TELANGANA
AMOUNT OF ESTIMATE
Rs ### Lakh
Ref :
Necessity :
Kodad-Revoor road is an improtant MDR road connecting to NH-65 road and Huzurnagar-Medlacheruvu,
kandibanda,thogarai, and Hemlathanda.There is a cement manufacturing Comapny (Maha Cements) has
located in this region.Due to heavy loads trucks and heavy traffic plying on this road and heavy rains road
was damaged badly. There is a dilapidated low level causeway vened span minor bridge a km 13\0-2 it is
very essential to construct a HLB n this locaion .As per the instructions of ENC P.RAVINDER RAO Sir
SR&CRN during inspecton on dated 22.8.2018.
Hence, the estimate has been prepared for the above road with the following provisions
1 ROAD PART
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth
8 Routine Maintenance of Jungle Clearance
9 Routine Maintenance Comprising of B.T Pot hole Filling
II Box Culvert
1 Dismantling the existing Cause ways
2 Earthwirk excation up to SDR
3 Plain cement Concrete (1:3:6)
4 VCC M 15 for levelling course
5 VRCC M 20 for wing walls
6 VRCC M 25 for Foundations
7 VRCC M 20 for side walls
8 VRCC M 25 for super structure
9 Providing Fe 500 HYSD bars for Foundations
10 Providing Fe 500 HYSD bars for substructure
11 Providing Fe 500 HYSD bars for superstrcture
12 VRCC M 40 for crash barrier
13 VRCC M 30 for approach slabs
14 VRCC M 30 for waering course
15 VCC M 15 for Curtain walls
16 Providing Weep holes
17 Providing Drainage spouts
18 Providing Dry rough stone pitching of 300 mm
19 Providing and laying filter materal undernerth
20 Back filling behing abutments
21 Providing 25.4 mm thick mastic pads
22 Providing and laying filter media
23 Providing and Laying of flecible apron
24 Forming embankment with borrowed earth
25 Forming gravel base
Box approach
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth
III Bridge
1 Dismantling the existing Cause ways
2 Earthwirk excation up to SDR
3 Plain cement Concrete (1:3:6)
4 VCC M 15 for levelling course
5 VRCC M 20 for wing walls
6 VRCC M 25 for Foundations
7 VRCC M 20 for side walls
8 VRCC M 25 for super structure
9 Providing Fe 500 HYSD bars for Foundations
10 Providing Fe 500 HYSD bars for substructure
11 Providing Fe 500 HYSD bars for superstrcture
12 VRCC M 40 for crash barrier
13 VRCC M 30 for approach slabs
14 VRCC M 30 for waering course
15 VCC M 15 for Curtain walls
16 Providing Weep holes
17 Providing Drainage spouts
18 Providing Dry rough stone pitching of 300 mm
19 Providing and laying filter materal undernerth
20 Back filling behing abutments
21 Providing 25.4 mm thick mastic pads
22 Providing and laying filter media
23 Providing and Laying of flecible apron
24 Forming embankment with borrowed earth
25 Forming gravel base
Bridge approach
1 scarifying existing B.T uptp 50 mm
2 Wet mix macadam
3 Providing and applying Prime coat with bitumen VG-10 Grade using Emulsion
4 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion
5 Providing and Laying of Dense Graded Bituminous Macadam
6 Providing, 40 mm thick Compacted Bituminous Concrete
7 Forming Shoulders with side earth
10 GST @ 12.00 %
11 Seigniorage Charges
12 Q.C Charges @ 1%
13 NAC @ 0.1%
14 L S for Roundings.
The Rates are worked out as per the Common SSR for the Year 2018-19.
Lakh
d Huzurnagar-Medlacheruvu,
apny (Maha Cements) has
s road and heavy rains road
inor bridge a km 13\0-2 it is
C P.RAVINDER RAO Sir
ing provisions
sing Emulsion
g Emulsion
sing Emulsion
g Emulsion
sing Emulsion
g Emulsion
018-19.
GENERAL ABSTRACT
Amount
S.No Description
(Rs.)
PART-I
1 Road work 49808883.50
2 Box culverts 18592588.00
(A) Box Approaches at 3/8-4/0,7/0-2,17/8,19/6-8 6450635.80
3 HLB at K.M 13/0-2 (5 V of 10.00 span) 20874609.00
(A) Bridge Approaches 9226317.10
3 HLB at K.M 15/0-2 (2 V of 10.00 span) 6392569.00
(A) Bridge Approaches 2347667.00
Sub Total 113693269.40
PART-II
4 GST on Part "I". 12.0% 13643192.00
5 Quality control charges on Part "I", 1.00% 1136932.69
6 L.S Price adjustment 600000.00
7 NAC on Part "I". 0.10% 113693.27
8 Segniorage Charges 3354282.36
9 L.S for variations foundation levels for HLB 1000000.00
10 L.S for RSI 3410798.08
11 L.S for unforeseen and rounding off 3047832.19
Total Amount Rs. 140000000.00
s
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working rea
21/2) in Suryapet District.
MEASUREMENTS
Sno Description Quantity
No LENT BRDT DPT
1 2 3 4 5 6 7
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of
1 scarified material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn.
No.305.4.3
534.00
say 534.00
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an
average output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per
table 500-4 of MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30
grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared
surface with mechanical paver finisher to the required grade, level and alignment and rolled as per
Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by
5 the Engineer-in-Charge including hire and operational charges all T&P and all other contingent
charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete
and as per MoRT&H specification No. 504 (5th Revision) (Excluding VAT Charges)
1051 5336.80
SAY 5337.00
Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of
all materials to work site and spreading in uniform layers by approved means, on prepared surface
and compacting with vibratory roller to achieve the desired density at OMC etc., complete for
7 finished item of work as per MoRT&H Specification 401& 407 (5th revision) and as directed by the
Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
19.80
Routine Maintenace of Comprising of B.T ot hole Filling B.T edge repairs (and other items on B.T
carriage way such as crack sealing ,Minor surface repairetc., and unpaved shoulder repairs
(Berm) /surface drains maintnace /including gravelling berms and jungle Clearance /tree and shrub
trimming and Culvert repair/ vent Maintenace /Parapet Wall repairs/retaing wall repairs., ordinary
9 to repairs to bridges and sign maintenace /guard stone maintenace /painting Km/Hm stones and
others for 3 years from the end of DLP as per 3000 of Mort&h (5 th revision) & As directed by the
Engineer in Charge (9.0 Km double lane x 3 Years) Part (C)
1 x 1 26.74
8 9 10
l means and disposal of
(5th Revision) Specn.
3600.00 km 71280.00
epairs (and other items on B.T
nd unpaved shoulder repairs
ngle Clearance /tree and shrub
/retaing wall repairs., ordinary
/painting Km/Hm stones and
revision) & As directed by the
30000.00 Km 802200.00
Total = 49808883.50
Executive Engineer
Division:Suryapet
BRIDGE DETAILED ESTIMATE
2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal
size mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per
MoRT&H specification 2100 (5th Revision) under Abutments,Piers & Wing walls.
32.67 69290.00
MT 1 MT
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure
of R.C.C items.
8.05 69565.00 1 MT
MT
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure
of R.C.C items.
47.00 70898.00 1 MT
MT
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work
Amount
al specifications,incuding
eleterious matter,dressing of
cation 304(5th Revision) and
81071.00
68800.00
623125.00
G crushed stone aggregate
o table 1000-2 including cost,
ing, laying, Vibrating, curing
mplete as per MoRT&H Spcn.
336166.00
HBG crushed stone
onforming to table 1000-2)
, machine mixing, laying,
l T&P etc., complete as per
MENTS, piers, wing
2723784.00
4075732.00
ushed stone aggregate
o table 1000-2) including cost,
ng, laying, vibrating, curing
pproved drawing excluding
cation 1500,1600,1700 &
directed during execution but
&H specification 1500,1700
ocks & Backing walls (Sub
171696.00
3838912.00
44328.00
207700.00
332650.00
106764.00
L,SHYAM) of different
nce of steel to site and all
g rods, tying grills, placing
nd all handling charges and
mplete for all R.C.C items for
neer-in-Charge and as per
5 for R.C.C items. for
2263951.00
L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Sub structure
559780.00
L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Super structure
3332206.00
82110.00
162307.00
4530.00
ion and as per drawing BD/1-
27070.00
66879.00
15620.00
13312.00
19138493.00
50000.00
500000.00
100000.00
200000.00
886116.00
20874609.00
2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal
size mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per
MoRT&H specification 2100 (5th Revision) under Abutments,Piers & Wing walls.
2.34 69290.00
MT 1 MT
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure
of R.C.C items.
4.07 69565.00 1 MT
MT
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges
for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item
of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure
of R.C.C items.
4.00 70898.00 1 MT
MT
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work
39.00 714.00 1 cum
Cum
16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in
Clause 2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and provided over the entire surface behind abutment and wing wall,
to the full height , compacted to a firm including cost, conveyance of all material charges and labour
charges,as directed by the Engineer-in-Charge as per drawing and technical specification as per clause
No.710.1.1 of IRC 78 and 2200 of MORTH 5th Revision for finished item of work.
Amount
al specifications,incuding
eleterious matter,dressing of
cation 304(5th Revision) and
12552.00
10742.00
99700.00
HBG crushed stone
onforming to table 1000-2)
, machine mixing, laying,
l T&P etc., complete as per
MENTS, piers, wing
1405824.00
1606396.00
93002.00
5 grade using 20 mm and 10
0-1 and fine aggregate
nd labour charges, centering,
operational charges of all
cost of steel and its
1700(5th revision ) and as
1544224.00
44328.00
180900.00
212896.00
104160.00
L,SHYAM) of different
nce of steel to site and all
g rods, tying grills, placing
nd all handling charges and
mplete for all R.C.C items for
neer-in-Charge and as per
5 for R.C.C items. for
162139.00
L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Sub structure
283130.00
L) of different diameters,
to site and all labour charges
lls, placing them in position
harges and operational
R.C.C items for finished item
ge and as per MoRT&H
C items. for Super structure
283592.00
27846.00
120525.00
55266.00
10828.00
18460.00
luding cost, and conveyance
work as per MoRT&H
der Revetment. For
19456.00
6392569.00
50000.00
500000.00
100000.00
200000.00
886116.00
8128685.00
2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per MoRT&H
specification 2100 (5th Revision) under Raft,Wingwalls,Rigid Aapron.
Piers
For VRCC M25 Raft 1 x 1 52.72 13.97 0.80
4 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG crushed
stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibratin
curing etc., including all other incidental and operational charges of all T&P etc. as per approved drawings and a
directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for footings of
Abutments, Piers and Winngwalls,Cut offwalls and Rigid Aapron.
Say
Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
6 cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibratin
curing etc., including other incidental hire and operational charges of all T&P as per approved drawing
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 & 2100 (5th revision ) and as directed by the Engineer-in-Charge for Raft.and as directe
during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutmen
Bedblocks Backing walls piers Bedblocks
Say
7 Furnishing and Placing Reinforced cement concrete in super-structure of M 30 grade using 20 mm and 10 mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 100
2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including other incidental hire and operational charges of all T&P etc.,complete for finished
item of work as per approved drawing,excluding cost of steel and its fabrication charges for finished item as per
MoRT&H specification 1500,1600 & 1700(5th revision ) and as directed by the Engineer-in-Charge.
10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and
conveyance of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including all
other incidental and operational charges,T&P etc., complete for finished item of work, as per drawing no.BD/1-69
(A), but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 270
(5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.
11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications as pe
MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel and its
fabrications charges as per approved drawing.
12 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL,SHYAM) of different diameters, wroug
and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabricatio
of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Foundation of R.C.C items.
FONDATIONS
Say
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Sub structure of R.C.C items.
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc., and including
over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
Revision) and as per I.S.1786 of 1985 for R.C.C items. for Super structure of R.C.C items.
or say
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per Clause
710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical
specifications for finished item of work
16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in Clause
2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind abutment and wing wall, to the full
height , compacted to a firm including cost, conveyance of all material charges and labour charges,as directed by
the Engineer-in-Charge as per drawing and technical specification as per clause No.710.1.1 of IRC 78 and 2200 of
MORTH 5th Revision for finished item of work.
Behind abutment 2 x 1 9.80 0.60 5.000
Behind Wing walls 4 x 1 3.50 0.60 5.000
or say
17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A.C
pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Comple
as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH
specification No 2706 & 2200 (5th Revision)
5 x 2
or say
18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-69 A.
2 x 5
or say
19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
(1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as
directed by the Engineer-in-Charge for quadrential revetment.
20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification
2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.
21 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance of
materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification
2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment. For pitching of slopes.
23 GST 12%
24 Seignorage charges
25 Provision for mastic pads
26 Provision for RSI Items
27 Provision for painting to crash barrier and unforeseen items and rounding off
Asst.Exe.Engineer (R&B) Dy Executive Engineer (R&B)
Section: Kodad Sub-Division : Kodad
Asst
.Exe
.Eng
inee
r Dy Executive Engineer (R&B)
(R&
B)
cations,incuding settting
,dressing of sides and
sion) and as directed by the
899.19
205.61
342.68
205.61
411.22
133.00
10.86
2208.16
2209.00
cum
968.36
33.74
64.41
147.62
305.78
105.44
131.80
8.80
21.00
1786.94
1787.00
cum
73.65
5.32
11.98
34.00
124.95
125.00
cum
e aggregate (coarse
uding cost, conveyance of
uring etc., including all
. No 1500,1700 & 2100 (4th
589.20
589.20
cum
28.80
46.66
26.60
32.20
56.67
79.08
37.09
25.76
4.32
3.00
52.55
25.76
10.20
5.00
433.70
434.00
ne aggregate (Coarse
cluding cost, conveyance of
ring etc., including other
ost of steel and its
0 (5th revision ) and as
ding cost of steel and its
h Revision ) and as directed
164.25
8.81
143.72
70.41
226.70
613.88
614.00
5.544
6.48
13.248
0.798
-2.4288
23.6412
24
ng 20 mm and 10 mm HBG
e conforming to table 1000-
chine mixing, laying,
etc.,complete for finished
for finished item as per
in-Charge.
532
532.00
d stone aggregate (Coarse
cluding cost, conveyance of
ring etc., including other
ation No.1500,1700 & 2100
7.70
7.70
8.00
one aggregate (Coarse
cluding cost, conveyance of
ring etc., including all other
s per Approved drawing but
1600,1700, & 2704 (5th
30.765
30.765
31.00
cum
cluding cost and
g,curing etc,including all
as per drawing no.BD/1-69
1500, 1600,1700, & 2702
ab.
42.90
6.27
49.17
50.00
cum
hnical specifications as per
t of steel and its
40.7664
40.7664
41.00
cum
different diameters, wrought
bour charges for fabrication
osition etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th
29.46
0.169
2.218
0.827
32.674
t diameters, wrought and
charges for fabrication of
tion etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th
ms.
1.150
2.218
0.827
1.488
2.364
8.047
MT
t diameters, wrought and
charges for fabrication of
tion etc., complete
charges etc., and including
ork as per standard
on 1600 &2200 (5th
ms.
35.235
2.950
2.615
6.563
47.364
47.000
MT
complete as per Clause
rawing and technical
114.66
115.00
cum
nts laid down in Clause
e towards the soil and
wing wall, to the full
our charges,as directed by
1.1 of IRC 78 and 2200 of
58.80
42.00
100.80
101.00
cum
h 100mm dia meter A.C
ards drawing face Complete
holes as per MORTH
10.00
Nos
10
per drawing BD/1-69 A.
10.00
10.00
No.s
ted with 0.20 cum of CC
for packing the stones for
5th Revision ) and as
27.00
27.00
cum
site and including labour
per MoRT&H specification
r Toe wall.
10.86
11.00
cum
ost, and conveyance of
r MoRT&H Specification
pitching of slopes.
13.50
13.00
cum
L.S
L.S
nding Engineer (R&B)
Nalgonda
BRIDGE DETAILED ESTIMATE
Name of Work:- :Construction of HLB at Km. 15/0-2 on kodad- Rvoor road in Suryapet distric
2 Providing Cement Concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal size
mechanically mixed ,placed in foundation and compacted by vibration including curing complete as per MoRT&H
specification 2100 (5th Revision) under Abutments,Piers & Wing walls.
4 Plain Vibrated Cement Concrete M20 Mix concrete using 40 mm,20 mm.10 mm HBG crushed stone aggregate (coar
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all ot
incidental and operational charges of all T&P etc., complete as per MoRT&H Spcn. No 1500,1700 & 2100 (4th
Revision)for FOOTINGS OF ABUTMENTS, piers, wing walls.
Piers
1st footing. 1 x 1 12.10 2.30 0.50
2nd footing. 1 x 1 12.10 1.70 0.50
Abutments Trep.footing (2.0+3.0)/2 2 x 1 12.00 2.50 1.00
2 nd footing 1 x 1 12.00 4.00 0.50
1st footing 1 x 1 12.00 5.00 0.50
Wing walls
1st footing 4 x 1 4.00 3.40 0.50
2nd footing 4 x 1 4.00 2.80 0.50
Trepizoidal footing (2.8+1.7)/2 4 x 1 4.00 2.25 1.00
5 Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 40 mm,20 mm.10 mm HBG crushed
stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibratin
curing etc., including all other incidental and operational charges of all T&P etc. as per approved drawings and a
directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Substructure of
Abutments and Piers & Wing walls.
6 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P as per approved drawing excluding cost of steel and its fabrica
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as directed by th
Engineer-in-Charge for Raft.and as directed during execution but excluding cost of steel and its fabrication charge
for finished item as per MoRT&H specification 1500,1700 & 2200 (5th Revision ) and as directed by the Engineer-i
Charge for Bed blocks & Backing walls (Sub Structure).
8 Vibrated Vibrated Cement Concrete M15 Mix using 40mm,20 mm and 10 mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P etc., complete as per MORTH specification No.1500,1700 & 2100
(5th Revision) for Levelling course below approach slab.
9 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance o
all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all oth
incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing bu
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th
Revision) and as directed by the Engineer-in-Charge for Approach slab.
10 V.R.C.C. M30 grade concrete using 20mm and 10mm size HBG crushed stone aggregate including cost and conveyan
of all materials to site, labour charges for machine mixing,laying,compacting,curing etc,including all other inciden
and operational charges,T&P etc., complete for finished item of work, as per drawing no.BD/1-69 (A), but excludin
cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) an
as directed by the Engineer-in-Charge for wearing coat over Deck slab.
11 Vibrated Reinforced Cement Concrete in super structure Complete aspr drawing and technical specifications as pe
MORT&H specifications Nos 1500,1700,2200 VRCC M-40 for crash barriers excluding cost of steel and its fabricatio
charges as per approved drawing.
13 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete includ
cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapp
welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per th
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1
of 1985 for R.C.C items. for Sub structure of R.C.C items.
14 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters, wrought and
up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete includ
cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapp
welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per th
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1
of 1985 for R.C.C items. for Super structure of R.C.C items.
15 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per Clause
710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical
specifications for finished item of work
Behind abutments and wing walls 0.50 x 0.5 9.80 3.400 4.600
or say
16 Providing and laying filter media with stone crushed aggregate satisfying the requirements laid down in Clause
2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigg
size towards the wall and provided over the entire surface behind abutment and wing wall, to the full height ,
compacted to a firm including cost, conveyance of all material charges and labour charges,as directed by the
Engineer-in-Charge as per drawing and technical specification as per clause No.710.1.1 of IRC 78 and 2200 of MOR
5th Revision for finished item of work.
or say
17 Providing weep holes in Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A.C pi
extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as
drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification
2706 & 2200 (5th Revision)
For abutments 2
Autments 2 x 10 3.00 1.36
Wing walls 4 x 3 3.00 1.100
or say
18 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification and as per drawing BD/1-69 A.
2 x 2
or say
19 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
(1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as direct
by the Engineer-in-Charge for quadrential revetment.
