x 1 50.00 7.00 0.050 17.50


Km 5/330-400 1 x 1 70.00 7.00 0.050 24.50
Km 5/500-700 1 x 1 200.00 7.00 0.050 70.00
Km 5/820-950 1 x 1 130.00 7.00 0.050 45.50
Km 6/350-400 1 x 1 50.00 7.00 0.050 17.50
KM 6/550-600 1 x 1 50.00 7.00 0.050 17.50
KM 6/930-7/0 1 x 1 70.00 7.00 0.050 24.50
at 21/0-130 1 x 1 130.00 7.00 0.050 45.50
262.50
Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type/ 40-60
TPH hot mix plant using HBG crushed aggregates of Grading-2 as per table 500-17 of specification
507 of MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler,
transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
6 level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of
work in all respects as directed by Engineer-in-Charge

1/4-15/0 1 x 1 13600.00 7.00 0.040 3808.00


15/0-21/2 1 x 1 6200.00 7.00 0.040 1736.00
Deductions for CD
Works 1 x 1 740.00 7.00 0.040 -207.20

1051 5336.80
SAY 5337.00
Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of
all materials to work site and spreading in uniform layers by approved means, on prepared surface
and compacting with vibratory roller to achieve the desired density at OMC etc., complete for
7 finished item of work as per MoRT&H Specification 401& 407 (5th revision) and as directed by the
Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

at Km 1/4-21/2 1 x 2 19060.00 1.50 0.100 5718.00


5718.00
SAY 5718.00
Routine Maintenace of Jungle Clearance /tree and shrub trimming and Culvert repair/ vent
Maintenace /Parapet Wall repairs/retaing wall repairs etc withen DLP as per 3000 of Mort&h (5 th
8
revision) & As directed by the Engineer in Charge (9.0 Km double lane x 2 Years) Part (B)

19.80
Routine Maintenace of Comprising of B.T ot hole Filling B.T edge repairs (and other items on B.T
carriage way such as crack sealing ,Minor surface repairetc., and unpaved shoulder repairs
(Berm) /surface drains maintnace /including gravelling berms and jungle Clearance /tree and shrub
trimming and Culvert repair/ vent Maintenace /Parapet Wall repairs/retaing wall repairs., ordinary
9 to repairs to bridges and sign maintenace /guard stone maintenace /painting Km/Hm stones and
others for 3 years from the end of DLP as per 3000 of Mort&h (5 th revision) & As directed by the
Engineer in Charge (9.0 Km double lane x 3 Years) Part (C)

1 x 1 26.74

Assistant Executive Engineer Dy. Executive Engineer


(R&B) Section: Kodad (R&B) Sub-Division: Kodad
m Km 1/4 to 28/140 (Working reach from Km 1/4 to

Rate Per Amount

8 9 10
l means and disposal of
(5th Revision) Specn.

8.70 sqm 18270.00


Emulsion ( Rapid setting RSI )
gs per sqm on the prepared
finished item of work as per
r-in-Charge.

49.30 sqm 106981.00


Emulsion ( Rapid setting RSI )
gs per sqm on the prepared
finished item of work as per
r-in-Charge.

10.00 sqm 1386700.00


stone aggregate to Wet Mix
and including premixing the
ed material by tipper to site ,
d surface and compacting with
the Engineer-in-Charge and as
. (Payment will be made based

1947.00 Cum 426393.00


hot mix plant producing an
egates of Grading - II as per
th bituminous binder of VG 30
d over a previously prepared
nd alignment and rolled as per
ed item of work as directed by
T&P and all other contingent
of all materials etc., complete
T Charges)

7149.00 Cum 1876612.50


0 TPH Batch Mix type/ 40-60
r table 500-17 of specification
rade @ 5.4 % of mix and filler,
finisher to the required grade,
andem rollers to achieve the
complete for finished item of
8075.00 CUM 43096275.00
ge) charges and conveyance of
d means, on prepared surface
ty at OMC etc., complete for
evision) and as directed by the
ed item of work ).

354.00 CUM 2024172.00


ng and Culvert repair/ vent
P as per 3000 of Mort&h (5 th
x 2 Years) Part (B)

3600.00 km 71280.00
epairs (and other items on B.T
nd unpaved shoulder repairs
ngle Clearance /tree and shrub
/retaing wall repairs., ordinary
/painting Km/Hm stones and
revision) & As directed by the

30000.00 Km 802200.00

Total = 49808883.50

Executive Engineer
Division:Suryapet
BRIDGE DETAILED ESTIMATE

Name of work: Construction of HLB on Kodad -Revoor road at Km 13/0-2 in Suryapet


District.

S.No. Description of Item Quantity Rate Per


1 2 5 6
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding
settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of
sides and bottom and back filling with approved material as per MORTH specification 304(5th Revision) and
as directed by the Engineer-in-Charge.

a Upto 3 m depth, Above L.B.L 2209.00 36.70 1 cum

b Upto 3 m depth, Below L.B.L 1787.00 38.50 1 cum


Cum

2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal
size mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per
MoRT&H specification 2100 (5th Revision) under Abutments,Piers & Wing walls.

125.00 4985.00 1 cum


Plain Vibrated Cement Concrete M25 Mix concrete using 20 mm.10 mm HBG crushed stone aggregate
(coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2 including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing
etc., including all other incidental and operational charges of all T&P etc., complete as per MoRT&H Spcn.
No 1500,1700 & 2100 (4th Revision)for Raft

589.20 570.55 1 cum


3 Plain Vibrated Cement Concrete M20 Mix concrete using 40 mm,20 mm.10 mm HBG crushed stone
aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete as per
MoRT&H Spcn. No 1500,1700 & 2100 (4th Revision)for FOOTINGS OF ABUTMENTS, piers, wing
walls,rigid aprons & cutoff walls.

434.00 6276.00 1 cum


Cum
4 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG
crushed stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to
table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine
mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc. as
per approved drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th revision ) and as directed by
the Engineer-in-Charge for Substructure of Abutments and Piers & Wing walls.

614.00 6638.00 1 cum


Cum
5 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved drawing excluding
cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
2100 (5th revision ) and as directed by the Engineer-in-Charge for Raft.and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700
& 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Bed blocks & Backing walls (Sub
Structure).

24.00 7154.00 1 cum


Cum
6 Furnishing and Placing Reinforced cement concrete in super-structure of M 25 grade using 20 mm and 10
mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all
T&P etc.,complete for finished item of work as per approved drawing,excluding cost of steel and its
fabrication charges for finished item as per MoRT&H specification 1500,1600 & 1700(5th revision ) and as
directed by the Engineer-in-Charge.

532.00 7216.00 1 cum


Cum
7 Vibrated Vibrated Cement Concrete M15 Mix using 40mm,20 mm and 10 mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P etc., complete as per MORTH
specification No.1500,1700 & 2100 (5th Revision) for Levelling course below approach slab.

8.00 5541.00 1 cum


Cum
8 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work
as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H
specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for
Approach slab.

31.00 6700.00 1 cum


Cum
10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and
conveyance of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including
all other incidental and operational charges,T&P etc., complete for finished item of work, as per drawing
no.BD/1-69 (A), but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500,
1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck
slab.

50.00 6653.00 1 cum


Cum
11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications
as per MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel
and its fabrications charges as per approved drawing.

41.00 2604.00 1cum


Cum
12 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL,SHYAM) of different
diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for
Foundation of R.C.C items.

32.67 69290.00
MT 1 MT
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure
of R.C.C items.

8.05 69565.00 1 MT
MT
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure
of R.C.C items.

47.00 70898.00 1 MT
MT
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work

115.00 714.00 1 cum


Cum
16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in
Clause 2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and provided over the entire surface behind abutment and wing wall,
to the full height , compacted to a firm including cost, conveyance of all material charges and labour
charges,as directed by the Engineer-in-Charge as per drawing and technical specification as per clause
No.710.1.1 of IRC 78 and 2200 of MORTH 5th Revision for finished item of work.

101.00 1607.00 1 cum


Cum
17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter
A.C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face
Complete as per drawing and technical specification, complete for finished item of work for weep holes as per
MORTH specification No 2706 & 2200 (5th Revision)

10.00 453.00 1 R.M.


R.M.
18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-
69 A.

10.00 2707.00 1 No.


No.s
19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum
of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the
stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th
Revision ) and as directed by the Engineer-in-Charge for quadrential revetment.

27.00 2477.00 1 cum


Cum
20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe
wall.
11.00 1420.00 cum
Cum
21 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance
of materials to site including labour charges etc., complete for finished item of work as per MoRT&H
Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment. For
pitching of slopes.

13.00 1024.00 1 cum


Cum
TOTAL

22 Provision for mastic pads


23 Provision for sub soil investigation and soil testing
24 Provision for Pylon construction
25 Provision for variation of foundation levels

Provision for painting to Crsh barrier and


dismantling existing delibated slab culvert
26 unforeseen items and rounding off

Asst.Exe.Engineer (R&B) Dy. Executive Engineer (R&B)


Section:
Section:Kodad
Medlacheruvu Sub Division : Kodad

Executive Engineer (R&B) Superintending Engineer (R&B


Division : Suryapet Circle : Nalgonda
Km 13/0-2 in Suryapet

Amount

al specifications,incuding
eleterious matter,dressing of
cation 304(5th Revision) and

81071.00

68800.00

e aggregate 40mm nominal


ding curing complete as per
s.

623125.00
G crushed stone aggregate
o table 1000-2 including cost,
ing, laying, Vibrating, curing
mplete as per MoRT&H Spcn.

336166.00
HBG crushed stone
onforming to table 1000-2)
, machine mixing, laying,
l T&P etc., complete as per
MENTS, piers, wing

2723784.00

40 mm,20 mm.10 mm HBG


e aggregate conforming to
ges, centering, machine
al charges of all T&P etc. as
steel and its fabrication
revision ) and as directed by
lls.

4075732.00
ushed stone aggregate
o table 1000-2) including cost,
ng, laying, vibrating, curing
pproved drawing excluding
cation 1500,1600,1700 &
directed during execution but
&H specification 1500,1700
ocks & Backing walls (Sub

171696.00

5 grade using 20 mm and 10


0-1 and fine aggregate
nd labour charges, centering,
operational charges of all
cost of steel and its
1700(5th revision ) and as

3838912.00

HBG crushed stone aggregate


o table 1000-2) including cost,
ng, laying, vibrating, curing
plete as per MORTH
approach slab.

44328.00

rushed stone aggregate


o table 1000-2) including cost,
ng, laying, vibrating, curing
lete for finished item of work
s as per MoRT&H
Engineer-in-Charge for

207700.00

aggregate including cost and


mpacting,curing etc,including
of work, as per drawing
MoRT&H specification 1500,
for wearing coat over Deck

332650.00

g and technical specifications


riers excluding cost of steel

106764.00
L,SHYAM) of different
nce of steel to site and all
g rods, tying grills, placing
nd all handling charges and
mplete for all R.C.C items for
neer-in-Charge and as per
5 for R.C.C items. for

2263951.00

L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Sub structure

559780.00

L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Super structure

3332206.00

e etc., complete as per


vision) and as per Drawing

82110.00

equirements laid down in


m with smaller size towards
ehind abutment and wing wall,
l charges and labour
pecification as per clause
k.

162307.00

wall with 100mm dia meter


V : 20H towards drawing face
of work for weep holes as per

4530.00
ion and as per drawing BD/1-

27070.00

size grouted with 0.20 cum


abour charges for packing the
ecification 2504 ( 5th
t.

66879.00

erials to site and including


tem of work as per MoRT&H
or Pitching of slopes for Toe

15620.00

luding cost, and conveyance


work as per MoRT&H
der Revetment. For

13312.00

19138493.00

50000.00
500000.00
100000.00
200000.00

886116.00
20874609.00

Dy. Executive Engineer (R&B)


Sub Division : Kodad

Superintending Engineer (R&B)


Circle : Nalgonda
Name of Work :- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet District.

Earth/ Gravel Metal/ Stone Sand


S.No Specification in Brief Unit Quantity cum cum cum
Factor Quantity Factor Quantity Factor Quantity
1 2 3 4 5 6 7 8 9 10
ROAD PART
1 Wet Mix Macadam 1 cum 534.00 1.320 704.88
2 Single coat surface dressing 1 sqm 0.00 0.004 0.00
3 Prime Coat with BT Emulsion 1 sqm 2170.00
4 Tack Coat with BT Emulsion 1 sqm 138670.00
5 BC-40 mm with BT 60/70 1 cum 5337.00 1.485 7925.45
6 DBM 50 mm with BT 80/100 1 cum 262.50 1.469 385.61
7 Gravel Shoulders 1 cum 5718.00 1.280 7319.040
Total Quantity 7325.04 9015.94 0.00
Rate 30.00 75.00 40.00
Amount Rs 219751.00 676196.00 0.00
Total Amount Rs 895947.00
HLB @ 15/0-2
1 E/W for Trench cutting/Embankment 1 cum 5855.00 1.000 5855.000
2 Granular Sub-base 1 cum 1701.00 1.280 2177.28
3 WBM Gr II 1 cum 1.450 0.00
4 WBM Gr III 1 cum 1.530 0.00
5 Wet Mix Macadam 1 cum 1070.00 1.320 1412.40
6 Single coat surface dressing 1 sqm 0.00 0.004 0.00
7 Prime Coat with BT Emulsion 1 sqm
8 Tack Coat with BT Emulsion 1 sqm
9 Mix seal 20 mm with BT 60/ 70 1 cum 0.027 0.00
10 BC-40 mm with BT 60/70 1 cum 129.00 1.485 191.57
11 DBM 50 mm with BT 80/100 1 cum 215.00 1.469 315.84
12 Gravel Shoulders 1 cum 276.00 1.280 353.280
13 VCC(1:4:8) 1 cum 0.900 0.00 0.450 0.00
14 VCC(1:3:6) 1 cum 145.00 0.900 130.50 0.450 65.25
15 VCC M15 Grade CC 1 cum 16.00 0.900 14.40 0.450 7.20
16 VRCC M20 Grade for footing 1 cum 658.00 0.900 592.20 0.450 296.10
17 VRCC M20 Grade for sub structure 1 cum 266.00 0.900 239.40 0.450 119.70
18 VRCC M25 for bedblocks 1 cum 37.00 0.900 33.30 0.450 16.65
19 VRCC M25 super structure 1 cum 746.00 0.900 671.40 0.450 335.70
20 VRCC M30Grade CC approach slab 1 cum 58.00 0.900 52.20 0.450 26.10
21 VRCC M30 Grade CC wearing coat 1 cum 82.00 0.900 73.80 0.450 36.90
22 VCC M40 Grade CC crash barrier 1 cum 81.00 0.900 72.90 0.450 36.45
23 Filter Material with Gravel 1 cum 32.00 1.200 38.40
24 Filter media using 150 mm stone 1 cum 190.00 1.2 228.000
25 Grouted Revetment with CC(1:4:8) 1 cum 66.00 0.000 1.200 79.20
26 Back filling with gravel 1 cum 154.00 1.180 181.72 0.090 13.86
27 100 mm dia AC Weep holes 1 cum 132.00 1.200 158.400
28 Rough Stone Revetment 1 cum 24.00 1.200 28.80
Total Quantity 6436.28 6305.31 1112.31
Rate 30.00 75.00 75.00
Amount Rs 193088.00 472898.00 83423.00
Total Amount Rs 749409.00
BOX CULVERTS
I Road Part (approaches)
1 Embankment 1 cum 672.00 1.0 672.000
2 Granular Sub-base 1 cum 528.00 1.280 675.84
II Box Approaches
1 Granular Sub-base 1 cum 818.00 1.280 1047.04
2 WMM 1 cum 1022.00 1.350 1379.70
3 DBM 1 cum 196.00 1.469 287.92
4 BC 1 cum 157.00 1.456 228.59
5 Gravel Shoulders 1 cum 252.00 1.280 322.56

III Box Culverts


1 E/W for Trench cutting/Embankment 1 cum 2819.00 1.0 2819.000
2 (PCC 1:3:6) 1 cum 184.00
3 VRCC M15 Grade CC 1 cum 30.00 0.900 27.00 0.450 13.50
4 VRCC M20 Grade CC 1 cum 162.00 0.900 145.80 0.450 72.90
5 VRCC M25 Grade CC 1 cum 202.00 0.900 181.80 0.450 90.90
6 VCC M30 1 cum 92.00 0.900 82.80 0.450 41.40
6 VCC M40 1 cum 98.91 0.900 89.02 0.450 44.51
7 Rough Stone Revetment 1 cum 303.00 1.200 363.60
8 Filter Material with Gravel 1 cum 152.00 1.2 182.400
9 Filter media using 150 mm stone 1 cum 414.00 1.200 496.80
10 Grouted Revetment with CC(1:4:8) 1 cum 0.00 1.180 0.00 0.090 0.00
11 Back filling with gravel 1 cum 1291.00
12 Flexible apron 1 cum 522.00 1.200 182.400
13 Sand filling in foundation 1 cum 0.00 1.200 0.000
14 100 mm dia AC Weep holes 1 m 438.00 0.002 0.770
Total Quantity 7319.04 9015.94 0.00
Rate 30.00 75.00 75.00
Amount Rs 219571.00 676196.00 0.00
BOX CULVERTS Total Amount Rs 895767.00
ROAD 895947.00
HLB 749409.00
###
As per instructions of Industries& Commere (Mines-I) Department, No 3573/MI(1)/2015 dtd: 13.05.2016 DM Fund 32% 813159.36 37.5
Total Amount Rs 3354282.36
BRIDGE DETAILED ESTIMATE

Name of work: Construction of HLB on Kodad -Revoor road at Km 15/02 in Suryapet


District.
S.No. Description of Item Quantity Rate Per
1 2 5 6
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding
settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of
sides and bottom and back filling with approved material as per MORTH specification 304(5th Revision) and
as directed by the Engineer-in-Charge.

a Upto 3 m depth, Above L.B.L 342.00 36.70 1 cum


279.00
b Upto 3 m depth, Below L.B.L 279.00 38.50 1 cum
Cum

2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal
size mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per
MoRT&H specification 2100 (5th Revision) under Abutments,Piers & Wing walls.

20.00 4985.00 1 cum


3 Plain Vibrated Cement Concrete M20 Mix concrete using 40 mm,20 mm.10 mm HBG crushed stone
aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete as per
MoRT&H Spcn. No 1500,1700 & 2100 (4th Revision)for FOOTINGS OF ABUTMENTS, piers, wing
walls,rigid aprons & cutoff walls.

224.00 6276.00 1 cum


Cum
4 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG
crushed stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to
table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine
mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc. as
per approved drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th revision ) and as directed by
the Engineer-in-Charge for Substructure of Abutments and Piers & Wing walls.

242.00 6638.00 1 cum


Cum
5 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved drawing excluding
cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
2100 (5th revision ) and as directed by the Engineer-in-Charge for Raft.and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700
& 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Bed blocks & Backing walls (Sub
Structure).

13.00 7154.00 1 cum


Cum
6 Furnishing and Placing Reinforced cement concrete in super-structure of M 25 grade using 20 mm and 10
mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all
T&P etc.,complete for finished item of work as per approved drawing,excluding cost of steel and its
fabrication charges for finished item as per MoRT&H specification 1500,1600 & 1700(5th revision ) and as
directed by the Engineer-in-Charge.

214.00 7216.00 1 cum


Cum
7 Vibrated Vibrated Cement Concrete M15 Mix using 40mm,20 mm and 10 mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P etc., complete as per MORTH
specification No.1500,1700 & 2100 (5th Revision) for Levelling course below approach slab.

8.00 5541.00 1 cum


Cum
8 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work
as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H
specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for
Approach slab.

27.00 6700.00 1 cum


Cum
10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and
conveyance of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including
all other incidental and operational charges,T&P etc., complete for finished item of work, as per drawing
no.BD/1-69 (A), but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500,
1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck
slab.

32.00 6653.00 1 cum


Cum
11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications
as per MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel
and its fabrications charges as per approved drawing.
40.00 2604.00 1cum
Cum
12 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL,SHYAM) of different
diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for
Foundation of R.C.C items.

2.34 69290.00
MT 1 MT
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure
of R.C.C items.

4.07 69565.00 1 MT
MT
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure
of R.C.C items.

4.00 70898.00 1 MT
MT
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work
39.00 714.00 1 cum
Cum
16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in
Clause 2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and provided over the entire surface behind abutment and wing wall,
to the full height , compacted to a firm including cost, conveyance of all material charges and labour
charges,as directed by the Engineer-in-Charge as per drawing and technical specification as per clause
No.710.1.1 of IRC 78 and 2200 of MORTH 5th Revision for finished item of work.

75.00 1607.00 1 cum


Cum
17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter
A.C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face
Complete as per drawing and technical specification, complete for finished item of work for weep holes as per
MORTH specification No 2706 & 2200 (5th Revision)
122.00 453.00 1 R.M.
R.M.
18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-
69 A.
4.00 2707.00 1 No.
No.s
19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum
of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the
stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th
Revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
39.00 2477.00 1 cum
Cum
20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe
wall.

13.00 1420.00 cum


Cum
21 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance
of materials to site including labour charges etc., complete for finished item of work as per MoRT&H
Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment. For
pitching of slopes.

19.00 1024.00 1 cum


Cum
TOTAL
22 Provision for mastic pads
23 Provision for sub soil investigation and soil testing
24 Provision for Pylon construction
25 Provision for variation of foundation levels
26 Provision for painting to Crsh barrier and dismantling existing delibated slab culvert unfor

Asst.Exe.Engineer (R&B) Dy. Executive Engineer (R&B)


Section: Medlacheruvu Sub Division : Huzurnagar

Executive Engineer (R&B) Superintending Engineer (R&B


Division : Suryapet Circle : Nalgonda
Km 15/02 in Suryapet

Amount

al specifications,incuding
eleterious matter,dressing of
cation 304(5th Revision) and

12552.00

10742.00

e aggregate 40mm nominal


ding curing complete as per
s.

99700.00
HBG crushed stone
onforming to table 1000-2)
, machine mixing, laying,
l T&P etc., complete as per
MENTS, piers, wing

1405824.00

40 mm,20 mm.10 mm HBG


e aggregate conforming to
ges, centering, machine
al charges of all T&P etc. as
steel and its fabrication
revision ) and as directed by
lls.

1606396.00

ushed stone aggregate


o table 1000-2) including cost,
ng, laying, vibrating, curing
pproved drawing excluding
cation 1500,1600,1700 &
directed during execution but
&H specification 1500,1700
ocks & Backing walls (Sub

93002.00
5 grade using 20 mm and 10
0-1 and fine aggregate
nd labour charges, centering,
operational charges of all
cost of steel and its
1700(5th revision ) and as

1544224.00

HBG crushed stone aggregate


o table 1000-2) including cost,
ng, laying, vibrating, curing
plete as per MORTH
approach slab.

44328.00

rushed stone aggregate


o table 1000-2) including cost,
ng, laying, vibrating, curing
lete for finished item of work
s as per MoRT&H
Engineer-in-Charge for

180900.00

aggregate including cost and


mpacting,curing etc,including
of work, as per drawing
MoRT&H specification 1500,
for wearing coat over Deck

212896.00

g and technical specifications


riers excluding cost of steel

104160.00

L,SHYAM) of different
nce of steel to site and all
g rods, tying grills, placing
nd all handling charges and
mplete for all R.C.C items for
neer-in-Charge and as per
5 for R.C.C items. for

162139.00
L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Sub structure

283130.00

L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Super structure

283592.00

e etc., complete as per


vision) and as per Drawing

27846.00

equirements laid down in


m with smaller size towards
ehind abutment and wing wall,
l charges and labour
pecification as per clause
k.

120525.00

wall with 100mm dia meter


V : 20H towards drawing face
of work for weep holes as per

55266.00

ion and as per drawing BD/1-

10828.00

size grouted with 0.20 cum


abour charges for packing the
ecification 2504 ( 5th
t.
96603.00

erials to site and including


tem of work as per MoRT&H
or Pitching of slopes for Toe

18460.00
luding cost, and conveyance
work as per MoRT&H
der Revetment. For

19456.00

6392569.00
50000.00
500000.00
100000.00
200000.00
886116.00
8128685.00

Dy. Executive Engineer (R&B)


Sub Division : Huzurnagar

Superintending Engineer (R&B)


Circle : Nalgonda
BRIDGE DETAILED ESTIMATE

Name of work: Construction of HLB at km 13/0-2 on Kodad-Revoor Road in Suryapet District


S.No. Description of Item No. Length Breadth Depth
1 2 3 4 5 6
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting
out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and
bottom and back filling with approved material as per MORTH specification 304(5th Revision) and as directed by th
Engineer-in-Charge.

a Upto 3 m depth, Above L.B.L


Raft 1 x 1 52.72 13.120 1.30
Rigid apron U \S 1 x 1 52.72 3.000 1.30
Rigid apron D \S 1 x 1 52.72 5.000 1.30
Flexible apron U \S 1 x 1 52.72 3.000 1.30
Flexible apron D \S 1 x 1 52.72 6.000 1.30
Wing walls 4 x 1 3.50 3.80 2.50
For toe walls (3.14*5.065*2/4)= 4 x 1 7.540 0.60 0.60

b Upto 3 m depth, Below L.B.L


Raft 1 x 1 52.72 13.12 1.4
Rigid apron U\S 1 x 1 51.12 2.200 0.30
D\S 1 x 1 51.12 4.20 0.30
Flexible apron U \S 1 x 1 52.72 2.800 1.00
Flexible apron D \S 1 x 1 52.72 5.800 1.00
For cutoff walls on U\S 1 x 1 52.720 1.00 2.00
For cutoff walls on D\S 1 x 1 52.720 1.00 2.50
For cross cutoff walls on U\S 1 x 2 2.200 1.00 2.00
For cross cutoff walls on D\S 1 x 2 4.200 1.00 2.50

2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per MoRT&H
specification 2100 (5th Revision) under Raft,Wingwalls,Rigid Aapron.

Raft 1 x 1 52.72 13.970 0.10


wing walls 4 x 1 3.50 3.800 0.10
Rigid apron U\S 1 x 1 51.52 1.55 0.15
Rigid apron D\S 1 x 1 51.52 4.40 0.15
3 Plain Vibrated Cement Concrete M25 Mix concrete using 20 mm.10 mm HBG crushed stone aggregate (coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2 including cost, conveyance of
all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all
other incidental and operational charges of all T&P etc., complete as per MoRT&H Spcn. No 1500,1700 & 2100 (4th
Revision)for Raft

Piers
For VRCC M25 Raft 1 x 1 52.72 13.97 0.80

4 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG crushed
stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibratin
curing etc., including all other incidental and operational charges of all T&P etc. as per approved drawings and a
directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for footings of
Abutments, Piers and Winngwalls,Cut offwalls and Rigid Aapron.

For Abutments trep (2.15+2.65)/2 2 x 1 12.00 2.4 0.500


Piers 4 x 1 12.82 1.82 0.5
Wing walls 1st footing 4 x 1 3.50 3.80 0.500
Wing Walls trep(1.8+2.8)/2 4 x 1 3.50 2.30 1.000
Rigid Aapron U/S 1 x 1 52.72 2.15 0.500
D/S 1 x 1 52.72 5.00 0.300
For cutoff walls on U\S 1 x 1 51.520 0.60 1.20
1 x 1 51.520 1.00 0.50
For cross cutoff walls on U\S 1 x 2 3.000 0.60 1.20
1 x 2 3.000 1.00 0.50
For cutoff walls on D\S 1 x 1 51.520 0.6 1.7
1 x 1 51.520 1 0.50
For cross cutoff walls on D\S 1 x 2 5.000 0.6 1.7
1 x 2 5.000 1 0.50
Total
Say
5 Vibrated reinforced cement concrete M 20grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P as per approved drawing excluding cost of steel and its
fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as
directed by the Engineer-in-Charge for Raft.and as directed during execution but excluding cost of steel and its
fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th Revision ) and as direct
by the Engineer-in-Charge for Abutments piers Wingwalls

Piers 4 x 1 12.00 0.82 4.17


Pier cutoff walls(22/7/4*82*82) 4 x 1 0.53 1.00 4.17
Abutments(.72+2.15)/2 2 x 1 12.00 1.44 4.17
Wing walls(.5+1.8)/2 4 x 1 3.50 1.15 4.373
Check dam 1 x 1 52.72 2.15 2.00

Say

Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
6 cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibratin
curing etc., including other incidental hire and operational charges of all T&P as per approved drawing
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 & 2100 (5th revision ) and as directed by the Engineer-in-Charge for Raft.and as directe
during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutmen
Bedblocks Backing walls piers Bedblocks

Bed blocks and Backing walls


Bed blocks over Abutments 2 x 1 12 0.77 0.3
Backing Wall on Abutments 2 x 1 12 0.3 0.9
Bed blocks over Piers 4 x 1 12 0.92 0.3
Cut off Walls for Bed Blocks (22/7/4*92*92 4 x 1 0.665 1 0.3
Deduct backing wall -2 x 1 11 0.3 0.368

Say
7 Furnishing and Placing Reinforced cement concrete in super-structure of M 30 grade using 20 mm and 10 mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 100
2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including other incidental hire and operational charges of all T&P etc.,complete for finished
item of work as per approved drawing,excluding cost of steel and its fabrication charges for finished item as per
MoRT&H specification 1500,1600 & 1700(5th revision ) and as directed by the Engineer-in-Charge.

Super Structure 5 x 1 106.4 each


Say
8 Vibrated Vibrated Cement Concrete M15 Mix using 40mm,20 mm and 10 mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P etc., complete as per MORTH specification No.1500,1700 & 2100
(5th Revision) for Levelling course below approach slab.

Under approach slab 2 x 1 3.50 11.00 0.100


9 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all oth
incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing bu
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th
Revision) and as directed by the Engineer-in-Charge for Approach slab.

For approach slab 2 x 1 3.80 11.00 0.368

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and
conveyance of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including all
other incidental and operational charges,T&P etc., complete for finished item of work, as per drawing no.BD/1-69
(A), but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 270
(5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

on super structure 5 x 1 10.4 11.00 0.075


Over approach slabs 2 x 1 3.80 11.00 0.075

11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications as pe
MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel and its
fabrications charges as per approved drawing.

Crash barrier 2 x 1 59.6 Sqm 0.342

12 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL,SHYAM) of different diameters, wroug
and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabricatio
of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Foundation of R.C.C items.

FONDATIONS

Raft 1 x 1 589.2 5.00 Kgs/Sqm


Skin Reinforcement in Abutments
(12*(0.5+.5*1.414)+0.5(2.65+2.15)) 2 x 1 16.884 5.00 Kgs/Sqm

Skin Reinforcement in Piers (12.82*(2)+1.82)


4 x 1 110.91 5.00 Kgs/Sqm

Skin Reinforcement in wing walls


(3.5*(2+1+1414+3.8)+1*(1.8+2.8)+3.8) 4 x 1 41.33 5.00 Kgs/Sqm

Say
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure of R.C.C items.

Skin Reinforcement in Abutments


4.173*(.72+2.15)+12*(4.173+4.411) 2 x 1 114.985 5.00 Kgs/Sqm

Skin Reinforcement in Piers


4.173*12*2+22/7*.82*4.173 4 x 1 110.91 5.00 Kgs/Sqm

Skin Reinforcement in wing walls


(4.373*(.5+1.8)+3.5*9(4.373+4.562)) 4 x 1 41.33 5.00 Kgs/Sqm

Skin Reinforcement in Check Dam


(52.72*(2*2.173)+52.72*(1.3)) 1 x 1 297.657 5.00 Kgs/Sqm

Bed blocks and Backing walls 1 x 1 23.64 100.00 Kgs/cum

14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure of R.C.C items.

Super Structure from MOST drawing 5 x 1 7047.00 Kgs/span


wearing coat 1 x 1 49.17 60.00 Kgs/Cum
Approach slab 1 x 1 30.77 85.00 Kgs/Cum
Crash barrier 1 x 1 40.7664 161.00 Kgs/cum

or say

15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per Clause
710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical
specifications for finished item of work

Behind abutments and wing walls 1.00 x 1 9.80 2.600 4.500


or say

16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in Clause
2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind abutment and wing wall, to the full
height , compacted to a firm including cost, conveyance of all material charges and labour charges,as directed by
the Engineer-in-Charge as per drawing and technical specification as per clause No.710.1.1 of IRC 78 and 2200 of
MORTH 5th Revision for finished item of work.
Behind abutment 2 x 1 9.80 0.60 5.000
Behind Wing walls 4 x 1 3.50 0.60 5.000

or say

17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A.C
pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Comple
as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH
specification No 2706 & 2200 (5th Revision)

5 x 2
or say

18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-69 A.

2 x 5
or say

19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
(1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as
directed by the Engineer-in-Charge for quadrential revetment.

For quadrants 22/7*4.5*4.5*1.414/4 4 x 1 22.498 0.300


or say

20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification
2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

Toe walls 2*22/7*4.8/4 4 x 1 7.543 0.6 0.6


or say

21 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance of
materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification
2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment. For pitching of slopes.

Quadrants 22/7*4.5*4.5*1.414/4 4 x 1 22.498 0.15


or say

23 GST 12%
24 Seignorage charges
25 Provision for mastic pads
26 Provision for RSI Items
27 Provision for painting to crash barrier and unforeseen items and rounding off
Asst.Exe.Engineer (R&B) Dy Executive Engineer (R&B)
Section: Kodad Sub-Division : Kodad

Executive Engineer (R&B) Superintending Engineer (R&B)


Division : Suryapet Circle : Nalgonda

Asst
.Exe
.Eng
inee
r Dy Executive Engineer (R&B)
(R&
B)

Section: Bhupalapally Sub-Division : Parkal

Executive Engineer (R&B)


Division : Warangal
d in Suryapet District
Quantity

cations,incuding settting
,dressing of sides and
sion) and as directed by the

899.19
205.61
342.68
205.61
411.22
133.00
10.86
2208.16
2209.00
cum

968.36
33.74
64.41
147.62
305.78
105.44
131.80
8.80
21.00
1786.94
1787.00
cum

ate 40mm nominal size


omplete as per MoRT&H

73.65
5.32
11.98
34.00
124.95
125.00
cum

e aggregate (coarse
uding cost, conveyance of
uring etc., including all
. No 1500,1700 & 2100 (4th

589.20
589.20
cum

mm.10 mm HBG crushed


rming to table 1000-2)
e mixing, laying, Vibrating,
r approved drawings and as
shed item as per MoRT&H
ge for footings of

28.80
46.66
26.60
32.20
56.67
79.08
37.09
25.76
4.32
3.00
52.55
25.76
10.20
5.00
433.70
434.00
ne aggregate (Coarse
cluding cost, conveyance of
ring etc., including other
ost of steel and its
0 (5th revision ) and as
ding cost of steel and its
h Revision ) and as directed

164.25
8.81
143.72
70.41
226.70
613.88
614.00

rushed stone aggregate


o table 1000-2) including
mixing, laying, vibrating,
as per approved drawing
oRT&H specification
e for Raft.and as directed
hed item as per MoRT&H
r-in-Charge for Abutment

5.544
6.48
13.248
0.798
-2.4288
23.6412
24
ng 20 mm and 10 mm HBG
e conforming to table 1000-
chine mixing, laying,
etc.,complete for finished
for finished item as per
in-Charge.

532
532.00
d stone aggregate (Coarse
cluding cost, conveyance of
ring etc., including other
ation No.1500,1700 & 2100

7.70
7.70
8.00
one aggregate (Coarse
cluding cost, conveyance of
ring etc., including all other
s per Approved drawing but
1600,1700, & 2704 (5th

30.765
30.765
31.00
cum
cluding cost and
g,curing etc,including all
as per drawing no.BD/1-69
1500, 1600,1700, & 2702
ab.

42.90
6.27
49.17
50.00
cum
hnical specifications as per
t of steel and its

40.7664
40.7664
41.00
cum
different diameters, wrought
bour charges for fabrication
osition etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th

29.46

0.169

2.218

0.827

32.674
t diameters, wrought and
charges for fabrication of
tion etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th
ms.

1.150

2.218

0.827

1.488

2.364
8.047
MT
t diameters, wrought and
charges for fabrication of
tion etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th
ms.

35.235
2.950
2.615
6.563
47.364
47.000
MT
complete as per Clause
rawing and technical

114.66
115.00
cum
nts laid down in Clause
e towards the soil and
wing wall, to the full
our charges,as directed by
1.1 of IRC 78 and 2200 of
58.80
42.00
100.80
101.00
cum
h 100mm dia meter A.C
ards drawing face Complete
holes as per MORTH

10.00
Nos
10
per drawing BD/1-69 A.

10.00
10.00
No.s
ted with 0.20 cum of CC
for packing the stones for
5th Revision ) and as

27.00
27.00
cum
site and including labour
per MoRT&H specification
r Toe wall.

10.86
11.00
cum
ost, and conveyance of
r MoRT&H Specification
pitching of slopes.

13.50
13.00
cum

L.S

L.S
nding Engineer (R&B)
Nalgonda
BRIDGE DETAILED ESTIMATE

Name of Work:- :Construction of HLB at Km. 15/0-2 on kodad- Rvoor road in Suryapet distric

S.No. Description of Item No. Length Breadth Depth


1 2 3 4 5 6
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting o
construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom a
back filling with approved material as per MORTH specification 304(5th Revision) and as directed by the Engineer-i
Charge.

a Upto 3 m depth, Above L.B.L


Abutments (A1,A2) 1 x 2 12.00 5.000 1.40
Pier P1 1 x 1 12.10 2.30 1.00
Wing walls 4 x 1 4.00 3.40 2.50
For toe walls (3.14*5.065*2/4)= 4 x 1 6.850 0.60 0.60

b Upto 3 m depth, Below L.B.L

Abutments (A1,A2) 1 x 2 12.00 5.000 2.00


Pier P1 1 x 1 12.10 2.30 1.40

2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per MoRT&H
specification 2100 (5th Revision) under Abutments,Piers & Wing walls.

Abutments (A1,A2) 1 x 2 12.00 5.000 0.10


Pier P1 1 x 1 12.10 2.300 0.10
wing walls 4 x 1 4.00 3.40 0.10

4 Plain Vibrated Cement Concrete M20 Mix concrete using 40 mm,20 mm.10 mm HBG crushed stone aggregate (coar
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all ot
incidental and operational charges of all T&P etc., complete as per MoRT&H Spcn. No 1500,1700 & 2100 (4th
Revision)for FOOTINGS OF ABUTMENTS, piers, wing walls.

Piers
1st footing. 1 x 1 12.10 2.30 0.50
2nd footing. 1 x 1 12.10 1.70 0.50
Abutments Trep.footing (2.0+3.0)/2 2 x 1 12.00 2.50 1.00
2 nd footing 1 x 1 12.00 4.00 0.50
1st footing 1 x 1 12.00 5.00 0.50
Wing walls
1st footing 4 x 1 4.00 3.40 0.50
2nd footing 4 x 1 4.00 2.80 0.50
Trepizoidal footing (2.8+1.7)/2 4 x 1 4.00 2.25 1.00

5 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG crushed
stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibratin
curing etc., including all other incidental and operational charges of all T&P etc. as per approved drawings and a
directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Substructure of
Abutments and Piers & Wing walls.

For Abutments (2.0+.720)/2 2 x 1 12.00 1.36 3.790


Piers 1 x 1 11.20 0.82 5.24
Cut waters (П/4*(0.9^2+1.0^2)/2) 1 x 1 0.64 1.00 5.24
Wing walls (0.5+1.7)/2 4 x 1 4.00 1.10 3.750

6 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P as per approved drawing excluding cost of steel and its fabrica
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as directed by th
Engineer-in-Charge for Raft.and as directed during execution but excluding cost of steel and its fabrication charge
for finished item as per MoRT&H specification 1500,1700 & 2200 (5th Revision ) and as directed by the Engineer-i
Charge for Bed blocks & Backing walls (Sub Structure).

Bed blocks over abutments: 2 x 1 12.00 0.77 0.30


Over Piers 1 x 1 11.20 0.92 0.30
Cut waters (П/4*(0.92)^2) 1 x 1 0.66 1.00 0.30
Backing walls over abutment: 2 x 1 12.00 0.30 0.790
deduct approach slab portion 2 x 1 11.00 0.30 0.30
7 Furnishing and Placing Reinforced cement concrete in super-structure of M 25 grade using 20 mm and 10 mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 100
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibratin
curing etc., including other incidental hire and operational charges of all T&P etc.,complete for finished item of w
as per approved drawing,excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1600 & 1700(5th revision ) and as directed by the Engineer-in-Charge.

Super Structure 2 x 1 106.4 each


Kerbs over wings 2 x 2 4.0 0.275 0.315

8 Vibrated Vibrated Cement Concrete M15 Mix using 40mm,20 mm and 10 mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P etc., complete as per MORTH specification No.1500,1700 & 2100
(5th Revision) for Levelling course below approach slab.

Under approach slab 2 x 1 4.00 9.80 0.100

9 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all oth
incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing bu
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th
Revision) and as directed by the Engineer-in-Charge for Approach slab.

For approach slab 2 x 1 4.00 11.00 0.300

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and conveyan
of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including all other inciden
and operational charges,T&P etc., complete for finished item of work, as per drawing no.BD/1-69 (A), but excludin
cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) an
as directed by the Engineer-in-Charge for wearing coat over Deck slab.

Over deck slabs 2 x 1 10.4 10.90 0.100


Over approach slabs 2 x 1 4.00 11.00 0.100

11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications as pe
MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel and its fabricatio
charges as per approved drawing.

Crash barrier 2 x 1 20 Sqm


12 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL,SHYAM) of different diameters, wroug
and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabricatio
of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawin
as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and a
per I.S.1786 of 1985 for R.C.C items. for Foundation of R.C.C items.

Skin Reinforcement in Abutments


(12*(1+.5+.5+5+.5+.5+1*1.414)+(5+4)) 2 x 1 121.968 5.00 Kgs/Sqm

Skin Reinforcement in Piers


(12.1*(2.3+1+1+1+1)+2.3+1.7 1 x 1 80.23 5.00 Kgs/Sqm

Skin Reinforcement in wing walls


4*(1*1.414+0.5+0.5+3.4+0.5+0.5+1)+(2.8+1.7) 4 x 1 35.756 5.00 Kgs/Sqm

13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete includ
cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapp
welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per th
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1
of 1985 for R.C.C items. for Sub structure of R.C.C items.