20 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification
2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.
Asst
.Exe
.Eng
inee
r Dy Executive Engineer (R&B)
(R&
B)
Quantity
168.00
27.83
136.00
9.86
341.69
342.00
cum
240.00
38.96
278.96
279.00
cum
12.00
2.78
5.44
20.22
20.00
cum
13.92
10.29
60.00
24.00
30.00
27.20
22.40
36.00
223.80
224.00
cum
123.71
48.12
3.33
66.00
241.16
242.00
cum
e aggregate (Coarse
uding cost, conveyance of
ng etc., including other
t of steel and its fabrication
n ) and as directed by the
and its fabrication charges
irected by the Engineer-in-
5.54
3.09
0.20
5.69
-1.98
12.54
13.00
cum
g 20 mm and 10 mm HBG
conforming to table 1000-2)
e mixing, laying, vibrating,
ete for finished item of work
em as per MoRT&H
212.8
1.386
214.19
214.00
Cum
stone aggregate (Coarse
uding cost, conveyance of
ng etc., including other
ion No.1500,1700 & 2100
7.84
7.84
8.00
cum
e aggregate (Coarse
uding cost, conveyance of
ng etc., including all other
per Approved drawing but
600,1700, & 2704 (5th
26.4
26.4
27.00
cum
luding cost and conveyance
ncluding all other incidental
BD/1-69 (A), but excluding
& 2702 (5th Revision) and
22.67
8.80
31.47
32.00
cum
nical specifications as per
of steel and its fabrications
40
40
40.00
cum
fferent diameters, wrought
our charges for fabrication
ition etc., complete
arges etc., and including
rk as per standard drawings,
00 (5th Revision) and as
1.220
0.401
0.715
2.336
2.340
MT
diameters, wrought and put
ges for fabrication of
on etc., complete including
., and including over lapping
ndard drawings, as per the
vision) and as per I.S.1786
1.201
0.661
0.944
1.254
4.060
4.070
MT
diameters, wrought and put
ges for fabrication of
on etc., complete including
., and including over lapping
ndard drawings, as per the
vision) and as per I.S.1786
0
1.102
2.244
0.480
0.139
3.964
4.000
MT
mplete as per Clause
awing and technical
38.32
39.00
cum
s laid down in Clause
towards the soil and bigger
l, to the full height ,
s,as directed by the
IRC 78 and 2200 of MORTH
44.57
30.36
74.93
75.00
cum
100mm dia meter A.C pipe
rawing face Complete as per
per MORTH specification No
81.60
39.60
121.20
122.00
R.M.
er drawing BD/1-69 A.
4.00
4.00
No.s
d with 0.20 cum of CC
r packing the stones for
h Revision ) and as directed
38.34
39.00
cum
te and including labour
per MoRT&H specification
Toe wall.
12.81
13.00
cum
st, and conveyance of
MoRT&H Specification 2504
g of slopes.
19.17
19.00
cum
Name of Work ::- Construction Of High Level Bridge at Km 13/0-2 on Kodada-Revoor Road
District.
Sno
Description Quantity Rate Per
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3
On Kodad side
Level portion 1 x 1 11.5 17.55 3.700 746.75
Gradient Portion 1 x 1 183.00 17.00 2.500 7777.50
On Revoor side
Level portion 1 x 1 11.5 17.25 3.500 694.31
Gradient Portion 1 x 1 235.00 16.80 2.400 9475.20
SAY 619.00 239.00 CUM
5 Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsion
pressure distributor on prepared surface of Granular base including cleaning of road surface and
spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of
work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.
6 Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at the
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical
broom for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by the
Engineer-in-Charge.
7 Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an average
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-4 of
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of
weight of total mixture, transported to site, laid over a previously prepared surface with mechanical
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to
achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other contingent charges necessary including
cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H
specification No. 504 (5th Revision) (Excluding VAT Charges)
Provision For Caution Boards,Village Name Boards &Guide Stones Hume Pipes And
10 L.S
Roundings
11
Provision for Diversion road L.S
Total =
Amount
10
13398.00
147941.00
2108351.00
1344052.00
152189.10
30870.00
1108095.00
750975.00
70446.00
5726317
1500000
2000000
9226317
utive Engineer
ision:Suryapet
DETAILED CUM ABSTRACT
Providing and applying Prime Coat with bitumen emulsion (Medium Setting) bulk using emulsi
pressure distributor on prepared surface of Granular base including cleaning of road surface a
spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item
5 work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and
directed by the Engineer-in-charge.
Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at t
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanic
6 broom for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by t
Engineer-in-Charge.
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an avera
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-4
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50%
weight of total mixture, transported to site, laid over a previously prepared surface with mechanic
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7
achieve the desired compaction for finished item of work as directed by the Engineer-in-Char
7 including hire and operational charges all T&P and all other contingent charges necessary includi
cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&
specification No. 504 (5th Revision) (Excluding VAT Charges)
8 9 10
eans and disposal of scarified
on) Specn. No.305.4.3
Executive Engineer
Division:Suryapet
ABSTRACT ESTIMATE FOR BOX CULVERTS
Periodical Renewals to Kodad-Revoor road from Km 1/4 to 2
Name of the Work
reach from Km 1/4 to 21/2) in Suryapet District
Sl. No. Description of work Quantity Rate
1 2 3 4
Box Culverts - at 3/8,7/2,17/8,19/6
Dismantling of Structures (superstructure, substructure, foundation and other
miscellaneous structures) and pavements including disposing of resulting materials and/or
salvaging useful materials up to a distance of 1 km from project road complete as per
1 Drawings and Technical Specification Clause MoRT&H 202 and as directed by the Engineer.
(By Mechanical means in Cement Concrete grade M-15 & M-20)
a For Box
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 42.53
Box Culvert at 7/0-2 (3 v of 3mx3m) 58.00
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 58.00
Box culvert at 19/6-8 ( 2v of 3m x 3m) 42.53
201.06
Say 202.00 5552.00
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as
approved by Ministry of Steel) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
9 required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC
items.
a)
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 7.44
Box Culvert at 7/0-2 (3 v of 3mx3m) 9.48
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 9.48
Box culvert at 19/6-8 ( 2v of 3m x 3m) 7.44
33.84
Say 34.00 60375.00
Providing HYSD bars ( Fe-500 ) from primary producers like TATA, SAIL, VSP and Jindal of
different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete
10 for all R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for substructure
M40 Grade concrete in crash barrier (on Box and Retaining wall)
(on Box and Retaining wall)
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 28.20
Box Culvert at 7/0-2 (3 v of 3mx3m) 34.60
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 34.60
Box culvert at 19/6-8 ( 2v of 3m x 3m) 28.20
125.60
Say 126.00 3282.00
RM
Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including all other incidental and operational charges of all T&P etc., complete for
13 finished item of work as per Approved drawing but excluding cost of steel and its
fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th
Revision) and as directed by the Engineer-in-Charge for Approach slab.
Curtain wall
Box culvert at 3/8 -4/0 ( 2v of 3m x 3m) 40.68
Box Culvert at 7/0-2 (3 v of 3mx3m) 40.68
Box culvert at 17/8 -18/0 ( 3v of 3m x 3m) 40.68
Box culvert at 19/6-8 ( 2v of 3m x 3m) 40.68
162.72
Say 163.00 4994.00
cum
Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC
pipe extending through the full width of the structure at 1.00m C/C in both horizontal
and vertical direction so that the weep holes in each horizontal direction is staggered
from the weep holes laying above and below lines as shown in drawing including cost and
conveyance of the A.C pipes and labour charges for cutting to required length, placing the
16
pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished
item of work for weep holes as per SSR Data
d other
g materials and/or
mplete as per
ed by the Engineer.
cum 1868400.00
or foundations of
out, construction
, dressing sides of
etc., complete
RT&H specification
cum 279081.00
HBG crushed stone
&H including cost,
charges, centering,
er incidental and
ork as per MoRT&H
Engineer-in-Charge
1 802976.00
nd 10mm size HBG
and fine aggregate
conveyance of all
laying in position,
other operational
n 1500,1700, 2100
1 145440.00
mm HBG crushed
nd fine aggregate
conveyance of all
, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge
1 1374452.00
m and 10 mm size
e 1000-1 and fine
seigniorage) and
, machine mixing,
r incidental and all
RT&H Specification
1 800280.00
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge
1 2445300.00
mm HBG crushed
nd fine aggregate
conveyance of all
, vibrating, curing
P as per approved
and its fabrication
Engineer-in-Charge
1 1121504.00
AIL, VSP,Jindal as
put up bars of all
abour charges for
tying grills, placing
nding wire and all
lapping welding if
k as per standard
as per MoRT&H
for foundation RCC
1 2052750.00
, VSP and Jindal of
ncluding cost and
of reinforcement
in position etc.,
ndling charges and
ed etc., complete
wings, as per the
1600 &2200 (5th
1 2302344.00
MT
, VSP and Jindal of
ncluding cost and
of reinforcement
in position etc.,
ndling charges and
ed etc., complete
wings, as per the
1600 &2200 (5th
1 2233296.00
MT
dges of the road,
rade concrete with
a, 450 mm long at
o the structure on
MOST circular No.
s in the approved
1 413532.00
RM
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
etc., complete for
of steel and its
0, & 2704 (5th
1 476836.00
cum
mm HBG crushed
nd fine aggregate
conveyance of all
g, vibrating, curing
P as per approved
and its fabrication
702 as directed by
1.00 155186.00
cum
nd 10mm size HBG
and fine aggregate
conveyance of all
laying in position,
other operational
n 1500,1700, 2100
1 814022.00
cum
00mm Diameter AC
in both horizontal
ection is staggered
including cost and
length, placing the
mplete for finished
1 112566.00
Rm
ause 1209 MORD &
1 83968.00
nos
not less than 300
nce of materials to
etc., complete for
and as directed by
1 376326.00
cum
in slopes including
te including labour
ification 2504 (5th
1 136800.00
cum
,conveyance and
Clause 710.1.4 of
as per Drawing and
1 806875.00
cum
pansion joints and
placing in position,
1 83244.00
sqm
one and 50 % of 40
04.2.2 of MoRT&H
owards the soil and
ind the abutment,
tion including cost
labour charges as
pecifications as per
or finished item of
1 582084.00
cum
nical specifications
niorage Charges &
1 669726.00
cum
earth from outside
ifts including pre-
at borrowed area,
oil, breaking clods,
ad Roller @ OMC to
perational charges
ification 305 (5th
1 137088.00
cum
eigniorage) charges
layers by approved
chieve the desired
T&H Specification
( Payment will be
1 186912.00
cum
al Amount 18592588.00
686.07
42.41
175.02
103.71
40.68
93.06
114.61
42.53
7.44
9.17
7.98
110.11
6.28
7.24
22.68
119.90
0.00
0.00
14.40
6.54
20.94
8.00
28.20
15.08
13.12
168.00
132.00
750.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (3x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.2 d 0.450 Thickness of slab
Width of Box 11.34 e 0.50 Thickness of raft
Depth of Levelling 0.15 f 0.47 Thickness of wall
crust 0.61 g 0.40 Intermediate wall Thk
Radius of Pitching 6.9 0.70 Key height
136.08 3 No. of Vents
(3VX3X3) - 12m Length 2No's - Ch Km
Item Length Width
Description Unit No. Height (m) Quantity
No. (m) (m)
Earthwork in excavation of foundation for structures, including all
1 lifts and leads complete as per drawing and Technical Specification Cum
Clause 304 and 2903
All types of Soil at Km 7/0-2
Box 1 12.30 11.64 1.85 264.87
key portion 2 11.64 0.65 0.70 10.59
Curtain wall
D/S 1 12.00 1.85 2.65 58.83
U/S 1 12.00 1.50 2.15 38.70
Flexible appron
Part-1 2 11.34 1.40 0.75 23.81
Part-2 D/S 1 25.18 4.60 0.75 86.87
Part-2 U/S 1 25.18 1.60 0.75 30.22
Return Wall 4 7.22 3.92 1.85 209.44
Providing Plain Cement Concrete for levelling course etc.
2 including centering all complete as per drawing and Technical Cum
Specifications Section Section 1500 & 1700
PCC M 15
Box 1 12.30 11.64 0.15 21.48
key portion 2 11.64 1.39 0.15 4.85
Curtain wall
D/S 1 12.00 1.85 0.15 3.33
U/S 1 12.00 1.50 0.15 2.70
Return Wall 4 7.22 3.92 0.15 16.98
Back filling with granular material of approved quality complete as
3 Cum
per drawing and Technical specification Clause 304 & 305.
Quadrants 4 0.26 47.61 3.45 172.01
Behind Box Walls Cum 2 9.24 1.66 3.95 120.97
Behind Return Walls 4 3.91 1.45 3.45 78.01
Providing and laying of Filter media of Stone aggregate
conforming to Technical Specifications Clause 2504.2.2 behind
4 Cum
abutment, wing wall, retaining wall and return walls, complete as
per drawing and Technical Specifications Clause 305 & 2504.
Behind Box Walls Cum 2 10.440 0.60 3.45 43.22
Return Wall Cum 4 7.22 0.60 3.45 59.78
Vibrated cement concrete M15 Grade Concrete Curtain wall (PCC
5 M 15) Cum
D/S 1st footing 1 12.00 1.65 0.55 10.89
D/S 2nd footing 1 12.00 0.75 0.75 6.75
D/S 3rd footing 1 12.00 0.45 0.80 4.32
D/S 4th footing 1 12.00 0.20 0.40 0.96
U/S 1st footing 1 12.00 1.30 0.80 12.48
U/S 2nd footing 1 12.00 0.45 0.80 4.32
U/S 3rd footing 1 12.00 0.20 0.40 0.96
Providing and laying Plain/Reinforced cement concrete for
6 foundation complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Raft Cum 1 12.00 11.34 0.50 68.04
Key portion 2 11.34 0.65 0.70 10.32
Providing and laying Plain/Reinforced cement concrete for
7 foundation complete as per drawing and Technical Specification 4 6.92 3.62 0.40 40.08
Section 1500, 1700, 2100 & 2200 Return Wall M 20 grade
Providing and laying Plain/Reinforced cement concrete for
8 substructure complete as per drawing and Technical Specification
Section 1500, 1700, 2100 & 2200
Box Walls (M25) Cum 2 12.00 0.47 3.00 33.84
Middle Box Walls (M25) Cum 2 12.00 0.40 3.00 28.80
Haunches (150x 150mm) Cum 12 12.00 0.08 0.15 1.62
Bracket (300 x 300mm) Cum 2 12.00 0.00 0.30 0.00
Return Wall-1 Cum 4 0.30 0.780 4.25 3.98
Return Wall-2 Cum 4 3.28 0.780 4.25 43.49
Return Wall-2-Bracket Cum 4 3.28 0.500 1.10 7.22
Providing and laying Reinforced cement concrete in
9 superstructure excluding cost steel complete as per drawing and
Technical Specification Section 1500, 1700, 2100 & 2300
Slab for box (M25) Cum 1 12.00 10.74 0.450 58.00
Providing TMT Reinforcement bar for the Structure complete as
10 MT 118.44 80.00 Kg/Cum 9475.20
per drawing and Technical Specification for foundation
Providing TMT Reinforcement bar for the Structure complete as
11 MT 118.95 80.00 Kg/Cum 9516.00
per drawing and Technical Specification for Sub Structure
Providing TMT Reinforcement bar for the Structure complete as
12 MT 124.64 80.00 Kg/Cum 9971.20
per drawing and Technical Specification for Super Structure
Providing weep holes in abutments, wing walls and return walls
13 Rm
complete as per drawing and Technical Specification clause 2706.
Box Walls (1.0m C/C 0.5m length) 2 12.00 0.47 3.00 33.84
Return Wall 4 6.00 0.780 4.00 74.88
Providing and laying Wearing Course comprising of 65mm
Bituminous concrete on top of deck slab including cost of tack
14 Cum 1 11.10 10.74 0.075 8.94
coat, using modified bitumen meeting the requirements given in
table 500-29
Plain Cement Concrete M15 for levelling course below approach
15 slabs complete as per drawings and Technical Specification Section Cum 2 3.35 11 0.10 7.37
clause 2704
Providing Reinforced Cement Concrete in approach slabs
16 including reinforcement complete as per drawings and Technical Cum
Specification Sections 1500,1600 1700 and 2700
RCC M30 grade Cum 2 3.50 11.00 0.30 23.10
Providing and laying flexible apron complete as per drawings and
17 technical specifications cluase 2503 of Mort&H 5th revision for
bridge work. (Excluding Segniorage Charges & VAT).
Part-1 Cum 2 11.34 1.40 0.75 23.81
Part-2 D/S Cum 1 25.18 4.60 0.75 86.87
Part-2 U/S Cum 1 25.18 1.60 0.75 30.22
Filter meterial (150 mm thick) underneath pitching in slopes and
18 flat surfaces complete as per drawing & Technical Specification Cum 4 10.84 7.71 0.15 50.14
Clause 2504
Providing and laying stone pitching on sloped surfaces (300 mm
19 thick) for earth protection complete (for Quadrants) as per drawings Cum 4 10.84 7.71 0.30 100.28
and Technical Specification Clause 2504
20 Providing 25.4 mm mastic pads Sqm 2 12.00 0.30 7.20
Return Walls Sqm 4 5.03 0.33 6.54
103.00
40.68
118.44
118.95
58.00
9.48
1477.84
9.52
1477.84
9.97
1477.84
108.72
3.4
8.94
7.37
23.10
140.90
50.14
100.28
7.20
6.54
13.74
4.00
34.60
21.48
13.12
168.00
132.00
750.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (3x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.2 d 0.450 Thickness of slab
Width of Box 11.34 e 0.50 Thickness of raft
Depth of Levelling 0.15 f 0.47 Thickness of wall
crust 0.61 g 0.40 Intermediate wall Thk
Radius of Pitching 6.9 0.70 Key height
136.08 3 No. of Vents
103.00
40.68
118.44
118.95
58.00
9.48
1477.84
9.52
1477.84
9.97
1477.84
108.72
3.4
8.94
7.37
23.10
140.90
50.14
100.28
21.60
6.54
28.14
12.00
34.60
21.48
13.12
168.00
132.00
675.00
BOX CULVERT General Box
Type of Construction: ReConstruction Length of structure 12.00 a 3.00 Span
Median width 0 b 3.00 Vent height
1 ReConstruction (2x3.0x3.0) Locations 1 c 0.30 Raft offset
Bed Level 1.5 d 0.470 Thickness of slab
Width of Box 8.14 e 0.45 Thickness of raft
Depth of Levelling 0.15 f 0.42 Thickness of wall
crust 0.61 g 0.35 Intermediate wall Thk
Radius of Pitching 6.94 0.75 Key height
97.68 2 No. of Vents
103.71
40.68
93.06
114.61
42.53
7.44
1477.84
9.17
1477.84
7.98
1477.84
110.11
3.4
6.28
7.24
22.68
119.90
50.76
101.51
14.40
6.54
20.94
8.00
28.20
15.08
13.12
168.00
132.00
525.00
DETAILED CUM ABSTRACT
784.00
SAY 784.00
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoR
Table 400-1 & 400-2 including cost, (excluding seigniorage) charges and conveyance of all materia
work site and spreading in uniform layers with motor grader or by approved means, on prep
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting
2 vibratory roller to achieve the desired density etc., complete for finished item of work as per MoR
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be m
based on levels for finished item of work ).
Providing and applying tack coat with bitumen VG-10 Grade using Emulsion pressure distributor at
rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical br
5 for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by the Engin
in-Charge.
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an ave
output of 37.5 tones per hour using HBR/HBT crushed aggregates of Grading - II as per table 500-
MoRT&H Specification 504 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50
weight of total mixture, transported to site, laid over a previously prepared surface with mechan
paver finisher to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.
6 achieve the desired compaction for finished item of work as directed by the Engineer-in-Ch
including hire and operational charges all T&P and all other contingent charges necessary including
of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H specification
504 (5th Revision) (Excluding VAT Charges)
8 9 10
ans and disposal of scarified
) Specn. No.305.4.3
Total = 6450636
Executive Engineer
Division:Suryapet
Name of Work ::- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach f
Km 1/4 to 21/2) in Suryapet District.
DATA
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3
1 (5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).
1 Page 68,69 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 100 Cum
1 (A) Labour
1 0.04 day Mate 456.00
1 1.00 day Mazdoor unskilled 425.00
1
1 0.0 % Municipal Area Allowance 443.24
1 TOTAL
1
1 (B) Machinery
1 1.67 hour Hydraulic Excavator 1 Cum bucket capacity @ 60 cum/hr 2821.50
1 800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00
1 Add 10% of cost of carriage to cover
1 cost of loading and unloading
1 0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2661.20
1 1.00 hour Motor Graders for Grading @ 100 cum per hour 3601.92
1 4.00 hour Water tanker 6 KL 698.88
1 1.00 hour Vibratory roller 8T 2878.90
1 TOTAL
1 (A + B )
1
1 5.00 % (C) Over Head Charges on (A+B) 20656.17
1
1 10.00 % (D) Contractors Profit on (A+B+C) 21688.98
1
1 (E ) Seigniorage charges
1 100.00 cum Earth 0.00
1
1 100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E)
1
1 Rate per 1 cum
1 Rate per 1 cum
2 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of
MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials
to work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made
based on levels for finished item of work ).
2 By Mix in Place Method
2 Page 94 of MoRT&H SDB
2 Unit = cum
2 Taking output = 300 cum
2 (A) Labour
2 0.48 day Mate 456.00
2 2.00 day Mazdoor skilled 456.00
2 10.00 day Mazdoor unskilled 425.00
2
2 0.0 % Municipal Area Allowance 5380.88
2 TOTAL
2 (B) Machinery
2 6.00 hour Motor grader 3.35M Blade @50 cum/Hr. 3601.92
2 6.00 hour Vibratory roller 8T 2878.90
2 12.00 hour Tractor - Rotavator (223+11=234) 472.64
2 3.00 hour Water tanker 6 KL 698.88
2 TOTAL
2
2 (C) Material
2 Granular sub-base material as per
2 Table 400-1, Grading VI material of MORT&H
2 45-9.5 mm IRC & MORT&H HBG Chips @ 35 %
2 134.40 cum Avg. rate of (40-45),(25-27),(19-22), (12-14), (9.5-11.2) 1215.10
2 11.2-2.36 mm IRC & MORT&H HBG Chips @ 47.5 %
2 182.40 cum Average rate of (9.5-11.2),(5-7)&(2.36-5) 1014.85
2 2.36mm and below @ 17.5%
2 67.20 cum (Rate of 2.36mm & below HBG metal) 770.35
2 384.00 TOTAL
2 (A + B +C)
2
2 5.00 % (D) Over Head Charges on (A+B+C) 452219.72
2
2 10.00 % (E) Contractors Profit on (A+B+C+D) 474830.71
2
2 (F ) Seigniorage charges
2 384.00 cum Metal 0.00
2
2 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F)
2 Rate per 1 cum
2 Rate per 1 cum
1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
Macadam specification including cost, (excluding seigniorage) of all materials and including premixing
the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on
levels for finished item of work)
1 Page 110,111 of MoRT&H SDB
1 Unit = cum
1 Taking output = 225 cum
1 (A) Labour
1 0.48 nos. Mate 456.00
1 2.00 nos. Mazdoor skilled 456.00
1 10.00 nos. Mazdoor 425.00
1
0.0 % Municipal Area Allowance 5380.88
0 TOTAL
0 (B) Machinery
0 6.60 hour Wet mix plant of 60 ton hr. capacity 1843.52
0 6.00 hour Electric generating set 125 KVA 1478.40
0 6.00 hour front end loader 1 cum capacity 1843.52
0 6.00 hour Mechanical Paver finisher 100 TPH 2518.88
0 3.90 hour Vibratory roller 8-10 T 2878.90
0 3.00 hour Water tanker 698.88
0 TOTAL
0 (C) Material
0 45 to 22.40mm IRC HBG metal @ 30%
0 89.10 cum Avg. rate of (40-45), (25-27), (19-22mm ) 1240.27
0 22.4-2.36mm IRC HBG metal @ 40%
0 118.80 cum Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below) 1130.10
0 2.36mm to 75 micron @ 30%
0 89.10 cum (2.36mm & below) 770.35
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 379319.09
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 398285.04
0
0 (F ) Seigniorage charges
0 297.00 cum Metal 0.00
0
0 225.00 cum TOTAL Cost for 225 cum = (A+B+C+D+E+F)
0 Rate per 1 cum
0 Rate per 1 cum
4 Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure
distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion
at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-
in-charge.
4 Page 123 of MoRT&H SDB
4 Unit = sqm
4 Taking output = 3500 sqm
4 (A) Labour
4 0.08 nos. Mate 456.00
4 2.00 nos. Mazdoor 425.00
4
0 0.0 % Municipal Area Allowance 886.48
0 TOTAL
0 (B) Machinery
0 2.80 hour Mechanical broom @ 1250 sqm/hr. 399.84
0 2.80 hour Air compressor 250 cfm 588.40
0 2.00 hour Emulsion pressure distributor @1750 sqm/hr. 963.20
0 1.00 hour water tanker 6 KL 698.88
0 TOTAL
0 (C) Material
0 2.45 MT Bitumen Emulsion @ 0.70 Kgs/sqm 58400.34
0 TOTAL
0 (A + B +C)
0
0 5.00 % (D) Over Head Charges on (A+B+C) 149359.66
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 156827.64
0
0 3500.00 sqm TOTAL Cost for 3500 sqm = (A+B+C+D+E)
0 Rate per 1 sqm
0 Rate per 1 sqm
1 Providing and applying tack coat with bitumen Emulsion (Medium setting) (Bulk) using Emulsion
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned
with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.
2 Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant using
HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed
with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with
Paver finisher for full width to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for
finished item of work) (Excluding VAT Charges)
per Amount
6 7
d disposal of scarified
No.305.4.3
1.00 4.56
1.00 106.25
110.81
0.22
A= 111.03
1.00 45.46
1.00 368.70
1.00 231.01
B= 645.17
756.20
37.81
79.40
873.41
8.73
8.70
ndary by mechanical
a, removal of top soil,
on the embankment,
onnes Vibratory Road
hire and operational
item of work as per
1.00 4711.91
t.km 4800.00
480.00
1.00 1330.60
1.00 3216.00
1.00 2795.52
1.00 2878.90
B= 20212.93
20656.17
1032.81
2168.90
1.00 0.00
23857.88
238.58
239.00
to Grading - VI of
yance of all materials
means, on prepared
and compacting with
work as per MoRT&H
ayment will be made
1.00 218.88
1.00 912.00
1.00 4250.00
5380.88
0.00
A= 5380.88
1.00 21611.52
1.00 17273.40
1.00 5671.68
1.00 2096.64
B= 46653.24
1.00 163309.44
1.00 185108.64
1.00 51767.52
C= 400185.60
452219.72
22610.99
47483.07
1.00 0.00
522313.78
1741.05
1741.00
gregate to Wet Mix
d including premixing
rial by tipper to site ,
and compacting with
in-Charge and as per
ill be made based on
1.00 218.88
1.00 912.00
1.00 4250.00
5380.88
0.00
A= 5380.88
1.00 12167.23
1.00 8870.40
1.00 11061.12
1.00 15113.28
1.00 11227.71
1.00 2096.64
B= 60536.38
1.00 110507.76
1.00 134255.88
1.00 68638.19
C= 313401.83
379319.09
18965.95
39828.50
1.00 0.00
438113.54
1947.17
1947.00
ing emulsion pressure
nd spraying emulsion
work etc., complete for NEW
ected by the Engineer-
1.00 36.48
1.00 850.00
886.48
0.00
A= 886.48
1.00 1119.55
1.00 1647.52
1.00 1926.40
1.00 698.88
B= 5392.35
1.00 143080.83
C= 143080.83
149359.66
7467.98
15682.76
172510.40
49.29
49.30
Bulk) using Emulsion
anular surface cleaned
3 (5th revision) and as
1.00 36.48
1.00 850.00
886.48
0.00
A= 886.48
1.00 1119.55
1.00 1647.52
1.00 1926.40
B= 4693.47
1.00 24788.25
C= 24788.25
30368.20
1518.41
3188.66
35075.27
10.02
10.00
TPH Batch Mix plant
Specification 505 (5th
ght of total mixture,
ydrostatic with sensor
d as per Clauses 501.6
d by the Engineer-in- NEW
nt charges necessary
and as per MoRT&H
1.00 383.04
1.00 5950.00
1.00 2280.00
8613.04
0.00
A= 8613.04
1.00 162429.12
1.00 15113.28
1.00 12432.00
1.00 11061.12
1.00 4410.90
1.00 5003.70
1.00 4410.90
B= 214861.02
1.00 687419.78
1.00 109009.31
1.00 83667.45
1.00 99068.84
1.00 4414.11
C= 983579.49
1207053.55
60352.68
126740.62
1.00 0.00
1394146.85
7149.47
7149.00
1.00 383.04
1.00 5950.00
1.00 2280.00
8613.04
0.00
A= 8613.04
1.00 162429.12
1.00 15113.28
1.00 12432.00
1.00 11061.12
1.00 4410.90
1.00 5003.70
1.00 4410.90
B= 214861.02
1.00 819252.53
1.00 66826.39
1.00 73999.08
1.00 130029.14
1.00 19582.20
1.00 2187.79
C= 1111877.13
1335351.19
66767.56
140211.88
1.00 0.00
1542330.63
8075.03
8075.00
d conveyance of all
/25Kgs 58.00
Each 25.92
Each 50.40
Each 21.25
Each 114.75
2.70
0.00
0.00
273.02
27.30
or say 27.00
Executive Engineer
(R&B)Division Suryapate
Name of Work:- :Construction of HLB at Km. 15/0-2 on kodad- Rvoor road in Suryapet district.
DATAS FOR BRIDGE PROPER SoR 2018-19
Sl
DESCRIPTION RATE
No
1 2 3
1 Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding
settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of
sides and bottom and back filling with approved material.
Machinery
240.00 cum Earth work excavation as per G.O. Ms. No.10 dt.26.07.2005 13
(B) Machinery
240.00 cum Earth work excavation as per G.O. Ms. No.10 dt.26.07.2005 13
b) Labour
0.64 day Mate 456.00
1.00 day Mason 445.00
15.00 day Mazdoor 425.00
0.00 % Municipal area allowance 7111.84
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
2.00 hr water tanker 6KL capacity 698.88
3 Plain Vibrated Cement Concrete M20 Mix in Open Foundation using 40 mm HBG (ss5)max size graded
M/c metal complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700,
2100 for FOOTINGS OF ABUTMENTS, piers, wing walls,rigid aprons & cutoff walls.
Unit = cum
Taking output = 15 cum
a) Material
5.16 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
5.40 cum 40 mm Aggregate 983.60
5.40 cum 20 mm Aggregate 1439.85
2.70 cum 10 mm Aggregate 1173.60
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
4
Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 20 mm HBG (ss5)max size
graded M/c metal complete as per drawings and technical specifications & as per MoRT&H Spcn. No
1500, 1700, 2200 for ABUTMENTS , piers , weir & wing walls.
Unit = cum
Taking output = 15 cum up to
5.00m height
a) Material
5.16 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
5.40 cum 40 mm Aggregate 983.60
5.40 cum 20 mm Aggregate 1439.85
2.70 cum 10 mm Aggregate 1173.60
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
5 Vibrated reinforced cement concrete M 25grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges of all T&P as per approved drawings
and as directed during execution but excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-
Charge for Bed blocks & Backing walls VRCC M 25 Sub structure for abutments.
Unit = cum
Taking output = 15 cum
a) Material
6.05 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
6 V.R.C.C concrete M - 20 grade for Super Structure Furnishing and Placing Reinforced cement concrete
in super-structure as per drawing and Technical Specification complete as per MoRT&H spcn. No. 1500,
1600 & 1700 as per MOST drawing No.SD/112 & SD/114
Unit = cum
Taking output = 15 cum
a) Material
5.21 MT Cement 4600.00
Min. rate of natural sand & Stone
5.40 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
6 Construction of VRCC railing of M 20 grade using HBG crushed stone aggregate of size not exceeding 12 mm fine
aggregate conforming to table 1000-2 true to line and grade, tolernce of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical posts not to exceed 1.87 m, leaving adequate space between vertical posts
for expansion including cost,conveyance of all materails to site and labour charges, centering,machine
mixing,laying,vibrating,curing etc.,including other incidental hire and operational charges of all T&P as per approved
drawings and as directed during execution but excluding cost of steel and its fabrication charges as per approved
drawings and technical specifications for finished item as per MoRT&H specification 1500,1600,1700 & 2703 (5th
revision ) and as directed by the Engineer-in-Charge.
Unit = 1 Rm
Hand rails with out footh paths
Taking output = 10.74 m ttotal apan
a) Material
5.21 MT Cement 4600.00
Min. rate of natural sand & Stone
5.40 cum 1644.15
sand
8.10 cum 20 mm Aggregate 916.00
5.40 cum 10 mm Aggregate 692.00
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
9597.16
c)Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 35 KVA 842.20
4730.35/10.
cost per 10.74 Rm
74
Cost per 1 RM=
Rate to be adopted per RM of each
side
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 63 KVA(33 KVA) 842.20
8 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item
of work as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H
specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for
Approach slab. (SD/104 M30)
Unit = cum
Taking output = 15 cum
a) Material
6.10 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20
b) Labour
0.86 day Mate 456.00
1.50 day Mason 470.00
20.00 day Mazdoor 425.00
0.00 % Municipal area allowance 9597.16
c) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20
10 Vibrated reinforced cement concrete M 40 grade using 20mm&10mm hard broken graded granite metal
(SS-5) including cost,centering,machine mixing,laying,vibrating,curing etc., including other incindental hire
and operational charges of all T&P and all water leads etc., complete as per approved drawing and as
directed during execution but excluding cost of steel and its fabrication charges for finished item as per as
per drawing no. AB/HVEW/STR/Misc/KM040-105/04, dt:20-02-2013 in VRCC M40. crash
barriers,excluding Reinforcement.
10.40 m span
Morth specification 809
Unit = 1cum
VRCC M 40 Grade P.No 237 & 478,479
Taking out put = 15cum
Adopted PSC M40 data
A) Labour
0.9 nos Mate 456.00
1.5 nos Mason 470.00
21 nos Mazdoor 425.00
0.00 % Municipal area allowance 10040.40
B) Material
6.45 MT Cement 4600.00
Min. rate of natural sand & Stone
6.75 cum 1644.15
sand
8.10 cum 20 mm Aggregate 1439.85
5.40 cum 10 mm Aggregate 1173.60
C) Machinery
Concrete mixer 0.40/0.28 cum
6.00 hour 472.60
Capacity
6.00 hour Generator 33 KVA 842.20
FORM WORK
0.10 Height upto 5m 76697.00
11 Providing HYSD bars (Fe-500 Primary Producers like TATA, SAIL, VSP, ZINDAL) of different diameters,
wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in
position etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for R.C.C items.
FOR FOUNDATION
Unit = 1 M.T.
Taking output = 1 M.T.
a) Material
HYSD bars including 5% over laps
1.05 MT and wastage (Rate as per SSR item 46000.00
No. 193)
6.00 Kg Binding wire 50.00
b) Labour Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.40 day Mate 456.00
2.00 day Black smith 445.00
6.00 day Mazdoor 470
0.00 % Municipal area allowance 3892.40
Rate for 1 MT
20.00 % Over head charges on Rs 52492.40
10.00 % Conctractor profit 62990.88
Rate per 1MT
Rate per 1MT
b) Labor Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.34 day Mate 456.00
2.00 day Black smith 445.00
6.50 day Mazdoor 470
0.00 % Municipal area allowance 4100.04
Rate for 1 MT
20.00 % Over head charges on Rs 52700.04
10.00 % Contractor's profit on Rs 63240.05
Rate per 1MT
Rate per 1MT
b) Labor Charges
labour for cutting, bending, shifting to
site,and placing in position with
binding wire
0.44 day Mate 456.00
3.00 day Black smith 470
8.00 day Mazdoor 425.00
0.00 % Municipal area allowance 5010.64
Rate for 1 MT
20.00 % Over head charges on Rs 53710.64
10.00 % Conctractor profit 64452.77
Rate per 1MT
Rate per 1MT
14 Back filling behind Abutments with gravel including cost ,conveyance and to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing
and technical specifications for finished item of work
Taking out put = 10.00 Cum
a) Labour
0.28 day Mate 456.00
7.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 3102.68
b) Material
12.00 cum Granular material 178.36
c) Mechinery
2.50 hours Plate compactor/ Power rammer 53.76
0.05 hours water tanker 698.88
15 Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid
down in clause 2504.2.2 of MORT&H (Rev. IV) specifications to a thickness of not less than 600mm with
smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind
abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and
technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78
Cl. 710.1.4 of IRC : 78 Unit : 1 Cum
Taking out put = 10.00 Cum
a) Labour
0.32 day Mate 456.00
1.00 day Mazdoor Skilled 456.00
7.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 3576.92
Material Filter media of stone
b) aggregate conforming to clause
2504.2.2 of MoRT&H
6.00 cum 150mm size IRC soling stone 442.35
6.00 cum 40mm size IRC metal 983.60
c) Mechinery
0.06 hours water tanker 6.0 Kl Capacity 698.88
Cost per 10 Cum = a+b+c
Cost per 1 Cum = (a+b+c) ÷ 10
20.00 % Over head charges 1217.46
16 Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with
100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H
towards drawing face Complete as per drawing and technical specification, complete for finished item of
work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)
Unit = nos
Taking output = 30 nos
Output = 1 Cum, Material for 1:3 Cement Mortor
(A) Labour
0.04 nos Mate 456.00
0.90 nos Mazdoor 425.00
0.00 % Municipal area allowance 400.74
Total
(B) Material
0.51 MT Cost of Cement 4600.00
Min. rate of natural sand & Stone
1.05 Cum sand 1644.15
Total
Cost per 1 Cum CM (1:3)
(A) Labour
0.03 nos Mate 456.00
0.50 nos Mason 470.00
0.25 Mazdoor 425.00
0.00 % Municipal area allowance 354.93
Total
(B) Material
31.5 RM Cost of 100mm dia AC pipe 287.10
including 5% wastage (average length= 1m)
10.00 Nos Collors for AC pipe (average) taking 10 28.71
30.00 Nos MS clamps 13.00
0.05 cum Cement mortor (1:3) 4473.10
Total
(C) Over head charges @ 20% (25%-VAT)
20.00 % Add for Over head charges on (A)+(B)+( C) 10299.34
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D) 12359.20
Cost Per 30 RM (D)+(E)
Cost per 1RM
Rate to be adopted
17 Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.2705 and as per
drawing SD/205.
out put = 1 No.
a) Material
4.00 Corrosion resistant structural steel
kg 36.50
including 5 percent wastage PR
2.00 m Cost of G.I Pipe 100mm dia 785.00
6.00 each GI Bolt 10mm dia 11.00
2.00 each Galvanized MS Flat clamp 25.00
18 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20
cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for
packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504
( 5th Revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
Cost of CC(1:4:8)
Taking output = 15 cum
(A) Labour
0.64 nos Mate 456.00
1.00 nos Mason 470.00
15.00 nos Mazdoor 425.00
0.00 % Municipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60
Min. rate of natural sand & Stone
6.75 cum sand 1644.15
2.43 MT Cement at site 4600.00
Total
(c) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60
6.00 hr Generator set 35 KVA 842.20
2.00 hours water tanker 6.0 Kl Capacity 698.88
Rate to be adopted
19 Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including
labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for
Toe wall.