Skin Reinforcement in Abutments


3.79*(.72+2.0)/2*2+12*(3.79+3.79*1.414) 2 x 1 120.098 5.00 Kgs/Sqm

Skin Reinforcement in Piers


(П*(0.9)*5.24+2*11.2*5.24) 1 x 1 132.198 5.00 Kgs/Sqm

Skin Reinforcement in wing walls


(5*(.5+1.7)/2*2+4*(3.75+3.75*1.414) 4 x 1 47.21 5.00 Kgs/Sqm

Bed blocks and Backing walls 1 x 1 12.54 100.00 Kgs/Cum

14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete includ
cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapp
welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per th
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1
of 1985 for R.C.C items. for Super structure of R.C.C items.

Super Structure from MOST drawing 2 x 1 0.00 Kgs/span


wearing coat 1 x 1 31.47 35.00 Kgs/Cum
Approach slab 1 x 1 26.40 85.00 Kgs/Cum
Crash barrier 1 x 1 40 12.00 Kgs/cum
Kerbs over wings 1 x 1 1.386 100.00 Kgs/Rm
or say

15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per Clause
710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical
specifications for finished item of work

Behind abutments and wing walls 0.50 x 0.5 9.80 3.400 4.600
or say

16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in Clause
2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigg
size towards the wall and provided over the entire surface behind abutment and wing wall, to the full height ,
compacted to a firm including cost, conveyance of all material charges and labour charges,as directed by the
Engineer-in-Charge as per drawing and technical specification as per clause No.710.1.1 of IRC 78 and 2200 of MOR
5th Revision for finished item of work.

Behind abutment 2 x 1 9.80 0.60 3.790


Behind Wing walls 4 x 1 3.40 0.60 3.720

or say

17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A.C pi
extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as
drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification
2706 & 2200 (5th Revision)

For abutments 2
Autments 2 x 10 3.00 1.36
Wing walls 4 x 3 3.00 1.100

or say

18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-69 A.

2 x 2
or say

19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
(1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as direct
by the Engineer-in-Charge for quadrential revetment.

For quadrants 22/7*5.365*5.365*1.414/4 4 x 1 31.949 0.300


or say

20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification
2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

Toe walls 2*22/7*(5.365+.3)/4 4 x 1 8.89405 0.6 0.6


or say
21 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance of
materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 25
(5th Revision) and as directed by the Engineer-in-Charge under Revetment. For pitching of slopes.

Quadrants 22/7*5.365*5.365*1.414/4 4 x 1 31.949 0.15


or say

Asst.Exe.Engineer (R&B) Dy Executive Engineer (R&B)


Section: Kodad Sub-Division :Kodad

Executive Engineer (R&B) Superintending Engineer (R&B


Division : Suryapet Circle : Nalgonda

Asst
.Exe
.Eng
inee
r Dy Executive Engineer (R&B)
(R&
B)

Section: Bhupalapally Sub-Division : Parkal

Executive Engineer (R&B)


Division : Warangal
d in Suryapet district.

Quantity

ations,incuding settting out,


ing of sides and bottom and
rected by the Engineer-in-

168.00
27.83
136.00
9.86
341.69
342.00
cum

240.00
38.96

278.96
279.00
cum

e 40mm nominal size


mplete as per MoRT&H

12.00
2.78
5.44
20.22
20.00
cum

d stone aggregate (coarse


uding cost, conveyance of
ing etc., including all other
00,1700 & 2100 (4th

13.92
10.29
60.00
24.00
30.00

27.20
22.40
36.00
223.80
224.00
cum

mm.10 mm HBG crushed


ming to table 1000-2)
mixing, laying, Vibrating,
approved drawings and as
ed item as per MoRT&H
for Substructure of

123.71
48.12
3.33
66.00
241.16
242.00
cum
e aggregate (Coarse
uding cost, conveyance of
ng etc., including other
t of steel and its fabrication
n ) and as directed by the
and its fabrication charges
irected by the Engineer-in-

5.54
3.09
0.20
5.69
-1.98
12.54
13.00
cum
g 20 mm and 10 mm HBG
conforming to table 1000-2)
e mixing, laying, vibrating,
ete for finished item of work
em as per MoRT&H

212.8
1.386
214.19
214.00
Cum
stone aggregate (Coarse
uding cost, conveyance of
ng etc., including other
ion No.1500,1700 & 2100

7.84
7.84
8.00
cum
e aggregate (Coarse
uding cost, conveyance of
ng etc., including all other
per Approved drawing but
600,1700, & 2704 (5th

26.4
26.4
27.00
cum
luding cost and conveyance
ncluding all other incidental
BD/1-69 (A), but excluding
& 2702 (5th Revision) and

22.67
8.80
31.47
32.00
cum
nical specifications as per
of steel and its fabrications

40
40
40.00
cum
fferent diameters, wrought
our charges for fabrication
ition etc., complete
arges etc., and including
rk as per standard drawings,
00 (5th Revision) and as

1.220

0.401

0.715

2.336
2.340
MT
diameters, wrought and put
ges for fabrication of
on etc., complete including
., and including over lapping
ndard drawings, as per the
vision) and as per I.S.1786

1.201

0.661

0.944

1.254
4.060
4.070
MT
diameters, wrought and put
ges for fabrication of
on etc., complete including
., and including over lapping
ndard drawings, as per the
vision) and as per I.S.1786

0
1.102
2.244
0.480
0.139
3.964
4.000
MT
mplete as per Clause
awing and technical

38.32
39.00
cum
s laid down in Clause
towards the soil and bigger
l, to the full height ,
s,as directed by the
IRC 78 and 2200 of MORTH

44.57
30.36
74.93
75.00
cum
100mm dia meter A.C pipe
rawing face Complete as per
per MORTH specification No

81.60
39.60
121.20
122.00
R.M.
er drawing BD/1-69 A.

4.00
4.00
No.s
d with 0.20 cum of CC
r packing the stones for
h Revision ) and as directed

38.34
39.00
cum
te and including labour
per MoRT&H specification
Toe wall.

12.81
13.00
cum
st, and conveyance of
MoRT&H Specification 2504
g of slopes.

19.17
19.00
cum

nding Engineer (R&B)


DETAILED CUM ABSTRACT

Name of Work ::- Construction Of High Level Bridge at Km 13/0-2 on Kodada-Revoor Road
District.
Sno
Description Quantity Rate Per
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3

On Kodad side 1 x 1 100.00 7.00 700.00


On Revoor side 1 x 1 120.00 7.00 840.00
1540.00 8.70 sqm
2 Forming embankment with Borrowed useful earth by mechanical means up to SDR including pre-
watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment,
spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and
operational charges of T&P and (excluding seigniorage) charges, complete for finished item of work
as per MoRT&H specification 305 (5th revision) (Payment will be made based on levels for finished
item of work).

On Kodad side
Level portion 1 x 1 11.5 17.55 3.700 746.75
Gradient Portion 1 x 1 183.00 17.00 2.500 7777.50
On Revoor side
Level portion 1 x 1 11.5 17.25 3.500 694.31
Gradient Portion 1 x 1 235.00 16.80 2.400 9475.20
SAY 619.00 239.00 CUM

3 Construction of Granular sub-base by providing HBG material confirming to Grading -VI of


MoRT&H Table 400-1 & 400-2 including cost, (excluding seigniorage) charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved means, on
prepared surface mixing by mix in place method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density etc., complete for finished item of
work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
( Payment will be made based on levels for finished item of work ).

On Kodad side 1 x 1 194.50 13.72 0.200 533.71


On Revoor side 1 x 1 246.50 13.72 0.200 676.40
1210.10
SAY 1211.00 1741.00 CUM
4 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadam specification including cost, seigniorage of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (4th revision) for finished item of work. (Payment will be made based on
levels for finished item of work)

On Kodad side 1 x 1 194.50 7.00 0.250 340.38


On Revoor side 1 x 1 246.50 7.00 0.250 431.38
771.75
SAY 772.00 1741.00 CUM

5 Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsion
pressure distributor on prepared surface of Granular base including cleaning of road surface and
spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of
work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

On Kodad side 1 x 1 194.50 7.00 1361.50


On Revoor side 1 x 1 246.50 7.00 1725.50
3087.00
SAY 3087.00 49.30 sqm

6 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at the
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical
broom for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by the
Engineer-in-Charge.

On Kodad side 1 x 1 194.50 7.00 1361.50


On Revoor side 1 x 1 246.50 7.00 1725.50
3087.00
SAY 3087.00 10.00 sqm

7 Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an average
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-4 of
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of
weight of total mixture, transported to site, laid over a previously prepared surface with mechanical
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to
achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other contingent charges necessary including
cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H
specification No. 504 (5th Revision) (Excluding VAT Charges)

On Kodad side 1 x 1 194.50 7.00 0.050 68.08


On Revoor side 1 x 1 246.50 7.00 0.050 86.28
154.35
SAY 155.00 7149.00 sqm
8 Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type/ 40-60 TPH
hot mix plant using HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of
MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler,
transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of
work in all respects as directed by Engineer-in-Charge

On Kodad side 1 x 1 194.50 7.00 0.030 40.85


On Revoor side 1 x 1 246.50 7.00 0.030 51.77
92.61
SAY 93.00 8075.00 CUM
9 Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of
all materials to work site and spreading in uniform layers by approved means, on prepared surface
and compacting with vibratory roller to achieve the desired density at OMC etc., complete for
finished item of work as per MoRT&H Specification 401& 407 (5th revision) and as directed by the
Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

On Kodad side 1 x 2 194.50 1.50 0.150 87.53


On Revoor side 1 x 2 246.50 1.50 0.150 110.93
198.45
SAY 199.00 354.00 CUM
Total =

Provision For Caution Boards,Village Name Boards &Guide Stones Hume Pipes And
10 L.S
Roundings
11
Provision for Diversion road L.S

Total =

Assistant Engineer Dy. Executive Engineer Executive En


(R&B) Section: Kodad (R&B) Sub-Division: Kodad Division:Su
or Road in Suryapet

Amount

10

13398.00

147941.00

2108351.00
1344052.00

152189.10

30870.00
1108095.00

750975.00

70446.00
5726317

1500000
2000000

9226317

utive Engineer
ision:Suryapet
DETAILED CUM ABSTRACT

Name of Work ::- Construction Of High Level Bridge at Km 15/02 on Kodada-Revoor Ro


Suryapet District.
MEASUREMENTS
Sno Description Quantity
No LENT BRDT DPT
1 2 3 4 5 6 7
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarifi
1 material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3

On Kodad side 1 x 1 80.00 7.00 560.00


On Revoor side 1 x 1 90.00 7.00 630.00
1190.00
Forming embankment with Borrowed useful earth by mechanical means up to SDR including pr
watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankmen
spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibrato
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire a
2 operational charges of T&P and (excluding seigniorage) charges, complete for finished item of wo
as per MoRT&H specification 305 (5th revision) (Payment will be made based on levels for finish
item of work).

Diversion Road 1 x 1 150.00 5.50 0.750 618.75


618.75
SAY 619.00

Construction of Granular sub-base by providing HBG material confirming to Grading -VI


MoRT&H Table 400-1 & 400-2 including cost, (excluding seigniorage) charges and conveyance of
materials to work site and spreading in uniform layers with motor grader or by approved means,
prepared surface mixing by mix in place method with Rotavator / approved means at OMC a
3 compacting with vibratory roller to achieve the desired density etc., complete for finished item
work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charg
( Payment will be made based on levels for finished item of work ).

On Kodad side 1 x 1 80.00 11.52 0.250 230.40


On Revoor side 1 x 1 90.00 11.52 0.250 259.20
489.60
SAY 490.00
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet M
macadam specification including cost, seigniorage of all materials and including premixing t
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site
laying in uniform layers with paver in base courses on well prepared surface and compacting wi
4 Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as p
MoRT&H specification.406 (4th revision) for finished item of work. (Payment will be made based
levels for finished item of work)
On Kodad side 1 x 1 80.00 7.00 0.250 140.00
On Revoor side 1 x 1 90.00 7.00 0.250 157.50
297.50
SAY 298.00

Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsi
pressure distributor on prepared surface of Granular base including cleaning of road surface a
spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item
5 work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and
directed by the Engineer-in-charge.

On Kodad side 1 x 1 80.00 7.00 560.00


On Revoor side 1 x 1 90.00 7.00 630.00
1190.00
SAY 1190.00

Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at t
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanic
6 broom for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by t
Engineer-in-Charge.

On Kodad side 1 x 1 80.00 7.00 560.00


On Revoor side 1 x 1 90.00 7.00 630.00
1190.00
SAY 1190.00

Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an avera
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-4
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50%
weight of total mixture, transported to site, laid over a previously prepared surface with mechanic
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7
achieve the desired compaction for finished item of work as directed by the Engineer-in-Char
7 including hire and operational charges all T&P and all other contingent charges necessary includi
cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&
specification No. 504 (5th Revision) (Excluding VAT Charges)

On Kodad side 1 x 1 80.00 7.00 0.050 28.00


On Revoor side 1 x 1 90.00 7.00 0.050 31.50
59.50
SAY 60.00
Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type/ 40-60 TP
hot mix plant using HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507
MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and fille
transporting the hot mix to work site, laying with mechanical paver finisher to the required grad
8 level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve t
desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item
work in all respects as directed by Engineer-in-Charge

On Kodad side 1 x 1 80.00 7.00 0.030 16.80


On Revoor side 1 x 1 90.00 7.00 0.030 18.90
35.70
SAY 36.00
Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance
all materials to work site and spreading in uniform layers by approved means, on prepared surfac
and compacting with vibratory roller to achieve the desired density at OMC etc., complete f
9 finished item of work as per MoRT&H Specification 401& 407 (5th revision) and as directed by t
Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

On Kodad side 1 x 2 80.00 1.50 0.150 36.00


On Revoor side 1 x 2 90.00 1.50 0.150 40.50
76.50
SAY 77.00

Assistant Execuive Engineer Dy. Executive Engineer


(R&B) Section: Kodad (R&B) Sub-Division:Kodad
5/02 on Kodada-Revoor Road in

Rate Per Amount

8 9 10
eans and disposal of scarified
on) Specn. No.305.4.3

8.70 sqm 10353.00


ans up to SDR including pre-
he soils on the embankment,
with 8 to 10 Tonnes Vibratory
&H, including all hire and
lete for finished item of work
e based on levels for finished

239.00 CUM 147941.00

onfirming to Grading -VI of


harges and conveyance of all
er or by approved means, on
approved means at OMC and
complete for finished item of
d by the Engineer-in-charge.

1741.00 CUM 853090.00


tone aggregate to Wet Mix
and including premixing the
d material by tipper to site ,
surface and compacting with
Engineer-in-Charge and as per
ment will be made based on
1741.00 CUM 518818.00

Setting) bulk using emulsion


cleaning of road surface and
stributor for finished item of
tion 502 (5th Revision) and as

49.30 sqm 58667.00

on pressure distributor at the


ce cleaned with mechanical
vision) and as directed by the

10.00 sqm 11900.00

x plant producing an average


ading - II as per table 500-4 of
er of VG 30 grade @ 4.50% of
ared surface with mechanical
er Clauses 501.6 and 501.7 to
d by the Engineer-in-Charge
t charges necessary including
plete and as per MoRT&H

7149.00 sqm 428940.00


Batch Mix type/ 40-60 TPH
500-17 of specification 507 of
@ 5.4 % of mix and filler,
nisher to the required grade,
ndem rollers to achieve the
omplete for finished item of

8075.00 CUM 290700.00


e) charges and conveyance of
means, on prepared surface
at OMC etc., complete for
ision) and as directed by the
item of work ).

354.00 CUM 27258.00


Total = 2347667

Executive Engineer
Division:Suryapet
ABSTRACT ESTIMATE FOR BOX CULVERTS
Periodical Renewals to Kodad-Revoor road from Km 1/4 to 2
Name of the Work
reach from Km 1/4 to 21/2) in Suryapet District
Sl. No. Description of work Quantity Rate
1 2 3 4
Box Culverts - at 3/8,7/2,17/8,19/6
Dismantling of Structures (superstructure, substructure, foundation and other
miscellaneous structures) and pavements including disposing of resulting materials and/or
salvaging useful materials up to a distance of 1 km from project road complete as per
1 Drawings and Technical Specification Clause MoRT&H 202 and as directed by the Engineer.
(By Mechanical means in Cement Concrete grade M-15 & M-20)

a Existing cause way at Km 17/8-18/0(3x3x3) 675.000


b Existing cause way at Km 19/6-8 (2x3x3) 525.000
c Existing cause way at Km 3/8-4/0 (2x3x3) 750.000
d Existing cause way at Km 7/0-2 (3x3x3) 750.000
2700.000 692.000
Earthwork excavation in soils upto SDR by mechanical means for foundations of
structures as per drawing and technical specification including setting out, construction
of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of
bottom, back filling the excavation earth to the extent required etc., complete
2 excluding seignioarge charges for finished item of work as per MoRT&H specification
304(5th Revision) and as directed by the Engineer-in-Charge.

1 For Box culvert


a) Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 686.07
Box Culvert at 7/0-2 (3 v of 3mx3m) 723.33
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 723.33
Box culvert at 19/6-8 ( 2v of 3m x 3m) 686.07
2,818.80
say 2819.00 99.00
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
(excluding seigniorage) conveyance of all materials to site and labour charges, centering,
machine mixing, laying, Vibrating, curing etc., including all other incidental and
3 operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge
for base coarse below CC Pavement.

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 42.41


Box Culvert at 7/0-2 (3 v of 3mx3m) 49.34
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 49.50
Box culvert at 19/6-8 ( 2v of 3m x 3m) 42.41
183.66
Say 184.00 4364.00
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
4 materials to site and all labour charges ,centering, machine mixing, laying in position,
Compacting , Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th Revision) for levelling Course (Box Culver & Approach Slab)
b) For Levelling Course
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 7.24
Box Culvert at 7/0-2 (3 v of 3mx3m) 7.37
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 7.37
Box culvert at 19/6-8 ( 2v of 3m x 3m) 7.24
29.22
Say 30.00 4848.00
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, weigh batcher, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved
5
drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per SBD specification as directed by the Engineer-in-Charge
for Foundation.

For Box culvert


Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 52.20
Box Culvert at 7/0-2 (3 v of 3mx3m) 78.36
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 78.36
Box culvert at 19/6-8 ( 2v of 3m x 3m) 52.20
261.12
Say 262.00 5246.00
Vibrated Reinforced cement concrete M 20 Grade Concrete using 20mm and 10 mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and
conveyance of all materials to site and all labour charges ,centering, machine mixing,
laying in position, Compacting , Vibrating and curing including all other incidental and all
6
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2100 (5th Revision) for footing ( curtain walls, Wing wall)

for wing walls


Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 40.86
Box Culvert at 7/0-2 (3 v of 3mx3m) 40.08
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 40.08
Box culvert at 19/6-8 ( 2v of 3m x 3m) 40.86
161.88
Say 162.00 4940.00
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved
7
drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per SBD specification as directed by the Engineer-in-Charge
for Sub structure (Side walls)

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 114.61


Box Culvert at 7/0-2 (3 v of 3mx3m) 118.95
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 118.95
Box culvert at 19/6-8 ( 2v of 3m x 3m) 114.61
467.12
Say 468.00 5225.00
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, weigh batcher, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved
8
drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per SBD specification as directed by the Engineer-in-Charge
for Super Structure.

a For Box
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 42.53
Box Culvert at 7/0-2 (3 v of 3mx3m) 58.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 58.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 42.53
201.06
Say 202.00 5552.00
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as
approved by Ministry of Steel) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
9 required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC
items.

a)
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 7.44
Box Culvert at 7/0-2 (3 v of 3mx3m) 9.48
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 9.48
Box culvert at 19/6-8 ( 2v of 3m x 3m) 7.44
33.84
Say 34.00 60375.00
Providing HYSD bars ( Fe-500 ) from primary producers like TATA, SAIL, VSP and Jindal of
different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete
10 for all R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for substructure

a HYSD For Box


Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 9.17
Box Culvert at 7/0-2 (3 v of 3mx3m) 9.52
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 9.52
Box culvert at 19/6-8 ( 2v of 3m x 3m) 9.17
37.37
Say 38.00 60588.00
MT
Providing HYSD bars ( Fe-500 ) from primary producers like TATA, SAIL, VSP and Jindal of
different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and
11 operational charges etc., and including over lapping welding if required etc., complete
for all R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for superstructure

M40 Grade concrete in crash barrier


Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 7.98
Box Culvert at 7/0-2 (3 v of 3mx3m) 9.97
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 9.97
Box culvert at 19/6-8 ( 2v of 3m x 3m) 7.98
35.89
Say 36.00 62036.00
MT
Provision of an Reinforced cement concrete crash barrier at the edges of the road,
approaches to bridge structures and medians, constructed with M-40 grade concrete with
HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at
expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on
12 which it is built and installed as per design given in the enclosure to MOST circular No.
RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved
drawing and at locations directed by the Engineer, all as specified

M40 Grade concrete in crash barrier (on Box and Retaining wall)
(on Box and Retaining wall)
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 28.20
Box Culvert at 7/0-2 (3 v of 3mx3m) 34.60
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 34.60
Box culvert at 19/6-8 ( 2v of 3m x 3m) 28.20
125.60
Say 126.00 3282.00
RM
Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including all other incidental and operational charges of all T&P etc., complete for
13 finished item of work as per Approved drawing but excluding cost of steel and its
fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th
Revision) and as directed by the Engineer-in-Charge for Approach slab.

For Approch slab


Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 22.68
Box Culvert at 7/0-2 (3 v of 3mx3m) 23.10
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 23.10
Box culvert at 19/6-8 ( 2v of 3m x 3m) 22.68
91.56
Say 92.00 5183.00
cum
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P as per approved
14
drawings and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per SBD specification 1500, 1600, 1700 & 2702 as directed by
the Engineer-in-Charge for Wearing Coat over Deck Slab

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 6.28


Box Culvert at 7/0-2 (3 v of 3mx3m) 8.94
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 8.94
Box culvert at 19/6-8 ( 2v of 3m x 3m) 6.28
30.44
Say 31.00 5006.00
cum
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges ,centering, machine mixing, laying in position,
15 Compacting , Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th Revision) for curtain wall.

Curtain wall
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 40.68
Box Culvert at 7/0-2 (3 v of 3mx3m) 40.68
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 40.68
Box culvert at 19/6-8 ( 2v of 3m x 3m) 40.68
162.72
Say 163.00 4994.00
cum
Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC
pipe extending through the full width of the structure at 1.00m C/C in both horizontal
and vertical direction so that the weep holes in each horizontal direction is staggered
from the weep holes laying above and below lines as shown in drawing including cost and
conveyance of the A.C pipes and labour charges for cutting to required length, placing the
16
pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished
item of work for weep holes as per SSR Data

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 110.11


Box Culvert at 7/0-2 (3 v of 3mx3m) 108.72
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 108.72
Box culvert at 19/6-8 ( 2v of 3m x 3m) 110.11
437.66
Say 438.00 257.00
RM
Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD &
17 2705 MORTH
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 8.00
Box Culvert at 7/0-2 (3 v of 3mx3m) 4.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 12.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 8.00
32.00
Say 32.00 2624.00
nos
Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300
mm size including cost, (excluding seigniorage) charges and conveyance of materials to
site and including labour charges for packing the stones for revetment etc., complete for
finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by
the Engineer-in-Charge for Pitching of slopes
18
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 0.00
Box Culvert at 7/0-2 (3 v of 3mx3m) 100.28
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 100.28
Box culvert at 19/6-8 ( 2v of 3m x 3m) 101.51
302.07
Say 303.00 1242.00
cum
Providing and laying filter material with Gravel underneath pitching in slopes including
cost, (excluding seigniorage) charges and conveyance of materials to site including labour
charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th
Revision) and as directed by the Engineer-in-Charge
19
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 0.00
Box Culvert at 7/0-2 (3 v of 3mx3m) 50.14
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 50.14
Box culvert at 19/6-8 ( 2v of 3m x 3m) 50.76
151.04
Say 152.00 900.00
cum
Back filling behind Abutments/Wing walls with gravel including cost ,conveyance and
(excluding seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of
20 IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and
technical specifications for finished item of work

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 175.02


Box Culvert at 7/0-2 (3 v of 3mx3m) 370.99
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 370.99
Box culvert at 19/6-8 ( 2v of 3m x 3m) 373.56
1290.56
Say 1291.00 625.00
cum
Providing 25.40 mm mastic pads for Longitudinal joints, Transversal expansion joints and
21 Construction joints of approved quality including cost, conveyance and placing in position,
etc., complete as directed by the Engineer-in-charge.

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 20.94


Box Culvert at 7/0-2 (3 v of 3mx3m) 13.74
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 28.14
Box culvert at 19/6-8 ( 2v of 3m x 3m) 20.94
83.76
Say 84.00 991.00
sqm
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40
mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H
specifications to a thickness of not less than 600mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind the abutment,
wing wall and return wall to the full height compacted to a firm condition including cost
21 and conveyance of all metal (excluding seigniorage) charges ,and all labour charges as
directed by the departmental officers as per drawing and Technical specifications as per
clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of
work.
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 103.71
Box Culvert at 7/0-2 (3 v of 3mx3m) 103.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 103.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 103.71
413.42
Say 414.00 1406.00
cum
Providing and laying flexible apron complete as per drawings and technical specifications
23 cluase 2503 of Mort&H 5th revision for bridge work. (Excluding Segniorage Charges &
VAT).
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 119.90
Box Culvert at 7/0-2 (3 v of 3mx3m) 140.90
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 140.90
Box culvert at 19/6-8 ( 2v of 3m x 3m) 119.90
521.60
Say 522.00 1283.00
cum
Forming Embankment with material obtained from borrowed useful earth from outside
road boundary by mechanical means upto SDR with all leads and lifts including pre-
watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods,
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to
24 meet requirement of table 300-2 of MoRT&H, including all hire and operational charges
of T&P, complete for finished item of work as per MoRT&H specification 305 (5th
revision). (The soil CBR>10%, PI<18% & MDD>1.8 g/cc)

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 168.00


Box Culvert at 7/0-2 (3 v of 3mx3m) 168.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 168.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 168.00
Say 672.00 204.00
cum
Construction of Gravel base & shoulders including cost, (excluding seigniorage) charges
and conveyance of all materials to work site and spreading in uniform layers by approved
means, on prepared surface and compacting with vibratory roller to achieve the desired
25 density at OMC etc., complete for finished item of work as per MoRT&H Specification
401& 408 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be
made based on levels for finished item of work ).

Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 132.00


Box Culvert at 7/0-2 (3 v of 3mx3m) 132.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 132.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 132.00
Say 528.00 354.00
cum
Total Amount

Assistant Engineer (R&B) Dy. Executive Engineer (


Section : Kodad Sub- division: Kodad

Executive Engineer (R&B) Superintending Engineer


Division : Suryapet Circle : Nalgonda
d from Km 1/4 to 28/140 (Working
in Suryapet District.
Per Amount (Rs.)
5 6

d other
g materials and/or
mplete as per
ed by the Engineer.

cum 1868400.00
or foundations of
out, construction
, dressing sides of
etc., complete
RT&H specification

cum 279081.00
HBG crushed stone
&H including cost,
charges, centering,
er incidental and
ork as per MoRT&H
Engineer-in-Charge
1 802976.00
nd 10mm size HBG
and fine aggregate
conveyance of all
laying in position,
other operational
n 1500,1700, 2100

1 145440.00
mm HBG crushed
nd fine aggregate
conveyance of all
, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge

1 1374452.00
m and 10 mm size
e 1000-1 and fine
seigniorage) and
, machine mixing,
r incidental and all
RT&H Specification

1 800280.00
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge

1 2445300.00
mm HBG crushed
nd fine aggregate
conveyance of all
, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge
1 1121504.00
AIL, VSP,Jindal as
put up bars of all
abour charges for
tying grills, placing
nding wire and all
lapping welding if
k as per standard
as per MoRT&H
for foundation RCC

1 2052750.00
, VSP and Jindal of
ncluding cost and
of reinforcement
in position etc.,
ndling charges and
ed etc., complete
wings, as per the
1600 &2200 (5th

1 2302344.00
MT
, VSP and Jindal of
ncluding cost and
of reinforcement
in position etc.,
ndling charges and
ed etc., complete
wings, as per the
1600 &2200 (5th

1 2233296.00
MT
dges of the road,
rade concrete with
a, 450 mm long at
o the structure on
MOST circular No.
s in the approved

1 413532.00
RM
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
etc., complete for
of steel and its
0, & 2704 (5th

1 476836.00
cum
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
P as per approved
and its fabrication
702 as directed by

1.00 155186.00
cum
nd 10mm size HBG
and fine aggregate
conveyance of all
laying in position,
other operational
n 1500,1700, 2100
1 814022.00
cum
00mm Diameter AC
in both horizontal
ection is staggered
including cost and
length, placing the
mplete for finished

1 112566.00
Rm
ause 1209 MORD &

1 83968.00
nos
not less than 300
nce of materials to
etc., complete for
and as directed by

1 376326.00
cum
in slopes including
te including labour
ification 2504 (5th

1 136800.00
cum
,conveyance and
Clause 710.1.4 of
as per Drawing and

1 806875.00
cum
pansion joints and
placing in position,

1 83244.00
sqm
one and 50 % of 40
04.2.2 of MoRT&H
owards the soil and
ind the abutment,
tion including cost
labour charges as
pecifications as per
or finished item of
1 582084.00
cum
nical specifications
niorage Charges &

1 669726.00
cum
earth from outside
ifts including pre-
at borrowed area,
oil, breaking clods,
ad Roller @ OMC to
perational charges
ification 305 (5th

1 137088.00
cum
eigniorage) charges
layers by approved
chieve the desired
T&H Specification
( Payment will be
1 186912.00
cum
al Amount 18592588.00

y. Executive Engineer (R&B)


ub- division: Kodad

uperintending Engineer (R&B)


rcle : Nalgonda
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (2x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.5 d 0.470 Thickness of slab
Width of Box 8.14 e 0.45 Thickness of raft
Depth of Levelling 0.15 f 0.42 Thickness of wall
crust 0.61 g 0.35 Intermediate wall Thk
Radius of Pitching 6.94 0.75 Key height
97.68 2 No. of Vents

(2VX3X3) - 12m Length 2No's - Ch Km


Item Length Width
Description Unit No. Height (m) Quantity
No. (m) (m)
Earthwork in excavation of foundation for structures, including all
1 lifts and leads complete as per drawing and Technical Specification Cum
Clause 304 and 2903
All types of Soil at Km 3/8-4/0
Box 1 12.30 8.44 2.10 218.01
key portion 2 8.44 0.68 0.75 8.55
Curtain wall
D/S 1 12.00 1.85 2.65 58.83
U/S 1 12.00 1.50 2.15 38.70
Flexible appron
Part-1 2 8.14 1.40 0.75 17.09
Part-2 D/S 1 22.11 4.60 0.75 76.28
Part-2 U/S 1 22.11 1.60 0.75 26.53
Return Wall 4 7.29 3.96 2.10 242.08
Providing Plain Cement Concrete for levelling course etc.
2 including centering all complete as per drawing and Technical Cum
Specifications Section Section 1500 & 1700
PCC M 15
Box 1 12.30 8.44 0.15 15.57
key portion 2 8.44 1.39 0.15 3.52
Curtain wall
D/S 1 12.00 1.85 0.15 3.33
U/S 1 12.00 1.50 0.15 2.70
Return Wall 4 7.29 3.96 0.15 17.29
Back filling with granular material of approved quality complete as
3 Cum
per drawing and Technical specification Clause 304 & 305.
Quadrants 4 0.26 48.16 3.47 175.02
Behind Box Walls Cum 2 9.14 0.00 3.92 0.00
Behind Return Walls 4 7.29 0.00 3.47 0.00
Providing and laying of Filter media of Stone aggregate
conforming to Technical Specifications Clause 2504.2.2 behind
4 Cum
abutment, wing wall, retaining wall and return walls, complete as
per drawing and Technical Specifications Clause 305 & 2504.
Behind Box Walls Cum 2 10.336 0.60 3.47 43.04
Return Wall Cum 4 7.29 0.60 3.47 60.67
Vibrated cement concrete M15 Grade Concrete Curtain wall (PCC
5 M 15) Cum
D/S 1st footing 1 12.00 1.65 0.55 10.89
D/S 2nd footing 1 12.00 0.75 0.75 6.75
D/S 3rd footing 1 12.00 0.45 0.80 4.32
D/S 4th footing 1 12.00 0.20 0.40 0.96
U/S 1st footing 1 12.00 1.30 0.80 12.48
U/S 2nd footing 1 12.00 0.45 0.80 4.32
U/S 3rd footing 1 12.00 0.20 0.40 0.96
Providing and laying Plain/Reinforced cement concrete M 25 for
6 foundation complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Raft Cum 1 12.00 8.14 0.45 43.96
Key portion 2 8.14 0.68 0.75 8.24
Providing and laying Plain/Reinforced cement concrete for
foundation complete as per drawing and Technical Specification
7 Section 1500, 1700, 2100 & 2200 Return Wall M 20 grade 4 6.99 3.66 0.40 40.86

Providing and laying Plain/Reinforced cement concrete M20 for


8 substructure complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Walls (M25) Cum 2 12.00 0.42 3.00 30.24
Middle Box Walls (M25) Cum 2 12.00 0.35 3.00 25.20
Haunches (150x 150mm) Cum 8 12.00 0.08 0.15 1.08
Bracket (300 x 300mm) Cum 2 12.00 0.00 0.30 0.00
Return Wall-1 Cum 4 0.30 0.832 4.27 4.26
Return Wall-2 Cum 4 3.28 0.832 4.27 46.61
Return Wall-2-Bracket Cum 4 3.28 0.500 1.10 7.22
Providing and laying Reinforced cement concrete in
9 superstructure excluding cost steel complete as per drawing and
Technical Specification Section 1500, 1700, 2100 & 2300
Slab for box (M25) Cum 1 12.00 7.54 0.470 42.53

Providing TMT Reinforcement bar for the Structure complete as


10 MT 93.06 80.00 Kg/Cum 7444.80
per drawing and Technical Specification for foundation

Providing TMT Reinforcement bar for the Structure complete as


11 MT 114.61 80.00 Kg/Cum 9168.80
per drawing and Technical Specification for Sub Structure

Providing TMT Reinforcement bar for the Structure complete as


12 MT 99.69 80.00 Kg/Cum 7975.20
per drawing and Technical Specification for Super Structure

Providing weep holes in abutments, wing walls and return walls


13 Rm
complete as per drawing and Technical Specification clause 2706.
Box Walls (1.0m C/C 0.5m length) 2 12.00 0.42 3.00 30.24
Return Wall 4 6.00 0.832 4.00 79.87
Providing and laying Wearing Course comprising of 65mm
Bituminous concrete on top of deck slab including cost of tack
14 Cum 1 11.10 7.54 0.075 6.28
coat, using modified bitumen meeting the requirements given in
table 500-29
Plain Cement Concrete M15 for levelling course below approach
15 slabs complete as per drawings and Technical Specification Section Cum 2 3.35 10.8 0.10 7.24
clause 2704
Providing Reinforced Cement Concrete in approach slabs
16 including reinforcement complete as per drawings and Technical Cum
Specification Sections 1500,1600 1700 and 2700
RCC M30 grade Cum 2 3.50 10.80 0.30 22.68
Providing and laying flexible apron complete as per drawings and
17 technical specifications cluase 2503 of Mort&H 5th revision for
bridge work. (Excluding Segniorage Charges & VAT).
Part-1 Cum 2 8.14 1.40 0.75 17.09
Part-2 D/S Cum 1 22.11 4.60 0.75 76.28
Part-2 U/S Cum 1 22.11 1.60 0.75 26.53
Filter meterial (150 mm thick) underneath pitching in slopes and
18 flat surfaces complete as per drawing & Technical Specification Cum 4 10.90 0.00 0.15 0.00
Clause 2504
Providing and laying stone pitching on sloped surfaces (300 mm
19 thick) for earth protection complete (for Quadrants) as per drawings Cum 4 10.90 0.00 0.30 0.00
and Technical Specification Clause 2504
20 Providing 25.4 mm mastic pads Sqm 4 12.00 0.30 14.40
Return Walls Sqm 4 5.03 0.33 6.54

Drainage spouts complete as per drawing and technical


21 Nos 8
specification clause 1209 MORD &2705 MORTH
22 Crash barrier(M-25)
Box Lm 2 7.54 15.08
Return Wall 4 3.28 13.12

Construction of embankment with material obtained from borrowed


useful earth CBR more than 7 % with a lead of 10.0 Km from
outside road boundary by mechanical means upto SDR with all
leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment,
23 spreading soil, breaking clods, sectioning, grading and Cum 1 80.00 7.00 0.30 168.00
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC
to meet requirement of table 300-2 of MoRT&H, including all hire
and operational charges of T&P and charges, complete for
finished item of work as per MoRT&H specification 305 (5th
revision) (Payment will be made based on level for finished item
of work).

Construction of Gravel base & shoulders including cost,


(excluding seigniorage) charges and conveyance of all materials to
work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve
24 Cum 1 80.00 5.50 0.30 132.00
the desired density at OMC etc., complete for finished item of work
as per MoRT&H Specification 401& 408 (5th revision) and as
directed by the Engineer-in-charge. ( Payment will be made based
on levels for finished item of work ).
Dismantling of Structures (superstructure, substructure, foundation
and other miscellaneous structures) and pavements including
disposing of resulting materials and/or salvaging useful materials
25 up to a distance of 1 km from project road complete as per Cum 1 50.00 7.50 2.00 750.00
Drawings and Technical Specification Clause MoRT&H 202 and as
directed by the Engineer.(By Mechanical means in Cement
Concrete grade M-15 & M-20)

Asst Executive Engineer Dy.Executive Engineer


R&B Section Kodad R&B Sub-Division Kodad

Executive Engineer Superintending Engineer


Division, Suryapet (R&B) Circle :: Nalgonda
Return Wall
6.99 Length WL
Vent height 4.67 Height As per Drawing Ho
Raft offset 3.66 Bottom Width BS
Thickness of slab 0.6 Top Width RW2
Thickness of raft 0.4 Thick. of raft
Thickness of wall 1.06 Thick at stem
Intermediate wall Thk 1.40 Toe
Key height 0.6 Top Width RW1
No. of Vents 6.00 Flex appron width D/S

3.00 Flex appron width U/S


Total 0.75 Flex appron Thk.
Quantity

686.07

42.41
175.02

103.71

40.68

93.06
114.61

42.53

7.44

9.17

7.98

110.11
6.28

7.24

22.68

119.90

0.00

0.00

14.40
6.54
20.94
8.00
28.20
15.08
13.12

168.00

132.00
750.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (3x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.2 d 0.450 Thickness of slab
Width of Box 11.34 e 0.50 Thickness of raft
Depth of Levelling 0.15 f 0.47 Thickness of wall
crust 0.61 g 0.40 Intermediate wall Thk
Radius of Pitching 6.9 0.70 Key height
136.08 3 No. of Vents
(3VX3X3) - 12m Length 2No's - Ch Km
Item Length Width
Description Unit No. Height (m) Quantity
No. (m) (m)
Earthwork in excavation of foundation for structures, including all
1 lifts and leads complete as per drawing and Technical Specification Cum
Clause 304 and 2903
All types of Soil at Km 7/0-2
Box 1 12.30 11.64 1.85 264.87
key portion 2 11.64 0.65 0.70 10.59
Curtain wall
D/S 1 12.00 1.85 2.65 58.83
U/S 1 12.00 1.50 2.15 38.70
Flexible appron
Part-1 2 11.34 1.40 0.75 23.81
Part-2 D/S 1 25.18 4.60 0.75 86.87
Part-2 U/S 1 25.18 1.60 0.75 30.22
Return Wall 4 7.22 3.92 1.85 209.44
Providing Plain Cement Concrete for levelling course etc.
2 including centering all complete as per drawing and Technical Cum
Specifications Section Section 1500 & 1700
PCC M 15
Box 1 12.30 11.64 0.15 21.48
key portion 2 11.64 1.39 0.15 4.85
Curtain wall
D/S 1 12.00 1.85 0.15 3.33
U/S 1 12.00 1.50 0.15 2.70
Return Wall 4 7.22 3.92 0.15 16.98
Back filling with granular material of approved quality complete as
3 Cum
per drawing and Technical specification Clause 304 & 305.
Quadrants 4 0.26 47.61 3.45 172.01
Behind Box Walls Cum 2 9.24 1.66 3.95 120.97
Behind Return Walls 4 3.91 1.45 3.45 78.01
Providing and laying of Filter media of Stone aggregate
conforming to Technical Specifications Clause 2504.2.2 behind
4 Cum
abutment, wing wall, retaining wall and return walls, complete as
per drawing and Technical Specifications Clause 305 & 2504.
Behind Box Walls Cum 2 10.440 0.60 3.45 43.22
Return Wall Cum 4 7.22 0.60 3.45 59.78
Vibrated cement concrete M15 Grade Concrete Curtain wall (PCC
5 M 15) Cum
D/S 1st footing 1 12.00 1.65 0.55 10.89
D/S 2nd footing 1 12.00 0.75 0.75 6.75
D/S 3rd footing 1 12.00 0.45 0.80 4.32
D/S 4th footing 1 12.00 0.20 0.40 0.96
U/S 1st footing 1 12.00 1.30 0.80 12.48
U/S 2nd footing 1 12.00 0.45 0.80 4.32
U/S 3rd footing 1 12.00 0.20 0.40 0.96
Providing and laying Plain/Reinforced cement concrete for
6 foundation complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Raft Cum 1 12.00 11.34 0.50 68.04
Key portion 2 11.34 0.65 0.70 10.32
Providing and laying Plain/Reinforced cement concrete for
7 foundation complete as per drawing and Technical Specification 4 6.92 3.62 0.40 40.08
Section 1500, 1700, 2100 & 2200 Return Wall M 20 grade
Providing and laying Plain/Reinforced cement concrete for
8 substructure complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Walls (M25) Cum 2 12.00 0.47 3.00 33.84
Middle Box Walls (M25) Cum 2 12.00 0.40 3.00 28.80
Haunches (150x 150mm) Cum 12 12.00 0.08 0.15 1.62
Bracket (300 x 300mm) Cum 2 12.00 0.00 0.30 0.00
Return Wall-1 Cum 4 0.30 0.780 4.25 3.98
Return Wall-2 Cum 4 3.28 0.780 4.25 43.49
Return Wall-2-Bracket Cum 4 3.28 0.500 1.10 7.22
Providing and laying Reinforced cement concrete in
9 superstructure excluding cost steel complete as per drawing and
Technical Specification Section 1500, 1700, 2100 & 2300
Slab for box (M25) Cum 1 12.00 10.74 0.450 58.00
Providing TMT Reinforcement bar for the Structure complete as
10 MT 118.44 80.00 Kg/Cum 9475.20
per drawing and Technical Specification for foundation
Providing TMT Reinforcement bar for the Structure complete as
11 MT 118.95 80.00 Kg/Cum 9516.00
per drawing and Technical Specification for Sub Structure
Providing TMT Reinforcement bar for the Structure complete as
12 MT 124.64 80.00 Kg/Cum 9971.20
per drawing and Technical Specification for Super Structure
Providing weep holes in abutments, wing walls and return walls
13 Rm
complete as per drawing and Technical Specification clause 2706.
Box Walls (1.0m C/C 0.5m length) 2 12.00 0.47 3.00 33.84
Return Wall 4 6.00 0.780 4.00 74.88
Providing and laying Wearing Course comprising of 65mm
Bituminous concrete on top of deck slab including cost of tack
14 Cum 1 11.10 10.74 0.075 8.94
coat, using modified bitumen meeting the requirements given in
table 500-29
Plain Cement Concrete M15 for levelling course below approach
15 slabs complete as per drawings and Technical Specification Section Cum 2 3.35 11 0.10 7.37
clause 2704
Providing Reinforced Cement Concrete in approach slabs
16 including reinforcement complete as per drawings and Technical Cum
Specification Sections 1500,1600 1700 and 2700
RCC M30 grade Cum 2 3.50 11.00 0.30 23.10
Providing and laying flexible apron complete as per drawings and
17 technical specifications cluase 2503 of Mort&H 5th revision for
bridge work. (Excluding Segniorage Charges & VAT).
Part-1 Cum 2 11.34 1.40 0.75 23.81
Part-2 D/S Cum 1 25.18 4.60 0.75 86.87
Part-2 U/S Cum 1 25.18 1.60 0.75 30.22
Filter meterial (150 mm thick) underneath pitching in slopes and
18 flat surfaces complete as per drawing & Technical Specification Cum 4 10.84 7.71 0.15 50.14
Clause 2504
Providing and laying stone pitching on sloped surfaces (300 mm
19 thick) for earth protection complete (for Quadrants) as per drawings Cum 4 10.84 7.71 0.30 100.28
and Technical Specification Clause 2504
20 Providing 25.4 mm mastic pads Sqm 2 12.00 0.30 7.20
Return Walls Sqm 4 5.03 0.33 6.54

Drainage spouts complete as per drawing and technical


21 Nos 4
specification clause 1209 MORD &2705 MORTH
22 Crash barrier(M-25)
Box Lm 2 10.74 21.48
Return Wall 4 3.28 13.12

Construction of embankment with material obtained from borrowed


useful earth CBR more than 7 % with a lead of 10.0 Km from
outside road boundary by mechanical means upto SDR with all
leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment,
23 spreading soil, breaking clods, sectioning, grading and Cum 1 80.00 7.00 0.30 168.00
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC
to meet requirement of table 300-2 of MoRT&H, including all hire
and operational charges of T&P and charges, complete for
finished item of work as per MoRT&H specification 305 (5th
revision) (Payment will be made based on level for finished item
of work).