Toe wall
Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos Mate 456.00
0.35 nos Mason 470.00
0.75 nos Mazdoor for laying stones, filling quarry spalls 425.00
0.00 % Municipal area allowance 501.49
Total
(B) Material
0.20 cum Quarry spalls and its carriage 328.35
1.00 cum Cost of Rough stone 300mm thick 508.35
Total
Rate to be adopted
20 Providing and laying filter material with Gravel underneath pitching in slopes including cost, and
conveyance of materials to site including labour charges etc., complete for finished item of work as per
MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.
Out put = 1 Cum
a) Labour
0.05 day Mate 456.00
0.25 day Mazdoor Skilled 456.00
1.00 Mazdoor for filling , watering,
day 425.00
ramming etc.,
0.00 % Municipal area allowance 561.80
b) Material
1.20 cum Granular material 178.36
1 145.92
1 3400.00
0.00
3545.92
cum 3120.00
6665.92
1333.18
7999.10
799.91
8799.01
36.66
36.66
say 36.70
cum
1 145.92
1 3400.00
0.00
3545.92
cum 3120.00
6665.92
333.30
6999.22
1399.84
8399.06
839.91
9238.97
38.50
38.50
say 38.50
cum
te and fine aggregate
s to site and labour
other incidental and
MoRT&H specification
dations
MT 15870.00
cum 11098.01
cum 13278.60
40246.61
day 291.84
day 445.00
day 6375.00
0.00
7111.84
hour 2835.60
hour 5053.20
hour 1397.76
9286.56
56645.01
11329.00
6797.40
74771.41
4984.76
say 4985.00
cum
MT 23736.00
cum 11098.01
644.77
cum 5311.44
cum 7775.19
cum 3168.72
51089.36
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
68575.32
4571.69
Cum 4571.69
182.87
950.91
570.55
6276.02
Say 6276.00
cum
MT 23736.00
cum 11098.01
cum 5311.44
cum 7775.19
cum 3168.72
51089.36
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
68575.32
4571.69
Cum 4571.69
457.17
1005.77
603.46
6638.09
Say 6638.00
cum
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
74414.20
4960.95
Cum 4960.95
496.10
1091.41
6548.45
654.8454
7203.30
Say 7203.00
cum
Cum 4960.95
99.22
595.31
848.32
6503.81
650.38
7154.19
Say 7154.00
cum
cum
MT 23966.00
cum 8878.41
cum 11662.79
cum 6337.44
50844.64
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
68330.60
4555.37
Cum 4555.37
911.07
1093.29
655.97
7215.71
Say 7216.00
cum
cum
Cum 4555.37
1138.84
854.13
654.83
7203.18
Say 7203.00
cum
e not exceeding 12 mm fine
post not to exceed 1 in 500,
e space between vertical posts
ntering,machine
es of all T&P as per approved
on charges as per approved
500,1600,1700 & 2703 (5th
MT 23966.00
cum 8878.41
cum 7419.60
cum 3736.80
44000.81
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
61486.77
4099.12
cum 2384.46
119.22
2503.68
125.18
2628.87
525.77
3154.64
315.46
3470.10
440.44
440.00
1 RM
Cum 4099.12
819.82
590.27
550.92
6060.14
Say 6060.00
tal including cost and
ng including hire and
of flow of water, if
awings and technical
MT 18998.00
cum 11098.01
cum 7967.16
cum 5831.39
cum 1584.36
45478.92
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
62964.88
Cum 62964.88
12592.98
7555.79
83113.64
5540.91
Say 5541.00
cum
hed stone aggregate
ble 1000-2) including
xing, laying, vibrating,
plete for finished item
rges as per MoRT&H
ngineer-in-Charge for
MT 28060.00
cum 11098.01
cum 11662.79
cum 6337.00
57157.80
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
74643.76
4976.25
99.53
1015.16
609.09
6700.02
Say 6700.00
cum
e aggregate including
ng,compacting,curing
but excluding cost of
02(5th Revision). For
MT 28060.00
cum 11098.01
cum 11662.79
cum 6337.00
57157.80
day 392.16
day 705.00
day 8500.00
0.00
9597.16
hour 2835.60
hour 5053.20
7888.80
74643.76
4976.25
63.75
1008.00
604.80
6652.80
Say 6653.00
cum
graded granite metal
other incindental hire
oved drawing and as
nished item as per as
RCC M40. crash
day 410.40
day 705.00
day 8925.00
0.00
10040.40
10040.40
MT 29670.00
cum 11098.01
cum 11662.79
cum 6337.00
58767.80
hour 2835.60
hour 5053.20
7888.80
76697.00
7669.70 18
84366.70
5624.45
5624.00
cum 19284.70
19284.70
day 18.24
day 425.00
0.00
443.24
19727.94
19727.94
3945.588
2367.3528
26040.88
2604.0881
2604
Rm
f different diameters,
o site and all labour
grills, placing them in
andling charges and
or all R.C.C items for
n-Charge and as per
.C.C items.
MT 48300.00
kg 300.00
48600.00
day 182.40
day 890.00
day 2820.00
0.00
3892.40
52492.40
10498.48
6299.09
69289.97
69290.00
MT 48300.00
kg 300.00
48600.00
day 155.04
day 890.00
day 3055.00
0.00
4100.04
52700.04
10540.01
6324.01
69564.06
69565.00
MT 48300.00
kg 400.00
48700.00
day 200.64
day 1410.00
day 3400.00
0.00
5010.64
53710.64
10742.13
6445.28
70898.05
Say 70898.00
day 127.68
day 2975.00
0.00
3102.68
day 2140.32
2140.32
hour 134.40
hour 34.94
169.34
5412.34
541.23
108.25
64.95
714.43
Say 714.00
cum
he requirements laid
1.4 of IRC 78
day 145.92
day 456.00
day 2975.00
0.00
3576.92
cum 2654.10
cum 5901.60
8555.70
hour 41.93
12174.55
1217.46
243.49
1460.95
146.09
1607.04
Say 1607.00
cum
wall/Return wall with
e of about 1 V : 20H
e for finished item of
MT 2346 2346.00
RM 9043.65 9043.65
2059.867 2059.87
12359.20 12359.21
1235.9202 1235.92
13595.12 13595.13
453.17 453.17
453.00 453.00
1RM 1 RM
No.2705 and as per
kg 146.00
m 1570.00
each 66.00 66.00
each 50.00 50.00
1832.00
410.19
246.11
2707.25
Say 2707.00
1no
hr 2835.60 2835.60
hr 5053.20 5053.20
hour 1397.76
9286.56 7888.80
51978.01 50580.25
3465.20 3372.02
cum 866.30
1876.14
375.22803 201.97
2251.37 1211.81
225.13682 121.18
2476.51 1332.99
2476.51 1332.99
2477.00 1333.00
1cum 1 Cum
o site and including
work as per MoRT&H
hing of slopes for
day 18.24
day 164.50
day 318.75
0.00
501.49
cum 65.67
cum 508.35
574.02
215.102
1290.61
129.0612
1419.67
1419.67
1420.00
1cum
under Revetment.
day 22.80
day 114.00
day 425.00
0.00
561.80
day 214.03
214.03
775.83
155.17
93.10
1024.10
Say 1024.00
1cum
ngineer (R&B)
Name of Work ::- Construction Of High Level Bridge at Km 15/02 on Kodada-Revoor Road i
Suryapet District.
DATA
1 2 3 4 5 6
10 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified
material with all leads and lifts up to 1000 m as per MoRT&H (5th Revision) Specn. No.305.4.3
1 (5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).
1 Page 68,69 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 100 Cum
1 (A) Labour
1 0.04 day Mate 456.00 1.00
1 1.00 day Mazdoor unskilled 425.00 1.00
1
1 0.0 % Municipal Area Allowance 443.24
1 TOTAL A=
1
1 (B) Machinery
1 1.67 hour Hydraulic Excavator 1 Cum bucket capacity @ 60 cum/hr 2821.50 1.00
1 800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00 t.km
1 Add 10% of cost of carriage to cover
1 cost of loading and unloading
1 0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2661.20 1.00
1 1.00 hour Motor Graders for Grading @ 100 cum per hour 3601.92 1.00
1 4.00 hour Water tanker 6 KL 698.88 1.00
1 1.00 hour Vibratory roller 8T 2878.90 1.00
1 TOTAL B=
1 (A + B )
1
1 5.00 % (C) Over Head Charges on (A+B) 20656.17
1
1 10.00 % (D) Contractors Profit on (A+B+C) 21688.98
1
1 (E ) Seigniorage charges
1 100.00 cum Earth 0.00 1.00
1
1 100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E)
1
1 Rate per 1 cum
1 Rate per 1 cum
2 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of
MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials
to work site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made
based on levels for finished item of work ).
6 Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant using
HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed
with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with
Paver finisher for full width to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for
finished item of work) (Excluding VAT Charges)
0.0%
Amount
4.56
106.25
110.81
0.00
110.81
45.46
368.70
231.01
645.17
755.98
37.80
79.38
873.16
8.73
8.70 OK
18.24
425.00
443.24
0.00
443.24
4711.91
4800.00
480.00
1330.60
3216.00
2795.52
2878.90
20212.93
20656.17
1032.81
2168.90
0.00
23857.88
238.58
239.00 New ok
218.88
912.00
4250.00
5380.88
0.00
5380.88
21611.52
17273.40
5671.68
2096.64
46653.24
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF! OK
218.88
912.00
4250.00
5380.88
0.00
5380.88
12167.23
8870.40
11061.12
15113.28
11227.71
2096.64
60536.38
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF! ok
NEW
36.48
850.00
886.48
0.00
886.48
1119.55
1647.52
1926.40
698.88
5392.35
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! ok
36.48
850.00
886.48
0.00
886.48
1119.55
1647.52
1926.40
4693.47
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! ok
NEW
383.04
5950.00
2280.00
8613.04
0.00
8613.04
162429.12
15113.28
12432.00
11061.12
4410.90
5003.70
4410.90
214861.02
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
NEW
383.04
5950.00
2280.00
8613.04
0.00
8613.04
162429.12
15113.28
12432.00
11061.12
4410.90
5003.70
4410.90
214861.02
#REF!
ok
#REF!
#REF!
#REF!
18943.65
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
182.40
912.00
3400.00
4494.40
0.00
4494.40
17273.40
2096.64
19370.04
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
Executive Engineer
384.00
1.28
134.4 134.4
153.6 183.36
96 66.24
384
7.75
450 450.000 30 0 0.000
22.50 24.300 25 0 0.000
427.50 425.700 43 0 0.000
1.485864 285 283.800 2 0 0.000
100
5.676
(B) Machinery
Hydraualic Excavator 1 Cum bucket
6.00 hr 2821.50 hr
capacity @ 60 cum/hr
240.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 cum
3
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for
base coarse below.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 Day Mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
6.75 cum Sand at site 1644.15 cum
3.45 MT Cement at site 4600.00 MT
Total
(C ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
(D) Over head charges @5 %
5.00% Over head charges 5% on (A) + (B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E) + (F)
Rate for 1 cum
Rate to be adopted
4 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for levelling Course (Box Culvert & Approach Slab)
5 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge (for Raft foundation)
6 Vibrated Reinforced cement concrete M 20 Grade Concrete using 20mm and 10 mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footing ( curtain walls, Wing wall)
7 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for Sub structure (Side walls)
8 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for BOX Culvert(OR Sub-Structure)
10 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
11 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
15 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for curtain wall.
16 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through the full width of the structure at 1.00m C/C in both horizontal and vertical
direction so that the weep holes in each horizontal direction is staggered from the weep holes laying
above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream
side face etc., complete for finished item of work for weep holes as per SSR Data
17 Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705
MORTH
Pg no 499 of SDB
Unit = 1 No
taking output=1 no
(A) for Fabrication
0.02 no mate 456.00 1.00
no Mason skilled 470.00 1.00
0.02 no Black smith 470.00 1.00
0.02 no Mazdoor 425.00 1.00
(B) Fixing
0.01 no mate 456.00 1.00
0.01 no Mason skilled 470.00 1.00
no Black smith 470.00 1.00
0.20 no Mazdoor 425.00 1.00
0% Muncipal area allowance 17.90
TOTAL A=
(B) Material
corrosion resistanct structural steel
0.004 MT including 5% wastage (M087, Pg.36 of SSR 44500.00 1.00
GI bolt 10mm Dia (M110, Pg.37 of SSR 2015-
2015-16)
6.00 nos 23.00 1.00
16)
G I Pipe 100 mm dia B Class (Sl.32, Pg.20 of
2.00 RM 675.00 1.00
Galvanised MSSSR
flat2015-16)
clamp(M101, Pg.37 of
2.00 each 195.00
SSR 2015-16)
TOTAL B=
(A + B )
labour (a+b) for electrodes, gas cutting,
5.00 % 2177.28
sealant, anti-corrosive bituminous paint,
5.00% Over head charges 5% on (A) + (B) 2177.28
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 cum Cost of stone spalls 328.35 cum
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1075.51
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate to be adopted
19 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges etc.,
complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed
by the Engineer-in-Charge
(B) Material
1.20 cum Cost of Gravel 178.36 cum
Total
(C) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 779.33
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
20 Back filling behind Abutments/Wing walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per
MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for
finished item of work
(B) Material
12.00 cum Cost of Selective earth 178.36 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 5412.34
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
21 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting
the requirements given in table 500-29, prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at
an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.
Unit = sqm
Taking output =35.00 Sqm (0.87 cum) assuming a
density of 2.3 tonn/cum Page 151 of MoRT&H SDB
(A) Labour
0.44 nos. Mate 425.00 day
10.00 nos. Mazdoor working with HMP, Mechanical 400.00 day
1.00 nos. broom, paver,roller,asphalt
Skilled Mazdoor for checkingcutter and
line and 470.00 day
levels.
Agency area allowance 4657.00
Total
(B) Machinary
0.06 hr Mechanical broom @ 1250 sqm per hour 357.00 hr
0.06 hr Air compressor 250 cfm 521.20 hr
6.00 hr Mastic cooker 1 tonne capacity 65.00 hr
6.00 hr Bitumen boiler 1500 litres capacity 209.00 hr
1.00 hr Tractor for towing and positioning of mastic 415.00 hr
cooker
Total and bitumen boiler
(C) Material
Base mastic (without coarse aggregates) =
60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40
Proportion
per cent . of material required for mastic
asphalt with coarse aggregates (based on
I)
mixBitumen
design 85/25
done byor CRRI
30/40for@ a10.2 per cent
specific case)
0.200 tonne 29607.00 tonne
by weight of mix. 2 x 10.2/100 = 0.204
retained on 0.075mm sieve @ 31.9 per cent
0.39 cum 1081.77 cum
by weight
content notofless
mixthan
= 2 x8031.9/100
per cent= by0.638
0.36 tonne iv) Coarse aggregates 6.3 by
mmweight
to 13.2 2616.00 tonne
weight @ 17.92 per cent ofmm
mix@=
0.55 cum 40 Pre-coated
v) per cent bystone
weight of mix
chips = 2 mm
of 13.2 x 40/100 1453.85 cum
0.02 cum = 0.8 MT size
nominal = 0.8/1.456
for skid = 0.55
resistance = 35 x 1568.02 cum
vi) Bitumen for coating of chips @ 2 per
0.50 kg 0.005/10 = 0.018
cent by weight = 0.018 x 1.456 x 2/100 = 29.607 kg
0.0005 MT = 0.5kg Total
A+B +C= TOTAL
(D) Over head charges
5.00% Over head charges 14899.52
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 35.00 Sqm
Rate per 1 Sqm
Rate to be adopted
22 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a
thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall
and provided over the entire surface behind the abutment, wing wall and return wall to the full
height compacted to a firm condition including cost and conveyance of all metal (excluding
seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing
and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision)
for finished item of work.
23 Providing and laying Boulder's apron on River Bed for protection against scour with stone boulders
weighing not less than 40 k.g each complete as per drawing and technical specification 300 mm thick
with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and
conveyance of materials to site and including labour charges for packing the stones for apron etc.,
complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed
by the Engineer-in-Charge for Bed Protection.
Unit : Cum
Taking out put = 1 Cum Page 520 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
0.35 day Mason 470.00 day
0.75 day Mazdoor Unskilled 425.00 day
0% Muncipal area allowance 501.49
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 Cost of stones spalls 504.35
5.00% Over head charges 5% on (A) + (B) 1110.71
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 10 sqm (D) + (E)
Rate per cum
Rate per 1 cum
24 Forming embankment with borrowed useful earth from outside road boundary by mechanical means
upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision).
(Payment Based on Levels) for diversion road
Unit : Cum
Taking out put = 100 Cum Page 70 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
1.00 day Mazdoor unskilled 425.00 day
0% Agency area allowance
(B) Machinery
100.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum
800.00 t.km Tipper (for 10Kms=160x5=800) 6.00 t.km
Add 10% of cost of carriage to cover cost of
loading
Dozer 80and
HP unloading
for spreading @ 200 cum per
0.50 hr 2661.20 cum
hour
Motor Grador for Grading @ 100 cum per
1.00 hr 3601.92 hr
hour
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr
25 Construction of Gravel base & shoulders including cost, (excluding seigniorage) charges and
conveyance of all materials to work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve the desired density at OMC etc.,
complete for finished item of work as per MoRT&H Specification 401& 408 (5th revision) and as
directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
Amount
(Rs.)
d other miscellaneous
lvaging useful materials
Technical Specification
Cement Concrete grade
9.12
114.00
106.25
0.00
229.37
Air compressor 250 cfm with 2 leads of
37.46
78.66
865.22
692.17
692.00
ons of structures as per
f shoring and bracing,
ck filling the excavation
or finished item of work
r-in-Charge.
145.92
3400.00
0.00
3545.92
16929.00
0.00
1023.75
21498.67
2149.87
23648.53
98.54
99.00
1 Cum
291.84
470.00
6375.00
0.00
7136.84
13278.60
11098.01
15870.00
40246.61
2835.60
5053.20
1397.76
9286.56
2833.50
59503.51
5950.35
65453.86
4363.59
4364.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
& Approach Slab)
392.16
705.00
8500.00
0.00
9597.16
7967.16
5831.39
1584.36
11098.01
18998.00
45478.92
2835.60
5053.20
0.00
7888.80
0.00
3148.24
66113.12
6611.31
72724.44
4848.30
4848.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
222548.00
455333.90
27600.00
0.00
0.00
28762.50
0.00
4193.28
60555.78
19699.98
27251.64
572284
57228.43
629513
5245.94
5246.00
1 Cum
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
191636.00
424421.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
19739.30
25661.09
538882.83
53888.28
592771.11
4939.76
4940.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
191636.00
424421.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
49348.24
27141.53
569972.21
56997.22
626969.44
5224.75
5225.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
222548.00
455333.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
52439.44
28841.69
605675.57
60567.56
666243.13
5552.03
5552.00
1 Cum
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
ms.
182.40
940.00
2550.00
0.00
3672.40
48300.00
300.00
48600.00
52272.40
2613.62
5488.60
60374.62
60374.62
60375.00 57233
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
R.C.C items.
155.04
940.00
2762.50
0.00
3857.54
48300.00
300.00
48600.00
52457.54
2622.88
5508.04
60588.46
60588.46
60588.00 57086
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
f R.C.C items.
200.64 0.44
1410.00 3
3400.00 8
0.00
5010.64
48300.00 3.5
400.00 1.75
48700.00
53710.64
2685.53
5639.62
62035.79
62035.79
62036.00 58243
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
, all as specified
428.64
1645.00
8500.00
0.00
10573.64
93302.28
50699.52
88784.10
237360.00
470145.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
54033.70
0.00
594370.74
0.00
594370.74
4953.09
4953.00
1 Cum
14859.00
18.24
425.00
0.00
443.24
12880.00
233.28
13113.28
28415.52
1420.78
2983.63
32819.93
3281.99
3282.00
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
other incidental and
er Approved drawing but
on 1500, 1600,1700, &
lab.