Construction of Gravel base & shoulders including cost,


(excluding seigniorage) charges and conveyance of all materials to
work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve
24 Cum 1 80.00 5.50 0.30 132.00
the desired density at OMC etc., complete for finished item of work
as per MoRT&H Specification 401& 408 (5th revision) and as
directed by the Engineer-in-charge. ( Payment will be made based
on levels for finished item of work ).

Dismantling of Structures (superstructure, substructure, foundation


and other miscellaneous structures) and pavements including
disposing of resulting materials and/or salvaging useful materials
25 up to a distance of 1 km from project road complete as per Cum 1 50.00 7.50 2.00 750.00
Drawings and Technical Specification Clause MoRT&H 202 and as
directed by the Engineer.(By Mechanical means in Cement
Concrete grade M-15 & M-20)
Asst Executive Engineer Dy.Executive Engineer
R&B Section :Kodad R&B Sub-Division Kodad

Executive Engineer Superintending Engineer


Division, Suryapet (R&B) Circle :: Nalgonda
Return Wall
6.92 Length WL
Vent height 4.65 Height As per Drawing Ho
Raft offset 3.62 Bottom Width BS
Thickness of slab 0.5 Top Width RW2
Thickness of raft 0.4 Thick. of raft
Thickness of wall 1.06 Thick at stem
Intermediate wall Thk 1.40 Toe
Key height 0.5 Top Width RW1
No. of Vents 6.00 Flex appron width D/S
3.00 Flex appron width U/S
Total 0.75 Flex appron Thk.
Quantity

723.33 Curtain wall Type-2 Curtain wall Type-1

Top width 0.2 Top width 0.2


Offset 0.125 Offset 0.125
3.45 Width @ S-1 0.45 Width @ S-1 0.45
Slant 7.71

Depth @ S-1 0.45 Depth @ S-1 0.45

49.34 Offset 0.425 Offset 0.15


Width @ S-2 1.3 Width @ S-2 0.75
Depth @ S-2 0.75 Depth @ S-2 0.75
Depth @ S-3 0.8 Offset 0.45

Width @ S-3 1.65

370.99 Depth @ S-3 0.75

Depth @ S-4 0.55


3.31
2.89

103.00

40.68

118.44
118.95

58.00
9.48
1477.84
9.52
1477.84
9.97
1477.84
108.72
3.4
8.94

7.37

23.10

140.90

50.14

100.28

7.20
6.54
13.74
4.00

34.60
21.48
13.12

168.00

132.00

750.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (3x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.2 d 0.450 Thickness of slab
Width of Box 11.34 e 0.50 Thickness of raft
Depth of Levelling 0.15 f 0.47 Thickness of wall
crust 0.61 g 0.40 Intermediate wall Thk
Radius of Pitching 6.9 0.70 Key height
136.08 3 No. of Vents

(3VX3X3) - 12m Length 3No's - Ch Km


Item Length Width Height
Description Unit No. Quantity
No. (m) (m) (m)
Earthwork in excavation of foundation for structures, including all
1 lifts and leads complete as per drawing and Technical Specification Cum
Clause 304 and 2903
All types of Soil at Km 17/8-18/0
Box 1 12.30 11.64 1.85 264.87
key portion 2 11.64 0.65 0.70 10.59
Curtain wall
D/S 1 12.00 1.85 2.65 58.83
U/S 1 12.00 1.50 2.15 38.70
Flexible appron
Part-1 2 11.34 1.40 0.75 23.81
Part-2 D/S 1 25.18 4.60 0.75 86.87
Part-2 U/S 1 25.18 1.60 0.75 30.22
Return Wall 4 7.22 3.92 1.85 209.44
Providing Plain Cement Concrete for levelling course etc. including
2 centering all complete as per drawing and Technical Specifications Cum
Section Section 1500 & 1700
PCC M (1:3:6)
Box 1 12.30 11.64 0.15 21.48
key portion 2 11.64 1.39 0.15 4.85
Curtain wall
D/S 1 12.00 1.85 0.15 3.33
U/S 1 12.00 1.50 0.15 2.70
Return Wall M 20 grade 4 7.22 3.92 0.15 17.14
Back filling with granular material of approved quality complete as
3 Cum
per drawing and Technical specification Clause 304 & 305.
Quadrants 4 0.26 47.61 3.45 172.01
Behind Box Walls Cum 2 9.24 1.66 3.95 120.97
Behind Return Walls 4 3.91 1.45 3.45 78.01
Providing and laying of Filter media of Stone aggregate conforming
to Technical Specifications Clause 2504.2.2 behind abutment, wing
4 Cum
wall, retaining wall and return walls, complete as per drawing and
Technical Specifications Clause 305 & 2504.
Behind Box Walls Cum 2 10.440 0.60 3.45 43.22
Return Wall Cum 4 7.22 0.60 3.45 59.78
Vibrated cement concrete M15 Grade Concrete Curtain wall (PCC
5 M 15) Cum
D/S 1st footing 1 12.00 1.65 0.55 10.89
D/S 2nd footing 1 12.00 0.75 0.75 6.75
D/S 3rd footing 1 12.00 0.45 0.80 4.32
D/S 4th footing 1 12.00 0.20 0.40 0.96
U/S 1st footing 1 12.00 1.30 0.80 12.48
U/S 2nd footing 1 12.00 0.45 0.80 4.32
U/S 3rd footing 1 12.00 0.20 0.40 0.96
Providing and laying Plain/Reinforced cement concrete M25 for
6 foundation complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Raft Cum 1 12.00 11.34 0.50 68.04
Key portion 2 11.34 0.65 0.70 10.32
Providing and laying Plain/Reinforced cement concrete for
7 foundation complete as per drawing and Technical Specification 4 6.92 3.62 0.40 40.08
Section 1500, 1700, 2100 & 2200 Return Wall M 20 grade
Providing and laying Plain/Reinforced cement concrete for
8 substructure complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Walls (M20) Cum 2 12.00 0.47 3.00 33.84
Middle Box Walls (M25) Cum 2 12.00 0.40 3.00 28.80
Haunches (150x 150mm) Cum 12 12.00 0.08 0.15 1.62
Bracket (300 x 300mm) Cum 2 12.00 0.00 0.30 0.00
Return Wall-1 Cum 4 0.30 0.780 4.25 3.98
Return Wall-2 Cum 4 3.28 0.780 4.25 43.49
Return Wall-2-Bracket Cum 4 3.28 0.500 1.10 7.22
Providing and laying Reinforced cement concrete in superstructure
9 excluding cost steel complete as per drawing and Technical
Specification Section 1500, 1700, 2100 & 2300
Slab for box (M25) Cum 1 12.00 10.74 0.450 58.00
Providing TMT Reinforcement bar for the Structure complete as
10 MT 118.44 80.00 Kg/Cum 9475.20
per drawing and Technical Specification for foundation
Providing TMT Reinforcement bar for the Structure complete as
11 MT 118.95 80.00 Kg/Cum 9516.00
per drawing and Technical Specification for Sub Structure
Providing TMT Reinforcement bar for the Structure complete as
12 MT 124.64 80.00 Kg/Cum 9971.20
per drawing and Technical Specification for Super Structure
Providing weep holes in abutments, wing walls and return walls
13 Rm
complete as per drawing and Technical Specification clause 2706.
Box Walls (1.0m C/C 0.5m length) 2 12.00 0.47 3.00 33.84
Return Wall 4 6.00 0.780 4.00 74.88
Providing and laying Wearing Course comprising of 65mm
Bituminous concrete on top of deck slab including cost of tack coat,
14 Cum 1 11.10 10.74 0.075 8.94
using modified bitumen meeting the requirements given in table
500-29
Plain Cement Concrete M15 for levelling course below approach
15 slabs complete as per drawings and Technical Specification Section Cum 2 3.35 11 0.10 7.37
clause 2704
Providing Reinforced Cement Concrete in approach slabs
16 including reinforcement complete as per drawings and Technical Cum
Specification Sections 1500,1600 1700 and 2700
RCC M30 grade Cum 2 3.50 11.00 0.30 23.10
Providing and laying flexible apron complete as per drawings and
17 technical specifications cluase 2503 of Mort&H 5th revision for
bridge work. (Excluding Segniorage Charges & VAT).
Part-1 Cum 2 11.34 1.40 0.75 23.81
Part-2 D/S Cum 1 25.18 4.60 0.75 86.87
Part-2 U/S Cum 1 25.18 1.60 0.75 30.22
Filter meterial (150 mm thick) underneath pitching in slopes and
18 flat surfaces complete as per drawing & Technical Specification Cum 4 10.84 7.71 0.15 50.14
Clause 2504
Providing and laying stone pitching on sloped surfaces (300 mm
19 thick) for earth protection complete (for Quadrants) as per drawings Cum 4 10.84 7.71 0.30 100.28
and Technical Specification Clause 2504
20 Providing 25.4 mm mastic pads Sqm 6 12.00 0.30 21.60
Return Walls Sqm 4 5.03 0.33 6.54

Drainage spouts complete as per drawing and technical


21 Nos 12
specification clause 1209 MORD &2705 MORTH
22 Crash barrier(M-25)
Box Lm 2 10.74 21.48
Return Wall 4 3.28 13.12

Construction of embankment with material obtained from borrowed


useful earth CBR more than 7 % with a lead of 10.0 Km from
outside road boundary by mechanical means upto SDR with all leads
and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil,
depositing the soil on the embankment, spreading soil, breaking
23 Cum 1 80.00 7.00 0.30 168.00
clods, sectioning, grading and consolidation with 8 to 10 Tonnes
Vibratory Road Roller @ OMC to meet requirement of table 300-2
of MoRT&H, including all hire and operational charges of T&P
and charges, complete for finished item of work as per MoRT&H
specification 305 (5th revision) (Payment will be made based on
level for finished item of work).

Construction of Gravel base & shoulders including cost, (excluding


seigniorage) charges and conveyance of all materials to work site
and spreading in uniform layers by approved means, on prepared
surface and compacting with vibratory roller to achieve the desired
24 Cum 1 80.00 5.50 0.30 132.00
density at OMC etc., complete for finished item of work as per
MoRT&H Specification 401& 408 (5th revision) and as directed by
the Engineer-in-charge. ( Payment will be made based on levels for
finished item of work ).

Dismantling of Structures (superstructure, substructure, foundation


and other miscellaneous structures) and pavements including
disposing of resulting materials and/or salvaging useful materials up
25 to a distance of 1 km from project road complete as per Drawings Cum 1 45.00 7.50 2.00 675.00
and Technical Specification Clause MoRT&H 202 and as directed by
the Engineer.(By Mechanical means in Cement Concrete grade M-
15 & M-20)
Asst Executive Engineer Dy.Executive Engineer
R&B Section Kodad R&B Sub-Division Kodad

Executive Engineer Superintending Engineer


Division, Suryapet (R&B) Circle :: Nalgonda
Return Wall
6.92 Length WL
Vent height 4.65 Height As per Drawing HO
Raft offset 3.62 Bottom Width BS
Thickness of slab 0.5 Top Width RW2
Thickness of raft 0.4 Thick. of raft
Thickness of wall 1.06 Thick at stem
Intermediate wall Thk 1.40 Toe
Key height 0.5 Top Width RW1
No. of Vents 6.00 Flex appron width D/S

3.00 Flex appron width U/S


0.75 Flex appron Thk.
Total Quantity

723.33 Curtain wall Type-2 Curtain wall Type-1

Top width 0.2 Top width 0.2


Offset 0.125 Offset 0.125
3.45 Width @ S-1 0.45 Width @ S-1 0.45
Slant 7.71

Depth @ S-1 0.45 Depth @ S-1 0.45

49.50 Offset 0.425 Offset 0.15


Width @ S-2 1.3 Width @ S-2 0.75
Depth @ S-2 0.75 Depth @ S-2 0.75
Depth @ S-3 0.8 Offset 0.45

Width @ S-3 1.65

370.99 Depth @ S-3 0.75

Depth @ S-4 0.55


3.31
2.89

103.00

40.68

118.44
118.95

58.00
9.48
1477.84
9.52
1477.84
9.97
1477.84
108.72
3.4
8.94

7.37

23.10

140.90

50.14

100.28

21.60
6.54
28.14
12.00

34.60
21.48
13.12

168.00

132.00

675.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (2x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.5 d 0.470 Thickness of slab
Width of Box 8.14 e 0.45 Thickness of raft
Depth of Levelling 0.15 f 0.42 Thickness of wall
crust 0.61 g 0.35 Intermediate wall Thk
Radius of Pitching 6.94 0.75 Key height
97.68 2 No. of Vents

(2VX3X3) - 12m Length 2No's - Ch Km


Item Length Width
Description Unit No. Height (m) Quantity
No. (m) (m)
Earthwork in excavation of foundation for structures, including all
1 lifts and leads complete as per drawing and Technical Specification Cum
Clause 304 and 2903
All types of Soil at Km 19/6-8
Box 1 12.30 8.44 2.10 218.01
key portion 2 8.44 0.68 0.75 8.55
Curtain wall
D/S 1 12.00 1.85 2.65 58.83
U/S 1 12.00 1.50 2.15 38.70
Flexible appron
Part-1 2 8.14 1.40 0.75 17.09
Part-2 D/S 1 22.11 4.60 0.75 76.28
Part-2 U/S 1 22.11 1.60 0.75 26.53
Return Wall 4 7.29 3.96 2.10 242.08
Providing Plain Cement Concrete for levelling course etc.
2 including centering all complete as per drawing and Technical Cum
Specifications Section Section 1500 & 1700
PCC M 15
Box 1 12.30 8.44 0.15 15.57
key portion 2 8.44 1.39 0.15 3.52
Curtain wall
D/S 1 12.00 1.85 0.15 3.33
U/S 1 12.00 1.50 0.15 2.70
Return Wall 4 7.29 3.96 0.15 17.29
Back filling with granular material of approved quality complete as
3 Cum
per drawing and Technical specification Clause 304 & 305.
Quadrants 4 0.26 48.16 3.47 175.02
Behind Box Walls Cum 2 9.14 1.64 3.92 117.80
Behind Return Walls 4 4.00 1.46 3.47 80.74
Providing and laying of Filter media of Stone aggregate
conforming to Technical Specifications Clause 2504.2.2 behind
4 Cum
abutment, wing wall, retaining wall and return walls, complete as
per drawing and Technical Specifications Clause 305 & 2504.
Behind Box Walls Cum 2 10.336 0.60 3.47 43.04
Return Wall Cum 4 7.29 0.60 3.47 60.67
Vibrated cement concrete M15 Grade Concrete Curtain wall (PCC
5 M 15) Cum
D/S 1st footing 1 12.00 1.65 0.55 10.89
D/S 2nd footing 1 12.00 0.75 0.75 6.75
D/S 3rd footing 1 12.00 0.45 0.80 4.32
D/S 4th footing 1 12.00 0.20 0.40 0.96
U/S 1st footing 1 12.00 1.30 0.80 12.48
U/S 2nd footing 1 12.00 0.45 0.80 4.32
U/S 3rd footing 1 12.00 0.20 0.40 0.96
Providing and laying Plain/Reinforced cement concrete M 25 for
6 foundation complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Raft Cum 1 12.00 8.14 0.45 43.96
Key portion 2 8.14 0.68 0.75 8.24
Providing and laying Plain/Reinforced cement concrete for
7 foundation complete as per drawing and Technical Specification 4 6.99 3.66 0.40 40.86
Section 1500, 1700, 2100 & 2200 Return Wall M 20 grade
Providing and laying Plain/Reinforced cement concrete for
8 substructure complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Walls (M25) Cum 2 12.00 0.42 3.00 30.24
Middle Box Walls (M25) Cum 2 12.00 0.35 3.00 25.20
Haunches (150x 150mm) Cum 8 12.00 0.08 0.15 1.08
Bracket (300 x 300mm) Cum 2 12.00 0.00 0.30 0.00
Return Wall-1 Cum 4 0.30 0.832 4.27 4.26
Return Wall-2 Cum 4 3.28 0.832 4.27 46.61
Return Wall-2-Bracket Cum 4 3.28 0.500 1.10 7.22
Providing and laying Reinforced cement concrete in
9 superstructure excluding cost steel complete as per drawing and
Technical Specification Section 1500, 1700, 2100 & 2300
Slab for box (M25) Cum 1 12.00 7.54 0.470 42.53
Providing TMT Reinforcement bar for the Structure complete as
10 MT 93.06 80.00 Kg/Cum 7444.80
per drawing and Technical Specification for foundation
Providing TMT Reinforcement bar for the Structure complete as
11 MT 114.61 80.00 Kg/Cum 9168.80
per drawing and Technical Specification for Sub Structure
Providing TMT Reinforcement bar for the Structure complete as
12 MT 99.69 80.00 Kg/Cum 7975.20
per drawing and Technical Specification for Super Structure
Providing weep holes in abutments, wing walls and return walls
13 Rm
complete as per drawing and Technical Specification clause 2706.
Box Walls (1.0m C/C 0.5m length) 2 12.00 0.42 3.00 30.24
Return Wall 4 6.00 0.832 4.00 79.87
Providing and laying Wearing Course comprising of 65mm
Bituminous concrete on top of deck slab including cost of tack
14 Cum 1 11.10 7.54 0.075 6.28
coat, using modified bitumen meeting the requirements given in
table 500-29
Plain Cement Concrete M15 for levelling course below approach
15 slabs complete as per drawings and Technical Specification Section Cum 2 3.35 10.8 0.10 7.24
clause 2704
Providing Reinforced Cement Concrete in approach slabs
16 including reinforcement complete as per drawings and Technical Cum
Specification Sections 1500,1600 1700 and 2700
RCC M30 grade Cum 2 3.50 10.80 0.30 22.68
Providing and laying flexible apron complete as per drawings and
17 technical specifications cluase 2503 of Mort&H 5th revision for
bridge work. (Excluding Segniorage Charges & VAT).
Part-1 Cum 2 8.14 1.40 0.75 17.09
Part-2 D/S Cum 1 22.11 4.60 0.75 76.28
Part-2 U/S Cum 1 22.11 1.60 0.75 26.53
Filter meterial (150 mm thick) underneath pitching in slopes and
18 flat surfaces complete as per drawing & Technical Specification Cum 4 10.90 7.76 0.15 50.76
Clause 2504
Providing and laying stone pitching on sloped surfaces (300 mm
19 thick) for earth protection complete (for Quadrants) as per drawings Cum 4 10.90 7.76 0.30 101.51
and Technical Specification Clause 2504
20 Providing 25.4 mm mastic pads Sqm 4 12.00 0.30 14.40
Return Walls Sqm 4 5.03 0.33 6.54

Drainage spouts complete as per drawing and technical


21 Nos 8
specification clause 1209 MORD &2705 MORTH
22 Crash barrier(M-25)
Box Lm 2 7.54 15.08
Return Wall 4 3.28 13.12

Construction of embankment with material obtained from borrowed


useful earth CBR more than 7 % with a lead of 10.0 Km from
outside road boundary by mechanical means upto SDR with all
leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment,
23 spreading soil, breaking clods, sectioning, grading and Cum 1 80.00 7.00 0.30 168.00
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC
to meet requirement of table 300-2 of MoRT&H, including all hire
and operational charges of T&P and charges, complete for
finished item of work as per MoRT&H specification 305 (5th
revision) (Payment will be made based on level for finished item
of work).

Construction of Gravel base & shoulders including cost,


(excluding seigniorage) charges and conveyance of all materials to
work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve
24 Cum 1 80.00 5.50 0.30 132.00
the desired density at OMC etc., complete for finished item of work
as per MoRT&H Specification 401& 408 (5th revision) and as
directed by the Engineer-in-charge. ( Payment will be made based
on levels for finished item of work ).

Dismantling of Structures (superstructure, substructure, foundation


and other miscellaneous structures) and pavements including
disposing of resulting materials and/or salvaging useful materials
25 up to a distance of 1 km from project road complete as per Cum 1 35.00 7.50 2.00 525.00
Drawings and Technical Specification Clause MoRT&H 202 and as
directed by the Engineer.(By Mechanical means in Cement
Concrete grade M-15 & M-20)
Asst Executive Engineer Dy.Executive Engineer
R&B Section Kodad R&B Sub-Division Koodad

Executive Engineer Superintending Engineer


Division, Suryapet (R&B) Circle :: Nalgonda
Return Wall
6.99 Length WL
Vent height 4.67 Height As per Drawing Ho
Raft offset 3.66 Bottom Width BS
Thickness of slab 0.6 Top Width RW2
Thickness of raft 0.4 Thick. of raft
Thickness of wall 1.06 Thick at stem
Intermediate wall Thk 1.40 Toe
Key height 0.6 Top Width RW1
No. of Vents 6.00 Flex appron width D/S

3.00 Flex appron width U/S


Total 0.75 Flex appron Thk.
Quantity

686.07 Curtain wall Type-2 Curtain wall Type-1

Top width 0.2 Top width 0.2


Offset 0.125 Offset 0.125
3.47 Width @ S-1 0.45 Width @ S-1 0.45
Slant 7.76

Depth @ S-1 0.45 Depth @ S-1 0.45

42.41 Offset 0.425 Offset 0.15


Width @ S-2 1.3 Width @ S-2 0.75
Depth @ S-2 0.75 Depth @ S-2 0.75
Depth @ S-3 0.8 Offset 0.45

Width @ S-3 1.65

373.56 Depth @ S-3 0.75

Depth @ S-4 0.55


3.29
2.91

103.71

40.68

93.06
114.61

42.53
7.44
1477.84
9.17
1477.84
7.98
1477.84
110.11
3.4
6.28

7.24

22.68

119.90

50.76

101.51

14.40
6.54
20.94
8.00

28.20
15.08
13.12

168.00

132.00

525.00
DETAILED CUM ABSTRACT

Name of Work ::- Construction Of Box Culvert at Km 3/8,7/2,17/8.19/6 on Kodada-Re


Suryapet District.
MEASUREMENTS
Sno Description Quantity
No LENT BRDT DPT
1 2 3 4 5 6 7
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarifi
1 material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.00 0.20 196.00


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.00 0.20 196.00
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.00 0.20 196.00
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.00 0.20 196.00

784.00
SAY 784.00
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoR
Table 400-1 & 400-2 including cost, (excluding seigniorage) charges and conveyance of all materia
work site and spreading in uniform layers with motor grader or by approved means, on prep
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting
2 vibratory roller to achieve the desired density etc., complete for finished item of work as per MoR
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be m
based on levels for finished item of work ).

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.30 0.200 204.40


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.30 0.200 204.40
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.30 0.200 204.40
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.30 0.200 204.40
817.60
SAY 818.00
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix maca
specification including cost, seigniorage of all materials and including premixing the material
water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in unif
layers with paver in base courses on well prepared surface and compacting with Vibratory rolle
3 achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoR
specification.406 (4th revision) for finished item of work. (Payment will be made based on levels
finished item of work)

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.30 0.250 255.50


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.30 0.250 255.50
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.30 0.250 255.50
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.30 0.250 255.50
1022.00
SAY 1022.00
Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emu
pressure distributor on prepared surface of Granular base including cleaning of road surface
spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item
4 work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) an
directed by the Engineer-in-charge.

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.00 980.00


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.00 980.00
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.00 980.00
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.00 980.00
3920.00
SAY 3920.00

Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical br
5 for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by the Engin
in-Charge.

at 3/8 -4/0 ( 2v of3 x3m) 1 x 2 140.00 7.00 1960.00


at 7/0-2 ( 3v of3 x3m) 1 x 2 140.00 7.00 1960.00
at 17/8-18/0 (3v of3x3m) 1 x 2 140.00 7.00 1960.00
at 19/6 -8 ( 2vof3 x3m) 1 x 2 140.00 7.00 1960.00
7840.00
SAY 7840.00

Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an ave
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50
weight of total mixture, transported to site, laid over a previously prepared surface with mechan
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.
6 achieve the desired compaction for finished item of work as directed by the Engineer-in-Ch
including hire and operational charges all T&P and all other contingent charges necessary including
of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H specification
504 (5th Revision) (Excluding VAT Charges)

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.00 0.050 49.00


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.00 0.050 49.00
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.00 0.050 49.00
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.00 0.050 49.00
196.00
SAY 196.00
Providing 40mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type/ 40-60 T
hot mix plant using HBG crushed aggregates of Grading-2 as per table 500-17 of specification 50
MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and fi
transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, l
7 and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the des
compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work i
respects as directed by Engineer-in-Charge

at 3/8 -4/0 ( 2v of3 x3m) 1 x 1 140.00 7.00 0.040 39.20


at 7/0-2 ( 3v of3 x3m) 1 x 1 140.00 7.00 0.040 39.20
at 17/8-18/0 (3v of3x3m) 1 x 1 140.00 7.00 0.040 39.20
at 19/6 -8 ( 2vof3 x3m) 1 x 1 140.00 7.00 0.040 39.20
156.80
SAY 157.00
Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance o
materials to work site and spreading in uniform layers by approved means, on prepared surface
compacting with vibratory roller to achieve the desired density at OMC etc., complete for finished
8 of work as per MoRT&H Specification 401& 407 (5th revision) and as directed by the Enginee
charge. ( Payment will be made based on levels for finished item of work ).

at 3/8 -4/0 ( 2v of3 x3m) 1 x 2 140.00 1.50 0.150 63.00


at 7/0-2 ( 3v of3 x3m) 1 x 2 140.00 1.50 0.150 63.00
at 17/8-18/0 (3v of3x3m) 1 x 2 140.00 1.50 0.150 63.00
at 19/6 -8 ( 2vof3 x3m) 1 x 2 140.00 1.50 0.150 63.00
252.00
SAY 252.00

Assistant Engineer Dy. Executive Engineer


(R&B) Section: Kodad (R&B) Sub-Division: Kodad
17/8.19/6 on Kodada-Revoor Road in

Rate Per Amount

8 9 10
ans and disposal of scarified
) Specn. No.305.4.3

8.70 CUM 6820.80


ng to Grading - VI of MoRT&H
conveyance of all materials to
proved means, on prepared
at OMC and compacting with
item of work as per MoRT&H
rge. ( Payment will be made

1741.00 CUM 1424138.00


gregate to Wet Mix macadam
premixing the material with
per to site , laying in uniform
cting with Vibratory roller to
harge and as per MoRT&H
be made based on levels for

1947.00 CUM 1989834.00


Setting) bulk using emulsion
leaning of road surface and
stributor for finished item of
ion 502 (5th Revision) and as

49.30 sqm 193256.00

on pressure distributor at the


eaned with mechanical broom
d as directed by the Engineer-

10.00 sqm 78400.00

x plant producing an average


ding - II as per table 500-4 of
r of VG 30 grade @ 4.50% of
ared surface with mechanical
er Clauses 501.6 and 501.7 to
d by the Engineer-in-Charge
arges necessary including cost
per MoRT&H specification No.

7149.00 sqm 1401204.00


Batch Mix type/ 40-60 TPH
00-17 of specification 507 of
@ 5.4 % of mix and filler,
r to the required grade, level
llers to achieve the desired
finished item of work in all

8075.00 CUM 1267775.00


charges and conveyance of all
ns, on prepared surface and
c., complete for finished item
directed by the Engineer-in-
.

354.00 CUM 89208.00

Total = 6450636

Executive Engineer
Division:Suryapet
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach f
Km 1/4 to 21/2) in Suryapet District.
DATA

SSR :: 2018-19 Date :: 18-8-2018 Municipal Area Allowance ::

SNo Quantity Unit Description of Item Rate


1 2 3 4 5

1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3

1 Page 67,68 of MoRT&H SDB


1 Unit = sqm
1 Taking output = 100 sqm
1 (A) Labour
1 0.01 day Mate 456.00
1 0.25 day Mazdoor 425.00
1
0 0.2 % Municipal Area Allowance 110.81
TOTAL
0 (B) Machinery
0 0.08 hour Tractor with ripper attachment @ 60 cum per hour 568.23
0 0.20 hour Front end loader 1 cum capacity 1843.52
0 0.23 hour Tipper 5.50 cum capacity, 4 trips/Hour 1004.40
0 TOTAL
0 (A + B )
0
0 5.00 % (C) Over Head Charges on (A+B) 756.20
0
0 10.00 % (D) Contractors Profit on (A+B+C) 794.01
0
0 100.00 sqm TOTAL Cost for 100 sqm = (A+B+C+D)
0 Rate per 1 sqm
0 Rate per 1 sqm
1 Construction of embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road
Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational
charges of T&P and (excluding seigniorage) charges, complete for finished item of work as per
MoRT&H specification 305

1 (5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).
1 Page 68,69 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 100 Cum
1 (A) Labour
1 0.04 day Mate 456.00
1 1.00 day Mazdoor unskilled 425.00
1
1 0.0 % Municipal Area Allowance 443.24
1 TOTAL
1
1 (B) Machinery
1 1.67 hour Hydraulic Excavator 1 Cum bucket capacity @ 60 cum/hr 2821.50
1 800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00
1 Add 10% of cost of carriage to cover
1 cost of loading and unloading
1 0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2661.20
1 1.00 hour Motor Graders for Grading @ 100 cum per hour 3601.92
1 4.00 hour Water tanker 6 KL 698.88
1 1.00 hour Vibratory roller 8T 2878.90
1 TOTAL
1 (A + B )
1
1 5.00 % (C) Over Head Charges on (A+B) 20656.17
1
1 10.00 % (D) Contractors Profit on (A+B+C) 21688.98
1
1 (E ) Seigniorage charges
1 100.00 cum Earth 0.00
1
1 100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E)
1
1 Rate per 1 cum
1 Rate per 1 cum
2 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of
MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials
to work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made
based on levels for finished item of work ).
2 By Mix in Place Method
2 Page 94 of MoRT&H SDB
2 Unit = cum
2 Taking output = 300 cum
2 (A) Labour
2 0.48 day Mate 456.00
2 2.00 day Mazdoor skilled 456.00
2 10.00 day Mazdoor unskilled 425.00
2
2 0.0 % Municipal Area Allowance 5380.88
2 TOTAL
2 (B) Machinery
2 6.00 hour Motor grader 3.35M Blade @50 cum/Hr. 3601.92
2 6.00 hour Vibratory roller 8T 2878.90
2 12.00 hour Tractor - Rotavator (223+11=234) 472.64
2 3.00 hour Water tanker 6 KL 698.88
2 TOTAL
2
2 (C) Material
2 Granular sub-base material as per
2 Table 400-1, Grading VI material of MORT&H
2 45-9.5 mm IRC & MORT&H HBG Chips @ 35 %
2 134.40 cum Avg. rate of (40-45),(25-27),(19-22), (12-14), (9.5-11.2) 1215.10
2 11.2-2.36 mm IRC & MORT&H HBG Chips @ 47.5 %
2 182.40 cum Average rate of (9.5-11.2),(5-7)&(2.36-5) 1014.85
2 2.36mm and below @ 17.5%
2 67.20 cum (Rate of 2.36mm & below HBG metal) 770.35
2 384.00 TOTAL
2 (A + B +C)
2
2 5.00 % (D) Over Head Charges on (A+B+C) 452219.72
2
2 10.00 % (E) Contractors Profit on (A+B+C+D) 474830.71
2
2 (F ) Seigniorage charges
2 384.00 cum Metal 0.00
2
2 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F)
2 Rate per 1 cum
2 Rate per 1 cum
1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
Macadam specification including cost, (excluding seigniorage) of all materials and including premixing
the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on
levels for finished item of work)
1 Page 110,111 of MoRT&H SDB
1 Unit = cum
1 Taking output = 225 cum
1 (A) Labour
1 0.48 nos. Mate 456.00
1 2.00 nos. Mazdoor skilled 456.00
1 10.00 nos. Mazdoor 425.00
1
0.0 % Municipal Area Allowance 5380.88
0 TOTAL
0 (B) Machinery
0 6.60 hour Wet mix plant of 60 ton hr. capacity 1843.52
0 6.00 hour Electric generating set 125 KVA 1478.40
0 6.00 hour front end loader 1 cum capacity 1843.52
0 6.00 hour Mechanical Paver finisher 100 TPH 2518.88
0 3.90 hour Vibratory roller 8-10 T 2878.90
0 3.00 hour Water tanker 698.88
0 TOTAL
0 (C) Material
0 45 to 22.40mm IRC HBG metal @ 30%
0 89.10 cum Avg. rate of (40-45), (25-27), (19-22mm ) 1240.27
0 22.4-2.36mm IRC HBG metal @ 40%
0 118.80 cum Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below) 1130.10
0 2.36mm to 75 micron @ 30%
0 89.10 cum (2.36mm & below) 770.35
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 379319.09
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 398285.04
0
0 (F ) Seigniorage charges
0 297.00 cum Metal 0.00
0
0 225.00 cum TOTAL Cost for 225 cum = (A+B+C+D+E+F)
0 Rate per 1 cum
0 Rate per 1 cum
4 Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure
distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion
at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-
in-charge.
4 Page 123 of MoRT&H SDB
4 Unit = sqm
4 Taking output = 3500 sqm
4 (A) Labour
4 0.08 nos. Mate 456.00
4 2.00 nos. Mazdoor 425.00
4
0 0.0 % Municipal Area Allowance 886.48
0 TOTAL
0 (B) Machinery
0 2.80 hour Mechanical broom @ 1250 sqm/hr. 399.84
0 2.80 hour Air compressor 250 cfm 588.40
0 2.00 hour Emulsion pressure distributor @1750 sqm/hr. 963.20
0 1.00 hour water tanker 6 KL 698.88
0 TOTAL
0 (C) Material
0 2.45 MT Bitumen Emulsion @ 0.70 Kgs/sqm 58400.34
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 149359.66
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 156827.64
0
0 3500.00 sqm TOTAL Cost for 3500 sqm = (A+B+C+D+E)
0 Rate per 1 sqm
0 Rate per 1 sqm
1 Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using Emulsion
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned
with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.

1 Page 124 of MoRT&H SDB


1 unit = sqm
1 Taking output = 3500 sqm
1 (A) Labour
1 0.08 no Mate 456.00
1 2.00 no Mazdoor 425.00
1
0.0 % Municipal Area Allowance 886.48
0 TOTAL
0 (B) Machinery
0 2.80 hour Mechanical broom Hydraulic @ 1250 sqm/hr. 399.84
0 2.80 hour Air compressor 250 cfm 588.40
0 2.00 hour Emulsion pressure distributor @1750 sqm/hr. 963.20
0 TOTAL
0 (C) Material
0 0.700 MT Bitumen Emulsion @ 0.20 Kgs/sqm 35411.78
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 30368.20
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 31886.61
0
0 3500.00 sqm TOTAL Cost for 3500 sqm = (A+B+C+D+E)
0 Rate per 1 sqm
0 Rate per 1 sqm
1 Providing and laying of Dense Graded Bituminous Macadam with with 100-120 TPH Batch Mix plant
using HBG crushed aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505 (5th
revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total mixture,
transported to site, laid over a previously prepared surface with Paver finisher hydrostatic with sensor
control 100 TPH for full width to the required grade, level and alignment and rolled as per Clauses 501.6
and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-
Charge including hire and operational charges all T&P and all other contingent charges necessary
including cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H
specification No. 505 (5th Revision) (Excluding VAT Charges)

1 Page 132,133 of MoRT&H SDB


1 Unit = cum
1 Taking out put = 195 cum (450 ton)
1 (A) Labour
1 0.84 nos. Mate 456.00
1 Mazdoor working with HMP, mechanical broom,
1 paver, roller, asphalt cutter and assistance for
1 14.00 nos. setting out lines, levels and layout of construction. 425.00
1 5.00 nos. Mazdoor skilled 456.00
1
0 0.0 % Municipal Area Allowance 8613.04
0 TOTAL
0 TOTAL
0 (B) Machinery
0 6.00 hour Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52
0 6.00 hour Paver finisher hydrostatic with sensor control 100 TPH 2518.88
0 6.00 hour Generator 250 KVA 2072.00
0 6.00 hour Front end loader 1 cum bucket capacity 1843.52
0 Smooth wheeled roller 8-10 tones
0 3.90 hour for initial break down rolling 1131.00
0 3.90 hour Pneumatic roller 8 tones for intermediate rolling 1283.00
0 Finish rolling with 6-8 tones
0 3.90 hour smooth wheeled tandem roller. 1131.00
0 TOTAL
0 (C) Material
0 Bitumen VG 30 @ 4.50 %
0 20.25 MT of weight of mix=205x2.2=450 ton 33946.66
0 ii) Aggregate
0 TOTAL weight of mix = 450 tones
0 weight of bitumen - 20.25 tones
0 Weight of aggregate = 450-20.25 = 429.75 tones
0 Taking density of aggregate = 1.5 ton/cum
0 Volume of aggregate = 286.50 cum
0 Grading - II (19 mm nominal size)
0 25-10 mm IRC & MORT&H HBG Chips @ 30 %
0 85.95 cum Avg. of(25-27),(19-22),(12-14) (9.5-11.2) 1268.29
0 10-5 mm IRC & MORT&H HBG Chips @ 28 %
0 80.22 cum Avg. of (9.5-11.2),( 5-7) 1042.98
0 5mm & below IRC & MORT&H HBG Chips@ 40 %
0 114.60 cum Avg. of (2.36-5),( 2.36mm & below) 864.48
0 5.73 cum Filler @ 2% of weight of aggregates. 770.35
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 1207053.55
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 1267406.23
0
0 (F ) Seigniorage charges
0 286.50 cum Metal 0.00
0
0 195.00 cum TOTAL Cost for 195 cum = (A+B+C+D+E+F)
0 Rate per 1 cum
0 Rate per 1 cum

2 Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant using
HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed
with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with
Paver finisher for full width to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for
finished item of work) (Excluding VAT Charges)

2 Page 138,139,140 of MoRT&H SDB


2 Unit = cum
2 Taking output = 191 cum (450 tones.)
2 (A) Labour
2 0.84 nos. Mate 456.00
2 Mazdoor working with HMP, Mechanical broom,
2 paver, roller, asphalt cutter and assistance for
2 14.00 nos. setting outlines, levels and layout of construction. 425.00
2 5.00 nos. Skilled Mazdoor for checking line and levels. 456.00
2
0.0 % Municipal Area Allowance 8613.04
0 TOTAL
0 (B) Machinery
0 6.00 hour Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52
0 6.00 hour Mechanical Paver finisher 2518.88
0 6.00 hour Generator 250 KVA 2072.00
0 6.00 hour Front end loader 1 cum capacity 1843.52
0 Power road roller 8 ton for initial
0 3.90 hour break down rolling 1131.00
0 3.90 hour Pneumatic roller 8 ton for intermediate rolling 1283.00
0 Finish rolling with 6-8 ton.
0 3.90 hour smooth wheeled tandem roller 1131.00
0 TOTAL
0 (C) Material
0 Bitumen VG 30 @ 5.40 %
0 24.30 MT of weight of mix=205x2.2=450 ton 33714.10
0 ii) Aggregate
0 TOTAL weight of mix = 450 tones
0 Weight of bitumen - 24.30 tones
0 Weight of aggregate = 450-24.30 = 425.70 tones
0 Taking density of aggregate = 1.5 ton/cum
0 Volume of aggregate = 283.80 cum
0 Grading-2 (13 mm nominal size)
0 13.2-10 mm IRC & MORT&H HBG Chips @ 20%
0 56.76 cum Avg. of (14-12),(9.5-11.2) 1177.35
0 10-5 mm IRC & MORT&H HBG Chips @ 25 %
0 70.95 cum Avg. of (9.5-11.2),( 5-7) 1042.98
0 5mm & below IRC & MORT&H HBG Chips@ 53 %
0 150.41 cum Avg. of (2.36-5),( 2.36mm & below) 864.48
0 4.26 MT Cement Filler @ 1% of weight of aggregates. 4600.00
0 2.84 cum Filler @ 1% of weight of aggregates. 770.35
0 285.22 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 1335351.19
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 1402118.75
0
0 (F ) Seigniorage charges
0 282.38 cum Metal 0.00
0
0 191.00 cum TOTAL Cost for 191 cum = (A+B+C+D+E+F)
0 Rate per 1 cum
0 Rate per 1 cum
0
White washing 2 coats using Ist quality of Janatha White cement including cost and conveyance of all
7 materials and all labour charges etc.complete
2.00 Kgs Cost of White Cement 29.00
0.05 Nos Cost of Ist class painter 540.00
0.11 Nos Cost of 2nd class painter 450.00
0.05 Nos Cost of Man Mazdoor 425.00
0.27 Nos Cost of Woman Mazdoor 425.00
Sundries for brushes and gum etc., @ 1%
Add for overhead charges
Add for contractors profit
Rate per 10 Sqm.
Rate per 1 Sqm.

Asst. Executive Engineer Dy. Executive Engineer


R&B Section,Kodad R&B Sub-Division Kodad
to 28/140 (Working reach from

l Area Allowance :: 20.0%

per Amount
6 7

d disposal of scarified
No.305.4.3

1.00 4.56
1.00 106.25
110.81
0.22
A= 111.03

1.00 45.46
1.00 368.70
1.00 231.01
B= 645.17
756.20

37.81

79.40

873.41
8.73
8.70
ndary by mechanical
a, removal of top soil,
on the embankment,
onnes Vibratory Road
hire and operational
item of work as per

ished item of work).


1.00 18.24
1.00 425.00
443.24
0.00
A= 443.24

1.00 4711.91
t.km 4800.00

480.00
1.00 1330.60
1.00 3216.00
1.00 2795.52
1.00 2878.90
B= 20212.93
20656.17

1032.81

2168.90

1.00 0.00

23857.88

238.58
239.00
to Grading - VI of
yance of all materials
means, on prepared
and compacting with
work as per MoRT&H
ayment will be made

1.00 218.88
1.00 912.00
1.00 4250.00
5380.88
0.00
A= 5380.88

1.00 21611.52
1.00 17273.40
1.00 5671.68
1.00 2096.64
B= 46653.24

1.00 163309.44

1.00 185108.64

1.00 51767.52
C= 400185.60
452219.72

22610.99

47483.07

1.00 0.00

522313.78
1741.05
1741.00
gregate to Wet Mix
d including premixing
rial by tipper to site ,
and compacting with
in-Charge and as per
ill be made based on

1.00 218.88
1.00 912.00
1.00 4250.00
5380.88
0.00
A= 5380.88

1.00 12167.23
1.00 8870.40
1.00 11061.12
1.00 15113.28
1.00 11227.71
1.00 2096.64
B= 60536.38

1.00 110507.76

1.00 134255.88

1.00 68638.19
C= 313401.83
379319.09

18965.95

39828.50

1.00 0.00

438113.54
1947.17
1947.00
ing emulsion pressure
nd spraying emulsion
work etc., complete for NEW
ected by the Engineer-

1.00 36.48
1.00 850.00
886.48
0.00
A= 886.48

1.00 1119.55
1.00 1647.52
1.00 1926.40
1.00 698.88
B= 5392.35

1.00 143080.83
C= 143080.83
149359.66

7467.98
15682.76

172510.40
49.29
49.30
Bulk) using Emulsion
anular surface cleaned
3 (5th revision) and as

1.00 36.48
1.00 850.00
886.48
0.00
A= 886.48

1.00 1119.55
1.00 1647.52
1.00 1926.40
B= 4693.47

1.00 24788.25
C= 24788.25
30368.20

1518.41

3188.66

35075.27
10.02
10.00
TPH Batch Mix plant
Specification 505 (5th
ght of total mixture,
ydrostatic with sensor
d as per Clauses 501.6
d by the Engineer-in- NEW
nt charges necessary
and as per MoRT&H
1.00 383.04

1.00 5950.00
1.00 2280.00
8613.04
0.00
A= 8613.04

1.00 162429.12
1.00 15113.28
1.00 12432.00
1.00 11061.12

1.00 4410.90
1.00 5003.70

1.00 4410.90
B= 214861.02

1.00 687419.78

1.00 109009.31

1.00 83667.45

1.00 99068.84
1.00 4414.11
C= 983579.49
1207053.55

60352.68

126740.62

1.00 0.00
1394146.85
7149.47
7149.00

pe hot mix plant using


(5th revision), premixed
o work site, laying with
h wheeled, vibratory and
NEW
h revision) complete for
made based on levels for

1.00 383.04

1.00 5950.00
1.00 2280.00
8613.04
0.00
A= 8613.04

1.00 162429.12
1.00 15113.28
1.00 12432.00
1.00 11061.12

1.00 4410.90
1.00 5003.70

1.00 4410.90
B= 214861.02

1.00 819252.53

1.00 66826.39

1.00 73999.08
1.00 130029.14
1.00 19582.20
1.00 2187.79
C= 1111877.13
1335351.19

66767.56

140211.88

1.00 0.00

1542330.63
8075.03
8075.00

d conveyance of all

/25Kgs 58.00
Each 25.92
Each 50.40
Each 21.25
Each 114.75
2.70
0.00
0.00
273.02
27.30
or say 27.00

Executive Engineer
(R&B)Division Suryapate
Name of Work:- :Construction of HLB at Km. 15/0-2 on kodad- Rvoor road in Suryapet district.
DATAS FOR BRIDGE PROPER SoR 2018-19
Sl
DESCRIPTION RATE
No
1 2 3
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding
settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of
sides and bottom and back filling with approved material.

I. ordinray soil upto SDR soils using machinary


unit cum
Taking out put = 240 cum

a) Up to 3.0m depth above LWL excluding dewatering charges


Labour

0.32 day Mate 456.00


8.00 day Mazdoor 425.00
0.00 % Municipal area allowance 3545.92

Machinery
240.00 cum Earth work excavation as per G.O. Ms. No.10 dt.26.07.2005 13

20.00 % Over head charges 6665.92

10.00 % Contractor Profit 7999.10


rate per 240 cum
rate per cum

b) Up to 3.0m depth below LWL including dewatering charges


(A) Labour

0.32 day Mate 456.00


8.00 day Mazdoor 425.00
0.00 % Municipal area allowance 3545.92

(B) Machinery
240.00 cum Earth work excavation as per G.O. Ms. No.10 dt.26.07.2005 13

0.05 add for Dewatering charges (labour +machinary)

Cost pr 240 cum (A)+(B)

20.00 % Over head charges 6999.22

10.00 % Contractor Profit 8399.06


rate per 240 cum
rate per cum
2 Providing Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundations
a) Material
3.45 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
13.50 cum 40 mm Aggregate 983.60

b) Labour
0.64 day Mate 456.00
1.00 day Mason 445.00
15.00 day Mazdoor 425.00
0.00 % Municipal area allowance 7111.84

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
2.00 hr water tanker 6KL capacity 698.88

20.00 % Over head charges 56645.01


10.00 % Contractors Profit 67974.01
Rtae for 15cum
rate for 1.0 cum

3 Plain Vibrated Cement Concrete M20 Mix in Open Foundation using 40 mm HBG (ss5)max size graded
M/c metal complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700,
2100 for FOOTINGS OF ABUTMENTS, piers, wing walls,rigid aprons & cutoff walls.
Unit = cum
Taking output = 15 cum
a) Material
5.16 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
5.40 cum 40 mm Aggregate 983.60
5.40 cum 20 mm Aggregate 1439.85
2.70 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20

Cost for 15 cum = a+b+c


Rate per cum = (a+b+c)/15 X

1.00 cum cost of VCC M15 as above X 4571.69


4.00 % Add for formwork 4571.69
20.00 % over head charges on Rs 4754.56
10.00 % Contractor profit 5705.47

4
Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 20 mm HBG (ss5)max size
graded M/c metal complete as per drawings and technical specifications & as per MoRT&H Spcn. No
1500, 1700, 2200 for ABUTMENTS , piers , weir & wing walls.
Unit = cum
Taking output = 15 cum up to
5.00m height
a) Material
5.16 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
5.40 cum 40 mm Aggregate 983.60
5.40 cum 20 mm Aggregate 1439.85
2.70 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20

Cost for 15 cum = a+b+c


Rate per cum = (a+b+c)/15 X

1.00 cum cost of VCC M20 as above X 4571.69


10.00 % Add for formwork
20.00 % over head charges on Rs 5028.86
10.00 % C.P on Rs 6034.63

Rate per Cum

5 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per approved drawings
and as directed during execution but excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-
Charge for Bed blocks & Backing walls VRCC M 25 Sub structure for abutments.
Unit = cum
Taking output = 15 cum
a) Material
6.05 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20

Cost for 15 cum = a+b+c


Rate per cum = (a+b+c)/15 X

cum cost of VRCC M20 as above


1.00 upto 5.00m X 4960.95
Form work @ 10% on cost of
10.00 % concrete I.e., cost of material, labour Y 4960.95
and machinery.
20.00 % overhead charges Z 5457.05
%
10.00 % Add for Contractors profit 6548.45

fot ht 5.0m to 10.00 m


1.00 cum cost of VRCC M30 as above X 4960.95
2.00 % add as above for extra lift 4960.95
Form work @ 10% on cost of
12.00 % concrete I.e., cost of material, labour Y 4960.95
and machinery.
15.00 % overhead charges Z 5655.48
%
10.00 % Add for Contractors profit 6503.81

6 V.R.C.C concrete M - 20 grade for Super Structure Furnishing and Placing Reinforced cement concrete
in super-structure as per drawing and Technical Specification complete as per MoRT&H spcn. No. 1500,
1600 & 1700 as per MOST drawing No.SD/112 & SD/114
Unit = cum
Taking output = 15 cum
a) Material
5.21 MT Cement 4600.00
Min. rate of natural sand & Stone
5.40 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20

Cost for 15 cum = a+b+c


Rate per cum = (a+b+c)/15 X
d) Form work and staging
1.00 cum cost of VRCC M 25 as above X 4555.37
height upto 5 m
20.00 % Form work and staging 4555.37
20.00 % over head charges on Rs 5466.44
10.00 % Conctractor profit 6559.73

Rate per Cum

d) Form work and staging (T-beam girder slab) 5.0m to 10.00m


1.00 cum cost of VRCC M25as above X 4555.37
height up to 5m to 10.00m
25.00 % centering charges 4555.37
15.00 % over head charges on Rs 5694.21
10.00 % Conctractor profit 6548.34

Rate per Cum

6 Construction of VRCC railing of M 20 grade using HBG crushed stone aggregate of size not exceeding 12 mm fine
aggregate conforming to table 1000-2 true to line and grade, tolernce of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical posts not to exceed 1.87 m, leaving adequate space between vertical posts
for expansion including cost,conveyance of all materails to site and labour charges, centering,machine
mixing,laying,vibrating,curing etc.,including other incidental hire and operational charges of all T&P as per approved
drawings and as directed during execution but excluding cost of steel and its fabrication charges as per approved
drawings and technical specifications for finished item as per MoRT&H specification 1500,1600,1700 & 2703 (5th
revision ) and as directed by the Engineer-in-Charge.

Unit = 1 Rm
Hand rails with out footh paths
Taking output = 10.74 m ttotal apan
a) Material
5.21 MT Cement 4600.00
Min. rate of natural sand & Stone
5.40 cum 1644.15
sand
8.10 cum 20 mm Aggregate 916.00
5.40 cum 10 mm Aggregate 692.00

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
9597.16

c)Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 35 KVA 842.20

Cost for 15 cum = a+b+c


Rate per cum = (a+b+c)/15 X
cost of railing for one side
0.5817 cum Cost per 10.74 RM 4099.12
5.00 % Add for form work for casing in yard

5.00 % Add for handling and fixing of precast pannels 2503.68


cost per 10.74 Rm
Over head charges @ 20%
Add for over head charges @ 20 %
20.00 %
on (a+b+c) 2628.87

10.00 % Conctractor profit 3154.64

4730.35/10.
cost per 10.74 Rm
74
Cost per 1 RM=
Rate to be adopted per RM of each
side

d) Form work and staging


1.00 cum cost of VRCC M 25 as above X 4099.12
height upto 5 m
20.00 % Form work and staging 4099.12
12.00 % over head charges on Rs 4918.94
10.00 % Conctractor profit 5509.22

Rate per Cum


7 Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and
conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and
operational charges of all T&P etc., and including island formation and diversion of flow of water, if
necessary etc., complete for Levelling course below approach slab as per drawings and technical
specifications & as per MoRT&H Specification No 2700.
Unit = cum
Taking output = 15 cum
a) Material
4.13 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 40 mm Aggregate 983.60
4.05 cum 20 mm Aggregate 1439.85
1.35 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20

Cost for 15 cum = a+b+c

1.00 15.00cum cost of VCC M15 as above X 62964.88


20.00 % over head charges on Rs 62964.88
10.00 % Conctractor profit 75557.86

1.00cum cost of VCC M15 as above

8 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item
of work as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H
specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for
Approach slab. (SD/104 M30)
Unit = cum
Taking output = 15 cum
a) Material
6.10 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20

Cost for 15 cum = a+b+c


Cost for one cum
Form work
2.00 % centering charges
20.00 % over head charges on Rs 5075.78
10.00 % Conctractor profit 6090.93
Rate per 1 Cum
9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone aggregate including
cost and conveyance of all materials to site, labour charges for machine mixing,laying,compacting,curing
etc,including all other incidental and operational charges,T&P chargesetc, complete but excluding cost of
steel and its fabrication charges, as per MoRT&H Specifications 1500,1700,2100 & 2702(5th Revision). For
Wearing coat over Deck slabs.(SD/205 M30)
Unit = cum
Taking output = 15 cum
a) Material
6.10 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60

b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16

c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20

Cost for 15 cum = a+b+c


Cost for one cum
Form work
Labour for clearing deck slab
0.15 425.00
concrete surface Rate per cum
20.00 % over head charges on Rs 5040.00
10.00 % Conctractor profit 6048.00
Rate per 1 Cum

10 Vibrated reinforced cement concrete M 40 grade using 20mm&10mm hard broken graded granite metal
(SS-5) including cost,centering,machine mixing,laying,vibrating,curing etc., including other incindental hire
and operational charges of all T&P and all water leads etc., complete as per approved drawing and as
directed during execution but excluding cost of steel and its fabrication charges for finished item as per as
per drawing no. AB/HVEW/STR/Misc/KM040-105/04, dt:20-02-2013 in VRCC M40. crash
barriers,excluding Reinforcement.
10.40 m span
Morth specification 809
Unit = 1cum
VRCC M 40 Grade P.No 237 & 478,479
Taking out put = 15cum
Adopted PSC M40 data
A) Labour
0.9 nos Mate 456.00
1.5 nos Mason 470.00
21 nos Mazdoor 425.00
0.00 % Municipal area allowance 10040.40
B) Material
6.45 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60

C) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20

FORM WORK
0.10 Height upto 5m 76697.00

Cost for 15 cum = a+b+c


Cost for one cum

for 1.10m height


Unit = Linear metre
Taking output = 10 m
3.429 cum a) M 40 grade concrete 5624.00
M 40 grade concrete
b) Labour
0.04 day Mate 456.00
1.00 day Mazdoor 425.00
0.00 % Municipal area allowance 443.24

Cost per 10 Rmt = a+b+c

0.20 % over head charges on Rs 19727.94


0.10 % Conctractor profit 23673.53
Cost for 10 metre = a+b+c+d+e
Rate per metre = (a+b+c+d+e)/10

11 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in
position etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items.

FOR FOUNDATION
Unit = 1 M.T.
Taking output = 1 M.T.
a) Material
HYSD bars including 5% over laps
1.05 MT and wastage (Rate as per SSR item 46000.00
No. 193)
6.00 Kg Binding wire 50.00

b) Labour Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.40 day Mate 456.00
2.00 day Black smith 445.00
6.00 day Mazdoor 470
0.00 % Municipal area allowance 3892.40

Rate for 1 MT
20.00 % Over head charges on Rs 52492.40
10.00 % Conctractor profit 62990.88
Rate per 1MT
Rate per 1MT

12 FOR SUB STRUCTURE


Unit = 1 M.T.
Taking output = 1 M.T.
a) Material
HYSD bars including 5% over laps
1.05 MT 46000.00
and wastage
6.00 Kg Binding wire 50.00

b) Labor Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.34 day Mate 456.00
2.00 day Black smith 445.00
6.50 day Mazdoor 470
0.00 % Municipal area allowance 4100.04

Rate for 1 MT
20.00 % Over head charges on Rs 52700.04
10.00 % Contractor's profit on Rs 63240.05
Rate per 1MT
Rate per 1MT

13 FOR SUPER STRUCTURE


Unit = 1 M.T.
Taking output = 1 M.T.
a) Material
HYSD bars including 5% over laps
1.05 MT 46000.00
and wastage.
8.00 Kg Binding wire 50.00

b) Labor Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.44 day Mate 456.00
3.00 day Black smith 470
8.00 day Mazdoor 425.00
0.00 % Municipal area allowance 5010.64

Rate for 1 MT
20.00 % Over head charges on Rs 53710.64
10.00 % Conctractor profit 64452.77
Rate per 1MT
Rate per 1MT

14 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work
Taking out put = 10.00 Cum
a) Labour
0.28 day Mate 456.00
7.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 3102.68

b) Material
12.00 cum Granular material 178.36

c) Mechinery
2.50 hours Plate compactor/ Power rammer 53.76
0.05 hours water tanker 698.88

Cost per 10 Cum = a+b+c


Cost per 1 Cum = (a+b+c) ÷ 10
20.00 % over head charges on Rs 541.23
10.00 % Conctractor profit 649.48

15 Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid

down in clause 2504.2.2 of MORT&H (Rev. IV) specifications to a thickness of not less than 600mm with

smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind

abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and

technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78
Cl. 710.1.4 of IRC : 78 Unit : 1 Cum
Taking out put = 10.00 Cum
a) Labour
0.32 day Mate 456.00
1.00 day Mazdoor Skilled 456.00
7.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 3576.92
Material Filter media of stone
b) aggregate conforming to clause
2504.2.2 of MoRT&H
6.00 cum 150mm size IRC soling stone 442.35
6.00 cum 40mm size IRC metal 983.60

c) Mechinery
0.06 hours water tanker 6.0 Kl Capacity 698.88
Cost per 10 Cum = a+b+c
Cost per 1 Cum = (a+b+c) ÷ 10
20.00 % Over head charges 1217.46

10.00 % Conctractor profit

16 Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with
100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H
towards drawing face Complete as per drawing and technical specification, complete for finished item of
work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)
Unit = nos
Taking output = 30 nos
Output = 1 Cum, Material for 1:3 Cement Mortor
(A) Labour
0.04 nos Mate 456.00
0.90 nos Mazdoor 425.00
0.00 % Municipal area allowance 400.74
Total
(B) Material
0.51 MT Cost of Cement 4600.00
Min. rate of natural sand & Stone
1.05 Cum sand 1644.15
Total
Cost per 1 Cum CM (1:3)
(A) Labour
0.03 nos Mate 456.00
0.50 nos Mason 470.00
0.25 Mazdoor 425.00
0.00 % Municipal area allowance 354.93
Total
(B) Material
31.5 RM Cost of 100mm dia AC pipe 287.10
including 5% wastage (average length= 1m)
10.00 Nos Collors for AC pipe (average) taking 10 28.71
30.00 Nos MS clamps 13.00
0.05 cum Cement mortor (1:3) 4473.10
Total
(C) Over head charges @ 20% (25%-VAT)
20.00 % Add for Over head charges on (A)+(B)+( C) 10299.34
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D) 12359.20
Cost Per 30 RM (D)+(E)
Cost per 1RM
Rate to be adopted
17 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.2705 and as per
drawing SD/205.
out put = 1 No.
a) Material
4.00 Corrosion resistant structural steel
kg 36.50
including 5 percent wastage PR
2.00 m Cost of G.I Pipe 100mm dia 785.00
6.00 each GI Bolt 10mm dia 11.00
2.00 each Galvanized MS Flat clamp 25.00

b) Labour for fabrication


0.02 day Mate 456.00
0.02 day Skilled (Blacksmith, welder etc.) 470
0.02 day Mazdoor 425.00
0.00 % Municipal area allowance 27.02
Total
(c) Labour for fixing in position
0.01 day Mate 456.00
0.01 day Mason 470.00
0.20 day Mazdoor 425.00
0.00 % Municipal area allowance 94.26
Total
Add 5% of cost of material and labour for
5% electrodes, cutting gas, sealant, anti-corrosive 1953.28
bituminous paint, mild steel grating etc.

20.00 % Over head charges


10.00 % Conctractor profit 2461.13

Rate of each drainage spout

18 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20
cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for
packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504
( 5th Revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
Cost of CC(1:4:8)
Taking output = 15 cum
(A) Labour
0.64 nos Mate 456.00
1.00 nos Mason 470.00
15.00 nos Mazdoor 425.00
0.00 % Municipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60
Min. rate of natural sand & Stone
6.75 cum sand 1644.15
2.43 MT Cement at site 4600.00
Total
(c) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60
6.00 hr Generator set 35 KVA 842.20
2.00 hours water tanker 6.0 Kl Capacity 698.88

Cost per 15 cum


Rate for 1 cum

Cost of Grouted Revetment


Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos Mate 456.00
0.35 nos Mason 470.00
0.75 nos Mazdoor for laying stones, filling quarry spalls 425.00
0.00 % Municipal area allowance 501.49
Total
(B) Material
1.00 cum Cost of Rough stone 300mm thick 508.35
Total

0.25 cum Add for cement concrete grouting 1:4:8 3465.20

(C) Over head charges (25%-VAT)


20.00 % Add for Over head charges on (A)+(B) 1876.14
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D) 2251.37

Rate to be adopted

19 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for
Toe wall.

Toe wall
Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos Mate 456.00
0.35 nos Mason 470.00
0.75 nos Mazdoor for laying stones, filling quarry spalls 425.00
0.00 % Municipal area allowance 501.49
Total
(B) Material
0.20 cum Quarry spalls and its carriage 328.35
1.00 cum Cost of Rough stone 300mm thick 508.35
Total

(C) Over head charges (25%-VAT)


20.00 % Add for Over head charges on (A)+(B) 1075.51
(D) Total of (A) + (B)+( C) 1290.61
(E) Add Contractors Profit at 10% on (D)
129.06

Rate to be adopted

20 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and

conveyance of materials to site including labour charges etc., complete for finished item of work as per

MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.
Out put = 1 Cum
a) Labour
0.05 day Mate 456.00
0.25 day Mazdoor Skilled 456.00
1.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 561.80

b) Material
1.20 cum Granular material 178.36

Cost per 1 Cum = a+b


20.00 % over head charges on Rs 775.83
10.00 % Conctractor profit 931.00

Asst.Exe.Engineer (R&B) Dy Executive Engineer (R&B)


Section: Kodad Sub-Division : Kodad

Executive Engineer (R&B)


Division : Suryapet
ad in Suryapet district.
18-19
UNIT AMOUNT
4 5
pecifications,incuding
us matter,dressing of

1 145.92
1 3400.00
0.00

3545.92

cum 3120.00
6665.92
1333.18
7999.10
799.91
8799.01
36.66
36.66
say 36.70
cum

1 145.92
1 3400.00
0.00

3545.92

cum 3120.00
6665.92
333.30

6999.22

1399.84
8399.06
839.91
9238.97
38.50
38.50
say 38.50
cum
te and fine aggregate
s to site and labour
other incidental and
MoRT&H specification
dations

MT 15870.00
cum 11098.01
cum 13278.60
40246.61

day 291.84
day 445.00
day 6375.00
0.00
7111.84

hour 2835.60
hour 5053.20
hour 1397.76
9286.56
56645.01
11329.00
6797.40
74771.41
4984.76
say 4985.00
cum

ss5)max size graded


Spcn. No 1500, 1700,
s.

MT 23736.00
cum 11098.01
644.77
cum 5311.44
cum 7775.19
cum 3168.72
51089.36

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

68575.32
4571.69

Cum 4571.69
182.87
950.91
570.55
6276.02
Say 6276.00
cum

m HBG (ss5)max size


r MoRT&H Spcn. No

MT 23736.00
cum 11098.01
cum 5311.44
cum 7775.19
cum 3168.72
51089.36

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

68575.32
4571.69

Cum 4571.69
457.17
1005.77
603.46
6638.09
Say 6638.00
cum

hed stone aggregate


ble 1000-2) including
xing, laying, vibrating,
r approved drawings
es for finished item as
d by the Engineer-in-
MT 27830.00
cum 11098.01
cum 11662.79
cum 6337.44
56928.24

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

74414.20
4960.95

Cum 4960.95

496.10

1091.41
6548.45
654.8454
7203.30
Say 7203.00
cum
Cum 4960.95
99.22

595.31

848.32
6503.81
650.38
7154.19
Say 7154.00
cum

cum

ced cement concrete


T&H spcn. No. 1500,

MT 23966.00
cum 8878.41
cum 11662.79
cum 6337.44
50844.64

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

68330.60
4555.37

Cum 4555.37

911.07
1093.29
655.97
7215.71
Say 7216.00
cum
cum
Cum 4555.37

1138.84
854.13
654.83
7203.18
Say 7203.00
cum
e not exceeding 12 mm fine
post not to exceed 1 in 500,
e space between vertical posts
ntering,machine
es of all T&P as per approved
on charges as per approved
500,1600,1700 & 2703 (5th

MT 23966.00
cum 8878.41
cum 7419.60
cum 3736.80
44000.81

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

61486.77
4099.12

cum 2384.46
119.22
2503.68
125.18
2628.87

525.77
3154.64
315.46
3470.10
440.44
440.00
1 RM

Cum 4099.12

819.82
590.27
550.92
6060.14
Say 6060.00
tal including cost and
ng including hire and
of flow of water, if
awings and technical

MT 18998.00
cum 11098.01
cum 7967.16
cum 5831.39
cum 1584.36
45478.92

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80

62964.88

Cum 62964.88
12592.98
7555.79
83113.64
5540.91
Say 5541.00
cum
hed stone aggregate
ble 1000-2) including
xing, laying, vibrating,
plete for finished item
rges as per MoRT&H
ngineer-in-Charge for

MT 28060.00
cum 11098.01
cum 11662.79
cum 6337.00
57157.80

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80
74643.76
4976.25

99.53
1015.16
609.09
6700.02
Say 6700.00
cum
e aggregate including
ng,compacting,curing
but excluding cost of
02(5th Revision). For

MT 28060.00
cum 11098.01
cum 11662.79
cum 6337.00
57157.80

day 392.16
day 705.00
day 8500.00
0.00
9597.16

hour 2835.60
hour 5053.20
7888.80
74643.76
4976.25

63.75
1008.00
604.80
6652.80
Say 6653.00
cum
graded granite metal
other incindental hire
oved drawing and as
nished item as per as
RCC M40. crash

day 410.40
day 705.00
day 8925.00
0.00
10040.40
10040.40
MT 29670.00

cum 11098.01

cum 11662.79
cum 6337.00
58767.80

hour 2835.60

hour 5053.20
7888.80
76697.00

7669.70 18

84366.70
5624.45
5624.00

cum 19284.70
19284.70

day 18.24
day 425.00
0.00
443.24

19727.94
19727.94
3945.588
2367.3528
26040.88
2604.0881
2604
Rm

f different diameters,
o site and all labour
grills, placing them in
andling charges and
or all R.C.C items for
n-Charge and as per
.C.C items.
MT 48300.00

kg 300.00
48600.00

day 182.40
day 890.00
day 2820.00
0.00
3892.40
52492.40
10498.48
6299.09
69289.97
69290.00

MT 48300.00
kg 300.00
48600.00

day 155.04
day 890.00
day 3055.00
0.00
4100.04
52700.04
10540.01
6324.01
69564.06
69565.00

MT 48300.00
kg 400.00
48700.00
day 200.64
day 1410.00
day 3400.00
0.00
5010.64
53710.64
10742.13
6445.28
70898.05
Say 70898.00

c., complete as per


) and as per Drawing

day 127.68
day 2975.00
0.00
3102.68

day 2140.32
2140.32

hour 134.40
hour 34.94
169.34
5412.34
541.23
108.25
64.95
714.43
Say 714.00
cum
he requirements laid

ess than 600mm with

ntire surface, behind

e as per drawing and

1.4 of IRC 78

day 145.92
day 456.00
day 2975.00
0.00
3576.92

cum 2654.10
cum 5901.60
8555.70

hour 41.93
12174.55
1217.46
243.49
1460.95
146.09
1607.04
Say 1607.00
cum
wall/Return wall with
e of about 1 V : 20H
e for finished item of

day 18.24 18.24


day 382.5 382.50
0.00 0
400.74 400.74

MT 2346 2346.00

cum 1726.3575 1726.36


4072.3575 4072.36
4473.0975 4473.10

day 13.68 13.68


day 235 235.00
day 106.25 106.25
0.00 0.00
354.93 354.93

RM 9043.65 9043.65

Each 287.1 287.10


Each 390 390.00
Cum 223.655 223.66
9944.41 9944.41 10299.34

2059.867 2059.87
12359.20 12359.21
1235.9202 1235.92
13595.12 13595.13
453.17 453.17
453.00 453.00
1RM 1 RM
No.2705 and as per

kg 146.00
m 1570.00
each 66.00 66.00
each 50.00 50.00
1832.00

day 9.12 9.12


day 9.40 9.40
day 8.50 8.50
0.00
27.02 27.02

day 4.56 4.56


day 4.70 4.70
day 85.00 85.00
0.00
94.26 94.26
1953.28 171.28
97.664 0.00
2050.94 171.28

410.19
246.11
2707.25
Say 2707.00
1no

ze grouted with 0.20


g labour charges for
&H specification 2504

day 291.84 291.84


day 470.00 470.00
day 6375.00 6375.00
0.00
7136.84 7136.84

cum 13278.60 13278.60


11098.01
cum 11098.01
MT 11178.00 11178.00
35554.61 35554.61

hr 2835.60 2835.60
hr 5053.20 5053.20
hour 1397.76
9286.56 7888.80
51978.01 50580.25
3465.20 3372.02

day 18.24 18.24


day 164.50 164.50
day 318.75 318.75
0.00
501.49 501.49

cum 508.35 508.35


508.35 508.35

cum 866.30
1876.14

375.22803 201.97
2251.37 1211.81
225.13682 121.18
2476.51 1332.99
2476.51 1332.99
2477.00 1333.00
1cum 1 Cum
o site and including
work as per MoRT&H
hing of slopes for

day 18.24
day 164.50
day 318.75
0.00
501.49

cum 65.67
cum 508.35
574.02

215.102
1290.61
129.0612
1419.67
1419.67
1420.00
1cum

including cost, and

item of work as per

under Revetment.
day 22.80
day 114.00
day 425.00
0.00
561.80

day 214.03
214.03
775.83
155.17
93.10
1024.10
Say 1024.00
1cum

ngineer (R&B)
Name of Work ::- Construction Of High Level Bridge at Km 15/02 on Kodada-Revoor Road i
Suryapet District.

DATA

SSR :: 2018-19 Date :: 20.12.2017 Municipal Area Allowance ::

SNo Quantity Unit Description of Item Rate per

1 2 3 4 5 6
10 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3

10 Page 67,68 of MoRT&H SDB


10 Unit = sqm
10 Taking output = 100 sqm
10 (A) Labour
10 0.01 day Mate 456.00 1.00
10 0.25 day Mazdoor 425.00 1.00
10
10 0.0 % Municipal Area Allowance 110.81
10 TOTAL A=
10 (B) Machinery
10 0.08 hour Tractor with ripper attachment @ 60 cum per hour 568.23 1.00
10 0.20 hour Front end loader 1 cum capacity 1843.52 1.00
10 0.23 hour Tipper 5.50 cum capacity, 4 trips/Hour 1004.40 1.00
10 TOTAL B=
10 (A + B )
10
10 5.00 % (C) Over Head Charges on (A+B) 755.98
10
10 10.00 % (D) Contractors Profit on (A+B+C) 793.78
10
10 100.00 sqm TOTAL Cost for 100 sqm = (A+B+C+D)
10 Rate per 1 sqm
10 Rate per 1 sqm
1 Construction of embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road
Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational
charges of T&P and (excluding seigniorage) charges, complete for finished item of work as per
MoRT&H specification 305

1 (5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).
1 Page 68,69 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 100 Cum
1 (A) Labour
1 0.04 day Mate 456.00 1.00
1 1.00 day Mazdoor unskilled 425.00 1.00
1
1 0.0 % Municipal Area Allowance 443.24
1 TOTAL A=
1
1 (B) Machinery
1 1.67 hour Hydraulic Excavator 1 Cum bucket capacity @ 60 cum/hr 2821.50 1.00
1 800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00 t.km
1 Add 10% of cost of carriage to cover
1 cost of loading and unloading
1 0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2661.20 1.00
1 1.00 hour Motor Graders for Grading @ 100 cum per hour 3601.92 1.00
1 4.00 hour Water tanker 6 KL 698.88 1.00
1 1.00 hour Vibratory roller 8T 2878.90 1.00
1 TOTAL B=
1 (A + B )
1
1 5.00 % (C) Over Head Charges on (A+B) 20656.17
1
1 10.00 % (D) Contractors Profit on (A+B+C) 21688.98
1
1 (E ) Seigniorage charges
1 100.00 cum Earth 0.00 1.00
1
1 100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E)
1
1 Rate per 1 cum
1 Rate per 1 cum
2 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of
MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials
to work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made
based on levels for finished item of work ).

2 By Mix in Place Method


2 Page 94 of MoRT&H SDB
2 Unit = cum
2 Taking output = 300 cum
2 (A) Labour
2 0.48 day Mate 456.00 1.00
2 2.00 day Mazdoor skilled 456.00 1.00
2 10.00 day Mazdoor unskilled 425.00 1.00
2
2 0.0 % Municipal Area Allowance 5380.88
2 TOTAL A=
2 (B) Machinery
2 6.00 hour Motor grader 3.35M Blade @50 cum/Hr. 3601.92 1.00
2 6.00 hour Vibratory roller 8T 2878.90 1.00
2 12.00 hour Tractor - Rotavator (223+11=234) 472.64 1.00
2 3.00 hour Water tanker 6 KL 698.88 1.00
2 TOTAL B=
2
2 (C) Material
2 Granular sub-base material as per
2 Table 400-1, Grading VI material of MORT&H
2 45-9.5 mm IRC & MORT&H HBG Chips @ 35 %
2 134.40 cum Avg. rate of (40-45),(25-27),(19-22), (12-14), (9.5-11.2) #REF! 1.00
2 11.2-2.36 mm IRC & MORT&H HBG Chips @ 47.5 %
2 182.40 cum Average rate of (9.5-11.2),(5-7)&(2.36-5) #REF! 1.00
2 2.36mm and below @ 17.5%
2 67.20 cum (Rate of 2.36mm & below HBG metal) #REF! 1.00
2 384.00 TOTAL C=
2 (A + B +C)
2
2 5.00 % (D) Over Head Charges on (A+B+C) #REF!
2
2 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
2
2 (F ) Seigniorage charges
2 384.00 cum Metal 0.00 1.00
2
2 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F)
2 Rate per 1 cum
2 Rate per 1 cum
3 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
Macadam specification including cost, (excluding seigniorage) of all materials and including premixing
the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on
levels for finished item of work)

3 Page 110,111 of MoRT&H SDB


3 Unit = cum
3 Taking output = 225 cum
3 (A) Labour
3 0.48 nos. Mate 456.00 1.00
3 2.00 nos. Mazdoor skilled 456.00 1.00
3 10.00 nos. Mazdoor 425.00 1.00
3
3 0.0 % Municipal Area Allowance 5380.88
3 TOTAL A=
3 (B) Machinery
3 6.60 hour Wet mix plant of 60 ton hr. capacity 1843.52 1.00
3 6.00 hour Electric generating set 125 KVA 1478.40 1.00
3 6.00 hour front end loader 1 cum capacity 1843.52 1.00
3 6.00 hour Mechanical Paver finisher 100 TPH 2518.88 1.00
3 3.90 hour Vibratory roller 8-10 T 2878.90 1.00
3 3.00 hour Water tanker 698.88 1.00
3 TOTAL B=
3 (C) Material
3 45 to 22.40mm IRC HBG metal @ 30%
3 89.10 cum Avg. rate of (40-45), (25-27), (19-22mm ) #REF! 1.00
3 22.4-2.36mm IRC HBG metal @ 40%
3 118.80 cum Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below) #REF! 1.00
3 2.36mm to 75 micron @ 30%
3 89.10 cum (2.36mm & below) #REF! 1.00
3 TOTAL C=
3 (A + B +C)
3
3 5.00 % (D) Over Head Charges on (A+B+C) #REF!
3
3 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
3
3 (F ) Seigniorage charges
3 297.00 cum Metal 0.00 1.00
3
3 225.00 cum TOTAL Cost for 225 cum = (A+B+C+D+E+F)
3 Rate per 1 cum
3 Rate per 1 cum
4 Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure
distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion
at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-
in-charge.

4 Page 123 of MoRT&H SDB


4 Unit = sqm
4 Taking output = 3500 sqm
4 (A) Labour
4 0.08 nos. Mate 456.00 1.00
4 2.00 nos. Mazdoor 425.00 1.00
4
4 0.0 % Municipal Area Allowance 886.48
4 TOTAL A=
4 (B) Machinery
4 2.80 hour Mechanical broom @ 1250 sqm/hr. 399.84 1.00
4 2.80 hour Air compressor 250 cfm 588.40 1.00
4 2.00 hour Emulsion pressure distributor @1750 sqm/hr. 963.20 1.00
4 1.00 hour water tanker 6 KL 698.88 1.00
4 TOTAL B=
4 (C) Material
4 2.45 MT Bitumen Emulsion @ 0.70 Kgs/sqm #REF! 1.00
4 TOTAL C=
4 (A + B +C)
4
4 5.00 % (D) Over Head Charges on (A+B+C) #REF!
4
4 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
4
4 3500.00 sqm TOTAL Cost for 3500 sqm = (A+B+C+D+E)
4 Rate per 1 sqm
4 Rate per 1 sqm
5 Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using Emulsion
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned
with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.

5 Page 124 of MoRT&H SDB


5 unit = sqm
5 Taking output = 3500 sqm
5 (A) Labour
5 0.08 no Mate 456.00 1.00
5 2.00 no Mazdoor 425.00 1.00
5
5 0.0 % Municipal Area Allowance 886.48
5 TOTAL A=
5 (B) Machinery
5 2.80 hour Mechanical broom Hydraulic @ 1250 sqm/hr. 399.84 1.00
5 2.80 hour Air compressor 250 cfm 588.40 1.00
5 2.00 hour Emulsion pressure distributor @1750 sqm/hr. 963.20 1.00
5 TOTAL B=
5 (C) Material
5 0.700 MT Bitumen Emulsion @ 0.20 Kgs/sqm #REF! 1.00
5 TOTAL C=
5 (A + B +C)
5
5 5.00 % (D) Over Head Charges on (A+B+C) #REF!
5
5 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
5
5 3500.00 sqm TOTAL Cost for 3500 sqm = (A+B+C+D+E)
5 Rate per 1 sqm
5 Rate per 1 sqm
6 Providing and laying of Dense Graded Bituminous Macadam with with 100-120 TPH Batch Mix plant
using HBG crushed aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505 (5th
revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total mixture,
transported to site, laid over a previously prepared surface with Paver finisher hydrostatic with sensor
control 100 TPH for full width to the required grade, level and alignment and rolled as per Clauses 501.6
and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-
Charge including hire and operational charges all T&P and all other contingent charges necessary
including cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H
specification No. 505 (5th Revision) (Excluding VAT Charges)

6 Page 132,133 of MoRT&H SDB


6 Unit = cum
6 Taking out put = 195 cum (450 ton)
6 (A) Labour
6 0.84 nos. Mate 456.00 1.00
6 Mazdoor working with HMP, mechanical broom,
6 paver, roller, asphalt cutter and assistance for
6 14.00 nos. setting out lines, levels and layout of construction. 425.00 1.00
6 5.00 nos. Mazdoor skilled 456.00 1.00
6
6 0.0 % Municipal Area Allowance 8613.04
6 TOTAL A=
6 TOTAL
6 (B) Machinery
6 6.00 hour Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52 1.00
6 6.00 hour Paver finisher hydrostatic with sensor control 100 TPH 2518.88 1.00
6 6.00 hour Generator 250 KVA 2072.00 1.00
6 6.00 hour Front end loader 1 cum bucket capacity 1843.52 1.00
6 Smooth wheeled roller 8-10 tones
6 3.90 hour for initial break down rolling 1131.00 1.00
6 3.90 hour Pneumatic roller 8 tones for intermediate rolling 1283.00 1.00
6 Finish rolling with 6-8 tones
6 3.90 hour smooth wheeled tandem roller. 1131.00 1.00
6 TOTAL B=
6 (C) Material
6 Bitumen VG 30 @ 4.50 %
6 20.25 MT of weight of mix=205x2.2=450 ton #REF! 1.00
6 ii) Aggregate
6 TOTAL weight of mix = 450 tones
6 weight of bitumen - 20.25 tones
6 Weight of aggregate = 450-20.25 = 429.75 tones
6 Taking density of aggregate = 1.5 ton/cum
6 Volume of aggregate = 286.50 cum
6 Grading - II (19 mm nominal size)
6 25-10 mm IRC & MORT&H HBG Chips @ 30 %
6 85.95 cum Avg. of(25-27),(19-22),(12-14) (9.5-11.2) #REF! 1.00
6 10-5 mm IRC & MORT&H HBG Chips @ 28 %
6 80.22 cum Avg. of (9.5-11.2),( 5-7) #REF! 1.00
6 5mm & below IRC & MORT&H HBG Chips@ 40 %
6 114.60 cum Avg. of (2.36-5),( 2.36mm & below) #REF! 1.00
6 5.73 cum Filler @ 2% of weight of aggregates. #REF! 1.00
6 TOTAL C=
6 (A + B +C)
6
6 5.00 % (D) Over Head Charges on (A+B+C) #REF!
6
6 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
6
6 (F ) Seigniorage charges
6 286.50 cum Metal 0.00 1.00
6
6 195.00 cum TOTAL Cost for 195 cum = (A+B+C+D+E+F)
6 Rate per 1 cum
6 Rate per 1 cum

6 Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant using
HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed
with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with
Paver finisher for full width to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for
finished item of work) (Excluding VAT Charges)

6 Page 138,139,140 of MoRT&H SDB


6 Unit = cum
6 Taking output = 191 cum (450 tones.)
6 (A) Labour
6 Mate 456.00
0.84 nos. 1.00
6 Mazdoor working with HMP, Mechanical broom,
6 paver, roller, asphalt cutter and assistance for
6 14.00 nos. setting outlines, levels and layout of construction. 425.00 1.00
6 5.00 nos. Skilled Mazdoor for checking line and levels. 456.00 1.00
6
6 0.0 % Municipal Area Allowance 8613.04
6 TOTAL A=
6 (B) Machinery
6 6.00 hour Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52 1.00
6 6.00 hour Mechanical Paver finisher 2518.88 1.00
6 6.00 hour Generator 250 KVA 2072.00 1.00
6 6.00 hour Front end loader 1 cum capacity 1843.52 1.00
6 Power road roller 8 ton for initial
6 3.90 hour break down rolling 1131.00 1.00
6 3.90 hour Pneumatic roller 8 ton for intermediate rolling 1283.00 1.00
6 Finish rolling with 6-8 ton.
6 3.90 hour smooth wheeled tandem roller 1131.00 1.00
6 TOTAL B=
6 (C) Material
6 Bitumen VG 30 @ 5.40 %
6 24.30 MT of weight of mix=205x2.2=450 ton #REF! 1.00
6 ii) Aggregate
6 TOTAL weight of mix = 450 tones
6 Weight of bitumen - 24.30 tones
6 Weight of aggregate = 450-24.30 = 425.70 tones
6 Taking density of aggregate = 1.5 ton/cum
6 Volume of aggregate = 283.80 cum
6 Grading-2 (13 mm nominal size)
6 13.2-10 mm IRC & MORT&H HBG Chips @ 20%
6
56.76 cum Avg. of (14-12),(9.5-11.2) #REF! 1.00
6 10-5 mm IRC & MORT&H HBG Chips @ 25 %
6
70.95 cum Avg. of (9.5-11.2),( 5-7) #REF! 1.00
6 5mm & below IRC & MORT&H HBG Chips@ 53 %
6 150.41 cum Avg. of (2.36-5),( 2.36mm & below) #REF! 1.00
6 4.26 MT Cement Filler @ 1% of weight of aggregates. 4450.00 1.00
6 2.84 cum Filler @ 1% of weight of aggregates. #REF! 1.00
6 285.22 TOTAL C=
6 (A + B +C)
6
6 5.00 % (D) Over Head Charges on (A+B+C) #REF!
6
6 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
6
6 (F ) Seigniorage charges
6 282.38 cum Metal 0.00 1.00
6
6 191.00 cum TOTAL Cost for 191 cum = (A+B+C+D+E+F)
6 Rate per 1 cum
6 Rate per 1 cum
7 Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of all
7 materials to work site and spreading in uniform
Page 95,96,114 of layers
MoRT&Hby approved
SDB means, on prepared surface and
7 Unit = cum
7 Taking output = 300 cum
7 (A) Labour
7 0.40 day Mate 456.00 1.00
7 2.00 day Mazdoor skilled 456.00 1.00
7 8.00 day Mazdoor unskilled 425.00 1.00
7
7 0.0 % Municipal Area Allowance 4494.40
7 TOTAL A=
7 (B) Machinery
7 6.00 hour Vibratory roller 8T 2878.90 1.00
7 3.00 hour Water tanker 6 KL 698.88 1.00
7 TOTAL B=
7 (C) Material
7 384.00 cum Gravel #REF!
7 TOTAL C=
7 (A + B +C)
7
7 5.00 % (D) Over Head Charges on (A+B+C) #REF!
7
7 10.00 % (E) Contractors Profit on (A+B+C+D) #REF!
7
7 (F ) Seigniorage charges
7 384.00 cum Gravel 0.00 1.00
7
7 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F)
7 Rate per 1 cum
7 Rate per 1 cum
5
Asst. Executive Engineer Executive Engineer
Dy. Executive Engineer
R&B Section,Kodad
(R&B)Div
ision
R&B Sub-Division Kodad Suryapate
ada-Revoor Road in

0.0%

Amount

4.56
106.25
110.81
0.00
110.81

45.46
368.70
231.01
645.17
755.98

37.80

79.38

873.16
8.73
8.70 OK
18.24
425.00
443.24
0.00

443.24

4711.91

4800.00

480.00
1330.60
3216.00

2795.52
2878.90
20212.93
20656.17

1032.81

2168.90

0.00
23857.88

238.58
239.00 New ok

218.88
912.00
4250.00
5380.88
0.00

5380.88

21611.52
17273.40
5671.68
2096.64
46653.24

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

0.00

#REF!