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
224480.00
457265.90
29718.00
0.00
2736.00
28762.50
0.00
0.00
61216.50
10558.51
26924.20
565408
56540.81
621949
5182.91
5183.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
SBD specification 1500,
r Deck Slab
410.40
705.00
8925.00
0.00
10040.40
11662.79
6337.44
11098.01
28060.00
57158.24
2835.60
5053.20
7888.80
0.00
0.00
75087.44
75087
5005.83
5006.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
392.16
705.00
8500.00
0.00
9597.16
7967.16
5831.39
1584.36
11098.01
18998.00
45478.92
2835.60
5053.20
0.00
7888.80
1888.95
3242.69
68096.52
6809.65
74906.17
4993.74
4994.00
1 Cum
mm Diameter AC pipe
horizontal and vertical
m the weep holes laying
he A.C pipes and labour
1V : 20H towards stream
ata
257.00
9.12
0.00
9.40
8.50
4.56
4.70
0.00
85.00
0.00
121.28
178.00
138.00
1350.00
390.00
2056.00
2177.28
108.86
108.86
228.61
2623.61
2623.61
2624.00 filter
less than 300 mm size
ls to site and including
hed item of work as per
-Charge for Pitching of
18.24
164.50
318.75
0.00
501.49
508.35
65.67
574.02
53.78
1129.29
112.93
1242.21
1242.00
slopes including cost,
ng labour charges etc.,
evision) and as directed
22.80
117.50
425.00
0.00
565.30
214.03
214.03
38.97
818.30
81.83
900.13
900.13
900.00
1 Cum
yance and (excluding
of IRC : 78 and as per
nical specifications for
127.68
2975.00
0.00
3102.68
2140.32
2140.32
134.40
34.94
169.34
270.62
5682.96
568.30
6251.25
625.13
625.00 512
1 Cum
grade bitumen meeting
d laid to required level
with bitumen precoated
5cum per 10 sqm and at
d into surface when the
over mastic surface, all
187.00
4000.00
470.00
0.00
4657.00
21.42
31.27
390.00
1254.00
415.00
2111.69
5921.4
421.9
941.8
799.6
31.4
14.8
8130.8
14899.5
744.98
15644.50
1564.45
17209.0
491.68
492.00
1 Sqm
nd 50 % of 40 mm HBG
&H specifications to a
er size towards the wall
return wall to the full
all metal (excluding
boulder
l officers as per drawing
f MoRT&H (5th Revision)
145.92
2975.00
456.00
0.00
3576.92
2654.10
5901.60
8555.70
41.93
41.93
608.73
12783.28
1278.33
14061.61
1406.16
1406.00 1199
1 Cum
our with stone boulders
ecification 300 mm thick
eigniorage) charges and
e stones for apron etc.,
evision ) and as directed
18.24
164.50
318.75
0.00
501.49
508.35
100.87
609.22
55.54
1166.25
116.62
1282.87
1282.87
1283.00
1 Cum
ry by mechanical means
ea, removal of top soil,
il on the embankment,
to 10 Tonnes Vibratory
all hire and operational
ation 305 (5th revision).
18.24
425.00
0.00
443.24 800
1300.00
4800.00 Tipper (for 10Kms=160x10=1600)
480.00
1330.60
3601.92
2795.52
2878.90
17186.94
881.51
18511.69
1851.17
20362.86
203.63
204.00 204
1 Cum
iorage) charges and
approved means, on
density at OMC etc.,
(5th revision) and as
finished item of work ).
182.40
912.00
3400.00
4494.40
0.00
4494.40
16929.00
2096.64
19025.64
68490.24
68490.24
92010.28
4600.51
9661.08
0.00
106271.87
354.24
354.00
ve Engineer (R&B)
n: Huzurnagar
Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet
District.
1 Metal Quarry at K.M 2/4+ 1.1 K.M away on Shantinagar- Nadigudam Road
C.T
Q= Lead of S-N- Road K.M 0.00 2.4
kodad-shanthinagar road K.M 0.00 7.2
Kodad-NH 65 K.M 0.00 1.4
1.1
2.40
7.20
1.40
12.1
22
22 K.Ms
1.2
15.00
71.60
1.40
89.2
11.3
99 K.Ms
444 K.M
1.40
445.4 K.M
455.3
or say 455
K.Ms
Executive Engineer
R&B, Suryapet
Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from
NW:
Suryapet District.
Construction of Box culverts
S.No. Description Nos Nos Unit
Dismantling of Structures (superstructure, substructure, foundation and other miscellaneou
and pavements including disposing of resulting materials and/or salvaging useful materials u
distance of 1 km from project road complete as per Drawings and Technical Specification Cl
1 MoRT&H 202 and as directed by the Engineer.(By Mechanical means in Cement Concrete gra
M-20)
Earthwork excavation in soils upto SDR by mechanical means for foundations of struc
drawing and technical specification including setting out, construction of shoring and brac
of stumps and other deleterious matter, dressing sides of bottom, back filling the excava
2 the extent required etc., complete excluding seignioarge charges for finished item of
MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conform
3 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site a
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing
other incidental and all other operational charges of T&P required etc., complete as
Specification 1500,1700, 2100 (5th Revision) for levelling course. (Curtain wall, Wing wa
Slab)
a For Box culvert ( 3 v of 3m x 3m)
PCC below box 1 1 Cum
below Curtain wall I U/s 1 1 Cum
below Curtain wall II 1 1 Cum
curtailn wall U/s 1 1 cum
curtailn wall D/s 1 1 cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall D/s 1 1 Cum
a For Box culvert ( 2 v of 3m x 3m)
PCC below box 1 1 Cum
below Curtain wall I U/s 1 1 Cum
below Curtain wall II D/s 1 1 Cum
curtailn wall U/s 1 1 cum
curtailn wall D/s 1 1 cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall U/s 1 1 Cum
curtailn wall D/s 1 1 Cum
curtailn wall D/s 1 1 Cum
b Levelling course Approch slab 1 2 Cum
b Levelling course Approch slab 1 2 Cum
Providing Plain Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggreg
aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of
to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., includ
4 incidental and operational charges of all T&P etc., complete for finished item of work as
specification 1500,1700, 2200 (5th Revision) and as directed by the Engineer-in-Charge fo
walls.
Plain Vibrated Cement Concrete M20 Mix in substructure for abutments using 20 mm HBG
6 graded M/c metal complete as per drawings and technical specifications & as per MoRT
1500, 1700, 2200 for ABUTMENTS , piers , weir & wing walls.
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed sto
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000
cost, seigniorage conveyance of all materials to site and labour charges, centering, mac
laying, vibrating, curing etc., including other incidental hire and operational charges of al
7 approved drawings and as directed during execution but excluding cost of steel and it
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revis
directed by the Engineer-in-Charge for Box Culvert (OR Sub-structure).
Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken gr
crushed metal (SS-5) including cost, seigniorage conveyance of all materials to site and lab
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire an
charges of all T&P and all water leads etc., complete as per approved drawings and as dire
8 execution but excluding cost of steel and its fabrication charges for finished item as
specification 809,1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-
Crash barrier, excluding Reinforcement.
Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed sto
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000
cost, _ conveyance of all materials to site and labour charges, centering, machine m
vibrating, curing etc., including all other incidental and operational charges of all T&P et
11 for finished item of work as per Approved drawing, excluding cost of steel and its fabricatio
per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the
Charge for Approach slab.
Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diamete
extending through the full width of the structure at 1.00m C/C in both horizontal and vertic
13 so that the weep holes in each horizontal direction is staggered from the weep holes laying
below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream s
etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 &
Revision).
weep holes for Box(3v of 3m x 3m) 1 2 Nr.
weep holes for Box(2v of 3m x 3m) 1 2 Nr.
Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.270
14 drawing SD/103.
Drainage spouts(3v of 3m x 3m) 1 4 Nr.
Drainage spouts(2v of 3m x 3m) 1 4 Nr.
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications t
of not less than 600mm with smaller size towards the soil and bigger size towards the wall
over the entire surface behind the abutment, wing wall and return wall to the full height c
a firm condition including cost and conveyance of all metal seignorage charges ,and all lab
15 as directed by the departmental officers as per drawing and Technical specifications a
710.1.1 of IRC:78 and Clause 2200 of MoRT&H (4th Revision) for finished item of work.
Providing and laying filter material with Gravel underneath pitching in slopes including co
and conveyance of materials to site including labour charges etc., complete for finished ite
16 per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-C
Revetment.
Back filling behind Abutments with gravel including cost ,conveyance and _ of all materials
17 complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (
and as per Drawing and technical specifications for finished item of work.
Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grout
cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site a
19 labour charges for packing the stones for revetment etc., complete for finished item of
MoRT&H specification 2504 (5th revision ) and as directed by the Engineer-in-Charge for
revetment.
Providing and laying Boulder's apron on River Bed for protection against scour with st
weighing not less than 40 k.g each complete as per drawing and technical specification 3
with HBG stone of not less than 300 mm size including cost, (excluding seigniorage)
20 conveyance of materials to site and including labour charges for packing the stones for
complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and a
the Engineer-in-Charge for Bed Protection.
L B D Quantity
tion and other miscellaneous structures)
salvaging useful materials up to a
d Technical Specification Clause
ans in Cement Concrete grade M-15 &
12.00 72.000
16.00 64.000
Say 136.00
rocured from primary producer like
including cost and conveyance of steel
ncluding cutting, bending, binding rods,
ost and conveyance of binding wire and
g over lapping welding if required etc.,
ndard drawings, as per the directions of
0 &2200 (5th revision) and as per
2.00 8.00
2.00 8.00
Say 8.00
soling stone and 50 % of 40 mm HBG
of MoRT&H specifications to a thickness
gger size towards the wall and provided
urn wall to the full height compacted to
norage charges ,and all labour charges
Technical specifications as per clause
inished item of work.
57.02
Say 57.00
ching in slopes including cost, _ charges
., complete for finished item of work as
ted by the Engineer-in-Charge under
(B) Machinery
Hydraualic Excavator 1 Cum bucket
6.00 hr 2821.50 hr
capacity @ 60 cum/hr
240.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 cum
2
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for
base coarse below.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 Day Mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
6.75 cum Sand at site 1644.15 cum
3.45 MT Cement at site 4600.00 MT
Total
(C ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
(D) Over head charges @5 %
5.00% Over head charges 5% on (A) + (B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E) + (F)
Rate for 1 cum
Rate to be adopted
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for levelling Course (Box Culvert & Approach Slab)
4 Back filling behind Abutments/Wing walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per
MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for
finished item of work
5 Vibrated Reinforced cement concrete M 20 Grade Concrete using 20mm and 10 mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footing ( curtain walls, Wing wall)
6 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge (for Raft foundation)
8 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification as
directed by the Engineer-in-Charge for BOX Culvert(OR Sub-Structure)
9 Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per Approved drawing but
excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, &
2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.
9 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Wing Wall and Curtain Wall.
10 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.
11 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
12 Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Jindal as approved by
Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for finished item of work as per
standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
13 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through the full width of the structure at 1.00m C/C in both horizontal and vertical
direction so that the weep holes in each horizontal direction is staggered from the weep holes laying
above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour
charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream
side face etc., complete for finished item of work for weep holes as per SSR Data
Unit : Cum
Taking out put = 1 Cum Page 520 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
0.35 day Mason 470.00 day
0.75 day Mazdoor Unskilled 425.00 day
0% Muncipal area allowance 501.49
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 508.35 cum
0.20 Cost of stones spalls 504.35
16.00 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting
the requirements given in table 500-29, prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at
an approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.
Unit = sqm
Taking output =35.00 Sqm (0.87 cum) assuming a
density of 2.3 tonn/cum Page 151 of MoRT&H SDB
(A) Labour
0.44 nos. Mate 425.00 day
10.00 nos. Mazdoor working with HMP, Mechanical 400.00 day
1.00 nos. broom, paver,roller,asphalt
Skilled Mazdoor for checkingcutter and
line and 470.00 day
levels.
Agency area allowance 4657.00
Total
(B) Machinary
0.06 hr Mechanical broom @ 1250 sqm per hour 357.00 hr
0.06 hr Air compressor 250 cfm 521.20 hr
6.00 hr Mastic cooker 1 tonne capacity 65.00 hr
6.00 hr Bitumen boiler 1500 litres capacity 209.00 hr
1.00 hr Tractor for towing and positioning of mastic 415.00 hr
cooker
Total and bitumen boiler
(C) Material
Base mastic (without coarse aggregates) =
60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40
Proportion
per cent . of material required for mastic
asphalt with coarse aggregates (based on
I)
mixBitumen
design 85/25
done byor CRRI
30/40for@ a10.2 per cent
specific case)
0.200 tonne 29607.00 tonne
by weight of mix. 2 x 10.2/100 = 0.204
retained on 0.075mm sieve @ 31.9 per cent
0.39 cum 1081.77 cum
by weight
content notofless
mixthan
= 2 x8031.9/100
per cent= by0.638
0.36 tonne iv) Coarse aggregates 6.3 by
mmweight
to 13.2 2616.00 tonne
weight @ 17.92 per cent ofmm
mix@=
0.55 cum 40 per cent bystone
v) Pre-coated weight of mix
chips = 2 mm
of 13.2 x 40/100 1453.85 cum
0.02 cum = 0.8
nominalMT = 0.8/1.456
sizefor
forcoating= 0.55
skid resistance 1568.02 cum
vi) Bitumen of chips =@35 x
2 per
0.50 kg 0.005/10 = 0.018
cent by weight = 0.018 x 1.456 x 2/100 = 29.607 kg
0.0005 MT = 0.5kg Total
A+B +C= TOTAL
(D) Over head charges
5.00% Over head charges 14899.52
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 35.00 Sqm
Rate per 1 Sqm
Rate to be adopted
16 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for curtain wall.
17 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure on which it is built and installed as per design
given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at locations directed by the Engineer, all as specified
18 Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705
MORTH
Pg no 499 of SDB
Unit = 1 No
taking output=1 no
(A) for Fabrication
0.02 no mate 456.00 1.00
no Mason skilled 470.00 1.00
0.02 no Black smith 470.00 1.00
0.02 no Mazdoor 425.00 1.00
(B) Fixing
0.01 no mate 456.00 1.00
0.01 no Mason skilled 470.00 1.00
no Black smith 470.00 1.00
0.20 no Mazdoor 425.00 1.00
0% Muncipal area allowance 17.90
TOTAL A=
(B) Material
corrosion resistanct structural steel
0.004 MT including 5% wastage (M087, Pg.36 of SSR 44500.00 1.00
GI bolt 10mm Dia (M110, Pg.37 of SSR 2015-
2015-16)
6.00 nos 23.00 1.00
16)
G I Pipe 100 mm dia B Class (Sl.32, Pg.20 of
2.00 RM 675.00 1.00
Galvanised MSSSR
flat2015-16)
clamp(M101, Pg.37 of
2.00 each 195.00
SSR 2015-16)
TOTAL B=
(A + B )
labour (a+b) for electrodes, gas cutting,
5.00 % 2177.28
sealant, anti-corrosive bituminous paint,
5.00% Over head charges 5% on (A) + (B) 2177.28
10.00 % (D) Contractors Profit on (A+B+C) 2286.14
(B) Material
12.00 cum Cost of Gravel 178.36 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 5412.34
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and SDB,
Page 340 fine Chapter-12
aggregate conforming to table 1000-2)
Taking output = 15 cum
(A) Labour
0.86 Day mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.050 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
3.75 % Form work @ 3.75 on (A)+(B)+( C) 76013.12 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 78863.61
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
3 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2
Unit = cum of 271
Page MoRT&H including
of MoRT&H SDB cost, (excluding seigniorage)
Taking output = 15 cum
(A) Labour
0.64 Day Mate 425.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 400.00 day
0% Agency area allowance 6742.00
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
6.75 cum Sand at site 1081.77 cum
3.45 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 624.00 hr
Total
(D) Form work
% Form work @ 10% on (A)+(B)+( C) 57614.62 Cum
(E) Over head charges @ 5%
5.00% Add for Over head charges @ 5% on (A)+(B)+( C) 57614.62
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
1000 mm Dia.,
(A) Labour
0.18 nos Mate 425.00 day
0.50 nos Mason 470.00 day
4.00 nos Mazdoor 400.00 day
0% Agency area allowance 1911.50
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 17968.15 RM
Total
(C) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 226513.34
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
Providing, laying Reinforced cement concrete Hume pipes of 300 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
300 mm Dia.,
(A) Labour
0.18 nos Mate 425.00 day
0.50 nos Mason 470.00 day
4.00 nos Mazdoor 400.00 day
0% Agency area allowance 1911.50
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 1322.08 RM
Total
(C) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 18437.47
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges etc.,
complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed
by the Engineer-in-Charge
(B) Material
1.20 cum Cost of Gravel 178.36 cum
Total
(C) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 779.33
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size
including cost, (excluding
Unit = seigniorage)
cum charges and of
Page 522 conveyance of materials to site and including
MoRT&H SDB
Taking output = 1 cum
(A) Labour
0.04 Day Mate 425.00 day
0.35 Day Mason 470.00 day
0.75 Day Mazdoor 400.00 day
0% Agency area allowance 481.50
Total
(B) Material
1.00 cum Cost of Rough stone HBG 300mm thick 835.77 cum
0.20 cum Cost of stone spalls 646.77 cum
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1446.62
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate to be adopted
#REF!
Unit = Sqm Page 220 of MoRT&H SDB
Taking output = 40 Sqm
(A) Labour
0.12 Day Mate 425.00 day
2.00 Day Painter 540.00 day
1.00 Day Mazdoor 400.00 day
0% Agency area allowance 1531.00
Total
(B) Material
6.00 cum Paint (Page No 20, Sno 71) 240.00 cum
Total
(C) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B) 2971.00
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 40 Sqm (E)+(F)
Rate for 1 Sqm
Rate to be adopted
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 335 of1000-1
MoRT&HandSDB
fine aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
4.13 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 4%
4.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges
5.00% Over head charges 5% on (A) + (B) 66704.68
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 1000-1
335,500 and fine SDB
of MoRT&H aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
4.13 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 10%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 70553.03
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table
Unit = cum Page 1000-1 andoffine
472, 457 aggregate
MoRT&H SDB conforming to table 1000-
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
0.00 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 20%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 78755.18
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table
Unit = cum Page 1000-1 andoffine
472, 457 aggregate
MoRT&H SDB conforming to table 1000-
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
0.00 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 20%
20.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 5%
5.0% Over head charges 5% on (A) + (B) 85914.74
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per SBD specification 1500,
1600, 1700 & 2702 as directed by the Engineer-in-Charge for Wearing Coat over Deck Slab
Unit = 1 Cum
Taking output = 1 cum
(B) Material
1.00 cum Cement Concrete M 30 Grade 5006.00 cum
0.08 cum HYSD Bar reinformcement 47000.00 cum
(B) Labour
0.15 day Labour for cleaning deck slab concrete 425.00 cum
Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and Construction
10 joints of approved quality including cost, conveyance and placing in position, etc., complete as
directed by the Engineer-in-charge.
Unit = Sqm
Rate as per Building SSR Item No.197 Unit = Sqm
17 Forming embankment with borrowed useful earth from outside road boundary by mechanical means
upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision).