#REF!
#REF! OK

218.88
912.00
4250.00
5380.88
0.00
5380.88

12167.23
8870.40
11061.12
15113.28
11227.71
2096.64
60536.38

#REF!

#REF!

#REF!
#REF!
#REF!

#REF!

#REF!

0.00

#REF!

#REF!
#REF! ok

NEW

36.48
850.00

886.48
0.00

886.48
1119.55
1647.52
1926.40
698.88

5392.35

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!
#REF! ok

36.48
850.00

886.48
0.00

886.48

1119.55
1647.52
1926.40

4693.47

#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!
#REF! ok

NEW

383.04

5950.00
2280.00
8613.04
0.00
8613.04

162429.12
15113.28
12432.00
11061.12

4410.90
5003.70

4410.90
214861.02

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

0.00

#REF!
#REF!
#REF!

NEW

383.04
5950.00
2280.00

8613.04
0.00

8613.04

162429.12
15113.28
12432.00
11061.12

4410.90
5003.70

4410.90

214861.02

#REF!

ok

#REF!

#REF!

#REF!
18943.65
#REF!
#REF!
#REF!

#REF!

#REF!

0.00

#REF!
#REF!
#REF!

182.40
912.00
3400.00
4494.40
0.00
4494.40

17273.40
2096.64
19370.04

#REF!
#REF!
#REF!

#REF!

#REF!

0.00

#REF!
#REF!
#REF!
Executive Engineer
384.00
1.28

134.4 134.4
153.6 183.36
96 66.24
384
7.75
450 450.000 30 0 0.000
22.50 24.300 25 0 0.000
427.50 425.700 43 0 0.000
1.485864 285 283.800 2 0 0.000
100
5.676

Cement filler instead of filler


DATA-CD STRUCTURES (2018-19)
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working
reach from Km 1/4 to 21/2) in Suryapet District.

S.No. Quantity Description of Item Rate per

BOX culverts at 3/8 ,6/8,17/8,19/6


1 Dismantling of Structures (superstructure, substructure, foundation and other miscellaneous
structures) and pavements including disposing of resulting materials and/or salvaging useful materials
up to a distance of 1 km from project road complete as per Drawings and Technical Specification
Clause MoRT&H 202 and as directed by the Engineer.(By Mechanical means in Cement Concrete grade
M-15 & M-20)

Page 23,24,25 of MoRT&H SDB


Unit = cum
Taking output = 1.25 cum
(A) Labour
0.020 no Mate 456.00 1.00
0.250 no Mazdoor skilled 456.00 1.00
0.250 no Mazdoor unskilled 425.00 1.00
0% Agency area allowance 229.37
TOTAL A=
(B ) Machinery
Air compressor 250 cfm with 2 leads of
0.67 pneumatic breaker @ 1.5 cum per hour 588.40
0.270 hour Tractor Trolley 464.80 1.00
TOTAL B=
(A + B )
(C) Over Head Charges on (A+B)
5.00% Over head charges 5% on (A) + (B) 749.10

10.00 % (D) Contractors Profit on (A+B+C) 786.56

1.25 cum TOTAL Cost for 1.25 cum = (A+B+C+D)


Rate per 1 cum
Rate per 1 cum
2 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation
earth to the extent required etc., complete excluding seignioarge charges for finished item of work
as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

Unit : Cum Page 323 of MoRT&H SDB


Taking out put = 240 Cum
(A) Labour
0.32 day Mate 456.00 day
8.00 day Mazdoor unskilled 425.00 day
0% Muncipal area allowance 3545.92

(B) Machinery
Hydraualic Excavator 1 Cum bucket
6.00 hr 2821.50 hr
capacity @ 60 cum/hr
240.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 cum

(C) Over head charges


5.00% Over head charges 5% on (A) + (B) 20474.92
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 240 cum (D)+(E)
Rate for 1 cum
Rate to be adopted

3
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for
base coarse below.

Unit = cum
Taking output = 15 cum
(A) Labour
0.64 Day Mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
6.75 cum Sand at site 1644.15 cum
3.45 MT Cement at site 4600.00 MT
Total
(C ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
(D) Over head charges @5 %
5.00% Over head charges 5% on (A) + (B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E) + (F)
Rate for 1 cum
Rate to be adopted
4 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for levelling Course (Box Culvert & Approach Slab)

Unit = cum Page 335 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 456.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9597.16
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Form work
% Form work @ 0% on (A)+(B)+( C) 62964.88 Cum
(E) Over head charges @ 5%
5% Add for Over head charges @ 5% on (A)+(B)+( C) 62964.88
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

5 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge (for Raft foundation)

Unit = cum Page 341 SDB, Chapter-12


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.380 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 4600.00 hr
6.00 hr Generator 100 KVA 0.00 hr
6.00 hr Loader 1 cum capacity 1 cum 0.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 tkm 0.00 tkm
Km, L - lead in Kilometer
6.00 hr Concrete Pump 698.88 hr
Total
(D) Form work
3.75 % Form work @ 3.75 on (A)+(B)+( C) 525332.72 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 545032.70
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6 Vibrated Reinforced cement concrete M 20 Grade Concrete using 20mm and 10 mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footing ( curtain walls, Wing wall)

Unit = cum Page 336 of MoRT&H SDB


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
41.660 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 15 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
4% Form work @ 4% on (A)+(B)+( C) 493482.44 Cum
(E) Over head charges @ 5%
5% Over head charges 5% on (A) + (B)+(C)+(D) 513221.74
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

7 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for Sub structure (Side walls)

Unit = cum Page 455 SDB, Chapter-13


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
41.660 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10.00 % Form work @ 10 on (A)+(B)+( C) 493482.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 542830.68
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

8 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for BOX Culvert(OR Sub-Structure)

Unit = cum Page 475 SDB, Chapter-14


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.380 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 524394.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 576833.88
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
9 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.

Page 449 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.40 no Mate 456.00 1.00
2.00 no Black smith 470.00 1.00
6.00 no Mazdoor 425.00 1.00
0% Agency area allowance 2550.00
TOTAL A=
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 1.00
6.00 Kg Binding wire ( I&CAD SSR item no.3 ) 50.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 52272.40

10.00 % (D) Contractors Profit on (A+B+C) 54886.02

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT

10 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

Page 459,460 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.34 no Mate 456.00 1.00
2.00 no Black smith 470.00 1.00
6.50 no Mazdoor 425.00 1.00
0% Muncipalarea allowance 2762.50
TOTAL A=
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 1.00
6.00 Kg Binding wire ( Building SSR item no.757 ) 50.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 52457.54

10.00 % (D) Contractors Profit on (A+B+C) 55080.42

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT

11 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

Page 489,490 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.44 no Mate 456.00 1.00
3.00 no Black smith 470.00 1.00
8.00 no Mazdoor 425.00 1.00
0% Muncipal area allowance 3400.00
TOTAL A=
(B) Material
HYSD bars including 5% overlaps and
1.05 MT 46000.00 1.00
wastage
8.00 Kg Binding wire ( Building SSR item no.757 ) 50.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 53710.64

10.00 % (D) Contractors Profit on (A+B+C) 56396.17

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT
12 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure on which it is built and installed as per design
given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Unit = RM Page 237 & 482
Taking output = 10 RM
M40 Grade concrete
Unit = cum Page SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.94 Day Mate 456.00 day
3.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Agency area allowance 2073.64
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
51.600 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10 % Form work @ 10 on (A)+(B)+( C) 540337.04 Cum
(E) Over head charges @
0.00% Add for Over head charges @ 3% on (A)+(B)+( C)+(D) 594370.74
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum
Rate for 1 cum
Rate to be adopted

Page 237 of MoRT&H SDB


(A) M40 grade concrete
3.00 Cum M 40 4953.00 1.00
(B) Labour
0.04 no Mate 456.00 1.00
1.00 no Mazdoor 425.00 1.00
0% Agency area allowance
TOTAL A=
(B) Material
0.28 MT HYSD bars including overlaps 46000.00 1.00
0.32 Kg Pre-moulded asphalt filler board 729.00 1.00
TOTAL B=
(A + B )
5.00 % (C) Over Head Charges on (A+B) 28415.52

10.00 % (D) Contractors Profit on (A+B+C) 29836.30

10.00 RM TOTAL Cost for 10 RM = (A+B+C+D)


Rate per 1 RM
Rate per 1 RM
13 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per Approved drawing but
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, &
2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.

Unit = cum Page 501 of MoRT&H SDB


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.800 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 4953.00 hr
6.00 hr Generator 100 KVA 0.00 hr
6.00 hr Loader 1 cum capacity 1 cum 456.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 tkm 0.00 tkm
Km, L - lead in Kilometer
6.00 hr Concrete Pump 0.00 hr
Total
(D) Form work
2.00 % Form work @ 3.75 on (A)+(B)+( C) 527925.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 538483.95
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
14 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification 1500,
1600, 1700 & 2702 as directed by the Engineer-in-Charge for Wearing Coat over Deck Slab

Unit = cum Page 477 SDB, Chapter-14


Taking output = 15 cum
(A) Labour
0.90 Day mate 456.00 day
1.50 Day Mason 470.00 day
21.00 Day Mazdoor 425.00 day

0% Muncipal area allowance 9630.00


Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
6.100 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
% Form work @ 20% on (A)+(B)+( C) 75087.44 Cum
(E) Over head charges @ 5%
Over head charges 5% on (A) + (B)+(C)+(D) 75087.44
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

15 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for curtain wall.

Unit = cum Page 335 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 456.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9597.16
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Form work
3.00 % Form work @ 3% on (A)+(B)+( C) 62964.88 Cum
(E) Over head charges @ 5%
5% Add for Over head charges @ 5% on (A)+(B)+( C) 64853.83
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

16 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through the full width of the structure at 1.00m C/C in both horizontal and vertical
direction so that the weep holes in each horizontal direction is staggered from the weep holes laying
above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream
side face etc., complete for finished item of work for weep holes as per SSR Data

Page No. 461, SSR 2016-17 Rm


Unit = RM

17 Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705
MORTH
Pg no 499 of SDB
Unit = 1 No
taking output=1 no
(A) for Fabrication
0.02 no mate 456.00 1.00
no Mason skilled 470.00 1.00
0.02 no Black smith 470.00 1.00
0.02 no Mazdoor 425.00 1.00
(B) Fixing
0.01 no mate 456.00 1.00
0.01 no Mason skilled 470.00 1.00
no Black smith 470.00 1.00
0.20 no Mazdoor 425.00 1.00
0% Muncipal area allowance 17.90
TOTAL A=
(B) Material
corrosion resistanct structural steel
0.004 MT including 5% wastage (M087, Pg.36 of SSR 44500.00 1.00
GI bolt 10mm Dia (M110, Pg.37 of SSR 2015-
2015-16)
6.00 nos 23.00 1.00
16)
G I Pipe 100 mm dia B Class (Sl.32, Pg.20 of
2.00 RM 675.00 1.00
Galvanised MSSSR
flat2015-16)
clamp(M101, Pg.37 of
2.00 each 195.00
SSR 2015-16)
TOTAL B=
(A + B )
labour (a+b) for electrodes, gas cutting,
5.00 % 2177.28
sealant, anti-corrosive bituminous paint,
5.00% Over head charges 5% on (A) + (B) 2177.28

10.00 % (D) Contractors Profit on (A+B+C) 2286.14

1.00 NO TOTAL Cost for 1 NO = (A+B+C+D)


Rate per 1 NO
Rate per 1 NO
18 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size
including cost, (excluding seigniorage) charges and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per
MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of
slopes

Unit = cum Page 522 of MoRT&H SDB


Taking output = 1 cum
(A) Labour
0.04 Day Mate 456.00 day
0.35 Day Mason 470.00 day
0.75 Day Mazdoor 425.00 day
0% Agency area allowance 501.49
Total

(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 cum Cost of stone spalls 328.35 cum
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1075.51
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate to be adopted
19 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges etc.,
complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed
by the Engineer-in-Charge

Unit = cum Page 523 of MoRT&H SDB


Taking output = 1 cum
(A) Labour
0.05 Day Mate 456.00 day
0.25 Day Mazdoor skilled 470.00 day
1.00 Day Mazdoor 425.00 day
0% Agency area allowance 565.30
Total

(B) Material
1.20 cum Cost of Gravel 178.36 cum
Total
(C) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 779.33
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

20 Back filling behind Abutments/Wing walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per
MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for
finished item of work

Unit = cum Page 462 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.28 Day Mate 456.00 day
7.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 3102.68
Total

(B) Material
12.00 cum Cost of Selective earth 178.36 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 5412.34
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
21 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting
the requirements given in table 500-29, prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at
an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.

Unit = sqm
Taking output =35.00 Sqm (0.87 cum) assuming a
density of 2.3 tonn/cum Page 151 of MoRT&H SDB
(A) Labour
0.44 nos. Mate 425.00 day
10.00 nos. Mazdoor working with HMP, Mechanical 400.00 day
1.00 nos. broom, paver,roller,asphalt
Skilled Mazdoor for checkingcutter and
line and 470.00 day
levels.
Agency area allowance 4657.00
Total
(B) Machinary
0.06 hr Mechanical broom @ 1250 sqm per hour 357.00 hr
0.06 hr Air compressor 250 cfm 521.20 hr
6.00 hr Mastic cooker 1 tonne capacity 65.00 hr
6.00 hr Bitumen boiler 1500 litres capacity 209.00 hr
1.00 hr Tractor for towing and positioning of mastic 415.00 hr
cooker
Total and bitumen boiler
(C) Material
Base mastic (without coarse aggregates) =
60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40
Proportion
per cent . of material required for mastic
asphalt with coarse aggregates (based on
I)
mixBitumen
design 85/25
done byor CRRI
30/40for@ a10.2 per cent
specific case)
0.200 tonne 29607.00 tonne
by weight of mix. 2 x 10.2/100 = 0.204
retained on 0.075mm sieve @ 31.9 per cent
0.39 cum 1081.77 cum
by weight
content notofless
mixthan
= 2 x8031.9/100
per cent= by0.638
0.36 tonne iv) Coarse aggregates 6.3 by
mmweight
to 13.2 2616.00 tonne
weight @ 17.92 per cent ofmm
mix@=
0.55 cum 40 Pre-coated
v) per cent bystone
weight of mix
chips = 2 mm
of 13.2 x 40/100 1453.85 cum
0.02 cum = 0.8 MT size
nominal = 0.8/1.456
for skid = 0.55
resistance = 35 x 1568.02 cum
vi) Bitumen for coating of chips @ 2 per
0.50 kg 0.005/10 = 0.018
cent by weight = 0.018 x 1.456 x 2/100 = 29.607 kg
0.0005 MT = 0.5kg Total
A+B +C= TOTAL
(D) Over head charges
5.00% Over head charges 14899.52
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 35.00 Sqm
Rate per 1 Sqm
Rate to be adopted
22 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a
thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall
and provided over the entire surface behind the abutment, wing wall and return wall to the full
height compacted to a firm condition including cost and conveyance of all metal (excluding
seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing
and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision)
for finished item of work.

Unit = cum Page 463 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.32 Day Mate 456.00 day
7.00 Day Mazdoor 425.00 day
1.00 Day Mazdoor skiled 456.00 day
0% Agency area allowance 3576.92
Total
(B) Material
6.00 cum Cost of 150mm size IRC soling stone 442.35 cum
6.00 cum Cost of 40mm size IRC metal 983.60 cum
Total
© Machinery
0.06 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B) 12174.55
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

23 Providing and laying Boulder's apron on River Bed for protection against scour with stone boulders
weighing not less than 40 k.g each complete as per drawing and technical specification 300 mm thick
with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and
conveyance of materials to site and including labour charges for packing the stones for apron etc.,
complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed
by the Engineer-in-Charge for Bed Protection.

Unit : Cum
Taking out put = 1 Cum Page 520 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
0.35 day Mason 470.00 day
0.75 day Mazdoor Unskilled 425.00 day
0% Muncipal area allowance 501.49

(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 Cost of stones spalls 504.35
5.00% Over head charges 5% on (A) + (B) 1110.71
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 sqm (D) + (E)
Rate per cum
Rate per 1 cum

24 Forming embankment with borrowed useful earth from outside road boundary by mechanical means
upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision).
(Payment Based on Levels) for diversion road

Unit : Cum
Taking out put = 100 Cum Page 70 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
1.00 day Mazdoor unskilled 425.00 day
0% Agency area allowance

(B) Machinery
100.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum
800.00 t.km Tipper (for 10Kms=160x5=800) 6.00 t.km
Add 10% of cost of carriage to cover cost of
loading
Dozer 80and
HP unloading
for spreading @ 200 cum per
0.50 hr 2661.20 cum
hour
Motor Grador for Grading @ 100 cum per
1.00 hr 3601.92 hr
hour
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr

(C) Over head charges


5% Over head charges 5% on (A) + (B) 17630.18
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 100 cum (D) + (E)
Rate per Cum
Rate per 1 cum

25 Construction of Gravel base & shoulders including cost, (excluding seigniorage) charges and
conveyance of all materials to work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve the desired density at OMC etc.,
complete for finished item of work as per MoRT&H Specification 401& 408 (5th revision) and as
directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

25 Page 95,96,114 of MoRT&H SDB


25 Unit = cum
25 Taking output = 300 cum
25 (A) Labour
25 0.40 day Mate 456.00 1.00
25 2.00 day Mazdoor skilled 456.00 1.00
25 8.00 day Mazdoor unskilled 425.00 1.00
25
0.0 % Municipal Area Allowance 4494.40
0 TOTAL A=
0 (B) Machinery
0 6.00 hour Vibratory roller 8T 2821.50 1.00
0 3.00 hour Water tanker 6 KL 698.88 1.00
0 TOTAL B=
0 (C) Material
0 384.00 cum Gravel 178.36
0 TOTAL C=
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 92010.28
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 96610.79
0
0 (F ) Seigniorage charges
0 384.00 cum Gravel 0.00 1.00
0
0 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F)
0 Rate per 1 cum
0 Rate per 1 cum

Asst. Executive Engineer (R&B) Dy. Executive Engineer (R&B)


Section : Medlacheruvu Sub- division: Huzurnagar

Executive Engineer (R&B) Superintending Engineer (R&B)


Division : Suryapet Circle : Nalgonda
/4 to 28/140 (Working

Amount
(Rs.)

d other miscellaneous
lvaging useful materials
Technical Specification
Cement Concrete grade

9.12
114.00
106.25
0.00
229.37
Air compressor 250 cfm with 2 leads of

394.23 pneumatic breaker @ 1.5 cum per hour


125.50
519.73
749.10

37.46

78.66

865.22
692.17
692.00
ons of structures as per
f shoring and bracing,
ck filling the excavation
or finished item of work
r-in-Charge.

145.92
3400.00
0.00
3545.92
16929.00
0.00

1023.75
21498.67
2149.87
23648.53
98.54
99.00
1 Cum

ed stone aggregate and


ance of all materials to
etc., including all other
d item of work as per
e Engineer-in-Charge for

291.84
470.00
6375.00
0.00
7136.84

13278.60
11098.01
15870.00
40246.61

2835.60
5053.20
1397.76
9286.56

2833.50
59503.51
5950.35
65453.86
4363.59
4364.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
& Approach Slab)

392.16
705.00
8500.00
0.00
9597.16

7967.16
5831.39
1584.36
11098.01
18998.00
45478.92

2835.60
5053.20
0.00
7888.80

0.00

3148.24
66113.12
6611.31
72724.44
4848.30
4848.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
222548.00
455333.90

27600.00
0.00
0.00
28762.50
0.00
4193.28
60555.78

19699.98

27251.64
572284
57228.43
629513
5245.94
5246.00
1 Cum

10 mm size HBG crushed


ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
wall)

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
191636.00
424421.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

19739.30

25661.09
538882.83
53888.28
592771.11
4939.76
4940.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
191636.00
424421.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
49348.24

27141.53
569972.21
56997.22
626969.44
5224.75
5225.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
222548.00
455333.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

52439.44

28841.69
605675.57
60567.56
666243.13
5552.03
5552.00
1 Cum
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
ms.

182.40
940.00
2550.00
0.00
3672.40

48300.00
300.00
48600.00
52272.40
2613.62

5488.60

60374.62
60374.62
60375.00 57233

,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
R.C.C items.

155.04
940.00
2762.50
0.00
3857.54
48300.00
300.00
48600.00
52457.54
2622.88

5508.04

60588.46
60588.46
60588.00 57086

,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
f R.C.C items.

200.64 0.44
1410.00 3
3400.00 8
0.00
5010.64

48300.00 3.5
400.00 1.75
48700.00
53710.64
2685.53

5639.62

62035.79
62035.79
62036.00 58243
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
, all as specified
428.64
1645.00
8500.00
0.00
10573.64

93302.28
50699.52
88784.10
237360.00
470145.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

54033.70

0.00
594370.74
0.00
594370.74
4953.09
4953.00
1 Cum

14859.00

18.24
425.00
0.00
443.24

12880.00
233.28
13113.28
28415.52
1420.78

2983.63

32819.93
3281.99
3282.00
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
other incidental and
er Approved drawing but
on 1500, 1600,1700, &
lab.

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
224480.00
457265.90

29718.00
0.00
2736.00
28762.50
0.00
0.00
61216.50

10558.51

26924.20
565408
56540.81
621949
5182.91
5183.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
SBD specification 1500,
r Deck Slab

410.40
705.00
8925.00

0.00
10040.40

11662.79
6337.44
11098.01
28060.00
57158.24

2835.60
5053.20
7888.80

0.00

0.00
75087.44

75087
5005.83
5006.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H

392.16
705.00
8500.00
0.00
9597.16

7967.16
5831.39
1584.36
11098.01
18998.00
45478.92

2835.60
5053.20
0.00
7888.80

1888.95

3242.69
68096.52
6809.65
74906.17
4993.74
4994.00
1 Cum
mm Diameter AC pipe
horizontal and vertical
m the weep holes laying
he A.C pipes and labour
1V : 20H towards stream
ata

257.00

209 MORD & 2705

9.12
0.00
9.40
8.50

4.56
4.70
0.00
85.00
0.00
121.28
178.00
138.00
1350.00
390.00
2056.00
2177.28
108.86
108.86

228.61

2623.61
2623.61
2624.00 filter
less than 300 mm size
ls to site and including
hed item of work as per
-Charge for Pitching of

18.24
164.50
318.75
0.00
501.49

508.35
65.67
574.02

53.78
1129.29
112.93
1242.21
1242.00
slopes including cost,
ng labour charges etc.,
evision) and as directed

22.80
117.50
425.00
0.00
565.30

214.03
214.03

38.97
818.30
81.83
900.13
900.13
900.00
1 Cum
yance and (excluding
of IRC : 78 and as per
nical specifications for

127.68
2975.00
0.00
3102.68

2140.32
2140.32

134.40
34.94
169.34

270.62
5682.96
568.30
6251.25
625.13
625.00 512
1 Cum
grade bitumen meeting
d laid to required level
with bitumen precoated
5cum per 10 sqm and at
d into surface when the
over mastic surface, all

age 151 of MoRT&H SDB

187.00
4000.00
470.00
0.00
4657.00

21.42
31.27
390.00
1254.00
415.00
2111.69

5921.4
421.9
941.8
799.6
31.4
14.8
8130.8
14899.5

744.98
15644.50
1564.45
17209.0
491.68
492.00
1 Sqm
nd 50 % of 40 mm HBG
&H specifications to a
er size towards the wall
return wall to the full
all metal (excluding
boulder
l officers as per drawing
f MoRT&H (5th Revision)

145.92
2975.00
456.00
0.00
3576.92

2654.10
5901.60
8555.70

41.93
41.93

608.73
12783.28
1278.33
14061.61
1406.16
1406.00 1199
1 Cum
our with stone boulders
ecification 300 mm thick
eigniorage) charges and
e stones for apron etc.,
evision ) and as directed

18.24
164.50
318.75
0.00
501.49

508.35
100.87
609.22
55.54
1166.25
116.62
1282.87
1282.87
1283.00
1 Cum
ry by mechanical means
ea, removal of top soil,
il on the embankment,
to 10 Tonnes Vibratory
all hire and operational
ation 305 (5th revision).

18.24
425.00
0.00
443.24 800

1300.00
4800.00 Tipper (for 10Kms=160x10=1600)
480.00
1330.60
3601.92
2795.52
2878.90
17186.94

881.51
18511.69
1851.17
20362.86
203.63
204.00 204
1 Cum
iorage) charges and
approved means, on
density at OMC etc.,
(5th revision) and as
finished item of work ).
182.40
912.00
3400.00
4494.40
0.00
4494.40

16929.00
2096.64
19025.64

68490.24
68490.24
92010.28

4600.51

9661.08

0.00

106271.87
354.24
354.00

ve Engineer (R&B)
n: Huzurnagar

ding Engineer (R&B)


Calculation of weighted Average lead calculations

Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet
District.
1 Metal Quarry at K.M 2/4+ 1.1 K.M away on Shantinagar- Nadigudam Road
C.T
Q= Lead of S-N- Road K.M 0.00 2.4
kodad-shanthinagar road K.M 0.00 7.2
Kodad-NH 65 K.M 0.00 1.4

Weightd avg lead (1/4-21/2) 12.1 19.8


2
or say
2 sand Quarry
C.T
Q= Lead of vangamarthi-nakerekal K.M 0.00 15.00
Hyderabad- vijayawada road km 179/6-108/0 (NH -65) road K.M 108.00 179.6
Kodad -NH 65 K.M 0.00 1.4

Weightd avg lead (1/4-21/2) 1.4 19.8


2
or say
3 Bitumen
Q Vizag Refinary to Vizag - NH 65 road (Hyderabad-vijayawada road)
Lead of Kodad- NH 65 K.M 0.0 1.40

Kodad -Revoor road


x= AB = 445.40
weighted avg lead (1/4-21/2) 445.4 19.8
2

Asst.Exe.Engineer Deputy Exe.Engineer


R&B,Mellacheruvu R&B, Huzurnagar
Km 1/4 to 21/2) in Suryapet

1.1
2.40
7.20
1.40
12.1

22

22 K.Ms

1.2
15.00
71.60
1.40
89.2
11.3

99 K.Ms

444 K.M
1.40
445.4 K.M

455.3

or say 455
K.Ms

Executive Engineer
R&B, Suryapet
Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from
NW:
Suryapet District.
Construction of Box culverts
S.No. Description Nos Nos Unit
Dismantling of Structures (superstructure, substructure, foundation and other miscellaneou
and pavements including disposing of resulting materials and/or salvaging useful materials u
distance of 1 km from project road complete as per Drawings and Technical Specification Cl
1 MoRT&H 202 and as directed by the Engineer.(By Mechanical means in Cement Concrete gra
M-20)

a Existing cause way at Km 17/8-18/0. 1 1 cum


b Existing cause way at Km 19/6-8 1 1 cum

Earthwork excavation in soils upto SDR by mechanical means for foundations of struc
drawing and technical specification including setting out, construction of shoring and brac
of stumps and other deleterious matter, dressing sides of bottom, back filling the excava
2 the extent required etc., complete excluding seignioarge charges for finished item of
MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

a For Box culvert ( 3 v of 3m x 3m)


Earth work excavation for Box 1 1 Cum
Earth work excavation (Shear key) 1 1 Cum
a For Box culvert ( 2 v of 3m x 3m)
Earth work excavation for Box 1 1 Cum
Earth work excavation (Shear key) 1 1 Cum
b For Retaining wall ( 3 v of 3m x 3m) 1 4 Cum
b For Retaining wall ( 2 v of 3m x 3m) 1 4 Cum

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conform
3 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site a
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing
other incidental and all other operational charges of T&P required etc., complete as
Specification 1500,1700, 2100 (5th Revision) for levelling course. (Curtain wall, Wing wa
Slab)
a For Box culvert ( 3 v of 3m x 3m)
PCC below box 1 1 Cum
below Curtain wall I U/s 1 1 Cum
below Curtain wall II 1 1 Cum
curtailn wall U/s 1 1 cum
curtailn wall D/s 1 1 cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall D/s 1 1 Cum
a For Box culvert ( 2 v of 3m x 3m)
PCC below box 1 1 Cum
below Curtain wall I U/s 1 1 Cum
below Curtain wall II D/s 1 1 Cum
curtailn wall U/s 1 1 cum
curtailn wall D/s 1 1 cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall D/s 1 1 Cum
b Levelling course Approch slab 1 2 Cum
b Levelling course Approch slab 1 2 Cum

Providing Plain Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggreg
aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of
to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., includ
4 incidental and operational charges of all T&P etc., complete for finished item of work as
specification 1500,1700, 2200 (5th Revision) and as directed by the Engineer-in-Charge fo
walls.

For Retaining wall ( 3 v of 3m x 3m)


levelling course for Retaining wall 1 4 Cum
For Retaining wall ( 2 v of 3m x 3m)
levelling course for Retaining wall 1 4 Cum
Plain Vibrated Cement Concrete M20 Mix in Open Foundation using 40 mm HBG (ss5)max
5 M/c metal complete as per drawings and technical specifications & as per MoRT&H Sp
1700, 2100 for FOOTINGS OF ABUTMENTS, piers, wing walls,rigid aprons & cutoff walls.

for wing walls ( 3 v of 3m x 3m) 1 4 Cum


1 4 Cum
for wing walls ( 1 v of 8m x 5m) 1 4 Cum
1 4 Cum

Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 20 mm HBG
6 graded M/c metal complete as per drawings and technical specifications & as per MoRT
1500, 1700, 2200 for ABUTMENTS , piers , weir & wing walls.

for wing walls ( 3 v of 3m x 3m) 1 4 nos


for wing walls ( 1 v of 8m x 5m) 1 4 nos

Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed sto
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000
cost, seigniorage conveyance of all materials to site and labour charges, centering, mac
laying, vibrating, curing etc., including other incidental hire and operational charges of al
7 approved drawings and as directed during execution but excluding cost of steel and it
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revis
directed by the Engineer-in-Charge for Box Culvert (OR Sub-structure).

a For Box culvert ( 3 v of 3m x 3m)


Concrete Quantities M25 Grade
Top slab 1 1 Cum
Bottom slab 1 1 Cum
Internal wall 1 2 Cum
External wall 1 1 2 Cum
Bracket 1 2 nos
haunch 3 4 nos
a For Box
For Box culvert ( 2 v of 3m x 3m)
Top slab 1 1 Cum
Bottom slab 1 1 Cum
Internal wall 1 1 Cum
External wall 1 1 2 Cum
Bracket 1 2 nos
haunch 1 4 nos

Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken gr
crushed metal (SS-5) including cost, seigniorage conveyance of all materials to site and lab
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire an
charges of all T&P and all water leads etc., complete as per approved drawings and as dire
8 execution but excluding cost of steel and its fabrication charges for finished item as
specification 809,1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-
Crash barrier, excluding Reinforcement.

a For Box culvert ( 3 v of 3m x 3m) 3 2 Cum


a For Box culvert ( 2 v of 3m x 3m) 2 2 Cum
Providing HYSD bars (Fe-500) of different diameters, procured from primary p
TATA,SAIL,VSP,Jindal wrought and put up bars of all diameters including cost and convey
to site and all labour charges for fabrication of reinforcement including cutting, bending,
tying grills, placing them in position etc., complete including cost and conveyance of bind
all handling charges and operational charges etc., and including over lapping welding if r
9 complete for all R.C.C items for finished item of work as per standard drawings, as per the
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision)
I.S.1786 of 1985 for Box portion

For Box culvert ( 3 v of 3m x 3m) 3 1 MT


For Box culvert ( 2 v of 3m x 3m) 2 1 MT

Providing HYSD bars (Fe-500) of different diameters, procured from primary p


TATA,SAIL,VSP,Jindal wrought and put up bars of all diameters including cost and convey
to site and all labour charges for fabrication of reinforcement including cutting, bending,
tying grills, placing them in position etc., complete including cost and conveyance of bind
all handling charges and operational charges etc., and including over lapping welding if r
10 complete for all R.C.C items for finished item of work as per standard drawings, as per the
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision)
I.S.1786 of 1985 for Sub-structure of R.C.C items.

a For Box culvert ( 3 v of 3m x 3m) 3 1 MT


b For Box culvert ( 2 v of 3m x 3m) 3 1 MT

Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed sto
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000
cost, _ conveyance of all materials to site and labour charges, centering, machine m
vibrating, curing etc., including all other incidental and operational charges of all T&P et
11 for finished item of work as per Approved drawing, excluding cost of steel and its fabricatio
per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the
Charge for Approach slab.

For Approch slab(3v of 3m x 3m) 1 2 Cum


For Approch slab(1v of 8m x 5m) 1 2 Cum
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed sto
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000
cost, _ conveyance of all materials to site and labour charges, centering, machine m
vibrating, curing etc., including all other incidental and operational charges of all T&P et
12 for finished item of work as per M.O.T.drawing SD/205 but excluding cost of steel and it
charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as dir
Engineer-in-Charge for wearing coat over Box culvert.

For Wearing Coat(3v of 3m x 3m) 1 1 Cum


For Wearing Coat(1v of 8m x 5m) 1 1 Cum

Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diamete
extending through the full width of the structure at 1.00m C/C in both horizontal and vertic
13 so that the weep holes in each horizontal direction is staggered from the weep holes laying
below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream s
etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 &
Revision).
weep holes for Box(3v of 3m x 3m) 1 2 Nr.
weep holes for Box(2v of 3m x 3m) 1 2 Nr.
Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.270
14 drawing SD/103.
Drainage spouts(3v of 3m x 3m) 1 4 Nr.
Drainage spouts(2v of 3m x 3m) 1 4 Nr.

Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications t
of not less than 600mm with smaller size towards the soil and bigger size towards the wall
over the entire surface behind the abutment, wing wall and return wall to the full height c
a firm condition including cost and conveyance of all metal seignorage charges ,and all lab
15 as directed by the departmental officers as per drawing and Technical specifications a
710.1.1 of IRC:78 and Clause 2200 of MoRT&H (4th Revision) for finished item of work.

a Stone Pitching 4 sides(3v of 3m x 3m) 1 4 Cum


5.3431
a Stone Pitching 4 sides(2v of 3m x 3m) 1 4 Cum
6.9146
(3.143*(3.1+0.3)*2)/4

Providing and laying filter material with Gravel underneath pitching in slopes including co
and conveyance of materials to site including labour charges etc., complete for finished ite
16 per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-C
Revetment.

Filter Media below pitching(3v of 3m x 3m) 1 4 Cum


Filter Media below pitching(2v of 3m x 3m) 1 4 Cum
22/7*1.414*3.1*3.1/4

Back filling behind Abutments with gravel including cost ,conveyance and _ of all materials
17 complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (
and as per Drawing and technical specifications for finished item of work.

Backfilling (3v of 3m x 3m) 1 2 Cum


Backfilling (2v of 3m x 3m) 1 2 Cum
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications
of not less than 600mm with smaller size towards the soil and bigger size towards the wall
over the entire surface behind the abutment, wing wall and return wall to the full height c
18 a firm condition including cost and conveyance of all metal _ charges ,and all labour
directed by the departmental officers as per drawing and Technical specifications a
710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

Filter Media Behind Box(3v of 3m x 3m) 1 2 Cum


Filter Media Behind Box(2v of 3m x 3m) 1 2 Cum

Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grout
cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site a
19 labour charges for packing the stones for revetment etc., complete for finished item of
MoRT&H specification 2504 (5th revision ) and as directed by the Engineer-in-Charge for
revetment.

Revetment(3v of 3m x 3m) 1 4 Cum


Revetment(2v of 3m x 3m) 1 4 Cum

Providing and laying Boulder's apron on River Bed for protection against scour with st
weighing not less than 40 k.g each complete as per drawing and technical specification 3
with HBG stone of not less than 300 mm size including cost, (excluding seigniorage)
20 conveyance of materials to site and including labour charges for packing the stones for
complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and a
the Engineer-in-Charge for Bed Protection.

Apron(3v of 3m x 3m) (U/S) 1 1 Cum


(D/S) 1 1 Cum
Apron(2v of 3m x 3m)(U/S) 1 1 Cum
(D/S) 1 1 Cum
Construction of embankment with material obtained from borrowed useful earth CBR m
with a lead of 10.0 Km from outside road boundary by mechanical means upto SDR with
lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils
area, conveyance of soil, depositing the soil on the embankment, spreading soil, bre
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ O
21 requirement of table 300-2 of MoRT&H, including all hire and operational charges of
charges, complete for finished item of work as per MoRT&H specification 305 (5th revisio
will be made based on level for finished item of work).

Forming Diversion road(3v of 3m x 3m) 1 1 Cum


Forming Diversion road(1v of 6m x 4m) 1 1 Cum

Construction of Granular sub-base by providing HBG/HBG material confirming toGra


MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all
work site and spreading in uniform layers with motor grader or by approved means,
surface mixing by mix in place method with Rotavator / approved means at OMC and com
22 vibratory roller to achieve the desired density etc., complete for finished item of work as
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment
based on levels for finished item of work ).

Forming Diversion road(3v of 3m x 3m) 1 1 Cum


Forming Diversion road(1v of 6m x 4m) 1 1 Cum

Assistant Engineer (R&B)


Section : Medlachruvu

Executive Engineer (R&B)


Division :Suryapet
/140 (Working reach from Km 1/4 to 21/2) in

L B D Quantity
tion and other miscellaneous structures)
salvaging useful materials up to a
d Technical Specification Clause
ans in Cement Concrete grade M-15 &

45.000 10.000 2.000 900.00


35.000 8.400 2.000 588.00
1488.000
Cum
ns for foundations of structures as per
ruction of shoring and bracing, removal
om, back filling the excavation earth to
arges for finished item of work as per
ngineer-in-Charge.