(Payment Based on Levels) for diversion road
Unit : Cum
Taking out put = 100 Cum Page 70 of MoRT&H SDB
(A) Labour
0.04 day Mate 456.00 day
1.00 day Mazdoor unskilled 425.00 day
0% Agency area allowance
(B) Machinery
100.00 cum Rate as per G.O. Ms No 10, Dt 26/7/2005 13.00 cum
800.00 t.km Tipper (for 10Kms=160x5=800) 6.00 t.km
Add 10% of cost of carriage to cover cost of
loading
Dozer 80and
HP unloading
for spreading @ 200 cum per
0.50 hr 2661.20 cum
hour
Motor Grador for Grading @ 100 cum per
1.00 hr 3601.92 hr
hour
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr
21 Providing Grouted Revetment with rough stone (HBG/HBT) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including
Unit = cum cost, seigniorage charges
Page 331, and conveyance of materials to site and
522 SDB
Taking output = 15 cum
(A) Labour
0.64 Day mate 456.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 425.00 day
0% Muncipal area allowance 7136.84
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 983.60 cum
cum Cost of 10mm SS-5 HBG M/C metal 1173.60 cum
6.75 cum Sand at site 1644.15 cum
2.430 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity -698.88 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 49182.49 Cum
(E) Over head charges @ 5%
Over head charges 5% on (A) + (B)+(C)+(D) 49182.49
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
(A) Labour
0.04 Day mate 456.00 day
0.35 Day Mason 470.00 day
0.75 Day Mazdoor 425.00 day
0% Muncipal area allowance 501.49
Total
(B) Material
0.20 cum Cost of CC (1:4:8) 3606.72 cum
1.00 cum Cost ofRough Stone HBG/HBT 300mm thick 508.35 cum
Total
(C) Machinery
hr Concrete mixer 0.4/0.28 cum 472.60 hr
hr Generator 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 1731.18 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 1731.18
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
11 Providing Grouted Revetment with rough stone (HBG/HBT) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engineer-in-Charge for
quadrennial revetment.
(A) Labour
0.04 Day mate 405.00 day
0.35 Day Mason 405.00 day
0.75 Day Mazdoor 350.00 day
0% Agency area allowance 420.45
Total
(B) Material
0.20 cum Cost of CC (1:4:8) 1778.80 cum
1.00 cum Cost of Rough Stone HBG/HBT 300mm thick 0.00 cum
Total
(C) Machinery
hr Concrete mixer 0.4/0.28 cum 472.60 hr
hr Generator 35 KVA 842.20 hr
hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Form work
% Form work @ 10 on (A)+(B)+( C) 776.21 Cum
(E) Over head charges @ 5%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 776.21
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
16 Providing and applying 2 coats of water based cement paint to unplastered concrete surface after
cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm
Unit : Sqm
Taking out put = 10 Sqm RBR-SPST-26 of SDB
(A) Labour
0.01 day Mate 540.00 day
0.25 day painter 425.00 day
0.25 day Mazdoor Unskilled 400.00 day
0% Agency area allowance 206.25
(B) Material
Water based paint of approved quality for
5.00 ltr 193.00 cum
cement concrete surface
15 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour
charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for foundation
16 Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate
Unit = cum conforming to table
Page 1000-1
335,455 and fine SDB
of MoRT&H aggregate conforming to table
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9070.50
Total
(B) Material
5.40 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
5.40 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
2.70 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.16 MT Cement at site 4750.00 MT
Total
(c ) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work charges @ 10%
10.00 % Add for Over head charges @ 4% on (A)+(B)+(C)
(E) Over head charges @ 3%
5.0% Over head charges 5% on (A) + (B) 76944.58
(F) Total of (A) + (B)+( C)+(D)
(G) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
7.09 Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe
extending through thePage
full461,333
width ofofthe structure
MoRT&H SDB at 1.00m C/C in both horizontal and vertical
Unit = RM
Taking output = 30 RM
Cement Mortar (1:3) (Out put = 1Cum)
(a) Material
0.51 MT Cost of Cement 4750.00 1.00
1.05 cum Cost of Sand motor 2061.01 1.00
TOTAL a=
(b) Labour
0.04 no Mate 425.00 1.00
0.90 no Mazdoor 400.00 1.00
0% Agency area allowance 377.00
TOTAL b=
Cost per 1 Cum (a+b)
(A) Material
31.50 RM RM 34.00 1.00
10.00 no collars for AC pipe 15.00 1.00
30.00 no MS clamps 5.00 1.00
0.05 cum Cement mortar (1:3) 4963.56 1.00
TOTAL A=
(B) Labour
0.03 no Mate 425.00 1.00
0.50 no Mason 357.00 1.00
0.25 no Mazdoor 400.00 1.00
7.15 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to
bridge structures andUnit
medians,
= RM constructed with M-40 grade concrete with HYSD reinforcement
Taking output = 10 RM
M40 Grade concrete Page 237 & 482 ( M40 Grade) SDB, Chapter-12
Unit = cum
Taking output = 120 cum
(A) Labour
0.94 no Mate 425.00 1.00
3.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 10044.50
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
51.600 MT Cement at site 4750.00 MT
25.800 Kg Admixture@0.4%of cement 95.00 KG
Super Plasticizer item 643 building SOR 2016-17
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
10.00 % Form work @ 10 on (A)+(B)+( C) 556824.00 Cum
(E) Over head charges @
5.00% Add for Over head charges @ 5% on (A)+(B)+( C)+(D) 612506.40
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
7.17 Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe
culverts including cost
Unitand conveyance ofPage
= metre Pipes etc., complete
272,273 of MoRT&Hand
SDBLabour charges for laying,
Taking output = 12.5 metre
1000 mm Dia.,
(A) Labour
0.36 nos Mate 425.00 day
1.00 nos Mason 470.00 day
8.00 nos Mazdoor 400.00 day
0% Agency area allowance 3823.00
Total
(B) Material
25.00 RM Cost of 1000mm Dia., pipes 17968.15 RM
Total
(C) Over head charges @
5.0% Over head charges 5% on (A) + (B) 453026.67
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
6 RBR- Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 357.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8271.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.380 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
3.75 % Form work @ 3.75% on (A)+(B)+( C) 537661.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 557823.81
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
13 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion joints and Construction
joints of approved quality including cost, conveyance and placing in position, etc., complete as
Unit = Sqm
Rate as per Building SSR Item No.197
12 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming
Unit =tocum
table 1000-2 ofPage
MoRT&H including
331 of MoRT&Hcost
SDBand conveyance of all materials
Taking output = 15 cum
(A) Labour
0.64 Day Mate 425.00 day
1.00 Day Mason 470.00 day
15.00 Day Mazdoor 400.00 day
0% Agency area allowance 6742.00
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
6.75 cum Sand at site 1081.77 cum
2.43 MT Cement at site 4750.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 624.00 hr
Total
(D) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B) 52769.62
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
5 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fineofaggregate
Page 472,457 conforming to table 1000-2)
MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 Day Mate 425.00 day
1.50 Day Mason 470.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 8705.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
5.12 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 71595.62 Cum
(E) Over head charges @ 3%
5.00% Add for Over head charges @ 3% on (A)+(B)+( C) 78755.18
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6.07 Vibrated reinforced cement concrete M.25 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fine
Page SDB, aggregate conforming to table 1000-2)
Chapter-12
Taking output = 15 cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 425.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8832.00
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.050 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
Total
(D) Form work
2.00 % Form work @ 10 on (A)+(B)+( C) 75774.62 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 77290.11
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6.02 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges
Unit = cum and conveyance of materials
Page 523 of MoRT&Hto site
SDB including labour charges etc.,
Taking output = 1 cum
(A) Labour
0.05 Day Mate 425.00 day
0.25 Day Mazdoor SKILLED 470.00 day
1.00 Day Mazdoor 400.00 day
0% Agency area allowance 538.75
Total
(B) Material
1.20 cum Cost of Gravel 178.25 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 0.00 hr
0.05 hr Water tanker 6 KL capacity 0.00 hr
Total
(D) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C) 752.65
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
7.02 Earth work in excavation of foundation of structures as per drawing and technical specification,
including
Unit : Cumsetting out, construction of shoring and327
Page bracing, removal
of MoRT&H SDBof stumps and other deleterious
Taking out put = 10 Cum
(A) Labour
0.20 day Mate 425.00 day
5.00 day Mazdoor unskilled 400.00 day
0% Agency area allowance 2085.00
(B) Machinery
Air Compressor 250 cfm with 2 leads of
6.00 hr 521.20 cum
pneumatic breaker
Rate to be adopted
6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 344 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mazdoor Skilled 470.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8610.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.800 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
3.50 % Form work @ 3.5% on (A)+(B)+( C) 539995.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 558895.34
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 458 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.84 Day mate 425.00 day
3.00 Day Mason 470.00 day
18.00 Day Mazdoor 400.00 day
0% Agency area allowance 8610.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.00 cum Sand at site 1081.77 cum
48.800 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
10.00 % Form work @ 13.1% on (A)+(B)+( C) 539995.50 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 593995.05
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 478 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.88 Day mate 425.00 day
3.00 Day Mason 470.00 day
19.00 Day Mazdoor 400.00 day
0% Agency area allowance 9010.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.60 cum Sand at site 1081.77 cum
48.790 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
20.00 % Form work @ 20% on (A)+(B)+( C) 541014.06 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 649216.87
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
16 Providing and fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing
and Technical Specification
Unit :RM
Taking out put = 12 m Page 507 of SDB, Chapter 14
(A) Labour
0.04 day Mate 425.00 day
0.50 day Mazdoor 400.00 day
0.50 day Mazdoor skilled 470.00 day
0% Agency area allowance 435.00
(B) Material
Copper Plate; (Sno 866, Pg No: 302 of SoR
55.00 Kg 605.00 Kg
2016-17)
6 RBR- Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
FNDN-4 (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
Unit = cum Page 478 SDB, Chapter-12
Taking output = 120cum
(A) Labour
0.88 Day mate 425.00 day
3.00 Day Mason 405.00 day
19.00 Day Mazdoor 400.00 day
0% Agency area allowance 8815.00
Total
(B) Material
64.80 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
43.20 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
54.60 cum Sand at site 1081.77 cum
48.790 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Batching Plant @ 20 cum/hour 1080.90 hr
6.00 hr Generator 100 KVA 1126.00 hr
6.00 hr Loader 1 cum capacity 1 cum 1646.00 hr
15.00 hr Transit Mixer 4 cum capacity for lead upto 1 1917.50 hr
Transit Mixer 4 cum capacity lead beyond 1
300.00 L 0.00 hr
Km, L - lead in Kilometer
6.00 hr Concrete Pump 803.00 hr
Total
(D) Form work
20.00 % Form work @ 3.5% on (A)+(B)+( C) 540819.06 Cum
(E) Over head charges
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 648982.87
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 120 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
6.08C Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and operational charges etc.,
and including over lapping welding if required etc., complete for all R.C.C items for finished item of
work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H
specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C
items.
(B) Material
4.09 Cum M 30 Grade Reinf Cement Concrete 6246.00 Kg
Add 5% cost for formwork for casting in
casting yard
0.87 MT HYSD bar Reinf 54635.00 Kg
Add 5% cost for handling and fixing of
precast panels in position
5.00% Over head charges 5% on (A) + (B) 74095.84
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 48 m (D) + (E)
Rate per sqm
Rate per 1 m
6.07 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate
(Coarse aggregate conforming
Unit = cumto table 1000-1 and fine ofaggregate
Page 344,501 conforming to table 1000-2)
SDB, Chapter-12
Taking output = 15 cum
(A) Labour
0.86 Day mate 425.00 day
1.50 Day Mason 425.00 day
20.00 Day Mazdoor 400.00 day
0% Agency area allowance 9003.00
Total
(B) Material
cum Cost of 40mm SS-5 HBG M/C metal 1336.77 cum
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1816.77 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 1536.77 cum
6.75 cum Sand at site 1081.77 cum
6.100 MT Cement at site 4750.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator 35 KVA 842.20 hr
Total
(D) Form work
2.00 % Form work @2 on (A)+(B)+( C) 76183.12 Cum
(E) Over head charges @ 3%
5.00% Over head charges 5% on (A) + (B)+(C)+(D) 77706.78
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as
per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Dowel Bars
Amount
(Rs.)
d other miscellaneous
lvaging useful materials
Technical Specification
Cement Concrete grade
9.12
114.00
106.25
0.00
229.37
394.23
125.50
519.73
749.10
37.46
78.66
865.22
692.17
692.00
ons of structures as per
f shoring and bracing,
ck filling the excavation
or finished item of work
r-in-Charge.
145.92
3400.00
0.00
3545.92
16929.00
0.00
1023.75
21498.67
2149.87
23648.53
98.54
99.00
1 Cum
291.84
470.00
6375.00
0.00
7136.84
13278.60
11098.01
15870.00
40246.61
2835.60
5053.20
1397.76
9286.56
2833.50
59503.51
5950.35
65453.86
4363.59
4364.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
& Approach Slab)
392.16
705.00
8500.00
0.00
9597.16
7967.16
5831.39
1584.36
11098.01
18998.00
45478.92
2835.60
5053.20
0.00
7888.80
0.00
3148.24
66113.12
6611.31
72724.44
4848.30
4848.00
1 Cum
127.68
2975.00
0.00
3102.68
2140.32
2140.32
134.40
34.94
169.34
270.62
5682.96
568.30
6251.25
625.13
625.00
1 Cum
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
197885.00
430670.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
19989.26
25986.04
545706.74
54570.67
600277.41
5002.31
5002.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
222548.00
455333.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
19664.79
27202.96
571262
57126.22
628388
5236.57
5237.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
191636.00
424421.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
49348.24
27141.53
569972.21
56997.22
626969.44
5224.75
5225.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
r SBD specification as
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
222548.00
455333.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
52439.44
28841.69
605675.57
60567.56
666243.13
5552.03
5552.00
1 Cum
383.04
1410.00
7650.00
0.00
9443.04
93302.28
50699.52
88784.10
224480.00
457265.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
10526.53
26842.65
563696
56369.56
620065
5167.21
5167.00
1 Cum
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
392.16
705.00
8500.00
0.00
9597.16
5311.44
7775.19
3168.72
11098.01
23736.00
51089.36
2835.60
5053.20
7888.80
2743.01
3565.92
74884.25
7488.42
82372.67
5491.51
5492.00
1 Cum
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
ms.
182.40
940.00
2550.00
0.00
3672.40
48300.00
366.00
48666.00
52338.40
2616.92
5495.53
60450.85
60450.85
60451.00
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
R.C.C items.
155.04
940.00
2762.50
0.00
3857.54
48300.00
366.00
48666.00
52523.54
2626.18
5514.97
60664.69
60664.69
60665.00
,Jindal as approved by
eters including cost and
ement including cutting,
ete including cost and
etc., and including over
d item of work as per
er MoRT&H specification
f R.C.C items.
200.64
1410.00
3400.00
0.00
5010.64
48300.00
488.00
48788.00
53798.64
2689.93
5648.86
62137.43
62137.43
62137.00
mm Diameter AC pipe
horizontal and vertical
m the weep holes laying
he A.C pipes and labour
1V : 20H towards stream
ata
257.00
nd 50 % of 40 mm HBG
&H specifications to a
er size towards the wall
return wall to the full
all metal (excluding
l officers as per drawing
f MoRT&H (5th Revision)
145.92
2975.00
456.00
0.00
3576.92
2654.10
5901.60
8555.70
41.93
41.93
608.73
12783.28
1278.33
14061.61
1406.16
1406.00
1 Cum
our with stone boulders
ecification 300 mm thick
eigniorage) charges and
e stones for apron etc.,
evision ) and as directed
18.24
164.50
318.75
0.00
501.49
508.35
100.87
609.22
55.54
1166.25
116.62
1282.87
1282.87
1283.00
1 Cum
grade bitumen meeting
d laid to required level
with bitumen precoated
5cum per 10 sqm and at
d into surface when the
over mastic surface, all
187.00
4000.00
470.00
0.00
4657.00
21.42
31.27
390.00
1254.00
415.00
2111.69
5921.4
421.9
941.8
799.6
31.4
14.8
8130.8
14899.5
744.98
15644.50
1564.45
17209.0
491.68
492.00
1 Sqm
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
392.16
705.00
8500.00
0.00
9597.16
7967.16
5831.39
1584.36
11098.01
18998.00
45478.92
2835.60
5053.20
0.00
7888.80
1888.95
3242.69
68096.52
6809.65
74906.17
4993.74
4994.00
1 Cum
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
, all as specified
428.64
1645.00
8500.00
0.00
10573.64
93302.28
50699.52
88784.10
237360.00
470145.90
6831.00
7566.72
11061.12
28762.50
0.00
5396.16
59617.50
54033.70
0.00
594370.74
0.00
594370.74
4953.09
4953.00
1 Cum
14859.00
18.24
425.00
0.00
443.24
12880.00
233.28
13113.28
28415.52
1420.78
2983.63
32819.93
3281.99
3282.00
9.12
0.00
9.40
8.50
4.56
4.70
0.00
85.00
0.00
121.28
178.00
138.00
1350.00
390.00
2056.00
2177.28
108.86
108.86
228.61
2623.61
2623.61
2624.00
xcluding seigniorage) of
8 and as per MoRT&H
nical specifications for
127.68
2975.00
0.00
3102.68
2140.32
2140.32
134.40
34.94
169.34
270.62
5682.96
568.30
6251.25
625.13
625.00
1 Cum
ve Engineer (R&B)
n: Huzurnagar
14715.83
8298.55
7301.94
28737.50
59053.82
2835.60
5053.20
7888.80
2850.49
3943.18
82806.79
8280.68
91087.47
6072.50
6073.00
1 Cum
ed stone aggregate and
excluding seigniorage)
272.00
470.00
6000.00
0.00
6742.00
18046.38
7301.94
16387.50
41735.82
2835.60
5053.20
1248.00
9136.80
2880.73
60495.35
6049.54
66544.89
4436.33
4436.00
1 Cum
76.50
235.00
1600.00
0.00
1911.50
224601.84
224601.84
11325.67
237839.01
23783.90
261622.91
20929.83
20930.00
1 RM
76.50
235.00
1600.00
0.00
1911.50
16525.97
16525.97
921.87
19359.34
1935.93
21295.28
1703.62
1704.00
1 RM
22.80
117.50
425.00
0.00
565.30
214.03
214.03
38.97
818.30
81.83
900.13
900.13
900.00
1 Cum
17.00
164.50
300.00
0.00
481.50
835.77
129.35
965.12
72.33
1518.95
151.90
1670.85
1671.00
51.00
1080.00
400.00
0.00
1531.00
1440.00
1440.00
148.55
3119.55
311.96
3431.51
85.79
86.00
1 Sqm
365.50
705.00
8000.00
0.00
9070.50
10827.83
7357.91
2074.64
7301.94
19617.50
47179.82
2835.60
5053.20
7888.80
2565.56
3335.23
70039.91
7003.99
77043.91
5136.26
5136.00
1 Cum
10mm size HBG crushed
ate conforming to table
365.50
705.00
8000.00
0.00
9070.50
10827.83
7357.91
2074.64
7301.94
19617.50
47179.82
2835.60
5053.20
7888.80
6413.91
3527.65
74080.68
7408.07
81488.75
5432.58
5433.00
1 Cum
ize HBG crushed stone
onforming to table 1000-
365.50
705.00
8000.00
0.00
9070.50
0.00
14715.83
8298.55
7301.94
24320.00
54636.32
2835.60
5053.20
7888.80
7159.56
3937.76
82692.94
8269.29
90962.23
6064.15
6064.00
1 Cum
ize HBG crushed stone
onforming to table 1000-
365.50
705.00
8000.00
0.00
9070.50
0.00
14715.83
8298.55
7301.94
24320.00
54636.32
2835.60
5053.20
7888.80
14319.12
4295.74
90210.48
9021.05
99231.52
6615.43
6615.00
1 Cum
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
er incidental hire and
during execution but
SBD specification 1500,
r Deck Slab
410.40
705.00
8925.00
0.00
10040.40
11662.79
6337.44
11098.01
28060.00
57158.24
2835.60
5053.20
7888.80
0.00
0.00
75087.44
75087
5005.83
5006.00
1 Cum
5006.00
5006.00
63.75
253.49
532.32
5856.00
1 Cum
991.00
ry by mechanical means
ea, removal of top soil,
il on the embankment,
to 10 Tonnes Vibratory
all hire and operational
ation 305 (5th revision).
18.24
425.00
0.00
443.24
1300.00
4800.00
480.00
1330.60
3601.92
2795.52
2878.90
17186.94
881.51
18511.69
1851.17
20362.86
203.63
204.00
1 Cum
he road, approaches to
th HYSD reinforcement
n joints filled with pre-
installed as per design
ed 24 June 1994 as per
eer, all as specified 809
17.00
0.00
400.00
0.00
417.00
16986.20
317.12
17303.32
0.00
0.00
0.00
354.41
903.74
18978.47
1897.85
18192.00
39068.31
3906.83
3907.00
1 Lm
00 mm size grouted with
of materials to site and
291.84
470.00
6375.00
0.00
7136.84
13278.60
0.00
11098.01
11178.00
35554.61
2835.60
5053.20
-1397.76
6491.04
0.00
0.00
49182.49
4918.25
54100.74
3606.72
3607.00
1 Cum
18.24
164.50
318.75
0.00
501.49
721.34
508.35
1229.69
0.00
0.00
0.00
0.00
0.00
86.56
1817.74
181.77
1999.51
1999.51
2000.00
1 Cum
00 mm size grouted with
of materials to site and
ete for finished item of
Engineer-in-Charge for
259.20
405.00
5250.00
0.00
5914.20
0.00
0.00
12879.00
12879.00
2835.60
5053.20
0.00
7888.80
0.00
0.00
26682.00
0.00
26682.00
1778.80
1779.00
1 Cum
16.20
141.75
262.50
0.00
420.45
355.76
0.00
355.76
0.00
0.00
0.00
0.00
0.00
38.81
815.02
81.50
896.52
896.52
897.00
1 Cum
5.40
106.25
100.00
0.00
211.65
965.00
965.00
58.83
1235.48
123.55
1359.03
135.90
136.00
1 sqm
10mm size HBG crushed
ate conforming to table
als to site and all labour
ng and curing including
omplete as per MoRT&H
365.50
705.00
8000.00
0.00
9070.50
7218.55
9810.55
4149.28
7301.94
24510.00
52990.32
2835.60
5053.20
7888.80
2797.98
3637.38
76384.98
7638.50
84023.48
5601.57
5602.00
1 Cum
10mm size HBG crushed
ate conforming to table
365.50
705.00
8000.00
0.00
9070.50
7218.55
9810.55
4149.28
7301.94
24510.00
52990.32
2835.60
5053.20
7888.80
6994.96
3847.23
80791.81
8079.18
88870.99
5924.73
5925.00
1 Cum
mm Diameter AC pipe
horizontal and vertical
2422.50
2164.06
4586.56
4586.56
17.00
360.00
0.00
377.00
4963.56
1071.00
150.00
150.00
248.18
1619.18
1619.18
12.75
178.50
100.00
0.00
291.25
1910.43
95.52
200.60
0.00
2206.55
73.55
74.00
he road, approaches to
th HYSD reinforcement
399.50
1645.00
8000.00
0.00
10044.50
117726.64
66388.43
58415.53
245100.00
2451.00
490081.60
6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90
55682.40
612506
612506
5104.22
5104.00
1 Cum
15312.00
17.00
400.00
0.00
417.00
13160.00
231.97
13391.97
29120.97
1456.05
3057.70
33634.72
3363.47
3363.00
153.00
470.00
3200.00
0.00
3823.00
449203.67
449203.67
22651.33
475678.00
47567.80
523245.80
41859.66
41860.00
1 RM
crushed stone aggregate
rming to table 1000-2)
te and labour charges,
357.00
1071.00
7200.00
0.00
8628.00
117726.64
66388.43
58415.53
229805.00
472335.60
6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90
20162.31
27891.19
585715.00
58571.50
644286.50
5369.05
5369.00
1 Cum
272.00
470.00
6000.00
0.00
6742.00
18046.38
7301.94
11542.50
36890.82
2835.60
5053.20
1248.00
9136.80
2638.48
55408.10
5540.81
60948.91
4063.26
4063.00
1 Cum
365.50
705.00
8000.00
0.00
9070.50
14715.83
8298.55
7301.94
24320.00
54636.32
2835.60
5053.20
7888.80
7159.56
3937.76
82692.94
8269.29
90962.23
6064.15
6064.00
1 Cum
357.00
1275.00
7200.00
0.00
8832.00
14715.83
8298.55
7301.94
28737.50
59053.82
2835.60
5053.20
7888.80
1515.49
3864.51
81154.62
8115.46
89270.08
5951.34
5951.00
1 Cum
21.25
117.50
400.00
0.00
538.75
213.90
213.90
0.00
0.00
0.00
37.63
790.28
79.03
869.31
869.31
869.00
1 Cum
technical specification,
s and other deleterious
85.00
2000.00
0.00
2085.00
3127.20
260.61
5472.81
547.28
6020.09
602.01
602.01
602.00
1 Cum
357.00
1410.00
7200.00
0.00
8967.00
117726.64
66388.43
58415.53
231800.00
474330.60
6485.40
6756.00
9876.00
28762.50
4818.00
56697.90
18899.84
27944.77
586840
58684.01
645524
5379.37
5379.00
1 Cum
357.00
1410.00
7200.00
0.00
8967.00
117726.64
66388.43
58415.53
231800.00
474330.60
6485.40
6756.00
9876.00
28762.50
4818.00
56697.90
53999.55
29699.75
623695
62369.48
686064
5717.20
5717.00
1 Cum
374.00
1410.00
7600.00
0.00
9384.00
117726.64
66388.43
59064.59
231752.50
474932.16
6485.40
6756.00
9876.00
28762.50
4818.00
56697.90
108202.81
32460.84
681678
68167.77
749845
6248.71
6249.00
1 Cum
33275.00
33275.00
1686.35
35413.35
3541.34
38954.69
3246.22
3246.00
374.00
1215.00
7600.00
0.00
9189.00
117726.64
66388.43
59064.59
231752.50
474932.16
6485.40
6756.00
9876.00
28762.50
0.00
4818.00
56697.90
108163.81
32449.14
681432
68143.20
749575
6246.46
6246.00
1 Cum
p bars of all diameters
cation of reinforcement
osition etc., complete
perational charges etc.,
ems for finished item of
rge and as per MoRT&H
uper structure of R.C.C
187.00
1410.00
3200.00
0.00
4797.00
49350.00
488.00
49838.00
54635.00
0.00
0.00
54635.00
54635.00
54635.00
ing 12 mm, true to line
centre spacing between
0.00
0.00
0.00
0.00
0.00
25558.63
1277.93
47259.28
2362.96
74095.84
3704.79
77800.63
7780.06
85580.70
1782.93
1783.00
365.50
637.50
8000.00
0.00
9003.00
0.00
14715.83
8298.55
7301.94
28975.00
59291.32
2835.60
5053.20
7888.80
1523.66
3885.34
81592.12
8159.21
89751.33
5983.42
5983.00
1 Cum
t and put up bars of all
arges for fabrication of
them in position etc.,
charges and operational
for all R.C.C items for
ngineer-in-Charge and as
985 for Dowel Bars
119.00
705.00
2200.00
0.00
3024.00
49350.00
366.00
49716.00
52740.00
2637.00
5537.70
60914.70
60914.70
60915.00
Name of Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Working reach from Km 1/4 to 21/2) in Suryapet Distr
Work ::
RMR.
Date :: 20.12.2017 SSR :: 2018-19
Average Lead
Crushing
Conveyance
Initial Rate
Machine
(-) Stacking
Conveyance
Initial Rate
of Material
Seigniorage
Charges
Loading &
of Material
unloading
Charging
Weighted
Charges
Stacking
Stacking
Charges
Charges
Charges
Blasting
charges
rate (-)
0
rate
S.No Nature of Metal
25% On (6+9)
(4-5) (7-5) on (9) %
1 2 3 4 5 6 7 8 9 10 11 12 13
5 Cement 4600.00
6 HYSD Steel 46000.00
7 MS Steel 44500.00
8 6 mm Mild Steel 46000.00
2 Sand for Mortar 99.00 1074.15 0.00 64.08 760.00 1074.15 760.00 -- -- 0.00 0.0
3 Sand for Concrete 99.00 1074.15 0.00 64.08 570.00 1074.15 570.00 -- -- 0.00 0.0
4 Sand for Filling 99.00 1074.15 0.00 64.08 570.00 1074.15 570.00 -- -- 0.00 0.0
0 R&B Section, ___ ___ ___ R&B Sub-Division___ (R&B) Division, ___ ___ ___
to 21/2) in Suryapet District.
TOTAL RATE
0
On (6+9) SUM of
Value ( 8 to12&14 )
14 15
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 902.35
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 770.35
0.00 872.35
0.00 792.35
0.00 752.35
0.00 508.35
0.00 328.35
0.00 442.35
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 #REF!
0.00 601.35
0.00 591.35
0.00 504.35
0.00 508.35
0.00 1503.35
35.79
0.00 178.36
4600.00
46000.00
44500.00
46000.00
0.00 1834.15
0.00 1644.15
0.00 1644.15
Name of Work:- Periodical Renewals to Kodad-Revoor road from Km 1/4 to 28/140 (Workin
reach from Km 1/4 to 21/2) in Suryapet District.
Vizag
Conveyance Rates
1.50
1.50
on 16-08-2018
Emulsion Emulsion
(S.S) (R.S)
49050.00 29280.00
6867.00 4099.20
55917.00 33379.20
1118.34 667.58
-- --
-- --
-- --
57035.34 34046.78
1365.00 1365.00
58400.34 35411.78
58400.34 35411.78
Emulsion
CRMB (M.S)
Gr 55
58400.34 35411.78
e Engineer (R&B)
ivision, Suryapet
OTHER MATERIALS SS5 HBG METAL
LABOUR
2018-19 2018-19
MATERIAL RATE
SGMETAL 0.00
SGSTONE 0.00
SGSAND 0.00
ADDITIONS
SGEARTH 0.00
OH 5.00 SGGRAVEL 0.00 GRAVEL_D
OH1 5.00
CP 10.00
VAT 0.00
LALI 13.00
IS:458-2003
Dia of Cement
Shell Quantity of
Pipes Outer Dia Content Cement Content
S.No Thick ness Concrete
NP3 class (mm) rate ( kg)
(mm) ( cum )
( mm ) ( kg/ cum)
1 2 3 4 5 6 7
Hot Applide Thermoplastic Compound( Item no. 353)( per Liter) 251.00
Reflectorising glass beads (Per kg) 80.30
Concrete mixer 0.4/0.28 cum 472.60
Tractor 345.00
Tractor with ripper attachment @ 60 cum per hour 568.23
Generator set 30 KVA 842.20
Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 27071.52
SS5 HBG METAL IRC HBG METAL
2018-19 2018-19
BUILDINGS SSR-2018-19
RATE SIZES RATE
SEIGNIORAGES-DATA WORKS
2014-15
2018-19 BASIC
CURRENT
MATERIAL PRICE
PRICE
DETAILS FOR PIPES
First 5 km Next 1 km
RATE
Lead Lead CEMENT 5500.00 4900.00
2400.00 2760.00
2260.00 2600.00
1950.00 2250.00
1150.00 1320.00
500.00 575.00
1350.00 1550.00
1150.00 1320.00
300.00 345.00
300.00 345.00
320.00 370.00
1150.00 1320.00
250.00 290.00
820.00 940.00
600.00 690.00
13500.00 15525.00
950.00 1090.00
470.00 540.00
1350.00 1320.00
900.00 1035.00
800.00 920.00
1350.00 1550.00
950.00 1090.00
800.00 920.00 To be Checked
7.22 Derived from previous data 3.90 4.50
0.05 and present rate 3.90 4.50
32.00 40.00
1800.00 2070.00
1268.00 1268.00
150.00 170.00
Rate as per
local
1268.00 90.00
competitive
quotations
200.00
65.00
300.00 345.00
300.00 345.00
300.00 345.00
540.00 620.00
From To Data
data Entry Entry
HMP 21.00 273.2913788
Crusher 21.00 273.2913788
Metal/ Stone
21.00 273.2913788
Qry
33 MT33 411.92
34 MT34 421.95
35 MT35 431.99
36 MT36 442.02
37 MT37 452.05
38 MT38 462.09
39 MT39 472.12
40 MT40 482.15
41 MT41 492.19
42 MT42 502.22
43 MT43 512.26
44 MT44 522.29
45 MT45 532.32
46 MT46 542.36
47 MT47 552.39
48 MT48 562.43
49 MT49 572.46
50 MT50 582.49
51 MT51 592.53
52 MT52 602.56
53 MT53 612.60
54 MT54 622.63
55 MT55 632.66
56 MT56 642.70
57 MT57 652.73
58 MT58 662.76
59 MT59 672.80
60 MT60 682.83
61 MT61 692.87
62 MT62 702.90
63 MT63 712.93
64 MT64 722.97
65 MT65 733.00
66 MT66 743.04
67 MT67 753.07
68 MT68 763.10
69 MT69 773.14
70 MT70 783.17
71 MT71 793.21
72 MT72 803.24
73 MT73 813.27
74 MT74 823.31
75 MT75 833.34
76 MT76 843.37
77 MT77 853.41
78 MT78 863.44
79 MT79 873.48
80 MT80 883.51
81 MT81 893.54
82 MT82 903.58
83 MT83 913.61
84 MT84 923.65
85 MT85 933.68
86 MT86 943.71
87 MT87 953.75
88 MT88 963.78
89 MT89 973.82
90 MT90 983.85
91 MT91 993.88
92 MT92 1003.92
93 MT93 1013.95
94 MT94 1023.98
95 MT95 1034.02
96 MT96 1044.05
97 MT97 1054.09
98 MT98 1064.12
99 MT99 1074.15
100 MT100 1084.19
101 MT101 1094.22
102 MT102 1104.26
103 MT103 1114.29
104 MT104 1124.32
105 MT105 1134.36
106 MT106 1144.39
107 MT107 1154.43
108 MT108 1164.46
109 MT109 1174.49
110 MT110 1184.53
111 MT111 1194.56
112 MT112 1204.59
113 MT113 1214.63
114 MT114 1224.66
115 MT115 1234.70
116 MT116 1244.73
117 MT117 1254.76
118 MT118 1264.80
119 MT119 1274.83
120 MT120 1284.87
121 MT121 1294.90
122 MT122 1304.93
123 MT123 1314.97
124 MT124 1325.00
125 MT125 1335.03
126 MT126 1345.07
127 MT127 1355.10
128 MT128 1365.14
129 MT129 1375.17
130 MT130 1385.20
131 MT131 1395.24
132 MT132 1405.27
133 MT133 1415.31
134 MT134 1425.34
135 MT135 1435.37
136 MT136 1445.41
137 MT137 1455.44
138 MT138 1465.48
139 MT139 1475.51
140 MT140 1485.54
141 MT141 1495.58
142 MT142 1505.61
143 MT143 1515.64
144 MT144 1525.68
145 MT145 1535.71
146 MT146 1545.75
147 MT147 1555.78
148 MT148 1565.81
149 MT149 1575.85
150 MT150 1585.88
151 MT151 1595.92
152 MT152 1605.95
153 MT153 1615.98
154 MT154 1626.02
155 MT155 1636.05
156 MT156 1646.09
157 MT157 1656.12
158 MT158 1666.15
159 MT159 1676.19
160 MT160 1686.22
161 MT161 1696.25
162 MT162 1706.29
163 MT163 1716.32
164 MT164 1726.36
165 MT165 1736.39
166 MT166 1746.42
167 MT167 1756.46
168 MT168 1766.49
169 MT169 1776.53
170 MT170 1786.56
171 MT171 1796.59
172 MT172 1806.63
173 MT173 1816.66
174 MT174 1826.70
175 MT175 1836.73
176 MT176 1846.76
177 MT177 1856.80
178 MT178 1866.83
179 MT179 1876.86
180 MT180 1886.90
181 MT181 1896.93
182 MT182 1906.97
183 MT183 1917.00
184 MT184 1927.03
185 MT185 1937.07
186 MT186 1947.10
187 MT187 1957.14
188 MT188 1967.17
189 MT189 1977.20
190 MT190 1987.24
191 MT191 1997.27
192 MT192 2007.31
193 MT193 2017.34
194 MT194 2027.37
195 MT195 2037.41
196 MT196 2047.44
197 MT197 2057.47
198 MT198 2067.51
199 MT199 2077.54
200 MT200 2087.58
201 MT201 2097.61
202 MT202 2107.64
203 MT203 2117.68
204 MT204 2127.71
205 MT205 2137.75
206 MT206 2147.78
207 MT207 2157.81
208 MT208 2167.85
209 MT209 2177.88
210 MT210 2187.92
211 MT211 2197.95
212 MT212 2207.98
213 MT213 2218.02
214 MT214 2228.05
215 MT215 2238.08
216 MT216 2248.12
217 MT217 2258.15
218 MT218 2268.19
219 MT219 2278.22
220 MT220 2288.25
221 MT221 2298.29
222 MT222 2308.32
223 MT223 2318.36
224 MT224 2328.39
225 MT225 2338.42
226 MT226 2348.46
227 MT227 2358.49
228 MT228 2368.53
229 MT229 2378.56
230 MT230 2388.59
231 MT231 2398.63
232 MT232 2408.66
233 MT233 2418.69
234 MT234 2428.73
235 MT235 2438.76
236 MT236 2448.80
237 MT237 2458.83
238 MT238 2468.86
239 MT239 2478.90
240 MT240 2488.93
241 MT241 2498.97
242 MT242 2509.00
243 MT243 2519.03
244 MT244 2529.07
245 MT245 2539.10
246 MT246 2549.14
247 MT247 2559.17
248 MT248 2569.20
249 MT249 2579.24
250 MT250 2589.27
251 MT251 2599.30
252 MT252 2609.34
253 MT253 2619.37
254 MT254 2629.41
255 MT255 2639.44
256 MT256 2649.47
257 MT257 2659.51
258 MT258 2669.54
259 MT259 2679.58
260 MT260 2689.61
261 MT261 2699.64
262 MT262 2709.68
263 MT263 2719.71
264 MT264 2729.75
265 MT265 2739.78
266 MT266 2749.81
267 MT267 2759.85
268 MT268 2769.88
269 MT269 2779.91
270 MT270 2789.95
271 MT271 2799.98
272 MT272 2810.02
273 MT273 2820.05
274 MT274 2830.08
275 MT275 2840.12
276 MT276 2850.15
277 MT277 2860.19
278 MT278 2870.22
279 MT279 2880.25
280 MT280 2890.29
281 MT281 2900.32
282 MT282 2910.36
283 MT283 2920.39
284 MT284 2930.42
285 MT285 2940.46
286 MT286 2950.49
287 MT287 2960.52
288 MT288 2970.56
289 MT289 2980.59
290 MT290 2990.63
291 MT291 3000.66
292 MT292 3010.69
293 MT293 3020.73
294 MT294 3030.76
295 MT295 3040.80
296 MT296 3050.83
297 MT297 3060.86
298 MT298 3070.90
299 MT299 3080.93
300 MT300 3090.97
301 MT301 3101.00
302 MT302 3111.03
303 MT303 3121.07
304 MT304 3131.10
305 MT305 3141.13
306 MT306 3151.17
307 MT307 3161.20
308 MT308 3171.24
309 MT309 3181.27
310 MT310 3191.30
311 MT311 3201.34
312 MT312 3211.37
313 MT313 3221.41
314 MT314 3231.44
315 MT315 3241.47
316 MT316 3251.51