15.30 11.94 1.50 274.02


11.94 (0.3+1.2)/2 0.80 7.16

15.30 7.99 1.50 183.37


7.99 (0.3+1.2)/2 0.80 6.07
4.00 3.00 2.00 96.00
4.00 3.00 2.00 96.00
662.63
Say 663.00

m , 20mm and 10mm size HBG crushed


and fine aggregate conforming to table
of all materials to site and all labour
ting , Vibrating and curing including all
quired etc., complete as per MoRT&H
se. (Curtain wall, Wing wall, Approach

12.80 11.94 0.10 15.28


11.94 1.50 0.10 1.79
11.94 1.85 0.10 2.21
11.94 1.30 0.80 12.42
11.94 1.65 0.55 10.84
11.94 0.45 0.75 4.03
11.94 0.75 0.75 6.72
11.94 0.20 0.45 1.07
11.94 0.45 0.75 4.03
11.94 0.20 0.45 1.07

13.40 7.99 0.10 10.71


7.99 1.50 0.10 1.20
7.99 1.85 0.10 1.48
7.99 1.30 0.80 8.31
7.99 1.65 0.55 7.25
7.99 0.45 0.75 2.70
7.99 0.75 0.75 4.49
7.99 0.20 0.45 0.72
7.99 0.45 0.75 2.70
7.99 0.20 0.45 0.72
3.50 14.00 0.15 14.70
3.50 14.00 0.15 14.70
129.13
Say 129.00
HBG crushed stone aggregate and fine
seigniorage conveyance of all materials
ibrating, curing etc., including all other
or finished item of work as per MoRT&H
y the Engineer-in-Charge for Raft &Wing

4.00 3.00 0.15 7.20

4.00 3.00 0.15 7.20


14.40
Say 14.40
using 40 mm HBG (ss5)max size graded
ions & as per MoRT&H Spcn. No 1500,
id aprons & cutoff walls.

4.00 3.00 0.50 24.00


4.00 1.50 1.00 24.00
4.00 3.00 0.50 24.00
4.00 1.50 1.00 24.00
96.00
say 96.00
utments using 20 mm HBG (ss5)max size
ecifications & as per MoRT&H Spcn. No

4.00 0.75 4.10 49.20


4.00 0.75 4.10 49.20
98.40
say 98.40
& 10mm HBG crushed stone aggregate
e conforming to table 1000-2) including
ur charges, centering, machine mixing,
d operational charges of all T&P as per
luding cost of steel and its fabrication
00,1700 & 2200 (5th revision ) and as
cture).

15.00 10.74 0.45 72.50


15.00 11.74 0.50 88.05
15.00 3.00 0.40 36.00
15.00 3.00 0.47 42.30
15.00 Area = 0.14 4.05
15.00 Area = 0.05 8.10
251.00

15.00 7.50 0.47 52.88


15.00 8.10 0.45 54.68
15.00 3.00 0.35 15.75
15.00 3.00 0.42 37.80
15.00 Area = 0.13 3.90
15.00 Area = 0.05 2.70
167.70
Say 418.70
m & 10mm hard broken graded granite
all materials to site and labour charges,
ng other incidental hire and operational
proved drawings and as directed during
rges for finished item as per MoRT&H
directed by the Engineer-in-Charge for

12.00 72.000
16.00 64.000
Say 136.00
rocured from primary producer like
including cost and conveyance of steel
ncluding cutting, bending, binding rods,
ost and conveyance of binding wire and
g over lapping welding if required etc.,
ndard drawings, as per the directions of
0 &2200 (5th revision) and as per

104.12 80kg/cu, 24.99


260.58 80kg/cu, 41.69
66.68
Say 67.00
rocured from primary producer like
including cost and conveyance of steel
ncluding cutting, bending, binding rods,
ost and conveyance of binding wire and
g over lapping welding if required etc.,
ndard drawings, as per the directions of
0 &2200 (5th revision) and as per

97.20 x5kgs/cum 1.46


97.20 x5kgs/cum 1.46
Say 2.92
Say 3.00
m & 10mm HBG crushed stone aggregate
e conforming to table 1000-2) including
es, centering, machine mixing, laying,
onal charges of all T&P etc., complete
t of steel and its fabrication charges as
on) and as directed by the Engineer-in-

3.50 14.00 0.37 36.06


3.50 14.00 0.37 36.06
36.06
Say 36.00
& 10mm HBG crushed stone aggregate
e conforming to table 1000-2) including
es, centering, machine mixing, laying,
onal charges of all T&P etc., complete
luding cost of steel and its fabrication
2 (5th Revision) and as directed by the

17.74 14.00 0.075 18.63


14.19 14.00 0.075 14.90
18.63
Say 18.60

walls with 100mm Diameter AC pipe


n both horizontal and vertical direction
rom the weep holes laying above and
f the A.C pipes and labour charges for
t 1V : 20H towards stream side face
oRT&H specification 2706 & 2200 (5th

14.00 1.50 42.00


14.00 1.50 42.00
Say 42.00
oRT&H Specification No.2705 and as per

2.00 8.00
2.00 8.00
Say 8.00
soling stone and 50 % of 40 mm HBG
of MoRT&H specifications to a thickness
gger size towards the wall and provided
urn wall to the full height compacted to
norage charges ,and all labour charges
Technical specifications as per clause
inished item of work.

19.800 0.60 0.60 28.51

19.800 0.60 0.60 28.51

57.02
Say 57.00
ching in slopes including cost, _ charges
., complete for finished item of work as
ted by the Engineer-in-Charge under

10.677 0.15 20.13


10.677 0.15 20.13
40.25
Say 40.30
ance and _ of all materials to site etc.,
&H Specification No. 2200 (5th Revision)
m of work.

14.00 3.40 3.10 147.56


14.00 3.40 3.10 147.56
295.12
Say 295.00
soling stone and 50 % of 40 mm HBG
of MoRT&H specifications to athickness
gger size towards the wall and provided
urn wall to the full height compacted to
_ charges ,and all labour charges as
Technical specifications as per clause
inished item of work.

14.00 0.60 3.00 50.40


14.00 0.60 3.00 50.40
100.80
Say 101.00

ess than 300 mm size grouted with 0.20


yance of materials to site and including
mplete for finished item of work as per
he Engineer-in-Charge for quadrential

10.68 0.30 12.81


10.68 0.30 12.81
25.62
Say 25.60
tion against scour with stone boulders
nd technical specification 300 mm thick
, (excluding seigniorage) charges and
for packing the stones for apron etc.,
2503 ( 5th revision ) and as directed by

13.44 3.00 0.90 36.29


13.44 6.00 0.90 72.58
7.99 3.00 0.90 21.57
7.99 6.00 0.90 43.15
173.58
Say 174.00
rowed useful earth CBR more than 7 %
ical means upto SDR with all leads and
op soil, excavation of soils at borrowed
kment, spreading soil, breaking clods,
ibratory Road Roller @ OMC to meet
nd operational charges of T&P and
ecification 305 (5th revision) (Payment

80.00 7.00 0.30 168.00


80.00 7.00 0.30 168.00
336.00
Say 336.00
material confirming toGrading - VI of
arges and conveyance of all materials to
or by approved means, on prepared
ed means at OMC and compacting with
or finished item of work as per MoRT&H
eer-in-charge. ( Payment will be made

80.00 5.50 0.15 66.00


80.00 5.50 0.15 66.00
Say 66.00

Dy. Executive Engineer (R&B)


Sub- division: Huzurnagar

Superintending Engineer (R&B)


Circle : Nalgonda
DATA-CD STRUCTURES (2018-19)
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working
reach from Km 1/4 to 21/2) in Suryapet District.

S.No. Quantity Description of Item Rate per

1 Dismantling of Structures (superstructure, substructure, foundation and other miscellaneous


structures) and pavements including disposing of resulting materials and/or salvaging useful materials
up to a distance of 1 km from project road complete as per Drawings and Technical Specification
Clause MoRT&H 202 and as directed by the Engineer.(By Mechanical means in Cement Concrete grade
M-15 & M-20)

Page 23,24,25 of MoRT&H SDB


Unit = cum
Taking output = 1.25 cum
(A) Labour
0.020 no Mate 456.00 1.00
0.250 no Mazdoor skilled 456.00 1.00
0.250 no Mazdoor unskilled 425.00 1.00
0% Agency area allowance 229.37
TOTAL A=
(B ) Machinery
Air compressor 250 cfm with 2 leads of
0.67 pneumatic breaker @ 1.5 cum per hour 588.40
0.270 hour Tractor Trolley 464.80 1.00
TOTAL B=
(A + B )
(C) Over Head Charges on (A+B)
5.00% Over head charges 5% on (A) + (B) 749.10

10.00 % (D) Contractors Profit on (A+B+C) 786.56

1.25 cum TOTAL Cost for 1.25 cum = (A+B+C+D)


Rate per 1 cum
Rate per 1 cum
2 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation
earth to the extent required etc., complete excluding seignioarge charges for finished item of work
as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

Unit : Cum Page 323 of MoRT&H SDB


Taking out put = 240 Cum
(A) Labour
0.32 day Mate 456.00 day
8.00 day Mazdoor unskilled 425.00 day
0% Muncipal area allowance 3545.92

(B) Machinery
Hydraualic Excavator 1 Cum bucket
6.00 hr 2821.50 hr
capacity @ 60 cum/hr
240.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 cum

(C) Over head charges


5.00% Over head charges 5% on (A) + (B) 20474.92
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 240 cum (D)+(E)
Rate for 1 cum
Rate to be adopted

2
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for
base coarse below.

Unit = cum
Taking output = 15 cum
(A) Labour
0.64 Day Mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
6.75 cum Sand at site 1644.15 cum
3.45 MT Cement at site 4600.00 MT
Total
(C ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
(D) Over head charges @5 %
5.00% Over head charges 5% on (A) + (B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E) + (F)
Rate for 1 cum
Rate to be adopted
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for levelling Course (Box Culvert & Approach Slab)

Unit = cum Page 335 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 456.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9597.16
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Form work
% Form work @ 0% on (A)+(B)+( C) 62964.88 Cum
(E) Over head charges @ 5%
5% Add for Over head charges @ 5% on (A)+(B)+( C) 62964.88
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

4 Back filling behind Abutments/Wing walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per
MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for
finished item of work

Unit = cum Page 462 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.28 Day Mate 456.00 day
7.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 3102.68
Total
(B) Material
12.00 cum Cost of Selective earth 178.36 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 5412.34
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

5 Vibrated Reinforced cement concrete M 20 Grade Concrete using 20mm and 10 mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footing ( curtain walls, Wing wall)

Unit = cum Page 336 of MoRT&H SDB


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
41.660 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 15 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
4% Form work @ 4% on (A)+(B)+( C) 499731.44 Cum
(E) Over head charges @ 5%
5% Over head charges 5% on (A) + (B)+(C)+(D) 519720.70
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge (for Raft foundation)

Unit = cum Page 341 SDB, Chapter-12


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.380 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 tkm 0.00 tkm
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
3.75 % Form work @ 3.75 on (A)+(B)+( C) 524394.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 544059.23
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
7 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for Sub structure (Side walls)

Unit = cum Page 455 SDB, Chapter-13


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
41.660 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10.00 % Form work @ 10 on (A)+(B)+( C) 493482.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 542830.68
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

8 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for BOX Culvert(OR Sub-Structure)

Unit = cum Page 475 SDB, Chapter-14


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.380 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 524394.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 576833.88
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

9 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per Approved drawing but
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, &
2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.

Unit = cum Page 501 of MoRT&H SDB


Taking output = 120cum
(A) Labour
0.84 Day mate 456.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9060.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
48.800 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 tkm 0.00 tkm
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
2.00 % Form work @ 3.75 on (A)+(B)+( C) 526326.44 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 536852.97
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

9 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Wing Wall and Curtain Wall.

Unit = cum Page 335,455 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 456.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9597.16
Total
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
5.40 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
2.70 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
5.16 MT Cement at site 4600.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 4%
4.00 % Add for Form work charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 71318.33
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

10 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.

Page 449 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.40 no Mate 456.00 1.00
2.00 no Black smith 470.00 1.00
6.00 no Mazdoor 425.00 1.00
0% Agency area allowance 2550.00
TOTAL A=
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 1.00
6.00 Kg Binding wire ( I&CAD SSR item no.3 ) 61.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 52338.40

10.00 % (D) Contractors Profit on (A+B+C) 54955.32

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT

11 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

Page 459,460 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.34 no Mate 456.00 1.00
2.00 no Black smith 470.00 1.00
6.50 no Mazdoor 425.00 1.00
0% Muncipalarea allowance 2762.50
TOTAL A=
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 1.00
6.00 Kg Binding wire ( Building SSR item no.757 ) 61.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 52523.54

10.00 % (D) Contractors Profit on (A+B+C) 55149.72

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT

12 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

Page 489,490 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.44 no Mate 456.00 1.00
3.00 no Black smith 470.00 1.00
8.00 no Mazdoor 425.00 1.00
0% Muncipal area allowance 3400.00
TOTAL A=
(B) Material
HYSD bars including 5% overlaps and
1.05 MT 46000.00 1.00
wastage
8.00 Kg Binding wire ( Building SSR item no.757 ) 61.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 53798.64

10.00 % (D) Contractors Profit on (A+B+C) 56488.57


1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)
Rate per 1 MT
Rate per 1 MT

13 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through the full width of the structure at 1.00m C/C in both horizontal and vertical
direction so that the weep holes in each horizontal direction is staggered from the weep holes laying
above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream
side face etc., complete for finished item of work for weep holes as per SSR Data

Page No. 461, SSR 2016-17 Rm


Unit = RM
14 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a
thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall
and provided over the entire surface behind the abutment, wing wall and return wall to the full
height compacted to a firm condition including cost and conveyance of all metal (excluding
seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing
and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision)
for finished item of work.

Unit = cum Page 463 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.32 Day Mate 456.00 day
7.00 Day Mazdoor 425.00 day
1.00 Day Mazdoor skiled 456.00 day
0% Agency area allowance 3576.92
Total
(B) Material
6.00 cum Cost of 150mm size IRC soling stone 442.35 cum
6.00 cum Cost of 40mm size IRC metal 983.60 cum
Total
© Machinery
0.06 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B) 12174.55
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
15 Providing and laying Boulder's apron on River Bed for protection against scour with stone boulders
weighing not less than 40 k.g each complete as per drawing and technical specification 300 mm thick
with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and
conveyance of materials to site and including labour charges for packing the stones for apron etc.,
complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed
by the Engineer-in-Charge for Bed Protection.

Unit : Cum
Taking out put = 1 Cum Page 520 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
0.35 day Mason 470.00 day
0.75 day Mazdoor Unskilled 425.00 day
0% Muncipal area allowance 501.49

(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 Cost of stones spalls 504.35

5.00% Over head charges 5% on (A) + (B) 1110.71


(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 sqm (D) + (E)
Rate per cum
Rate per 1 cum

16.00 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting
the requirements given in table 500-29, prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at
an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.

Unit = sqm
Taking output =35.00 Sqm (0.87 cum) assuming a
density of 2.3 tonn/cum Page 151 of MoRT&H SDB
(A) Labour
0.44 nos. Mate 425.00 day
10.00 nos. Mazdoor working with HMP, Mechanical 400.00 day
1.00 nos. broom, paver,roller,asphalt
Skilled Mazdoor for checkingcutter and
line and 470.00 day
levels.
Agency area allowance 4657.00
Total
(B) Machinary
0.06 hr Mechanical broom @ 1250 sqm per hour 357.00 hr
0.06 hr Air compressor 250 cfm 521.20 hr
6.00 hr Mastic cooker 1 tonne capacity 65.00 hr
6.00 hr Bitumen boiler 1500 litres capacity 209.00 hr
1.00 hr Tractor for towing and positioning of mastic 415.00 hr
cooker
Total and bitumen boiler
(C) Material
Base mastic (without coarse aggregates) =
60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40
Proportion
per cent . of material required for mastic
asphalt with coarse aggregates (based on
I)
mixBitumen
design 85/25
done byor CRRI
30/40for@ a10.2 per cent
specific case)
0.200 tonne 29607.00 tonne
by weight of mix. 2 x 10.2/100 = 0.204
retained on 0.075mm sieve @ 31.9 per cent
0.39 cum 1081.77 cum
by weight
content notofless
mixthan
= 2 x8031.9/100
per cent= by0.638
0.36 tonne iv) Coarse aggregates 6.3 by
mmweight
to 13.2 2616.00 tonne
weight @ 17.92 per cent ofmm
mix@=
0.55 cum 40 per cent bystone
v) Pre-coated weight of mix
chips = 2 mm
of 13.2 x 40/100 1453.85 cum
0.02 cum = 0.8
nominalMT = 0.8/1.456
sizefor
forcoating= 0.55
skid resistance 1568.02 cum
vi) Bitumen of chips =@35 x
2 per
0.50 kg 0.005/10 = 0.018
cent by weight = 0.018 x 1.456 x 2/100 = 29.607 kg
0.0005 MT = 0.5kg Total
A+B +C= TOTAL
(D) Over head charges
5.00% Over head charges 14899.52
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 35.00 Sqm
Rate per 1 Sqm
Rate to be adopted

16 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for curtain wall.

Unit = cum Page 335 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 456.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 9597.16
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Form work
3.00 % Form work @ 3% on (A)+(B)+( C) 62964.88 Cum
(E) Over head charges @ 5%
5% Add for Over head charges @ 5% on (A)+(B)+( C) 64853.83
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

17 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure on which it is built and installed as per design
given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at locations directed by the Engineer, all as specified

Unit = RM Page 237 & 482


Taking output = 10 RM
M40 Grade concrete
Unit = cum Page SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.94 Day Mate 456.00 day
3.50 Day Mason 470.00 day
20.00 Day Mazdoor 425.00 day
0% Agency area allowance 2073.64
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
54.00 cum Sand at site 1644.15 cum
51.600 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1138.50 hr
6.00 hr Generator 100 KVA 1261.12 hr
6.00 hr Loader 1 cum capacity 1 cum 1843.52 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 899.36 hr
Total
(D) Form work
10 % Form work @ 10 on (A)+(B)+( C) 540337.04 Cum
(E) Over head charges @
0.00% Add for Over head charges @ 3% on (A)+(B)+( C)+(D) 594370.74
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum
Rate for 1 cum
Rate to be adopted
Page 237 of MoRT&H SDB
(A) M40 grade concrete
3.00 Cum M 40 4953.00 1.00
(B) Labour
0.04 no Mate 456.00 1.00
1.00 no Mazdoor 425.00 1.00
0% Agency area allowance
TOTAL A=
(B) Material
0.28 MT HYSD bars including overlaps 46000.00 1.00
0.32 Kg Pre-moulded asphalt filler board 729.00 1.00
TOTAL B=
(A + B )
5.00 % (C) Over Head Charges on (A+B) 28415.52

10.00 % (D) Contractors Profit on (A+B+C) 29836.30

10.00 RM TOTAL Cost for 10 RM = (A+B+C+D)


Rate per 1 RM
Rate per 1 RM

18 Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705
MORTH
Pg no 499 of SDB
Unit = 1 No
taking output=1 no
(A) for Fabrication
0.02 no mate 456.00 1.00
no Mason skilled 470.00 1.00
0.02 no Black smith 470.00 1.00
0.02 no Mazdoor 425.00 1.00
(B) Fixing
0.01 no mate 456.00 1.00
0.01 no Mason skilled 470.00 1.00
no Black smith 470.00 1.00
0.20 no Mazdoor 425.00 1.00
0% Muncipal area allowance 17.90
TOTAL A=
(B) Material
corrosion resistanct structural steel
0.004 MT including 5% wastage (M087, Pg.36 of SSR 44500.00 1.00
GI bolt 10mm Dia (M110, Pg.37 of SSR 2015-
2015-16)
6.00 nos 23.00 1.00
16)
G I Pipe 100 mm dia B Class (Sl.32, Pg.20 of
2.00 RM 675.00 1.00
Galvanised MSSSR
flat2015-16)
clamp(M101, Pg.37 of
2.00 each 195.00
SSR 2015-16)
TOTAL B=
(A + B )
labour (a+b) for electrodes, gas cutting,
5.00 % 2177.28
sealant, anti-corrosive bituminous paint,
5.00% Over head charges 5% on (A) + (B) 2177.28
10.00 % (D) Contractors Profit on (A+B+C) 2286.14

1.00 NO TOTAL Cost for 1 NO = (A+B+C+D)


Rate per 1 NO
Rate per 1 NO
19 Filling in between body walls with gravel including cost,conveyance and (excluding seigniorage) of
all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H
Specification No. 2200 & 2907 (5th Revision) and as per Drawing and technical specifications for
finished item of work

Unit = cum Page 462 of MoRT&H SDB


Taking output = 10 cum
(A) Labour
0.28 Day Mate 456.00 day
7.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 0.00
Total

(B) Material
12.00 cum Cost of Gravel 178.36 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 5412.34
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Asst. Executive Engineer (R&B) Dy. Executive Engineer (R&B)


Section : Medlacheruvu Sub- division: Huzurnagar

Executive Engineer (R&B) Superintending Engineer (R&B)


Division : Suryapet Circle : Nalgonda

Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and SDB,
Page 340 fine Chapter-12
aggregate conforming to table 1000-2)
Taking output = 15 cum
(A) Labour
0.86 Day mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.050 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
3.75 % Form work @ 3.75 on (A)+(B)+( C) 76013.12 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 78863.61
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

3 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2
Unit = cum of 271
Page MoRT&H including
of MoRT&H SDB cost, (excluding seigniorage)
Taking output = 15 cum
(A) Labour
0.64 Day Mate 425.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 400.00 day
0% Agency area allowance 6742.00
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
6.75 cum Sand at site 1081.77 cum
3.45 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 624.00 hr
Total
(D) Form work
% Form work @ 10% on (A)+(B)+( C) 57614.62 Cum
(E) Over head charges @ 5%
5.00% Add for Over head charges @ 5% on (A)+(B)+( C) 57614.62
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
1000 mm Dia.,
(A) Labour
0.18 nos Mate 425.00 day
0.50 nos Mason 470.00 day
4.00 nos Mazdoor 400.00 day
0% Agency area allowance 1911.50
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 17968.15 RM
Total
(C) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 226513.34
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

Providing, laying Reinforced cement concrete Hume pipes of 300 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
300 mm Dia.,
(A) Labour
0.18 nos Mate 425.00 day
0.50 nos Mason 470.00 day
4.00 nos Mazdoor 400.00 day
0% Agency area allowance 1911.50
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 1322.08 RM
Total
(C) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 18437.47
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges etc.,
complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed
by the Engineer-in-Charge

Unit = cum Page 523 of MoRT&H SDB


Taking output = 1 cum
(A) Labour
0.05 Day Mate 456.00 day
0.25 Day Mazdoor skilled 470.00 day
1.00 Day Mazdoor 425.00 day
0% Agency area allowance 565.30
Total

(B) Material
1.20 cum Cost of Gravel 178.36 cum
Total
(C) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 779.33
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size
including cost, (excluding
Unit = seigniorage)
cum charges and of
Page 522 conveyance of materials to site and including
MoRT&H SDB
Taking output = 1 cum
(A) Labour
0.04 Day Mate 425.00 day
0.35 Day Mason 470.00 day
0.75 Day Mazdoor 400.00 day
0% Agency area allowance 481.50
Total

(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 835.77 cum
0.20 cum Cost of stone spalls 646.77 cum
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1446.62
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate to be adopted

#REF!
Unit = Sqm Page 220 of MoRT&H SDB
Taking output = 40 Sqm
(A) Labour
0.12 Day Mate 425.00 day
2.00 Day Painter 540.00 day
1.00 Day Mazdoor 400.00 day
0% Agency area allowance 1531.00
Total

(B) Material
6.00 cum Paint (Page No 20, Sno 71) 240.00 cum
Total
(C) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B) 2971.00
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 40 Sqm (E)+(F)
Rate for 1 Sqm
Rate to be adopted

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 335 of1000-1
MoRT&HandSDB
fine aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
4.13 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 4%
4.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges
5.00% Over head charges 5% on (A) + (B) 66704.68
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 1000-1
335,500 and fine SDB
of MoRT&H aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
4.13 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 10%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 70553.03
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table
Unit = cum Page 1000-1 andoffine
472, 457 aggregate
MoRT&H SDB conforming to table 1000-
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
0.00 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 20%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 78755.18
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table
Unit = cum Page 1000-1 andoffine
472, 457 aggregate
MoRT&H SDB conforming to table 1000-
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
0.00 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 20%
20.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 85914.74
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification 1500,
1600, 1700 & 2702 as directed by the Engineer-in-Charge for Wearing Coat over Deck Slab

Unit = cum Page 477 SDB, Chapter-14


Taking output = 15 cum
(A) Labour
0.90 Day mate 456.00 day
1.50 Day Mason 470.00 day
21.00 Day Mazdoor 425.00 day

0% Muncipal area allowance 9630.00


Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1439.85 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
6.100 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
% Form work @ 20% on (A)+(B)+( C) 75087.44 Cum
(E) Over head charges @ 5%
Over head charges 5% on (A) + (B)+(C)+(D) 75087.44
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Unit = 1 Cum
Taking output = 1 cum
(B) Material
1.00 cum Cement Concrete M 30 Grade 5006.00 cum
0.08 cum HYSD Bar reinformcement 47000.00 cum

(B) Labour
0.15 day Labour for cleaning deck slab concrete 425.00 cum

(E) Over head charges @ 5%


5.00% Over head charges 5% on (A) + (B)+(C)+(D) 5069.75
(G) Add Contractors Profit at 10% on (F) 5323.24

Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and Construction
10 joints of approved quality including cost, conveyance and placing in position, etc., complete as
directed by the Engineer-in-charge.

Unit = Sqm
Rate as per Building SSR Item No.197 Unit = Sqm

17 Forming embankment with borrowed useful earth from outside road boundary by mechanical means
upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision).
(Payment Based on Levels) for diversion road

Unit : Cum
Taking out put = 100 Cum Page 70 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
1.00 day Mazdoor unskilled 425.00 day
0% Agency area allowance

(B) Machinery
100.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum
800.00 t.km Tipper (for 10Kms=160x5=800) 6.00 t.km
Add 10% of cost of carriage to cover cost of
loading
Dozer 80and
HP unloading
for spreading @ 200 cum per
0.50 hr 2661.20 cum
hour
Motor Grador for Grading @ 100 cum per
1.00 hr 3601.92 hr
hour
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr

(C) Over head charges


5% Over head charges 5% on (A) + (B) 17630.18
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 100 cum (D) + (E)
Rate per Cum
Rate per 1 cum
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure on which it is built and installed as per design
given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at locations directed by the Engineer, all as specified 809
MORTH

Unit = 1 Lm Page 472,497 of MoRT&H SDB


Taking output = 10 Lm
(A) Labour
0.04 Day mate 425.00 day
0.00 Day Mason 425.00 day
1.00 Day Mazdoor 400.00 day
0% Agency area allowance 417.00
Total
(B) Material
0.28 cum HYSD Steel Reinforcement including Dowel B 60665.00 cum
0.32 cum Pre moulded Asphalt filler Board 991.00 cum
Total
(C) Machinery
0.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
0.00 hr Generator 35 KVA 842.20 hr
Total
(D) Form work
2.00 % Form work @ 10 on (A)+(B)+( C) 17720.32 Cum
(E) Over head charges @ 5%
5.00% Over head charges 18074.73
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
3 6064.00
Cost per 15 cum (F)+(G)
Rate for 1Lm
Rate to be adopted

21 Providing Grouted Revetment with rough stone (HBG/HBT) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including
Unit = cum cost, seigniorage charges
Page 331, and conveyance of materials to site and
522 SDB
Taking output = 15 cum
(A) Labour
0.64 Day mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
2.430 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity -698.88 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 49182.49 Cum
(E) Over head charges @ 5%
Over head charges 5% on (A) + (B)+(C)+(D) 49182.49
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

(A) Labour
0.04 Day mate 456.00 day
0.35 Day Mason 470.00 day
0.75 Day Mazdoor 425.00 day
0% Muncipal area allowance 501.49
Total
(B) Material
0.20 cum Cost of CC (1:4:8) 3606.72 cum
1.00 cum Cost ofRough Stone HBG/HBT 300mm thick 508.35 cum
Total
(C) Machinery
hr Concrete mixer 0.4/0.28 cum 472.60 hr
hr Generator 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 1731.18 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1731.18
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

11 Providing Grouted Revetment with rough stone (HBG/HBT) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engineer-in-Charge for
quadrennial revetment.

Unit = cum Page 331, 522 SDB


Taking output = 15 cum
(A) Labour
0.64 Day mate 405.00 day
1.00 Day Mason 405.00 day
15.00 Day Mazdoor 350.00 day
0% Agency area allowance 5914.20
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 0.00 cum
6.75 cum Sand at site 0.00 cum
2.43 MT Cement at site 5300.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 26682.00 Cum
(E) Over head charges @ 5%
Over head charges 5% on (A) + (B)+(C)+(D) 26682.00
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

(A) Labour
0.04 Day mate 405.00 day
0.35 Day Mason 405.00 day
0.75 Day Mazdoor 350.00 day
0% Agency area allowance 420.45
Total
(B) Material
0.20 cum Cost of CC (1:4:8) 1778.80 cum
1.00 cum Cost of Rough Stone HBG/HBT 300mm thick 0.00 cum
Total
(C) Machinery
hr Concrete mixer 0.4/0.28 cum 472.60 hr
hr Generator 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 776.21 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 776.21
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

16 Providing and applying 2 coats of water based cement paint to unplastered concrete surface after
cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm
Unit : Sqm
Taking out put = 10 Sqm RBR-SPST-26 of SDB
(A) Labour
0.01 day Mate 540.00 day
0.25 day painter 425.00 day
0.25 day Mazdoor Unskilled 400.00 day
0% Agency area allowance 206.25

(B) Material
Water based paint of approved quality for
5.00 ltr 193.00 cum
cement concrete surface

5.00% Over head charges 5% on (A) + (B) 1176.65


(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 sqm (D) + (E)
Rate per sqm
Rate per 1 sqm

15 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for foundation

Unit = cum Page 335,455 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
5.40 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
2.70 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.16 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 10%
4.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 3%
5.0% Over head charges 5% on (A) + (B) 72747.60
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

16 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 1000-1
335,455 and fine SDB
of MoRT&H aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
5.40 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
2.70 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.16 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 10%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 3%
5.0% Over head charges 5% on (A) + (B) 76944.58
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

7.09 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through thePage
full461,333
width ofofthe structure
MoRT&H SDB at 1.00m C/C in both horizontal and vertical
Unit = RM
Taking output = 30 RM
Cement Mortar (1:3) (Out put = 1Cum)
(a) Material
0.51 MT Cost of Cement 4750.00 1.00
1.05 cum Cost of Sand motor 2061.01 1.00

TOTAL a=

(b) Labour
0.04 no Mate 425.00 1.00
0.90 no Mazdoor 400.00 1.00
0% Agency area allowance 377.00

TOTAL b=
Cost per 1 Cum (a+b)

(A) Material
31.50 RM RM 34.00 1.00
10.00 no collars for AC pipe 15.00 1.00
30.00 no MS clamps 5.00 1.00
0.05 cum Cement mortar (1:3) 4963.56 1.00
TOTAL A=

(B) Labour
0.03 no Mate 425.00 1.00
0.50 no Mason 357.00 1.00
0.25 no Mazdoor 400.00 1.00

0% Agency area allowance 291.25


TOTAL B=
(A + B )

5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1910.43

10.00 % (D) Contractors Profit on (A+B+C) 2005.95

(E ) (excluding seigniorage) cha


0.0525 cum 0.00 1.00

30.00 RM TOTAL Cost for 30 RM = (A+B+C+D+E)


Rate per 1 RM
Rate per 1 RM

7.15 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures andUnit
medians,
= RM constructed with M-40 grade concrete with HYSD reinforcement
Taking output = 10 RM
M40 Grade concrete Page 237 & 482 ( M40 Grade) SDB, Chapter-12
Unit = cum
Taking output = 120 cum
(A) Labour
0.94 no Mate 425.00 1.00
3.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 10044.50
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
51.600 MT Cement at site 4750.00 MT
25.800 Kg Admixture@0.4%of cement 95.00 KG
Super Plasticizer item 643 building SOR 2016-17
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
10.00 % Form work @ 10 on (A)+(B)+( C) 556824.00 Cum
(E) Over head charges @
5.00% Add for Over head charges @ 5% on (A)+(B)+( C)+(D) 612506.40
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

(A) M40 grade concrete


3.00 Cum M 40 5104.00 1.00
(B) Labour
0.04 no Mate 425.00 1.00
1.00 no Mazdoor 400.00 1.00
0% Agency area allowance
TOTAL A=
(B) Material
0.28 MT HYSD bars including overlaps 47000.00 1.00
0.32 Kg Pre-moulded asphalt filler board 724.90 1.00
TOTAL B=
(A + B )
5% % (C) Over Head Charges on (A+B) 29120.97
10.00 % (D) Contractors Profit on (A+B+C) 30577.02

10.00 RM TOTAL Cost for 10 RM = (A+B+C+D)


Rate per 1 RM
Rate per 1 RM

7.17 Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
1000 mm Dia.,
(A) Labour
0.36 nos Mate 425.00 day
1.00 nos Mason 470.00 day
8.00 nos Mazdoor 400.00 day
0% Agency area allowance 3823.00
Total
(B) Material
25.00 RM Cost of 1000mm Dia., pipes 17968.15 RM
Total
(C) Over head charges @
5.0% Over head charges 5% on (A) + (B) 453026.67
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
6 RBR- Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 357.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8271.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.380 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
3.75 % Form work @ 3.75% on (A)+(B)+( C) 537661.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 557823.81
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

13 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and Construction
joints of approved quality including cost, conveyance and placing in position, etc., complete as
Unit = Sqm
Rate as per Building SSR Item No.197
12 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming
Unit =tocum
table 1000-2 ofPage
MoRT&H including
331 of MoRT&Hcost
SDBand conveyance of all materials
Taking output = 15 cum
(A) Labour
0.64 Day Mate 425.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 400.00 day
0% Agency area allowance 6742.00
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
6.75 cum Sand at site 1081.77 cum
2.43 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 624.00 hr
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 52769.62
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

5 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fineofaggregate
Page 472,457 conforming to table 1000-2)
MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 71595.62 Cum
(E) Over head charges @ 3%
5.00% Add for Over head charges @ 3% on (A)+(B)+( C) 78755.18
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6.07 Vibrated reinforced cement concrete M.25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fine
Page SDB, aggregate conforming to table 1000-2)
Chapter-12
Taking output = 15 cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 425.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8832.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.050 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
Total
(D) Form work
2.00 % Form work @ 10 on (A)+(B)+( C) 75774.62 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 77290.11
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6.02 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges
Unit = cum and conveyance of materials
Page 523 of MoRT&Hto site
SDB including labour charges etc.,
Taking output = 1 cum
(A) Labour
0.05 Day Mate 425.00 day
0.25 Day Mazdoor SKILLED 470.00 day
1.00 Day Mazdoor 400.00 day
0% Agency area allowance 538.75
Total

(B) Material
1.20 cum Cost of Gravel 178.25 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 0.00 hr
0.05 hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 752.65
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

7.02 Earth work in excavation of foundation of structures as per drawing and technical specification,
including
Unit : Cumsetting out, construction of shoring and327
Page bracing, removal
of MoRT&H SDBof stumps and other deleterious
Taking out put = 10 Cum
(A) Labour
0.20 day Mate 425.00 day
5.00 day Mazdoor unskilled 400.00 day
0% Agency area allowance 2085.00

(B) Machinery
Air Compressor 250 cfm with 2 leads of
6.00 hr 521.20 cum
pneumatic breaker

(C) Over head charges


5.00% Over head charges 5% on (A) + (B) 5212.20
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 cum (D)+(E)
Rate for 1 cum
Add seignorage charges (1*22)

Rate to be adopted

6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 344 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mazdoor Skilled 470.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8610.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.800 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
3.50 % Form work @ 3.5% on (A)+(B)+( C) 539995.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 558895.34
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 458 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8610.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.800 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
10.00 % Form work @ 13.1% on (A)+(B)+( C) 539995.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 593995.05
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 478 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.88 Day mate 425.00 day
3.00 Day Mason 470.00 day
19.00 Day Mazdoor 400.00 day
0% Agency area allowance 9010.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.60 cum Sand at site 1081.77 cum
48.790 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
20.00 % Form work @ 20% on (A)+(B)+( C) 541014.06 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 649216.87
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

16 Providing and fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing
and Technical Specification
Unit :RM
Taking out put = 12 m Page 507 of SDB, Chapter 14
(A) Labour
0.04 day Mate 425.00 day
0.50 day Mazdoor 400.00 day
0.50 day Mazdoor skilled 470.00 day
0% Agency area allowance 435.00

(B) Material
Copper Plate; (Sno 866, Pg No: 302 of SoR
55.00 Kg 605.00 Kg
2016-17)

5.00% Over head charges 5% on (A) + (B) 33727.00


(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12 m (D) + (E)
Rate per sqm
Rate per 1 m

6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 478 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.88 Day mate 425.00 day
3.00 Day Mason 405.00 day
19.00 Day Mazdoor 400.00 day
0% Agency area allowance 8815.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.60 cum Sand at site 1081.77 cum
48.790 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
20.00 % Form work @ 3.5% on (A)+(B)+( C) 540819.06 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 648982.87
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

6.08C Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc.,
and including over lapping welding if required etc., complete for all R.C.C items for finished item of
work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C
items.

Page 489,490 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.44 no Mate 425.00 1.00
3.00 no Black smith 470.00 1.00
8.00 no Mazdoor 400.00 1.00
0% Agency area allowance 3200.00
TOTAL A=
(B) Material
HYSD bars including 5% overlaps and
1.05 MT 47000.00 1.00
wastage
8.00 Kg Binding wire ( Building SSR item no.757 ) 61.00 1.00
TOTAL B=
(A + B )
(C) Over Head Charges on (A+B) 54635.00

% (D) Contractors Profit on (A+B+C) 54635.00

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT
16 Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line
and
Unit grade,
:RM tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between
Taking out put = 2x24=48 m Page 495 of SDB
(A) Labour
day Mate 425.00 day
day Mazdoor 2567.00 day
day Mazdoor skilled 2249.00 day
0% Agency area allowance 0.00

(B) Material
4.09 Cum M 30 Grade Reinf Cement Concrete 6246.00 Kg
Add 5% cost for formwork for casting in
casting yard
0.87 MT HYSD bar Reinf 54635.00 Kg
Add 5% cost for handling and fixing of
precast panels in position
5.00% Over head charges 5% on (A) + (B) 74095.84
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 48 m (D) + (E)
Rate per sqm
Rate per 1 m

6.07 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fine ofaggregate
Page 344,501 conforming to table 1000-2)
SDB, Chapter-12
Taking output = 15 cum
(A) Labour
0.86 Day mate 425.00 day
1.50 Day Mason 425.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9003.00
Total
(B) Material
cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.100 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
Total
(D) Form work
2.00 % Form work @2 on (A)+(B)+( C) 76183.12 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 77706.78
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as
per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Dowel Bars

Page 460,461 of MoRT&H SDB


Unit = MT
Taking output = 1 MT
(A) Labour
0.28 no Mate 425.00 1.00
1.50 no Black smith 470.00 1.00
5.50 no Mazdoor 400.00 1.00
0% Agency area allowance 2200.00
TOTAL A=
(B) Material
1.05 MT HYSD bars including overlaps 47000.00 1.00
6.00 Kg Binding wire ( Building SSR item no.757 ) 61.00 1.00
TOTAL B=
(A + B )
5.00% (C) Over Head Charges on (A+B) 52740.00

10.00 % (D) Contractors Profit on (A+B+C) 55377.00

1.00 MT TOTAL Cost for 1 MT = (A+B+C+D)


Rate per 1 MT
Rate per 1 MT
/4 to 28/140 (Working

Amount
(Rs.)

d other miscellaneous
lvaging useful materials
Technical Specification
Cement Concrete grade

9.12
114.00
106.25
0.00
229.37

394.23
125.50
519.73
749.10

37.46

78.66

865.22
692.17
692.00
ons of structures as per
f shoring and bracing,
ck filling the excavation
or finished item of work
r-in-Charge.

145.92
3400.00
0.00
3545.92
16929.00
0.00

1023.75
21498.67
2149.87
23648.53
98.54
99.00
1 Cum

ed stone aggregate and


ance of all materials to
etc., including all other
d item of work as per
e Engineer-in-Charge for

291.84
470.00
6375.00
0.00
7136.84

13278.60
11098.01
15870.00
40246.61

2835.60
5053.20
1397.76
9286.56

2833.50
59503.51
5950.35
65453.86
4363.59
4364.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
& Approach Slab)

392.16
705.00
8500.00
0.00
9597.16

7967.16
5831.39
1584.36
11098.01
18998.00
45478.92

2835.60
5053.20
0.00
7888.80

0.00

3148.24
66113.12
6611.31
72724.44
4848.30
4848.00
1 Cum

yance and (excluding


of IRC : 78 and as per
nical specifications for

127.68
2975.00
0.00
3102.68
2140.32
2140.32

134.40
34.94
169.34

270.62
5682.96
568.30
6251.25
625.13
625.00
1 Cum

10 mm size HBG crushed


ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
wall)

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
197885.00
430670.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

19989.26
25986.04
545706.74
54570.67
600277.41
5002.31
5002.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
222548.00
455333.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

19664.79

27202.96
571262
57126.22
628388
5236.57
5237.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
191636.00
424421.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

49348.24

27141.53
569972.21
56997.22
626969.44
5224.75
5225.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
222548.00
455333.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

52439.44

28841.69
605675.57
60567.56
666243.13
5552.03
5552.00
1 Cum

crushed stone aggregate


rming to table 1000-2)
te and labour charges,
other incidental and
er Approved drawing but
on 1500, 1600,1700, &
lab.

383.04
1410.00
7650.00
0.00
9443.04

93302.28
50699.52
88784.10
224480.00
457265.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

10526.53

26842.65
563696
56369.56
620065
5167.21
5167.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H

392.16
705.00
8500.00
0.00
9597.16

5311.44
7775.19
3168.72
11098.01
23736.00
51089.36

2835.60
5053.20
7888.80
2743.01

3565.92
74884.25
7488.42
82372.67
5491.51
5492.00
1 Cum
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
ms.

182.40
940.00
2550.00
0.00
3672.40

48300.00
366.00
48666.00
52338.40
2616.92

5495.53

60450.85
60450.85
60451.00

,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
R.C.C items.
155.04
940.00
2762.50
0.00
3857.54

48300.00
366.00
48666.00
52523.54
2626.18

5514.97

60664.69
60664.69
60665.00

,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
f R.C.C items.

200.64
1410.00
3400.00
0.00
5010.64

48300.00
488.00
48788.00
53798.64
2689.93

5648.86
62137.43
62137.43
62137.00

mm Diameter AC pipe
horizontal and vertical
m the weep holes laying
he A.C pipes and labour
1V : 20H towards stream
ata

257.00

nd 50 % of 40 mm HBG
&H specifications to a
er size towards the wall
return wall to the full
all metal (excluding
l officers as per drawing
f MoRT&H (5th Revision)

145.92
2975.00
456.00
0.00
3576.92

2654.10
5901.60
8555.70

41.93
41.93

608.73
12783.28
1278.33
14061.61
1406.16
1406.00
1 Cum
our with stone boulders
ecification 300 mm thick
eigniorage) charges and
e stones for apron etc.,
evision ) and as directed

18.24
164.50
318.75
0.00
501.49

508.35
100.87
609.22

55.54
1166.25
116.62
1282.87
1282.87
1283.00
1 Cum
grade bitumen meeting
d laid to required level
with bitumen precoated
5cum per 10 sqm and at
d into surface when the
over mastic surface, all

age 151 of MoRT&H SDB

187.00
4000.00
470.00
0.00
4657.00

21.42
31.27
390.00
1254.00
415.00
2111.69
5921.4
421.9
941.8
799.6
31.4
14.8
8130.8
14899.5

744.98
15644.50
1564.45
17209.0
491.68
492.00
1 Sqm
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H

392.16
705.00
8500.00
0.00
9597.16

7967.16
5831.39
1584.36
11098.01
18998.00
45478.92

2835.60
5053.20
0.00
7888.80

1888.95
3242.69
68096.52
6809.65
74906.17
4993.74
4994.00
1 Cum
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
, all as specified

428.64
1645.00
8500.00
0.00
10573.64

93302.28
50699.52
88784.10
237360.00
470145.90

6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50

54033.70

0.00
594370.74
0.00
594370.74
4953.09
4953.00
1 Cum
14859.00

18.24
425.00
0.00
443.24

12880.00
233.28
13113.28
28415.52
1420.78

2983.63

32819.93
3281.99
3282.00

209 MORD & 2705

9.12
0.00
9.40
8.50

4.56
4.70
0.00
85.00
0.00
121.28

178.00
138.00
1350.00
390.00
2056.00
2177.28
108.86
108.86
228.61

2623.61
2623.61
2624.00
xcluding seigniorage) of
8 and as per MoRT&H
nical specifications for

127.68
2975.00
0.00
3102.68

2140.32
2140.32

134.40
34.94
169.34

270.62
5682.96
568.30
6251.25
625.13
625.00
1 Cum

ve Engineer (R&B)
n: Huzurnagar

ding Engineer (R&B)

crushed stone aggregate


rming to table 1000-2)
365.50
705.00
8000.00
0.00
9070.50

14715.83
8298.55
7301.94
28737.50
59053.82

2835.60
5053.20
7888.80

2850.49

3943.18
82806.79
8280.68
91087.47
6072.50
6073.00
1 Cum
ed stone aggregate and
excluding seigniorage)

272.00
470.00
6000.00
0.00
6742.00

18046.38
7301.94
16387.50
41735.82

2835.60
5053.20
1248.00
9136.80
2880.73
60495.35
6049.54
66544.89
4436.33
4436.00
1 Cum

a., NP-4 class for pipe


our charges for laying,

76.50
235.00
1600.00
0.00
1911.50

224601.84
224601.84

11325.67
237839.01
23783.90
261622.91
20929.83
20930.00
1 RM

a., NP-4 class for pipe


our charges for laying,

76.50
235.00
1600.00
0.00
1911.50

16525.97
16525.97

921.87
19359.34
1935.93
21295.28
1703.62
1704.00
1 RM

slopes including cost,


ng labour charges etc.,
evision) and as directed

22.80
117.50
425.00
0.00
565.30

214.03
214.03

38.97
818.30
81.83
900.13
900.13
900.00
1 Cum

less than 300 mm size


ls to site and including

17.00
164.50
300.00
0.00
481.50

835.77
129.35
965.12

72.33
1518.95
151.90
1670.85
1671.00

51.00
1080.00
400.00
0.00
1531.00

1440.00
1440.00

148.55
3119.55
311.96
3431.51
85.79
86.00
1 Sqm

10mm size HBG crushed


ate conforming to table

365.50
705.00
8000.00
0.00
9070.50

10827.83
7357.91
2074.64
7301.94
19617.50
47179.82

2835.60
5053.20
7888.80

2565.56

3335.23
70039.91
7003.99
77043.91
5136.26
5136.00
1 Cum
10mm size HBG crushed
ate conforming to table

365.50
705.00
8000.00
0.00
9070.50

10827.83
7357.91
2074.64
7301.94
19617.50
47179.82

2835.60
5053.20
7888.80

6413.91

3527.65
74080.68
7408.07
81488.75
5432.58
5433.00
1 Cum
ize HBG crushed stone
onforming to table 1000-

365.50
705.00
8000.00
0.00
9070.50

0.00
14715.83
8298.55
7301.94
24320.00
54636.32

2835.60
5053.20
7888.80

7159.56

3937.76
82692.94
8269.29
90962.23
6064.15
6064.00
1 Cum
ize HBG crushed stone
onforming to table 1000-

365.50
705.00
8000.00
0.00
9070.50

0.00
14715.83
8298.55
7301.94
24320.00
54636.32

2835.60
5053.20
7888.80

14319.12

4295.74
90210.48
9021.05
99231.52
6615.43
6615.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
SBD specification 1500,
r Deck Slab

410.40
705.00
8925.00

0.00
10040.40

11662.79
6337.44
11098.01
28060.00
57158.24

2835.60
5053.20
7888.80

0.00

0.00
75087.44

75087
5005.83
5006.00
1 Cum

5006.00

5006.00
63.75

253.49
532.32
5856.00
1 Cum

oints and Construction


etc., complete as

991.00

ry by mechanical means
ea, removal of top soil,
il on the embankment,
to 10 Tonnes Vibratory
all hire and operational
ation 305 (5th revision).

18.24
425.00
0.00
443.24

1300.00
4800.00
480.00
1330.60
3601.92
2795.52
2878.90
17186.94

881.51
18511.69
1851.17
20362.86
203.63
204.00
1 Cum
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
eer, all as specified 809

17.00
0.00
400.00
0.00
417.00

16986.20
317.12
17303.32

0.00
0.00
0.00

354.41

903.74
18978.47
1897.85
18192.00
39068.31
3906.83
3907.00
1 Lm
00 mm size grouted with
of materials to site and

291.84
470.00
6375.00
0.00
7136.84

13278.60
0.00
11098.01
11178.00
35554.61
2835.60
5053.20
-1397.76
6491.04

0.00

0.00
49182.49
4918.25
54100.74
3606.72
3607.00
1 Cum

18.24
164.50
318.75
0.00
501.49

721.34
508.35
1229.69

0.00
0.00
0.00
0.00

0.00

86.56
1817.74
181.77
1999.51
1999.51
2000.00
1 Cum
00 mm size grouted with
of materials to site and
ete for finished item of
Engineer-in-Charge for
259.20
405.00
5250.00
0.00
5914.20

0.00
0.00
12879.00
12879.00

2835.60
5053.20
0.00
7888.80

0.00

0.00
26682.00
0.00
26682.00
1778.80
1779.00
1 Cum

16.20
141.75
262.50
0.00
420.45

355.76
0.00
355.76

0.00
0.00
0.00
0.00

0.00

38.81
815.02
81.50
896.52
896.52
897.00
1 Cum

concrete surface after


nt @ of 1 litre for 2 sqm

5.40
106.25
100.00
0.00
211.65

965.00
965.00

58.83
1235.48
123.55
1359.03
135.90
136.00
1 sqm
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H

365.50
705.00
8000.00
0.00
9070.50

7218.55
9810.55
4149.28
7301.94
24510.00
52990.32

2835.60
5053.20
7888.80
2797.98

3637.38
76384.98
7638.50
84023.48
5601.57
5602.00
1 Cum
10mm size HBG crushed
ate conforming to table

365.50
705.00
8000.00
0.00
9070.50

7218.55
9810.55
4149.28
7301.94
24510.00
52990.32

2835.60
5053.20
7888.80

6994.96

3847.23
80791.81
8079.18
88870.99
5924.73
5925.00
1 Cum

mm Diameter AC pipe
horizontal and vertical

2422.50
2164.06

4586.56
4586.56

17.00
360.00
0.00

377.00
4963.56

1071.00
150.00
150.00
248.18
1619.18
1619.18

12.75
178.50
100.00

0.00
291.25
1910.43

95.52

200.60

0.00

2206.55
73.55
74.00

he road, approaches to
th HYSD reinforcement
399.50
1645.00
8000.00
0.00
10044.50

117726.64
66388.43
58415.53
245100.00
2451.00

490081.60

6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90

55682.40

612506

612506
5104.22
5104.00
1 Cum

15312.00

17.00
400.00
0.00
417.00

13160.00
231.97
13391.97
29120.97
1456.05
3057.70

33634.72
3363.47
3363.00

a., NP-4 class for pipe


our charges for laying,

153.00
470.00
3200.00
0.00
3823.00

449203.67
449203.67

22651.33
475678.00
47567.80
523245.80
41859.66
41860.00
1 RM
crushed stone aggregate
rming to table 1000-2)
te and labour charges,

357.00
1071.00
7200.00
0.00
8628.00

117726.64
66388.43
58415.53
229805.00
472335.60

6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90

20162.31

27891.19
585715.00
58571.50
644286.50
5369.05
5369.00
1 Cum

oints and Construction


etc., complete as
991.00
ed stone aggregate and
veyance of all materials

272.00
470.00
6000.00
0.00
6742.00
18046.38
7301.94
11542.50
36890.82

2835.60
5053.20
1248.00
9136.80

2638.48
55408.10
5540.81
60948.91
4063.26
4063.00
1 Cum

crushed stone aggregate


rming to table 1000-2)

365.50
705.00
8000.00
0.00
9070.50

14715.83
8298.55
7301.94
24320.00
54636.32

2835.60
5053.20
7888.80

7159.56

3937.76
82692.94
8269.29
90962.23
6064.15
6064.00
1 Cum

crushed stone aggregate


rming to table 1000-2)

357.00
1275.00
7200.00
0.00
8832.00

14715.83
8298.55
7301.94
28737.50
59053.82

2835.60
5053.20
7888.80

1515.49

3864.51
81154.62
8115.46
89270.08
5951.34
5951.00
1 Cum

slopes including cost,


ng labour charges etc.,

21.25
117.50
400.00
0.00
538.75

213.90
213.90
0.00
0.00
0.00

37.63
790.28
79.03
869.31
869.31
869.00
1 Cum

technical specification,
s and other deleterious

85.00
2000.00
0.00
2085.00

3127.20

260.61
5472.81
547.28
6020.09
602.01

602.01
602.00
1 Cum

crushed stone aggregate


rming to table 1000-2)
te and labour charges,

357.00
1410.00
7200.00
0.00
8967.00
117726.64
66388.43
58415.53
231800.00
474330.60

6485.40
6756.00
9876.00
28762.50

4818.00
56697.90

18899.84

27944.77
586840
58684.01
645524
5379.37
5379.00
1 Cum

crushed stone aggregate


rming to table 1000-2)
te and labour charges,

357.00
1410.00
7200.00
0.00
8967.00

117726.64
66388.43
58415.53
231800.00
474330.60

6485.40
6756.00
9876.00
28762.50

4818.00
56697.90

53999.55

29699.75
623695
62369.48
686064
5717.20
5717.00
1 Cum

crushed stone aggregate


rming to table 1000-2)
te and labour charges,

374.00
1410.00
7600.00
0.00
9384.00

117726.64
66388.43
59064.59
231752.50
474932.16

6485.40
6756.00
9876.00
28762.50

4818.00
56697.90

108202.81

32460.84
681678
68167.77
749845
6248.71
6249.00
1 Cum

omplete as per drawing


17.00
200.00
235.00
0.00
452.00

33275.00
33275.00

1686.35
35413.35
3541.34
38954.69
3246.22
3246.00

crushed stone aggregate


rming to table 1000-2)
te and labour charges,

374.00
1215.00
7600.00
0.00
9189.00

117726.64
66388.43
59064.59
231752.50
474932.16

6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90

108163.81

32449.14
681432
68143.20
749575
6246.46
6246.00
1 Cum
p bars of all diameters
cation of reinforcement
osition etc., complete
perational charges etc.,
ems for finished item of
rge and as per MoRT&H
uper structure of R.C.C

187.00
1410.00
3200.00
0.00
4797.00

49350.00
488.00
49838.00
54635.00
0.00

0.00

54635.00
54635.00
54635.00
ing 12 mm, true to line
centre spacing between

0.00
0.00
0.00
0.00
0.00

25558.63
1277.93
47259.28
2362.96
74095.84

3704.79
77800.63
7780.06
85580.70
1782.93
1783.00

crushed stone aggregate


rming to table 1000-2)

365.50
637.50
8000.00
0.00
9003.00

0.00
14715.83
8298.55
7301.94
28975.00
59291.32

2835.60
5053.20
7888.80

1523.66

3885.34
81592.12
8159.21
89751.33
5983.42
5983.00
1 Cum
t and put up bars of all
arges for fabrication of
them in position etc.,
charges and operational
for all R.C.C items for
ngineer-in-Charge and as
985 for Dowel Bars

119.00
705.00
2200.00
0.00
3024.00

49350.00
366.00
49716.00
52740.00
2637.00

5537.70

60914.70
60914.70
60915.00
Name of Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet Distr
Work ::

RMR.
Date :: 20.12.2017 SSR :: 2018-19

Average Lead

Crushing
Conveyance
Initial Rate

Machine
(-) Stacking
Conveyance

Initial Rate
of Material

Seigniorage
Charges
Loading &

of Material
unloading
Charging
Weighted

Charges
Stacking

Stacking
Charges

Charges

Charges
Blasting
charges

rate (-)

0
rate
S.No Nature of Metal
25% On (6+9)
(4-5) (7-5) on (9) %
1 2 3 4 5 6 7 8 9 10 11 12 13

IRC and MORT&H HBG/HBT METALS ( HMP LEADS )


40 mm to 45 mm
1 #REF! 285.35 0.00 112.57 520.00 285.35 520.00 #REF! 130.00 #REF! 0.0
M.Cto
25 mm Metal
27 mm
2 #REF! 285.35 0.00 112.57 790.00 285.35 790.00 #REF! 197.50 #REF! 0.0
M.C Metal
19 mm to 22 mm
3 #REF! 285.35 0.00 112.57 821.00 285.35 821.00 #REF! 205.25 #REF! 0.0
M.Cto
12 mm Metal
14 mm
4 #REF! 285.35 0.00 112.57 700.00 285.35 700.00 #REF! 175.00 #REF! 0.0
M.C chips
9.5 mm to 11.2 mm
5 #REF! 285.35 0.00 112.57 620.00 285.35 620.00 #REF! 155.00 #REF! 0.0
5 mmM.C
to 7chips
mm M.C
6 #REF! 285.35 0.00 112.57 485.00 285.35 485.00 #REF! 121.25 #REF! 0.0
chips
7 2.36 mm to 5 mm #REF! 285.35 0.00 112.57 485.00 285.35 485.00 #REF! 121.25 #REF! 0.0
Below 2.36 mm
8 #REF! 285.35 0.00 112.57 485.00 285.35 485.00 -- -- #REF! 0.0
(Dust)
IRC and MORT&H HBG/HBT METALS ( CRUSHER
50 mm to 55 mm LEADS )
10 22.00 285.35 0.00 112.57 440.00 285.35 440.00 67.00 110.00 0.00 0.0
40 mm Metal
to 45 mm
11 22.00 285.35 0.00 #REF! 520.00 285.35 520.00 #REF! 130.00 #REF! 0.0
M.Cto
25 mm Metal
27 mm
12 22.00 285.35 0.00 #REF! 790.00 285.35 790.00 #REF! 197.50 #REF! 0.0
M.Cto
19 mm Metal
22 mm
13 22.00 285.35 0.00 #REF! 821.00 285.35 821.00 #REF! 205.25 #REF! 0.0
M.Cto
12 mm Metal
14 mm
14 22.00 285.35 0.00 #REF! 700.00 285.35 700.00 #REF! 175.00 #REF! 0.0
M.Ctochips
9.5 mm 11.2 mm
15 22.00 285.35 0.00 #REF! 620.00 285.35 620.00 #REF! 155.00 #REF! 0.0
5 mmM.C
to 7chips
mm M.C
16 22.00 285.35 0.00 #REF! 485.00 285.35 485.00 #REF! 121.25 #REF! 0.0
chips
17 2.36 mm to 5 mm 22.00 285.35 0.00 #REF! 485.00 285.35 485.00 #REF! 121.25 #REF! 0.0
Below 2.36 mm
18 22.00 285.35 0.00 #REF! 485.00 285.35 485.00 -- -- #REF! 0.0
(Dust)
IRC and MORT&H HBG/HBT METALS ( QUARRY
40 mm to 45 mm LEADS )
12 22.00 285.35 0.00 112.57 520.00 285.35 520.00 67.00 -- 0.00 0.0
50 mm Metal
to 55 mm
13 22.00 285.35 0.00 112.57 440.00 285.35 440.00 67.00 -- 0.00 0.0
60 mm Metal
to 63 mm
14 22.00 285.35 0.00 112.57 400.00 285.35 400.00 67.00 -- 0.00 0.0
SS 300mmMetal
(HBG) for
15 22.00 285.35 0.00 112.57 156.00 285.35 156.00 67.00 -- 0.00 0.0
revetment
Quarry spall( Field
22.00 285.35
Av.picked
Of ratemetal)
25mm &
16 22.00 285.35 0.00 112.57 43.00 285.35 43.00 -- -- 0.00 0.0
150 mm40mm
soling stone
17 22.00 285.35 0.00 112.57 90.00 285.35 90.00 67.00 -- 0.00 0.0
HBG metal

HBG/HBT SS 5 METALS ( CRUSHER LEADS )


6 mm size M.C.
1 22.00 285.35 0.00 #REF! 505.00 285.35 505.00 #REF! 126.25 #REF! 0.0
10 mmChips
size M.C.
2 22.00 285.35 0.00 #REF! 657.00 285.35 657.00 #REF! 164.25 #REF! 0.0
Chips
12 mm size M.C.
3 22.00 285.35 0.00 #REF! 781.00 285.35 781.00 #REF! 195.25 #REF! 0.0
20 mmChips
size M.C.
4 22.00 285.35 0.00 #REF! 870.00 285.35 870.00 #REF! 217.50 #REF! 0.0
Metal
25 mm size M.C.
5 22.00 285.35 0.00 #REF! 830.00 285.35 830.00 #REF! 207.50 #REF! 0.0
40 mmMetal
size M.C.
6 22.00 285.35 0.00 #REF! 505.00 285.35 505.00 #REF! 126.25 #REF! 0.0
Metal

HBG/HBT SS 5 METALS ( QUARRY LEADS )


1 CRS Stone 22.00 285.35 0.00 112.57 249.00 285.35 249.00 67.00 -- 0.00 0.0
2 Rough stone 22.00 285.35 0.00 112.57 239.00 285.35 239.00 67.00 -- 0.00 0.0
3 SS 225 mm 22.00 285.35 0.00 112.57 152.00 285.35 152.00 67.00 -- 0.00 0.0
4 Rough stone
Bond 300 mm 22.00 285.35 0.00 112.57 156.00 285.35 156.00 67.00 -- 0.00 0.0
5 Stones(600x200x200) 22.00 285.35 0.00 112.57 1218.00 285.35 1218.00 0.00 -- 0.00 0.0
42 No Cost of each Bond Stone
1 Gravel 5.00 80.36 0.00 64.08 98.00 80.36 98.00 -- -- 0.00 0.0

5 Cement 4600.00
6 HYSD Steel 46000.00
7 MS Steel 44500.00
8 6 mm Mild Steel 46000.00

2 Sand for Mortar 99.00 1074.15 0.00 64.08 760.00 1074.15 760.00 -- -- 0.00 0.0
3 Sand for Concrete 99.00 1074.15 0.00 64.08 570.00 1074.15 570.00 -- -- 0.00 0.0
4 Sand for Filling 99.00 1074.15 0.00 64.08 570.00 1074.15 570.00 -- -- 0.00 0.0

0 Asst. Executive Engineer Dy. Executive Engineer Executive Engineer

0 R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___
to 21/2) in Suryapet District.

TOTAL RATE
0

On (6+9) SUM of
Value ( 8 to12&14 )
14 15

0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!

0.00 902.35
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 770.35

0.00 872.35
0.00 792.35
0.00 752.35
0.00 508.35

0.00 328.35
0.00 442.35

0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!

0.00 601.35
0.00 591.35
0.00 504.35
0.00 508.35
0.00 1503.35
35.79
0.00 178.36

4600.00
46000.00
44500.00
46000.00

0.00 1834.15
0.00 1644.15
0.00 1644.15
Name of Work:- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Workin
reach from Km 1/4 to 21/2) in Suryapet District.

BITUMEN LEADS & RATES


STRAIGHT LEAD :: Bitumen Lead 455.00 km Vizag
Lead Conveyance Rates
Lead for Emulsion ( round the trip ):: 910.00 km 1.50
Lead for Bulk Bitumen ( round the trip ) :: 910.00 km 1.50
BT as on 1-2-2019 Emulsion as on 16-08-2018

Bulk VG 10 Bulk VG 30 Emulsion


TYPE OF BITUMEN
(80/100) (60/70) (S.S)

Initial cost (Ex.Vizag) 27820.00 28020.00 49050.00


Excise Duty 14.00 % 3894.80 3922.80 6867.00
31714.80 31942.80 55917.00
Add CST @ 2.00 % 634.30 638.86 1118.34
Deduct loading -- -- --
Deduct loading, Unloading & Stacking -- -- --
Deduct cost of Empty Emulsion Drums -- -- --
Total 32349.10 32581.66 57035.34
Lead charges for Bulk BT 1.5 x 910 1365.00 1365.00
Lead charges for Emulsion 1.5 x 910 1365.00
Total 33714.10 33946.66 58400.34
OR SAY 33714.10 33946.66 58400.34

Bulk Bulk CRMB


TYPE OF BITUMEN
(80/100) (60/70) Gr 55
Rates Linked to Data 33714.10 33946.66 58400.34

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)


R&B Section, Kodad R&B Sub-Division,Kodad (R&B) Division, Suryapet
1/4 to 28/140 (Working

Vizag
Conveyance Rates
1.50
1.50
on 16-08-2018

Emulsion Emulsion
(S.S) (R.S)

49050.00 29280.00
6867.00 4099.20
55917.00 33379.20
1118.34 667.58
-- --
-- --
-- --
57035.34 34046.78

1365.00 1365.00
58400.34 35411.78
58400.34 35411.78

Emulsion
CRMB (M.S)
Gr 55
58400.34 35411.78

e Engineer (R&B)
ivision, Suryapet
OTHER MATERIALS SS5 HBG METAL
LABOUR
2018-19 2018-19

DETAILS RATE SIZES


2018-19
GRAVEL 98.00 SS6
MSAND 760.00 SS10
DETAILS RATE
CSAND 570.00 SS12

MASONI 470.00 FSAND 560.00 SS20

MASONII 450.00 CRS 249.00 SS25


Mate 456.00 ROUGH 239.00 SS40
Mazdoor skilled 456.00 BOND600 29.00 SS50
Mazdoor unskilled 425.00 SS150 90.00 SS60
SS225 152.00 SS65
SS300 156.00 SS75

QS25 43.00 Metals BLAST

QS40 43.00 CRS BLAST3


RR BLAST2

BITUMEN LEADS & RATES


2018-19
RATE SEIGNIORAGES-RMR
MATERIAL
km/ MT
PACKED BITUMEN 1.75 Preamble 7
2018-19
BULK BITUMEN 1.50

MATERIAL RATE

SGMETAL 0.00
SGSTONE 0.00
SGSAND 0.00
ADDITIONS
SGEARTH 0.00
OH 5.00 SGGRAVEL 0.00 GRAVEL_D
OH1 5.00
CP 10.00
VAT 0.00
LALI 13.00

IS:458-2003
Dia of Cement
Shell Quantity of
Pipes Outer Dia Content Cement Content
S.No Thick ness Concrete
NP3 class (mm) rate ( kg)
(mm) ( cum )
( mm ) ( kg/ cum)

1 2 3 4 5 6 7

1 600 85 770 0.1829 340 62.186


2 800 95 990 0.2671 340 90.814
3 1000 115 1230 0.4028 340 136.952
4 1200 120 1440 0.4976 340 169.184

MACHINERY 2018-19 RATE


AT PLANT
Dozer 80 HP for spreading @ 200 cum per hour 2661.20
Motor Graders for Grading @ 100 cum per hour 3601.92
Hydraulic Excavator 2821.50
Front end loader 1 Cum. bucket capacity 1843.52
Tippers 5.50 cum capacity 1004.40
Vibratory roller 8 Tones for GSB, EARTH/ WMM rolling 2878.90
Finish rolling with 6-8 Tones smooth wheeled tandem roller. 1131.00
Water tanker 6 KL 698.88
Tractor with Rotavator 472.64
Air Compressor 250 cfm 588.40
Wet mix plant of 60 tonne hr. capacity 1843.52
Mechanical broom @ 1250 Sqm./Hour 399.84
Bitumen pressure distributor @1750 sqm/hr 1677.76
Emulsion pressure distributor @ 1750 Sqm./Hour 963.20
Hot Mix Plant 120 TPH 31556.00
Hot Mix Plant 100 TPH 27071.52
Hot Mix Plant 60 TPH 24268.16
Hot Mix Plant 40 to 60 TPH 21414.40
Sensor Paver finisher @ 100 TPH 3426.65
Mechanical Paver finisher @ 100 TPH 2518.88
Smooth wheeled roller 8-10 Tones for initial break down rolling 1131.00
Vibratory roller 8 Tones for intermediate rolling 2878.90

Pneumatic road Roller 1436.96


Hire charges of bitumen boiler 40mm metal 234.08
GSB Plant 50 cum 1280.16
Generator 250 KVA 2072.00
Electric generating set 125 KVA 1478.40
Generator 100 KVA 1261.12
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix. 1004.40
Tipper 5.50 cum capacity per 10 Tonnes per t.km 6.00
Plate compactor/Power rammer/road roller 53.76
Hydraulic self propelled chip spreader @ 1500 sqm/hr. 2567.00
Mini hot mix plant (SDB of MOST 1994-95 page 131 ) 1268.00
Hire charges of bitumen boiler 10-12mm metal 234.08

Road Marking Machine@ 80sqm per hour 124.32

Hot Applide Thermoplastic Compound( Item no. 353)( per Liter) 251.00
Reflectorising glass beads (Per kg) 80.30
Concrete mixer 0.4/0.28 cum 472.60
Tractor 345.00
Tractor with ripper attachment @ 60 cum per hour 568.23
Generator set 30 KVA 842.20
Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52
SS5 HBG METAL IRC HBG METAL
2018-19 2018-19
BUILDINGS SSR-2018-19
RATE SIZES RATE

505.00 IRC2.36 485.00


MASTIC PADS
657.00 IRC5 485.00
781.00 IRC9 620.00 25.4 mm 991.00 BMS-W.20

870.00 IRC12 700.00 12.7 mm 568.00 BMS-W.21

830.00 IRC19 821.00 PAINTS 240.00


505.00 IRC25 790.00
433.00 IRC40 520.00
398.00 IRC50 440.00
360.00 IRC60 400.00 SCRAP from SCARIFYING
289.00 IRC65 360.00 2015-16

67.00 IRC75 290.00 LEAD NOTATION

67.00 DUST 485.00 MLOAD


67.00 MUNLOAD

SEIGNIORAGES-DATA WORKS

2014-15

MATERIAL RATE WORKS RATE

METAL_D 0.00 EWBULK


STONE_D 0.00 EW20A
SAND_D 0.00 ES20B
EARTH_D 0.00
GRAVEL_D 0.00

NP4 CLASS PIPES


CEMENT & STEEL

2018-19 BASIC
CURRENT
MATERIAL PRICE
PRICE
DETAILS FOR PIPES
First 5 km Next 1 km
RATE
Lead Lead CEMENT 5500.00 4900.00

450 mm 1887.00 64.270 2.21 HYSD 35000.00


800 mm 5262.00 141.520 5.71 MS6 36000.00 36000.00
1000 mm 7907.00 223.610 10.77 MS 34500.00
1200 mm 10686.00 271.200 11.72 BWIRE 50.00

2007-08 2008-09 2014-15

2400.00 2760.00
2260.00 2600.00
1950.00 2250.00
1150.00 1320.00
500.00 575.00
1350.00 1550.00
1150.00 1320.00
300.00 345.00
300.00 345.00
320.00 370.00
1150.00 1320.00
250.00 290.00
820.00 940.00
600.00 690.00

13500.00 15525.00

950.00 1090.00
470.00 540.00
1350.00 1320.00

900.00 1035.00

800.00 920.00
1350.00 1550.00
950.00 1090.00
800.00 920.00 To be Checked
7.22 Derived from previous data 3.90 4.50
0.05 and present rate 3.90 4.50
32.00 40.00
1800.00 2070.00
1268.00 1268.00
150.00 170.00
Rate as per
local
1268.00 90.00
competitive
quotations
200.00
65.00
300.00 345.00
300.00 345.00
300.00 345.00
540.00 620.00
From To Data
data Entry Entry
HMP 21.00 273.2913788
Crusher 21.00 273.2913788
Metal/ Stone
21.00 273.2913788
Qry

METAL LEADS & RATES


2018-19
From
LEAD NOTATION RATE
SSR
MLOAD 97.35
MUNLOAD 15.23
MSTACK

SCRAP from SCARIFYING


2015-16 0.00 0 0.00
From
RATE 1 MT1 29.05 33.00
SSR
32.00 2 MT2 40.66 46.20
16.00 3 MT3 56.24 63.90
4 MT4 68.30 77.60
5 MT5 80.36 91.30
6 MT6 92.42 13.70 6-30
7 MT7 104.48 11.40 >30
8 MT8 116.53 162.00
9 MT9 128.59 168.00

10 MT10 140.65 174.00

11 MT11 152.71 180.00


12 MT12 164.77 186.00
13 MT13 176.83 192.00
14 MT14 188.88 198.00
15 MT15 200.94 204.00
16 MT16 213.00 210.00
17 MT17 225.06 216.00
18 MT18 237.12 222.00
19 MT19 249.17 228.00
20 MT20 261.23 234.00
21 MT21 273.29 5.7500
22 MT22 285.35 5.5000
23 MT23 297.41 5.0000
24 MT24 309.47 4.7500
25 MT25 321.52 4.5000
26 MT26 333.58
598.1 27 MT27 345.64
526.3389517 28 MT28 357.70
29 MT29 369.76
30 MT30 381.82
31 MT31 391.85
32 MT32 401.88

33 MT33 411.92

34 MT34 421.95
35 MT35 431.99
36 MT36 442.02
37 MT37 452.05
38 MT38 462.09
39 MT39 472.12
40 MT40 482.15
41 MT41 492.19
42 MT42 502.22
43 MT43 512.26
44 MT44 522.29
45 MT45 532.32
46 MT46 542.36
47 MT47 552.39
48 MT48 562.43
49 MT49 572.46
50 MT50 582.49
51 MT51 592.53
52 MT52 602.56
53 MT53 612.60
54 MT54 622.63
55 MT55 632.66
56 MT56 642.70
57 MT57 652.73
58 MT58 662.76
59 MT59 672.80
60 MT60 682.83
61 MT61 692.87
62 MT62 702.90
63 MT63 712.93
64 MT64 722.97
65 MT65 733.00
66 MT66 743.04
67 MT67 753.07
68 MT68 763.10
69 MT69 773.14
70 MT70 783.17
71 MT71 793.21
72 MT72 803.24
73 MT73 813.27
74 MT74 823.31
75 MT75 833.34
76 MT76 843.37
77 MT77 853.41
78 MT78 863.44
79 MT79 873.48

80 MT80 883.51

81 MT81 893.54
82 MT82 903.58
83 MT83 913.61
84 MT84 923.65
85 MT85 933.68
86 MT86 943.71
87 MT87 953.75
88 MT88 963.78
89 MT89 973.82
90 MT90 983.85
91 MT91 993.88
92 MT92 1003.92
93 MT93 1013.95
94 MT94 1023.98
95 MT95 1034.02
96 MT96 1044.05
97 MT97 1054.09
98 MT98 1064.12
99 MT99 1074.15
100 MT100 1084.19
101 MT101 1094.22
102 MT102 1104.26
103 MT103 1114.29
104 MT104 1124.32
105 MT105 1134.36
106 MT106 1144.39
107 MT107 1154.43
108 MT108 1164.46
109 MT109 1174.49
110 MT110 1184.53
111 MT111 1194.56
112 MT112 1204.59
113 MT113 1214.63
114 MT114 1224.66
115 MT115 1234.70
116 MT116 1244.73
117 MT117 1254.76
118 MT118 1264.80
119 MT119 1274.83
120 MT120 1284.87
121 MT121 1294.90
122 MT122 1304.93
123 MT123 1314.97
124 MT124 1325.00
125 MT125 1335.03
126 MT126 1345.07
127 MT127 1355.10
128 MT128 1365.14
129 MT129 1375.17
130 MT130 1385.20
131 MT131 1395.24
132 MT132 1405.27
133 MT133 1415.31
134 MT134 1425.34
135 MT135 1435.37
136 MT136 1445.41
137 MT137 1455.44
138 MT138 1465.48
139 MT139 1475.51
140 MT140 1485.54
141 MT141 1495.58
142 MT142 1505.61
143 MT143 1515.64
144 MT144 1525.68
145 MT145 1535.71
146 MT146 1545.75
147 MT147 1555.78
148 MT148 1565.81
149 MT149 1575.85
150 MT150 1585.88
151 MT151 1595.92
152 MT152 1605.95
153 MT153 1615.98
154 MT154 1626.02
155 MT155 1636.05
156 MT156 1646.09
157 MT157 1656.12
158 MT158 1666.15
159 MT159 1676.19
160 MT160 1686.22
161 MT161 1696.25
162 MT162 1706.29
163 MT163 1716.32
164 MT164 1726.36
165 MT165 1736.39
166 MT166 1746.42
167 MT167 1756.46
168 MT168 1766.49
169 MT169 1776.53
170 MT170 1786.56
171 MT171 1796.59
172 MT172 1806.63
173 MT173 1816.66
174 MT174 1826.70
175 MT175 1836.73
176 MT176 1846.76
177 MT177 1856.80
178 MT178 1866.83
179 MT179 1876.86
180 MT180 1886.90
181 MT181 1896.93
182 MT182 1906.97
183 MT183 1917.00
184 MT184 1927.03
185 MT185 1937.07
186 MT186 1947.10
187 MT187 1957.14
188 MT188 1967.17
189 MT189 1977.20
190 MT190 1987.24
191 MT191 1997.27
192 MT192 2007.31
193 MT193 2017.34
194 MT194 2027.37
195 MT195 2037.41
196 MT196 2047.44
197 MT197 2057.47
198 MT198 2067.51
199 MT199 2077.54
200 MT200 2087.58
201 MT201 2097.61
202 MT202 2107.64
203 MT203 2117.68
204 MT204 2127.71
205 MT205 2137.75
206 MT206 2147.78
207 MT207 2157.81
208 MT208 2167.85
209 MT209 2177.88
210 MT210 2187.92
211 MT211 2197.95
212 MT212 2207.98
213 MT213 2218.02
214 MT214 2228.05
215 MT215 2238.08
216 MT216 2248.12
217 MT217 2258.15
218 MT218 2268.19
219 MT219 2278.22
220 MT220 2288.25
221 MT221 2298.29
222 MT222 2308.32
223 MT223 2318.36
224 MT224 2328.39
225 MT225 2338.42
226 MT226 2348.46
227 MT227 2358.49
228 MT228 2368.53
229 MT229 2378.56
230 MT230 2388.59
231 MT231 2398.63
232 MT232 2408.66
233 MT233 2418.69
234 MT234 2428.73
235 MT235 2438.76
236 MT236 2448.80
237 MT237 2458.83
238 MT238 2468.86
239 MT239 2478.90
240 MT240 2488.93
241 MT241 2498.97
242 MT242 2509.00
243 MT243 2519.03
244 MT244 2529.07
245 MT245 2539.10
246 MT246 2549.14
247 MT247 2559.17
248 MT248 2569.20
249 MT249 2579.24
250 MT250 2589.27
251 MT251 2599.30
252 MT252 2609.34
253 MT253 2619.37
254 MT254 2629.41
255 MT255 2639.44
256 MT256 2649.47
257 MT257 2659.51
258 MT258 2669.54
259 MT259 2679.58
260 MT260 2689.61
261 MT261 2699.64
262 MT262 2709.68
263 MT263 2719.71
264 MT264 2729.75
265 MT265 2739.78
266 MT266 2749.81
267 MT267 2759.85
268 MT268 2769.88
269 MT269 2779.91
270 MT270 2789.95
271 MT271 2799.98
272 MT272 2810.02
273 MT273 2820.05
274 MT274 2830.08
275 MT275 2840.12
276 MT276 2850.15
277 MT277 2860.19
278 MT278 2870.22
279 MT279 2880.25
280 MT280 2890.29
281 MT281 2900.32
282 MT282 2910.36
283 MT283 2920.39
284 MT284 2930.42
285 MT285 2940.46
286 MT286 2950.49
287 MT287 2960.52
288 MT288 2970.56
289 MT289 2980.59
290 MT290 2990.63
291 MT291 3000.66
292 MT292 3010.69
293 MT293 3020.73
294 MT294 3030.76
295 MT295 3040.80
296 MT296 3050.83
297 MT297 3060.86
298 MT298 3070.90
299 MT299 3080.93
300 MT300 3090.97
301 MT301 3101.00
302 MT302 3111.03
303 MT303 3121.07
304 MT304 3131.10
305 MT305 3141.13
306 MT306 3151.17
307 MT307 3161.20
308 MT308 3171.24
309 MT309 3181.27
310 MT310 3191.30
311 MT311 3201.34
312 MT312 3211.37
313 MT313 3221.41
314 MT314 3231.44
315 MT315 3241.47
316 MT316 3251.51
317 MT317 3261.54
318 MT318 3271.58
319 MT319 3281.61
320 MT320 3291.64
321 MT321 3301.68
322 MT322 3311.71
323 MT323 3321.74
324 MT324 3331.78
325 MT325 3341.81
326 MT326 3351.85
327 MT327 3361.88
328 MT328 3371.91
329 MT329 3381.95
330 MT330 3391.98
331 MT331 3402.02
332 MT332 3412.05
333 MT333 3422.08
334 MT334 3432.12
335 MT335 3442.15
336 MT336 3452.19
337 MT337 3462.22
338 MT338 3472.25
339 MT339 3482.29
340 MT340 3492.32
341 MT341 3502.35
342 MT342 3512.39
343 MT343 3522.42
344 MT344 3532.46
345 MT345 3542.49
346 MT346 3552.52
347 MT347 3562.56
348 MT348 3572.59
349 MT349 3582.63
350 MT350 3592.66
351 MT351 3602.69
352 MT352 3612.73
353 MT353 3622.76
354 MT354 3632.79
355 MT355 3642.83
356 MT356 3652.86
357 MT357 3662.90
358 MT358 3672.93
359 MT359 3682.96
360 MT360 3693.00
361 MT361 3703.03
362 MT362 3713.07
363 MT363 3723.10
364 MT364 3733.13
365 MT365 3743.17
366 MT366 3753.20
367 MT367 3763.24
368 MT368 3773.27
369 MT369 3783.30
370 MT370 3793.34
371 MT371 3803.37
372 MT372 3813.40
373 MT373 3823.44
374 MT374 3833.47
375 MT375 3843.51
376 MT376 3853.54
377 MT377 3863.57
378 MT378 3873.61
379 MT379 3883.64
380 MT380 3893.68
381 MT381 3903.71
382 MT382 3913.74
383 MT383 3923.78
384 MT384 3933.81
385 MT385 3943.85
386 MT386 3953.88
387 MT387 3963.91
388 MT388 3973.95
389 MT389 3983.98
390 MT390 3994.01
391 MT391 4004.05
392 MT392 4014.08
393 MT393 4024.12
394 MT394 4034.15
395 MT395 4044.18
396 MT396 4054.22
397 MT397 4064.25
398 MT398 4074.29
399 MT399 4084.32
400 MT400 4094.35
401 MT401 4104.39
402 MT402 4114.42
403 MT403 4124.46
404 MT404 4134.49
405 MT405 4144.52
406 MT406 4154.56
407 MT407 4164.59
408 MT408 4174.62
409 MT409 4184.66
410 MT410 4194.69
411 MT411 4204.73
412 MT412 4214.76
413 MT413 4224.79
414 MT414 4234.83
415 MT415 4244.86
416 MT416 4254.90
417 MT417 4264.93
418 MT418 4274.96
419 MT419 4285.00
420 MT420 4295.03
421 MT421 4305.07
422 MT422 4315.10
423 MT423 4325.13
424 MT424 4335.17
425 MT425 4345.20
426 MT426 4355.23
427 MT427 4365.27
428 MT428 4375.30
429 MT429 4385.34
430 MT430 4395.37
431 MT431 4405.40
432 MT432 4415.44
433 MT433 4425.47
434 MT434 4435.51
435 MT435 4445.54
436 MT436 4455.57
437 MT437 4465.61
438 MT438 4475.64
439 MT439 4485.68
440 MT440 4495.71
441 MT441 4505.74
442 MT442 4515.78
443 MT443 4525.81
444 MT444 4535.84
445 MT445 4545.88
446 MT446 4555.91
447 MT447 4565.95
448 MT448 4575.98
449 MT449 4586.01
450 MT450 4596.05
451 MT451 4606.08
452 MT452 4616.12
453 MT453 4626.15
454 MT454 4636.18
455 MT455 4646.22
456 MT456 4656.25
457 MT457 4666.29
458 MT458 4676.32
459 MT459 4686.35
460 MT460 4696.39
461 MT461 4706.42
462 MT462 4716.45
463 MT463 4726.49
464 MT464 4736.52
465 MT465 4746.56
466 MT466 4756.59
467 MT467 4766.62
468 MT468 4776.66
469 MT469 4786.69
470 MT470 4796.73
471 MT471 4806.76
472 MT472 4816.79
473 MT473 4826.83
474 MT474 4836.86
475 MT475 4846.90
476 MT476 4856.93
477 MT477 4866.96
478 MT478 4877.00
479 MT479 4887.03
480 MT480 4897.06
481 MT481 4907.10
482 MT482 4917.13
483 MT483 4927.17
484 MT484 4937.20
485 MT485 4947.23
486 MT486 4957.27
487 MT487 4967.30
488 MT488 4977.34
489 MT489 4987.37
490 MT490 4997.40
491 MT491 5007.44
492 MT492 5017.47
493 MT493 5027.51
494 MT494 5037.54
495 MT495 5047.57
496 MT496 5057.61
497 MT497 5067.64
498 MT498 5077.67
499 MT499 5087.71
500 MT500 5097.74
From To Data
data Entry Entry
E/W 5.00 80.35910751 METAL LEADS & RATE
Gravel 21.00 273.2913788 2008-09

Sand 90.00 983.8489636 LEAD

SAND/ EARTH LEADS & RATES


2017-18
From
LEAD NOTATION RATE 0.00
SSR
SLOAD 48.85 0.25
SUNLOAD 15.23 0.50
SSTACK 1
2
3
0.00 0 0.00 4

1 SD1 30.10 34.20 5

2 SD2 42.16 47.90 6


3 SD3 56.24 63.90 7
4 SD4 68.30 77.60 8
5 SD5 80.36 91.30 9
6 SD6 92.42 13.70 6-30 10
7 SD7 104.48 11.40 >30 11
8 SD8 116.53 12
9 SD9 128.59 13

10 SD10 140.65 14

11 SD11 152.71 15
12 SD12 164.77 16
13 SD13 176.83 17
14 SD14 188.88 18
15 SD15 200.94 187.9153281 19
16 SD16 213.00 20
17 SD17 225.06 21
18 SD18 237.12 22
19 SD19 249.17 23
20 SD20 261.23 24
21 SD21 273.29 25
22 SD22 285.35 26
23 SD23 297.41 27
24 SD24 309.47 28
25 SD25 321.52 29
26 SD26 333.58 30
27 SD27 345.64 31
28 SD28 357.70 32
29 SD29 369.76 33
30 SD30 381.82 34
31 SD31 391.85 35
32 SD32 401.88 36

33 SD33 411.92 37

34 SD34 421.95 38
35 SD35 431.99 39
36 SD36 442.02 40
37 SD37 452.05 41
38 SD38 462.09 42
39 SD39 472.12 43
40 SD40 482.15 44
41 SD41 492.19 45
42 SD42 502.22 46
43 SD43 512.26 47
44 SD44 522.29 48
45 SD45 532.32 49
46 SD46 542.36 50
47 SD47 552.39 51
48 SD48 562.43 52
49 SD49 572.46 53
50 SD50 582.49 54
51 SD51 592.53 55
52 SD52 602.56 56
53 SD53 612.60 57
54 SD54 622.63 58
55 SD55 632.66 59
56 SD56 642.70 60
57 SD57 652.73 61
58 SD58 662.76 62
59 SD59 672.80 63
60 SD60 682.83 64
61 SD61 692.87 65
62 SD62 702.90 66
63 SD63 712.93 67
64 SD64 722.97 68
65 SD65 733.00 69
66 SD66 743.04 70
67 SD67 753.07 71
68 SD68 763.10 72
69 SD69 773.14 73
70 SD70 783.17 74
71 SD71 793.21 75
72 SD72 803.24 76
73 SD73 813.27 77
74 SD74 823.31 78
75 SD75 833.34 79
76 SD76 843.37 80
77 SD77 853.41 81
78 SD78 863.44 82
79 SD79 873.48 83

80 SD80 883.51 84

81 SD81 893.54 85
82 SD82 903.58 86
83 SD83 913.61 87
84 SD84 923.65 88
85 SD85 933.68 89
86 SD86 943.71 90
87 SD87 953.75 91
88 SD88 963.78 92
89 SD89 973.82 93
90 SD90 983.85 94
91 SD91 993.88 95
92 SD92 1003.92 96
93 SD93 1013.95 97
94 SD94 1023.98 98
95 SD95 1034.02 99
96 SD96 1044.05 100
97 SD97 1054.09 101
98 SD98 1064.12 102
99 SD99 1074.15 103
100 SD100 1084.19 104
101 SD101 1094.22 105
102 SD102 1104.26 106
103 SD103 1114.29 107
104 SD104 1124.32 108
105 SD105 1134.36 109
106 SD106 1144.39 110
107 SD107 1154.43 111
108 SD108 1164.46 112
109 SD109 1174.49 113
110 SD110 1184.53 114
111 SD111 1194.56 115
112 SD112 1204.59 116
113 SD113 1214.63 117
114 SD114 1224.66 118
115 SD115 1234.70 119
116 SD116 1244.73 120
117 SD117 1254.76 121
118 SD118 1264.80 122
119 SD119 1274.83 123
120 SD120 1284.87 124
121 SD121 1294.90 125
122 SD122 1304.93 126
123 SD123 1314.97 127
124 SD124 1325.00 128
125 SD125 1335.03 129
126 SD126 1345.07 130
127 SD127 1355.10 131
128 SD128 1365.14 132
129 SD129 1375.17 133
130 SD130 1385.20 134
131 SD131 1395.24 135
132 SD132 1405.27 136
133 SD133 1415.31 137
134 SD134 1425.34 138
135 SD135 1435.37 139
136 SD136 1445.41 140
137 SD137 1455.44 141
138 SD138 1465.48 142
139 SD139 1475.51 143
140 SD140 1485.54 144
141 SD141 1495.58 145
142 SD142 1505.61 146
143 SD143 1515.64 147
144 SD144 1525.68 148
145 SD145 1535.71 149
146 SD146 1545.75 150
147 SD147 1555.78 151
148 SD148 1565.81 152
149 SD149 1575.85 153
150 SD150 1585.88 154
151 SD151 1595.92 155
152 SD152 1605.95 156
153 SD153 1615.98 157
154 SD154 1626.02 158
155 SD155 1636.05 159
156 SD156 1646.09 160
157 SD157 1656.12 161
158 SD158 1666.15 162
159 SD159 1676.19 163
160 SD160 1686.22 164
161 SD161 1696.25 165
162 SD162 1706.29 166
163 SD163 1716.32 167
164 SD164 1726.36 168
165 SD165 1736.39 169
166 SD166 1746.42 170
167 SD167 1756.46 171
168 SD168 1766.49 172
169 SD169 1776.53 173
170 SD170 1786.56 174
171 SD171 1796.59 175
172 SD172 1806.63 176
173 SD173 1816.66 177
174 SD174 1826.70 178
175 SD175 1836.73 179
176 SD176 1846.76 180
177 SD177 1856.80 181
178 SD178 1866.83 182
179 SD179 1876.86 183
180 SD180 1886.90 184
181 SD181 1896.93 185
182 SD182 1906.97 186
183 SD183 1917.00 187
184 SD184 1927.03 188
185 SD185 1937.07 189
186 SD186 1947.10 190
187 SD187 1957.14 191
188 SD188 1967.17 192
189 SD189 1977.20 193
190 SD190 1987.24 194
191 SD191 1997.27 195
192 SD192 2007.31 196
193 SD193 2017.34 197
194 SD194 2027.37 198
195 SD195 2037.41 199
196 SD196 2047.44 200
197 SD197 2057.47 201
198 SD198 2067.51 202
199 SD199 2077.54 203
200 SD200 2087.58 204
201 SD201 2097.61 205
202 SD202 2107.64 206
203 SD203 2117.68 207
204 SD204 2127.71 208
205 SD205 2137.75 209
206 SD206 2147.78 210
207 SD207 2157.81 211
208 SD208 2167.85 212
209 SD209 2177.88 213
210 SD210 2187.92 214
211 SD211 2197.95 215
212 SD212 2207.98 216
213 SD213 2218.02 217
214 SD214 2228.05 218
215 SD215 2238.08 219
216 SD216 2248.12 220
217 SD217 2258.15 221
218 SD218 2268.19 222
219 SD219 2278.22 223
220 SD220 2288.25 224
221 SD221 2298.29 225
222 SD222 2308.32 226
223 SD223 2318.36 227
224 SD224 2328.39 228
225 SD225 2338.42 229
226 SD226 2348.46 230
227 SD227 2358.49 231
228 SD228 2368.53 232
229 SD229 2378.56 233
230 SD230 2388.59 234
231 SD231 2398.63 235
232 SD232 2408.66 236
233 SD233 2418.69 237
234 SD234 2428.73 238
235 SD235 2438.76 239
236 SD236 2448.80 240
237 SD237 2458.83 241
238 SD238 2468.86 242
239 SD239 2478.90 243
240 SD240 2488.93 244
241 SD241 2498.97 245
242 SD242 2509.00 246
243 SD243 2519.03 247
244 SD244 2529.07 248
245 SD245 2539.10 249
246 SD246 2549.14 250
247 SD247 2559.17 251
248 SD248 2569.20 252
249 SD249 2579.24 253
250 SD250 2589.27 254
251 SD251 2599.30 255
252 SD252 2609.34 256
253 SD253 2619.37 257
254 SD254 2629.41 258
255 SD255 2639.44 259
256 SD256 2649.47 260
257 SD257 2659.51 261
258 SD258 2669.54 262
259 SD259 2679.58 263
260 SD260 2689.61 264
261 SD261 2699.64 265
262 SD262 2709.68 266
263 SD263 2719.71 267
264 SD264 2729.75 268
265 SD265 2739.78 269
266 SD266 2749.81 270
267 SD267 2759.85 271
268 SD268 2769.88 272
269 SD269 2779.91 273
270 SD270 2789.95 274
271 SD271 2799.98 275
272 SD272 2810.02 276
273 SD273 2820.05 277
274 SD274 2830.08 278
275 SD275 2840.12 279
276 SD276 2850.15 280
277 SD277 2860.19 281
278 SD278 2870.22 282
279 SD279 2880.25 283
280 SD280 2890.29 284
281 SD281 2900.32 285
282 SD282 2910.36 286
283 SD283 2920.39 287
284 SD284 2930.42 288
285 SD285 2940.46 289
286 SD286 2950.49 290
287 SD287 2960.52 291
288 SD288 2970.56 292
289 SD289 2980.59 293
290 SD290 2990.63 294
291 SD291 3000.66 295
292 SD292 3010.69 296
293 SD293 3020.73 297
294 SD294 3030.76 298
295 SD295 3040.80 299
296 SD296 3050.83 300
297 SD297 3060.86
298 SD298 3070.90
299 SD299 3080.93
300 SD300 3090.97
301 SD301 3101.00
302 SD302 3111.03
303 SD303 3121.07
304 SD304 3131.10
305 SD305 3141.13
306 SD306 3151.17
307 SD307 3161.20
308 SD308 3171.24
309 SD309 3181.27
310 SD310 3191.30
311 SD311 3201.34
312 SD312 3211.37
313 SD313 3221.41
314 SD314 3231.44
315 SD315 3241.47
316 SD316 3251.51
317 SD317 3261.54
318 SD318 3271.58
319 SD319 3281.61
320 SD320 3291.64
321 SD321 3301.68
322 SD322 3311.71
323 SD323 3321.74
324 SD324 3331.78
325 SD325 3341.81
326 SD326 3351.85
327 SD327 3361.88
328 SD328 3371.91
329 SD329 3381.95
330 SD330 3391.98
331 SD331 3402.02
332 SD332 3412.05
333 SD333 3422.08
334 SD334 3432.12
335 SD335 3442.15
336 SD336 3452.19
337 SD337 3462.22
338 SD338 3472.25
339 SD339 3482.29
340 SD340 3492.32
341 SD341 3502.35
342 SD342 3512.39
343 SD343 3522.42
344 SD344 3532.46
345 SD345 3542.49
346 SD346 3552.52
347 SD347 3562.56
348 SD348 3572.59
349 SD349 3582.63
350 SD350 3592.66
351 SD351 3602.69
352 SD352 3612.73
353 SD353 3622.76
354 SD354 3632.79
355 SD355 3642.83
356 SD356 3652.86
357 SD357 3662.90
358 SD358 3672.93
359 SD359 3682.96
360 SD360 3693.00
361 SD361 3703.03
362 SD362 3713.07
363 SD363 3723.10
364 SD364 3733.13
365 SD365 3743.17
366 SD366 3753.20
367 SD367 3763.24
368 SD368 3773.27
369 SD369 3783.30
370 SD370 3793.34
371 SD371 3803.37
372 SD372 3813.40
373 SD373 3823.44
374 SD374 3833.47
375 SD375 3843.51
376 SD376 3853.54
377 SD377 3863.57
378 SD378 3873.61
379 SD379 3883.64
380 SD380 3893.68
381 SD381 3903.71
382 SD382 3913.74
383 SD383 3923.78
384 SD384 3933.81
385 SD385 3943.85
386 SD386 3953.88
387 SD387 3963.91
388 SD388 3973.95
389 SD389 3983.98
390 SD390 3994.01
391 SD391 4004.05
392 SD392 4014.08
393 SD393 4024.12
394 SD394 4034.15
395 SD395 4044.18
396 SD396 4054.22
397 SD397 4064.25
398 SD398 4074.29
399 SD399 4084.32
400 SD400 4094.35
401 SD401 4104.39
402 SD402 4114.42
403 SD403 4124.46
404 SD404 4134.49
405 SD405 4144.52
406 SD406 4154.56
407 SD407 4164.59
408 SD408 4174.62
409 SD409 4184.66
410 SD410 4194.69
411 SD411 4204.73
412 SD412 4214.76
413 SD413 4224.79
414 SD414 4234.83
415 SD415 4244.86
416 SD416 4254.90
417 SD417 4264.93
418 SD418 4274.96
419 SD419 4285.00
420 SD420 4295.03
421 SD421 4305.07
422 SD422 4315.10
423 SD423 4325.13
424 SD424 4335.17
425 SD425 4345.20
426 SD426 4355.23
427 SD427 4365.27
428 SD428 4375.30
429 SD429 4385.34
430 SD430 4395.37
431 SD431 4405.40
432 SD432 4415.44
433 SD433 4425.47
434 SD434 4435.51
435 SD435 4445.54
436 SD436 4455.57
437 SD437 4465.61
438 SD438 4475.64
439 SD439 4485.68
440 SD440 4495.71
441 SD441 4505.74
442 SD442 4515.78
443 SD443 4525.81
444 SD444 4535.84
445 SD445 4545.88
446 SD446 4555.91
447 SD447 4565.95
448 SD448 4575.98
449 SD449 4586.01
450 SD450 4596.05
451 SD451 4606.08
452 SD452 4616.12
453 SD453 4626.15
454 SD454 4636.18
455 SD455 4646.22
456 SD456 4656.25
457 SD457 4666.29
458 SD458 4676.32
459 SD459 4686.35
460 SD460 4696.39
461 SD461 4706.42
462 SD462 4716.45
463 SD463 4726.49
464 SD464 4736.52
465 SD465 4746.56
466 SD466 4756.59
467 SD467 4766.62
468 SD468 4776.66
469 SD469 4786.69
470 SD470 4796.73
471 SD471 4806.76
472 SD472 4816.79
473 SD473 4826.83
474 SD474 4836.86
475 SD475 4846.90
476 SD476 4856.93
477 SD477 4866.96
478 SD478 4877.00
479 SD479 4887.03
480 SD480 4897.06
481 SD481 4907.10
482 SD482 4917.13
483 SD483 4927.17
484 SD484 4937.20
485 SD485 4947.23
486 SD486 4957.27
487 SD487 4967.30
488 SD488 4977.34
489 SD489 4987.37
490 SD490 4997.40
491 SD491 5007.44
492 SD492 5017.47
493 SD493 5027.51
494 SD494 5037.54
495 SD495 5047.57
496 SD496 5057.61
497 SD497 5067.64
498 SD498 5077.67
499 SD499 5087.71
500 SD500 5097.74
METAL LEADS & RATES SAND/ EARTH LEADS & RATES
2008-09 2008-09
From From
NOTATION RATE LEAD NOTATION RATE
SSR SSR
MLOAD 12.80 12.80 SLOAD 10.00 10.00
MUNLOAD 8.70 8.70 SUNLOAD 8.50 8.50
MSTACK 8.70 8.70 SSTACK 5.50 5.50

0.00 0 0.00

110.00 0.25 SD250 50.00 50.00


MT500 110.00 110.00 0.50 SD500 75.00 75.00
MT1 120.00 120.00 1 SD1 100.00 100.00
MT2 126.00 126.00 2 SD2 106.00 106.00
MT3 132.00 132.00 3 SD3 112.00 112.00
MT4 138.00 138.00 4 SD4 118.00 118.00

MT5 144.00 144.00 5 SD5 124.00 124.00

MT6 150.00 150.00 6 SD6 130.00 130.00


MT7 156.00 156.00 7 SD7 136.00 136.00
MT8 162.00 162.00 8 SD8 142.00 142.00
MT9 168.00 168.00 9 SD9 148.00 148.00
MT10 174.00 174.00 10 SD10 154.00 154.00
MT11 180.00 180.00 11 SD11 160.00 160.00
MT12 186.00 186.00 12 SD12 166.00 166.00
MT13 192.00 192.00 13 SD13 172.00 172.00

MT14 198.00 198.00 14 SD14 178.00 178.00

MT15 204.00 204.00 15 SD15 184.00 184.00


MT16 210.00 210.00 16 SD16 190.00 190.00
MT17 216.00 216.00 17 SD17 196.00 196.00
MT18 222.00 222.00 18 SD18 202.00 202.00
MT19 228.00 228.00 19 SD19 208.00 208.00
MT20 234.00 234.00 20 SD20 214.00 214.00
MT21 239.75 5.7500 21 SD21 219.00 5.0000
MT22 245.50 5.5000 22 SD22 224.00 4.8000
MT23 251.25 5.0000 23 SD23 229.00 4.6000
MT24 257.00 4.7500 24 SD24 234.00 4.4000
MT25 262.75 4.5000 25 SD25 239.00 4.2000
MT26 268.50 26 SD26 244.00
MT27 274.25 27 SD27 249.00
MT28 280.00 28 SD28 254.00
MT29 285.75 29 SD29 259.00
MT30 291.50 30 SD30 264.00
MT31 297.00 31 SD31 268.80
MT32 302.50 32 SD32 273.60
MT33 308.00 33 SD33 278.40
MT34 313.50 34 SD34 283.20
MT35 319.00 35 SD35 288.00
MT36 324.50 36 SD36 292.80

MT37 330.00 37 SD37 297.60

MT38 335.50 38 SD38 302.40


MT39 341.00 39 SD39 307.20
MT40 346.50 40 SD40 312.00
MT41 352.00 41 SD41 316.80
MT42 357.50 42 SD42 321.60
MT43 363.00 43 SD43 326.40
MT44 368.50 44 SD44 331.20
MT45 374.00 45 SD45 336.00
MT46 379.50 46 SD46 340.80
MT47 385.00 47 SD47 345.60
MT48 390.50 48 SD48 350.40
MT49 396.00 49 SD49 355.20
MT50 401.50 50 SD50 360.00
MT51 406.50 51 SD51 364.60
MT52 411.50 52 SD52 369.20
MT53 416.50 53 SD53 373.80
MT54 421.50 54 SD54 378.40
MT55 426.50 55 SD55 383.00
MT56 431.50 56 SD56 387.60
MT57 436.50 57 SD57 392.20
MT58 441.50 58 SD58 396.80
MT59 446.50 59 SD59 401.40
MT60 451.50 60 SD60 406.00
MT61 456.50 61 SD61 410.60
MT62 461.50 62 SD62 415.20
MT63 466.50 63 SD63 419.80
MT64 471.50 64 SD64 424.40
MT65 476.50 65 SD65 429.00
MT66 481.50 66 SD66 433.60
MT67 486.50 67 SD67 438.20
MT68 491.50 68 SD68 442.80
MT69 496.50 69 SD69 447.40
MT70 501.50 70 SD70 452.00
MT71 506.50 71 SD71 456.60
MT72 511.50 72 SD72 461.20
MT73 516.50 73 SD73 465.80
MT74 521.50 74 SD74 470.40
MT75 526.50 75 SD75 475.00
MT76 531.50 76 SD76 479.60
MT77 536.50 77 SD77 484.20
MT78 541.50 78 SD78 488.80
MT79 546.50 79 SD79 493.40
MT80 551.50 80 SD80 498.00
MT81 556.25 81 SD81 502.40
MT82 561.00 82 SD82 506.80
MT83 565.75 83 SD83 511.20

MT84 570.50 84 SD84 515.60

MT85 575.25 85 SD85 520.00


MT86 580.00 86 SD86 524.40
MT87 584.75 87 SD87 528.80
MT88 589.50 88 SD88 533.20
MT89 594.25 89 SD89 537.60
MT90 599.00 90 SD90 542.00
MT91 603.75 91 SD91 546.40
MT92 608.50 92 SD92 550.80
MT93 613.25 93 SD93 555.20
MT94 618.00 94 SD94 559.60
MT95 622.75 95 SD95 564.00
MT96 627.50 96 SD96 568.40
MT97 632.25 97 SD97 572.80
MT98 637.00 98 SD98 577.20
MT99 641.75 99 SD99 581.60
MT100 646.50 100 SD100 586.00
MT101 651.00 101 SD101 590.20
MT102 655.50 102 SD102 594.40
MT103 660.00 103 SD103 598.60
MT104 664.50 104 SD104 602.80
MT105 669.00 105 SD105 607.00
MT106 673.50 106 SD106 611.20
MT107 678.00 107 SD107 615.40
MT108 682.50 108 SD108 619.60
MT109 687.00 109 SD109 623.80
MT110 691.50 110 SD110 628.00
MT111 696.00 111 SD111 632.20
MT112 700.50 112 SD112 636.40
MT113 705.00 113 SD113 640.60
MT114 709.50 114 SD114 644.80
MT115 714.00 115 SD115 649.00
MT116 718.50 116 SD116 653.20
MT117 723.00 117 SD117 657.40
MT118 727.50 118 SD118 661.60
MT119 732.00 119 SD119 665.80
MT120 736.50 120 SD120 670.00
MT121 741.00 121 SD121 674.20
MT122 745.50 122 SD122 678.40
MT123 750.00 123 SD123 682.60
MT124 754.50 124 SD124 686.80
MT125 759.00 125 SD125 691.00
MT126 763.50 126 SD126 695.20
MT127 768.00 127 SD127 699.40
MT128 772.50 128 SD128 703.60
MT129 777.00 129 SD129 707.80
MT130 781.50 130 SD130 712.00
MT131 786.00 131 SD131 716.20
MT132 790.50 132 SD132 720.40
MT133 795.00 133 SD133 724.60
MT134 799.50 134 SD134 728.80
MT135 804.00 135 SD135 733.00
MT136 808.50 136 SD136 737.20
MT137 813.00 137 SD137 741.40
MT138 817.50 138 SD138 745.60
MT139 822.00 139 SD139 749.80
MT140 826.50 140 SD140 754.00
MT141 831.00 141 SD141 758.20
MT142 835.50 142 SD142 762.40
MT143 840.00 143 SD143 766.60
MT144 844.50 144 SD144 770.80
MT145 849.00 145 SD145 775.00
MT146 853.50 146 SD146 779.20
MT147 858.00 147 SD147 783.40
MT148 862.50 148 SD148 787.60
MT149 867.00 149 SD149 791.80
MT150 871.50 150 SD150 796.00
MT151 876.00 151 SD151 800.20
MT152 880.50 152 SD152 804.40
MT153 885.00 153 SD153 808.60
MT154 889.50 154 SD154 812.80
MT155 894.00 155 SD155 817.00
MT156 898.50 156 SD156 821.20
MT157 903.00 157 SD157 825.40
MT158 907.50 158 SD158 829.60
MT159 912.00 159 SD159 833.80
MT160 916.50 160 SD160 838.00
MT161 921.00 161 SD161 842.20
MT162 925.50 162 SD162 846.40
MT163 930.00 163 SD163 850.60
MT164 934.50 164 SD164 854.80
MT165 939.00 165 SD165 859.00
MT166 943.50 166 SD166 863.20
MT167 948.00 167 SD167 867.40
MT168 952.50 168 SD168 871.60
MT169 957.00 169 SD169 875.80
MT170 961.50 170 SD170 880.00
MT171 966.00 171 SD171 884.20
MT172 970.50 172 SD172 888.40
MT173 975.00 173 SD173 892.60
MT174 979.50 174 SD174 896.80
MT175 984.00 175 SD175 901.00
MT176 988.50 176 SD176 905.20
MT177 993.00 177 SD177 909.40
MT178 997.50 178 SD178 913.60
MT179 1002.00 179 SD179 917.80
MT180 1006.50 180 SD180 922.00
MT181 1011.00 181 SD181 926.20
MT182 1015.50 182 SD182 930.40
MT183 1020.00 183 SD183 934.60
MT184 1024.50 184 SD184 938.80
MT185 1029.00 185 SD185 943.00
MT186 1033.50 186 SD186 947.20
MT187 1038.00 187 SD187 951.40
MT188 1042.50 188 SD188 955.60
MT189 1047.00 189 SD189 959.80
MT190 1051.50 190 SD190 964.00
MT191 1056.00 191 SD191 968.20
MT192 1060.50 192 SD192 972.40
MT193 1065.00 193 SD193 976.60
MT194 1069.50 194 SD194 980.80
MT195 1074.00 195 SD195 985.00
MT196 1078.50 196 SD196 989.20
MT197 1083.00 197 SD197 993.40
MT198 1087.50 198 SD198 997.60
MT199 1092.00 199 SD199 1001.80
MT200 1096.50 200 SD200 1006.00
MT201 1101.00 201 SD201 1010.20
MT202 1105.50 202 SD202 1014.40
MT203 1110.00 203 SD203 1018.60
MT204 1114.50 204 SD204 1022.80
MT205 1119.00 205 SD205 1027.00
MT206 1123.50 206 SD206 1031.20
MT207 1128.00 207 SD207 1035.40
MT208 1132.50 208 SD208 1039.60
MT209 1137.00 209 SD209 1043.80
MT210 1141.50 210 SD210 1048.00
MT211 1146.00 211 SD211 1052.20
MT212 1150.50 212 SD212 1056.40
MT213 1155.00 213 SD213 1060.60
MT214 1159.50 214 SD214 1064.80
MT215 1164.00 215 SD215 1069.00
MT216 1168.50 216 SD216 1073.20
MT217 1173.00 217 SD217 1077.40
MT218 1177.50 218 SD218 1081.60
MT219 1182.00 219 SD219 1085.80
MT220 1186.50 220 SD220 1090.00
MT221 1191.00 221 SD221 1094.20
MT222 1195.50 222 SD222 1098.40
MT223 1200.00 223 SD223 1102.60
MT224 1204.50 224 SD224 1106.80
MT225 1209.00 225 SD225 1111.00
MT226 1213.50 226 SD226 1115.20
MT227 1218.00 227 SD227 1119.40
MT228 1222.50 228 SD228 1123.60
MT229 1227.00 229 SD229 1127.80
MT230 1231.50 230 SD230 1132.00
MT231 1236.00 231 SD231 1136.20
MT232 1240.50 232 SD232 1140.40
MT233 1245.00 233 SD233 1144.60
MT234 1249.50 234 SD234 1148.80
MT235 1254.00 235 SD235 1153.00
MT236 1258.50 236 SD236 1157.20
MT237 1263.00 237 SD237 1161.40
MT238 1267.50 238 SD238 1165.60
MT239 1272.00 239 SD239 1169.80
MT240 1276.50 240 SD240 1174.00
MT241 1281.00 241 SD241 1178.20
MT242 1285.50 242 SD242 1182.40
MT243 1290.00 243 SD243 1186.60
MT244 1294.50 244 SD244 1190.80
MT245 1299.00 245 SD245 1195.00
MT246 1303.50 246 SD246 1199.20
MT247 1308.00 247 SD247 1203.40
MT248 1312.50 248 SD248 1207.60
MT249 1317.00 249 SD249 1211.80
MT250 1321.50 250 SD250 1216.00
MT251 1326.00 251 SD251 1220.20
MT252 1330.50 252 SD252 1224.40
MT253 1335.00 253 SD253 1228.60
MT254 1339.50 254 SD254 1232.80
MT255 1344.00 255 SD255 1237.00
MT256 1348.50 256 SD256 1241.20
MT257 1353.00 257 SD257 1245.40
MT258 1357.50 258 SD258 1249.60
MT259 1362.00 259 SD259 1253.80
MT260 1366.50 260 SD260 1258.00
MT261 1371.00 261 SD261 1262.20
MT262 1375.50 262 SD262 1266.40
MT263 1380.00 263 SD263 1270.60
MT264 1384.50 264 SD264 1274.80
MT265 1389.00 265 SD265 1279.00
MT266 1393.50 266 SD266 1283.20
MT267 1398.00 267 SD267 1287.40
MT268 1402.50 268 SD268 1291.60
MT269 1407.00 269 SD269 1295.80
MT270 1411.50 270 SD270 1300.00
MT271 1416.00 271 SD271 1304.20
MT272 1420.50 272 SD272 1308.40
MT273 1425.00 273 SD273 1312.60
MT274 1429.50 274 SD274 1316.80
MT275 1434.00 275 SD275 1321.00
MT276 1438.50 276 SD276 1325.20
MT277 1443.00 277 SD277 1329.40
MT278 1447.50 278 SD278 1333.60
MT279 1452.00 279 SD279 1337.80
MT280 1456.50 280 SD280 1342.00
MT281 1461.00 281 SD281 1346.20
MT282 1465.50 282 SD282 1350.40
MT283 1470.00 283 SD283 1354.60
MT284 1474.50 284 SD284 1358.80
MT285 1479.00 285 SD285 1363.00
MT286 1483.50 286 SD286 1367.20
MT287 1488.00 287 SD287 1371.40
MT288 1492.50 288 SD288 1375.60
MT289 1497.00 289 SD289 1379.80
MT290 1501.50 290 SD290 1384.00
MT291 1506.00 291 SD291 1388.20
MT292 1510.50 292 SD292 1392.40
MT293 1515.00 293 SD293 1396.60
MT294 1519.50 294 SD294 1400.80
MT295 1524.00 295 SD295 1405.00
MT296 1528.50 296 SD296 1409.20
MT297 1533.00 297 SD297 1413.40
MT298 1537.50 298 SD298 1417.60
MT299 1542.00 299 SD299 1421.80
MT300 1546.50 300 SD300 1426.00
SSR 2016-17:- Rates
Cost of Materials, Labour AGENCY AREA ALLOWANCE =
Material Rates S.S.R: sl.No./pg

60 to 63 mm IRC & MoRTH HBG metal 419.00 53/14


done
50 to 55 mm IRC & MoRTH HBG metal 456.00 52/14 done
40 to 45 mm IRC & MoRTH HBG metal 500.00 51/14 done

Roughstone 300mm (HBG)for revetment 156.00 9/10 done


Roughstone 225mm (HBG)for revetment 154.00 8/10 done
SS Revetment work 225mm 144.00 2/10 done
SS Revetment work 300mm 164.00 3/10 done
SS Revetment work 450mm 136.00 4/10 done
Laterite for Revetment 225mm 118.00 6/10 done
Laterite for Revetment 300mm 138.00 7/10 done
Jeddy stone above 450mm to 600mm 188.00 5/10 done

Gravel / Quarry spall 103.00 done

150 mm soling stone HBG metal 95.00 79/15 done


150 mm Soling stone OG metal 66.00 81/15 done
40 mm HBG metal 532.00 51/14 done
40 mm Hard Broken Stone of OG metal 170.00 67/15 done

40 to 45 mm IRC & MoRTH HBG M/C metal 500.00 51/14 done


25 to 27 mm IRC & MoRTH HBG M/C metal 824.00 50/14 done
19 to 22 mm IRC & MoRTH HBG M/C metal 864.00 49/14 done
12 to 14 mm IRC & MoRTH HBG M/C metal 717.00 48/14 done
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal 656.00 47/14 done
5 to 7 mm IRC & MoRTH HBG M/C metal 504.00 46/14 done
2.36 to 5 mm IRC & MoRTH HBG M/C metal 320.00 45/14 done
HBG Stone chips 2.36mm and below 360.00 16/92 done

Earth - 181/15
Gravel 103.00 90/15 done
Quarri Rubbish 81.00 91/16 done

40 mm SS-5 m/c HBG metal 532.00 30/12 done


25 mm SS-5 m/c HBG metal 847.00 29/12 done
20 mm SS-5 m/c HBG metal 916.00 28/12 done
12 mm SS-5 m/c HBG metal 822.00 27/12 done
10 mm SS-5 m/c HBG metal 692.00 26/12 done
6 mm SS-5 m/c HBG metal 532.00 25/12 done

Sand for Mortar 760.00 93/16 done , new


Sand for Filling 560.00 95/16 done , new
sand for concrete 560.00 94/16 done , new

Blasting charges
Blasting charges 70.00 done
Blasting charges for rough stone 0.00
Seigniorage charges( As per G.Oms.No.67 of industries and commerce (Mines.I)Dept., dt: 26-09-2015
Metal ****************************
75.00
Gravel/earth ****************************
30.00
Sand ****************************
40.00

Labour Rates
1st Class Mason 470.00 1/6 done , new
2nd Class Mason 450.00 44/8 done , new
Mate 456.00 71/8 done , new
Mason (considered as) 470.00 done , new
Mazdoor unskilled 425.00 73/8 done , new
Mazdoor skilled 456.00 done , new

Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour 2661.20 done , new
Motor grader 3.35M Blade @50 cum/Hr 3601.92 done
Hydralic excavator 2821.50 done , new
Front end loader 1 cum capacity 1843.52 done
Tipper 5.5 cum, per Hour 1004.40 done , new
Vibratory roller 8T 2878.90 done , new
smooth wheeled roller 8 Ton 1131.00 done , new
Water tanker 6 KL 698.88 done
Tractor 464.88 done
Tractor with Rotavator 472.80 done
Tractor with ripper attachment @ 60 cum per hour 1843.52 done , new
Air compressor 250 cfm 588.40 done , new
Wet mix plant of 60 tonne hr. capacity 1843.52 done
Mechanical broom @ 1250 sqm/hr. 399.84 done
Bitumen pressure distributor @1750 sqm/hr 1677.76 done
Emulsion pressure distributor @1750 sqm/hr 963.20 done
Hot mix plant 40 to 60 TPH 21414.40 done
Hot mix plant 100TPH 27071.52 done
Paver finisher hydrostatic with sensor control @ 75 cum per hour 3426.65 done
Mechanical Paver finisher 100 TPH 2518.88 done
Hydraulic self propelled chip spreader @ 1500 sqm/hr. 3426.65 done
Finish rolling with 6-8 tonne smooth wheeled tandem roller. 1131.00 done
Pneumatic road Roller 1436.96 done
GSB Plant 50 Cum 1280.16 done
Generator 250 KVA 234.08 done
Generator set 125 KVA 1478.40 done
Generator set 35 KVA 842.20 30KVA done , new
Concrete mixer 0.4/0.28 cum 472.60 done , new
Tipper 5.50 cum capacity per 10 Tonnes per tkm ****************************
1004.40
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix 1004.40
Plate compactor/Power rammer 53.76 done
Crane with Grab bucket 0.75 CuM done
Crane with 3.0 tonnes capacity(per hour) done

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

Electric Detonators cost/each done

Steel & Cement Rates


HYSD Steel / MT (Fe 500) 43000.00
Mild Steel ,Structural Steel 43000.00
Cement/MT, 4750.00
Mild Steel 6mm 43000.00
binding wire 50.00 done
black smith 470
Bulk 80/100
20073.000 Bulk 80/100 (VG-10)Grade (16 -02-2016)
(V-10) Grade.
Bulk 60/70
20873.00 Bulk 60/70 (VG-30)Grade (16-02-2016)
(V-30) Grade.
Slow Setting Emulsion (Bulk) 17533.00 Emulsion (Bulk) (16-02-2016)

LEAD for BITUMEN from refinery 597.00 km


Lead charges for bulk (Two -way) per km @ 1.50

LEAD CHARGES
Earth/Gravel/S Metal
and
loading 48.85 97.35
unloading 15.23 15.23
stacking 0.00 0.00
0.25 30.10 29.05
0.50 30.10 29.05
1.00 30.10 29.05
2.00 38.68 37.37
3.00 51.67 51.67
4.00 62.72 62.72
5.00 73.77 73.77
6.00 85.17 84.77
7.00 96.57 95.77
8.00 107.97 106.77
9.00 119.37 117.77
10.00 130.77 128.77
11.00 142.17 139.77
12.00 153.57 150.77
13.00 164.97 161.77
14.00 176.37 172.77
15.00 187.77 183.77
16.00 199.17 194.77
17.00 210.57 205.77
18.00 221.97 216.77
19.00 233.37 227.77
20.00 244.77 238.77
21.00 256.17 249.77
22.00 267.57 260.77
23.00 278.97 271.77
24.00 290.37 282.77
25.00 301.77 293.77
26.00 313.17 304.77
27.00 324.57 315.77
28.00 335.97 326.77
29.00 347.37 337.77
30.00 358.37 348.77
31.00 367.61 358.01
32.00 376.85 367.25
33.00 386.09 376.49
34.00 395.33 385.73
35.00 404.57 394.97
36.00 413.81 404.21
37.00 423.05 413.45
38.00 432.29 422.69
39.00 441.53 431.93
40.00 450.77 441.17
41.00 460.01 450.41
42.00 469.25 459.65
43.00 478.49 468.89
44.00 487.73 478.13
45.00 496.97 487.37
46.00 506.21 496.61
47.00 515.45 505.85
48.00 524.69 515.09
49.00 533.93 524.33
50.00 543.17 533.57
51.00 552.41 542.81
52.00 561.65 552.05
53.00 570.89 561.29
54.00 580.13 570.53
55.00 589.37 579.77
56.00 598.61 589.01
57.00 607.85 598.25
58.00 617.09 607.49
59.00 626.33 616.73
60.00 635.57 625.97
61.00 644.81 635.21
62.00 654.05 644.45
63.00 663.29 653.69
64.00 672.53 662.93
65.00 681.77 672.17
66.00 691.01 681.41
67.00 700.25 690.65
68.00 709.49 699.89
69.00 718.73 709.13
70.00 727.97 718.37
71.00 737.21 727.61
72.00 746.45 736.85
73.00 755.69 746.09
74.00 764.93 755.33
75.00 774.17 764.57
76.00 783.41 773.81
77.00 792.65 783.05
78.00 801.89 792.29
79.00 811.13 801.53
80.00 820.37 810.77
81.00 829.61 820.01
82.00 838.85 829.25
83.00 848.09 838.49
84.00 857.33 847.73
85.00 866.57 856.97
86.00 875.81 866.21
87.00 885.05 875.45
88.00 894.29 884.69
89.00 903.53 893.93
90.00 912.77 903.17
91.00 922.01 912.41
92.00 931.25 921.65
93.00 940.49 930.89
94.00 949.73 940.13
95.00 958.97 949.37
96.00 968.21 958.61
97.00 977.45 967.85
98.00 986.69 977.09
99.00 995.93 986.33
100.00 1005.17 995.57
101.00 1014.41 1004.81
102.00 1023.65 1014.05
103.00 1032.89 1023.29
104.00 1042.13 1032.53
105.00 1051.37 1041.77
106.00 1060.61 1051.01
107.00 1069.85 1060.25
108.00 1079.09 1069.49
109.00 1088.33 1078.73
110.00 1097.57 1087.97
111.00 1106.81 1097.21
112.00 1116.05 1106.45
113.00 1125.29 1115.69
114.00 1134.53 1124.93
115.00 1143.77 1134.17
116.00 1153.01 1143.41
117.00 1162.25 1152.65
118.00 1171.49 1161.89
119.00 1180.73 1171.13
120.00 1189.97 1180.37
121.00 1199.21 1189.61
122.00 1208.45 1198.85
123.00 1217.69 1208.09
124.00 1226.93 1217.33
125.00 1236.17 1226.57
126.00 1245.41 1235.81
127.00 1254.65 1245.05
128.00 1263.89 1254.29
129.00 1273.13 1263.53
130.00 1282.37 1272.77
131.00 1291.61 1282.01
132.00 1300.85 1291.25
133.00 1310.09 1300.49
134.00 1319.33 1309.73
135.00 1328.57 1318.97
136.00 1337.81 1328.21
137.00 1347.05 1337.45
138.00 1356.29 1346.69
139.00 1365.53 1355.93
140.00 1374.77 1365.17
141.00 1384.01 1374.41
142.00 1393.25 1383.65
143.00 1402.49 1392.89
144.00 1411.73 1402.13
145.00 1420.97 1411.37
146.00 1430.21 1420.61
147.00 1439.45 1429.85
148.00 1448.69 1439.09
149.00 1457.93 1448.33
150.00 1467.17 1457.57
151.00 1476.41 1466.81
152.00 1485.65 1476.05
153.00 1494.89 1485.29
154.00 1504.13 1494.53
155.00 1513.37 1503.77
156.00 1522.61 1513.01
157.00 1531.85 1522.25
158.00 1541.09 1531.49
159.00 1550.33 1540.73
160.00 1559.57 1549.97
161.00 1568.81 1559.21
162.00 1578.05 1568.45
163.00 1587.29 1577.69
164.00 1596.53 1586.93
165.00 1605.77 1596.17
166.00 1615.01 1605.41
167.00 1624.25 1614.65
168.00 1633.49 1623.89
169.00 1642.73 1633.13
170.00 1651.97 1642.37
171.00 1661.21 1651.61
172.00 1670.45 1660.85
173.00 1679.69 1670.09
174.00 1688.93 1679.33
175.00 1698.17 1688.57
176.00 1707.41 1697.81
177.00 1716.65 1707.05
178.00 1725.89 1716.29
179.00 1735.13 1725.53
180.00 1744.37 1734.77
181.00 1753.61 1744.01
182.00 1762.85 1753.25
183.00 1772.09 1762.49
184.00 1781.33 1771.73
185.00 1790.57 1780.97
186.00 1799.81 1790.21
187.00 1809.05 1799.45
188.00 1818.29 1808.69
189.00 1827.53 1817.93
190.00 1836.77 1827.17
191.00 1846.01 1836.41
192.00 1855.25 1845.65
193.00 1864.49 1854.89
194.00 1873.73 1864.13
195.00 1882.97 1873.37
196.00 1892.21 1882.61
197.00 1901.45 1891.85
198.00 1910.69 1901.09
199.00 1919.93 1910.33
200.00 1929.17 1919.57
CY AREA ALLOWANCE = 0%
LEAD CHARGES
Earth/Gravel/ Metal
Sand
loading 10.00 12.80
unloading 8.50 8.70
stacking 5.50 8.70

(materials other than covered under irrigation


, dt: 26-09-2015
)Grade (16 -02-2016)
Grade (16-02-2016)

Lead Lead Charge for Rubble/size


Charge stones/cut stones/Coarse
S.No. Distance for aggregare per cu.meter
Earth/San
d/Gravel/
Murrum/L
1 Lead up to 1km 34.20 33.00
2 Lead up to 2km 47.90 46.20
3 Lead up to 3km 63.90 63.90
4 Lead up to 4km 77.60 77.60
5 Lead up to 5km 91.30 91.30
6 Lead from >5 km 13.70 13.70
7 Lead from 30> (for 11.40 11.40

Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Hea

Lead Lead Charge for Rubble/size


Charge stones/cut stones/Coarse
S.No. Distance for aggregare per cu.meter
Earth/San
d/Gravel/
Murrum/L
1 Lead up to 1km 30.10 29.05
2 Lead up to 2km 42.16 40.66
3 Lead up to 3km 56.24 56.24
4 Lead up to 4km 68.30 68.30
5 Lead up to 5km 80.36 80.36
6 Lead from >5 km 12.06 12.06
7 Lead from 30> (for 10.03 10.03

Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Hea