317 MT317 3261.54
318 MT318 3271.58
319 MT319 3281.61
320 MT320 3291.64
321 MT321 3301.68
322 MT322 3311.71
323 MT323 3321.74
324 MT324 3331.78
325 MT325 3341.81
326 MT326 3351.85
327 MT327 3361.88
328 MT328 3371.91
329 MT329 3381.95
330 MT330 3391.98
331 MT331 3402.02
332 MT332 3412.05
333 MT333 3422.08
334 MT334 3432.12
335 MT335 3442.15
336 MT336 3452.19
337 MT337 3462.22
338 MT338 3472.25
339 MT339 3482.29
340 MT340 3492.32
341 MT341 3502.35
342 MT342 3512.39
343 MT343 3522.42
344 MT344 3532.46
345 MT345 3542.49
346 MT346 3552.52
347 MT347 3562.56
348 MT348 3572.59
349 MT349 3582.63
350 MT350 3592.66
351 MT351 3602.69
352 MT352 3612.73
353 MT353 3622.76
354 MT354 3632.79
355 MT355 3642.83
356 MT356 3652.86
357 MT357 3662.90
358 MT358 3672.93
359 MT359 3682.96
360 MT360 3693.00
361 MT361 3703.03
362 MT362 3713.07
363 MT363 3723.10
364 MT364 3733.13
365 MT365 3743.17
366 MT366 3753.20
367 MT367 3763.24
368 MT368 3773.27
369 MT369 3783.30
370 MT370 3793.34
371 MT371 3803.37
372 MT372 3813.40
373 MT373 3823.44
374 MT374 3833.47
375 MT375 3843.51
376 MT376 3853.54
377 MT377 3863.57
378 MT378 3873.61
379 MT379 3883.64
380 MT380 3893.68
381 MT381 3903.71
382 MT382 3913.74
383 MT383 3923.78
384 MT384 3933.81
385 MT385 3943.85
386 MT386 3953.88
387 MT387 3963.91
388 MT388 3973.95
389 MT389 3983.98
390 MT390 3994.01
391 MT391 4004.05
392 MT392 4014.08
393 MT393 4024.12
394 MT394 4034.15
395 MT395 4044.18
396 MT396 4054.22
397 MT397 4064.25
398 MT398 4074.29
399 MT399 4084.32
400 MT400 4094.35
401 MT401 4104.39
402 MT402 4114.42
403 MT403 4124.46
404 MT404 4134.49
405 MT405 4144.52
406 MT406 4154.56
407 MT407 4164.59
408 MT408 4174.62
409 MT409 4184.66
410 MT410 4194.69
411 MT411 4204.73
412 MT412 4214.76
413 MT413 4224.79
414 MT414 4234.83
415 MT415 4244.86
416 MT416 4254.90
417 MT417 4264.93
418 MT418 4274.96
419 MT419 4285.00
420 MT420 4295.03
421 MT421 4305.07
422 MT422 4315.10
423 MT423 4325.13
424 MT424 4335.17
425 MT425 4345.20
426 MT426 4355.23
427 MT427 4365.27
428 MT428 4375.30
429 MT429 4385.34
430 MT430 4395.37
431 MT431 4405.40
432 MT432 4415.44
433 MT433 4425.47
434 MT434 4435.51
435 MT435 4445.54
436 MT436 4455.57
437 MT437 4465.61
438 MT438 4475.64
439 MT439 4485.68
440 MT440 4495.71
441 MT441 4505.74
442 MT442 4515.78
443 MT443 4525.81
444 MT444 4535.84
445 MT445 4545.88
446 MT446 4555.91
447 MT447 4565.95
448 MT448 4575.98
449 MT449 4586.01
450 MT450 4596.05
451 MT451 4606.08
452 MT452 4616.12
453 MT453 4626.15
454 MT454 4636.18
455 MT455 4646.22
456 MT456 4656.25
457 MT457 4666.29
458 MT458 4676.32
459 MT459 4686.35
460 MT460 4696.39
461 MT461 4706.42
462 MT462 4716.45
463 MT463 4726.49
464 MT464 4736.52
465 MT465 4746.56
466 MT466 4756.59
467 MT467 4766.62
468 MT468 4776.66
469 MT469 4786.69
470 MT470 4796.73
471 MT471 4806.76
472 MT472 4816.79
473 MT473 4826.83
474 MT474 4836.86
475 MT475 4846.90
476 MT476 4856.93
477 MT477 4866.96
478 MT478 4877.00
479 MT479 4887.03
480 MT480 4897.06
481 MT481 4907.10
482 MT482 4917.13
483 MT483 4927.17
484 MT484 4937.20
485 MT485 4947.23
486 MT486 4957.27
487 MT487 4967.30
488 MT488 4977.34
489 MT489 4987.37
490 MT490 4997.40
491 MT491 5007.44
492 MT492 5017.47
493 MT493 5027.51
494 MT494 5037.54
495 MT495 5047.57
496 MT496 5057.61
497 MT497 5067.64
498 MT498 5077.67
499 MT499 5087.71
500 MT500 5097.74
From To Data
data Entry Entry
E/W 5.00 80.35910751 METAL LEADS & RATE
Gravel 21.00 273.2913788 2008-09
10 SD10 140.65 14
11 SD11 152.71 15
12 SD12 164.77 16
13 SD13 176.83 17
14 SD14 188.88 18
15 SD15 200.94 187.9153281 19
16 SD16 213.00 20
17 SD17 225.06 21
18 SD18 237.12 22
19 SD19 249.17 23
20 SD20 261.23 24
21 SD21 273.29 25
22 SD22 285.35 26
23 SD23 297.41 27
24 SD24 309.47 28
25 SD25 321.52 29
26 SD26 333.58 30
27 SD27 345.64 31
28 SD28 357.70 32
29 SD29 369.76 33
30 SD30 381.82 34
31 SD31 391.85 35
32 SD32 401.88 36
33 SD33 411.92 37
34 SD34 421.95 38
35 SD35 431.99 39
36 SD36 442.02 40
37 SD37 452.05 41
38 SD38 462.09 42
39 SD39 472.12 43
40 SD40 482.15 44
41 SD41 492.19 45
42 SD42 502.22 46
43 SD43 512.26 47
44 SD44 522.29 48
45 SD45 532.32 49
46 SD46 542.36 50
47 SD47 552.39 51
48 SD48 562.43 52
49 SD49 572.46 53
50 SD50 582.49 54
51 SD51 592.53 55
52 SD52 602.56 56
53 SD53 612.60 57
54 SD54 622.63 58
55 SD55 632.66 59
56 SD56 642.70 60
57 SD57 652.73 61
58 SD58 662.76 62
59 SD59 672.80 63
60 SD60 682.83 64
61 SD61 692.87 65
62 SD62 702.90 66
63 SD63 712.93 67
64 SD64 722.97 68
65 SD65 733.00 69
66 SD66 743.04 70
67 SD67 753.07 71
68 SD68 763.10 72
69 SD69 773.14 73
70 SD70 783.17 74
71 SD71 793.21 75
72 SD72 803.24 76
73 SD73 813.27 77
74 SD74 823.31 78
75 SD75 833.34 79
76 SD76 843.37 80
77 SD77 853.41 81
78 SD78 863.44 82
79 SD79 873.48 83
80 SD80 883.51 84
81 SD81 893.54 85
82 SD82 903.58 86
83 SD83 913.61 87
84 SD84 923.65 88
85 SD85 933.68 89
86 SD86 943.71 90
87 SD87 953.75 91
88 SD88 963.78 92
89 SD89 973.82 93
90 SD90 983.85 94
91 SD91 993.88 95
92 SD92 1003.92 96
93 SD93 1013.95 97
94 SD94 1023.98 98
95 SD95 1034.02 99
96 SD96 1044.05 100
97 SD97 1054.09 101
98 SD98 1064.12 102
99 SD99 1074.15 103
100 SD100 1084.19 104
101 SD101 1094.22 105
102 SD102 1104.26 106
103 SD103 1114.29 107
104 SD104 1124.32 108
105 SD105 1134.36 109
106 SD106 1144.39 110
107 SD107 1154.43 111
108 SD108 1164.46 112
109 SD109 1174.49 113
110 SD110 1184.53 114
111 SD111 1194.56 115
112 SD112 1204.59 116
113 SD113 1214.63 117
114 SD114 1224.66 118
115 SD115 1234.70 119
116 SD116 1244.73 120
117 SD117 1254.76 121
118 SD118 1264.80 122
119 SD119 1274.83 123
120 SD120 1284.87 124
121 SD121 1294.90 125
122 SD122 1304.93 126
123 SD123 1314.97 127
124 SD124 1325.00 128
125 SD125 1335.03 129
126 SD126 1345.07 130
127 SD127 1355.10 131
128 SD128 1365.14 132
129 SD129 1375.17 133
130 SD130 1385.20 134
131 SD131 1395.24 135
132 SD132 1405.27 136
133 SD133 1415.31 137
134 SD134 1425.34 138
135 SD135 1435.37 139
136 SD136 1445.41 140
137 SD137 1455.44 141
138 SD138 1465.48 142
139 SD139 1475.51 143
140 SD140 1485.54 144
141 SD141 1495.58 145
142 SD142 1505.61 146
143 SD143 1515.64 147
144 SD144 1525.68 148
145 SD145 1535.71 149
146 SD146 1545.75 150
147 SD147 1555.78 151
148 SD148 1565.81 152
149 SD149 1575.85 153
150 SD150 1585.88 154
151 SD151 1595.92 155
152 SD152 1605.95 156
153 SD153 1615.98 157
154 SD154 1626.02 158
155 SD155 1636.05 159
156 SD156 1646.09 160
157 SD157 1656.12 161
158 SD158 1666.15 162
159 SD159 1676.19 163
160 SD160 1686.22 164
161 SD161 1696.25 165
162 SD162 1706.29 166
163 SD163 1716.32 167
164 SD164 1726.36 168
165 SD165 1736.39 169
166 SD166 1746.42 170
167 SD167 1756.46 171
168 SD168 1766.49 172
169 SD169 1776.53 173
170 SD170 1786.56 174
171 SD171 1796.59 175
172 SD172 1806.63 176
173 SD173 1816.66 177
174 SD174 1826.70 178
175 SD175 1836.73 179
176 SD176 1846.76 180
177 SD177 1856.80 181
178 SD178 1866.83 182
179 SD179 1876.86 183
180 SD180 1886.90 184
181 SD181 1896.93 185
182 SD182 1906.97 186
183 SD183 1917.00 187
184 SD184 1927.03 188
185 SD185 1937.07 189
186 SD186 1947.10 190
187 SD187 1957.14 191
188 SD188 1967.17 192
189 SD189 1977.20 193
190 SD190 1987.24 194
191 SD191 1997.27 195
192 SD192 2007.31 196
193 SD193 2017.34 197
194 SD194 2027.37 198
195 SD195 2037.41 199
196 SD196 2047.44 200
197 SD197 2057.47 201
198 SD198 2067.51 202
199 SD199 2077.54 203
200 SD200 2087.58 204
201 SD201 2097.61 205
202 SD202 2107.64 206
203 SD203 2117.68 207
204 SD204 2127.71 208
205 SD205 2137.75 209
206 SD206 2147.78 210
207 SD207 2157.81 211
208 SD208 2167.85 212
209 SD209 2177.88 213
210 SD210 2187.92 214
211 SD211 2197.95 215
212 SD212 2207.98 216
213 SD213 2218.02 217
214 SD214 2228.05 218
215 SD215 2238.08 219
216 SD216 2248.12 220
217 SD217 2258.15 221
218 SD218 2268.19 222
219 SD219 2278.22 223
220 SD220 2288.25 224
221 SD221 2298.29 225
222 SD222 2308.32 226
223 SD223 2318.36 227
224 SD224 2328.39 228
225 SD225 2338.42 229
226 SD226 2348.46 230
227 SD227 2358.49 231
228 SD228 2368.53 232
229 SD229 2378.56 233
230 SD230 2388.59 234
231 SD231 2398.63 235
232 SD232 2408.66 236
233 SD233 2418.69 237
234 SD234 2428.73 238
235 SD235 2438.76 239
236 SD236 2448.80 240
237 SD237 2458.83 241
238 SD238 2468.86 242
239 SD239 2478.90 243
240 SD240 2488.93 244
241 SD241 2498.97 245
242 SD242 2509.00 246
243 SD243 2519.03 247
244 SD244 2529.07 248
245 SD245 2539.10 249
246 SD246 2549.14 250
247 SD247 2559.17 251
248 SD248 2569.20 252
249 SD249 2579.24 253
250 SD250 2589.27 254
251 SD251 2599.30 255
252 SD252 2609.34 256
253 SD253 2619.37 257
254 SD254 2629.41 258
255 SD255 2639.44 259
256 SD256 2649.47 260
257 SD257 2659.51 261
258 SD258 2669.54 262
259 SD259 2679.58 263
260 SD260 2689.61 264
261 SD261 2699.64 265
262 SD262 2709.68 266
263 SD263 2719.71 267
264 SD264 2729.75 268
265 SD265 2739.78 269
266 SD266 2749.81 270
267 SD267 2759.85 271
268 SD268 2769.88 272
269 SD269 2779.91 273
270 SD270 2789.95 274
271 SD271 2799.98 275
272 SD272 2810.02 276
273 SD273 2820.05 277
274 SD274 2830.08 278
275 SD275 2840.12 279
276 SD276 2850.15 280
277 SD277 2860.19 281
278 SD278 2870.22 282
279 SD279 2880.25 283
280 SD280 2890.29 284
281 SD281 2900.32 285
282 SD282 2910.36 286
283 SD283 2920.39 287
284 SD284 2930.42 288
285 SD285 2940.46 289
286 SD286 2950.49 290
287 SD287 2960.52 291
288 SD288 2970.56 292
289 SD289 2980.59 293
290 SD290 2990.63 294
291 SD291 3000.66 295
292 SD292 3010.69 296
293 SD293 3020.73 297
294 SD294 3030.76 298
295 SD295 3040.80 299
296 SD296 3050.83 300
297 SD297 3060.86
298 SD298 3070.90
299 SD299 3080.93
300 SD300 3090.97
301 SD301 3101.00
302 SD302 3111.03
303 SD303 3121.07
304 SD304 3131.10
305 SD305 3141.13
306 SD306 3151.17
307 SD307 3161.20
308 SD308 3171.24
309 SD309 3181.27
310 SD310 3191.30
311 SD311 3201.34
312 SD312 3211.37
313 SD313 3221.41
314 SD314 3231.44
315 SD315 3241.47
316 SD316 3251.51
317 SD317 3261.54
318 SD318 3271.58
319 SD319 3281.61
320 SD320 3291.64
321 SD321 3301.68
322 SD322 3311.71
323 SD323 3321.74
324 SD324 3331.78
325 SD325 3341.81
326 SD326 3351.85
327 SD327 3361.88
328 SD328 3371.91
329 SD329 3381.95
330 SD330 3391.98
331 SD331 3402.02
332 SD332 3412.05
333 SD333 3422.08
334 SD334 3432.12
335 SD335 3442.15
336 SD336 3452.19
337 SD337 3462.22
338 SD338 3472.25
339 SD339 3482.29
340 SD340 3492.32
341 SD341 3502.35
342 SD342 3512.39
343 SD343 3522.42
344 SD344 3532.46
345 SD345 3542.49
346 SD346 3552.52
347 SD347 3562.56
348 SD348 3572.59
349 SD349 3582.63
350 SD350 3592.66
351 SD351 3602.69
352 SD352 3612.73
353 SD353 3622.76
354 SD354 3632.79
355 SD355 3642.83
356 SD356 3652.86
357 SD357 3662.90
358 SD358 3672.93
359 SD359 3682.96
360 SD360 3693.00
361 SD361 3703.03
362 SD362 3713.07
363 SD363 3723.10
364 SD364 3733.13
365 SD365 3743.17
366 SD366 3753.20
367 SD367 3763.24
368 SD368 3773.27
369 SD369 3783.30
370 SD370 3793.34
371 SD371 3803.37
372 SD372 3813.40
373 SD373 3823.44
374 SD374 3833.47
375 SD375 3843.51
376 SD376 3853.54
377 SD377 3863.57
378 SD378 3873.61
379 SD379 3883.64
380 SD380 3893.68
381 SD381 3903.71
382 SD382 3913.74
383 SD383 3923.78
384 SD384 3933.81
385 SD385 3943.85
386 SD386 3953.88
387 SD387 3963.91
388 SD388 3973.95
389 SD389 3983.98
390 SD390 3994.01
391 SD391 4004.05
392 SD392 4014.08
393 SD393 4024.12
394 SD394 4034.15
395 SD395 4044.18
396 SD396 4054.22
397 SD397 4064.25
398 SD398 4074.29
399 SD399 4084.32
400 SD400 4094.35
401 SD401 4104.39
402 SD402 4114.42
403 SD403 4124.46
404 SD404 4134.49
405 SD405 4144.52
406 SD406 4154.56
407 SD407 4164.59
408 SD408 4174.62
409 SD409 4184.66
410 SD410 4194.69
411 SD411 4204.73
412 SD412 4214.76
413 SD413 4224.79
414 SD414 4234.83
415 SD415 4244.86
416 SD416 4254.90
417 SD417 4264.93
418 SD418 4274.96
419 SD419 4285.00
420 SD420 4295.03
421 SD421 4305.07
422 SD422 4315.10
423 SD423 4325.13
424 SD424 4335.17
425 SD425 4345.20
426 SD426 4355.23
427 SD427 4365.27
428 SD428 4375.30
429 SD429 4385.34
430 SD430 4395.37
431 SD431 4405.40
432 SD432 4415.44
433 SD433 4425.47
434 SD434 4435.51
435 SD435 4445.54
436 SD436 4455.57
437 SD437 4465.61
438 SD438 4475.64
439 SD439 4485.68
440 SD440 4495.71
441 SD441 4505.74
442 SD442 4515.78
443 SD443 4525.81
444 SD444 4535.84
445 SD445 4545.88
446 SD446 4555.91
447 SD447 4565.95
448 SD448 4575.98
449 SD449 4586.01
450 SD450 4596.05
451 SD451 4606.08
452 SD452 4616.12
453 SD453 4626.15
454 SD454 4636.18
455 SD455 4646.22
456 SD456 4656.25
457 SD457 4666.29
458 SD458 4676.32
459 SD459 4686.35
460 SD460 4696.39
461 SD461 4706.42
462 SD462 4716.45
463 SD463 4726.49
464 SD464 4736.52
465 SD465 4746.56
466 SD466 4756.59
467 SD467 4766.62
468 SD468 4776.66
469 SD469 4786.69
470 SD470 4796.73
471 SD471 4806.76
472 SD472 4816.79
473 SD473 4826.83
474 SD474 4836.86
475 SD475 4846.90
476 SD476 4856.93
477 SD477 4866.96
478 SD478 4877.00
479 SD479 4887.03
480 SD480 4897.06
481 SD481 4907.10
482 SD482 4917.13
483 SD483 4927.17
484 SD484 4937.20
485 SD485 4947.23
486 SD486 4957.27
487 SD487 4967.30
488 SD488 4977.34
489 SD489 4987.37
490 SD490 4997.40
491 SD491 5007.44
492 SD492 5017.47
493 SD493 5027.51
494 SD494 5037.54
495 SD495 5047.57
496 SD496 5057.61
497 SD497 5067.64
498 SD498 5077.67
499 SD499 5087.71
500 SD500 5097.74
METAL LEADS & RATES SAND/ EARTH LEADS & RATES
2008-09 2008-09
From From
NOTATION RATE LEAD NOTATION RATE
SSR SSR
MLOAD 12.80 12.80 SLOAD 10.00 10.00
MUNLOAD 8.70 8.70 SUNLOAD 8.50 8.50
MSTACK 8.70 8.70 SSTACK 5.50 5.50
0.00 0 0.00
Earth - 181/15
Gravel 103.00 90/15 done
Quarri Rubbish 81.00 91/16 done
Blasting charges
Blasting charges 70.00 done
Blasting charges for rough stone 0.00
Seigniorage charges( As per G.Oms.No.67 of industries and commerce (Mines.I)Dept., dt: 26-09-2015
Metal ****************************
75.00
Gravel/earth ****************************
30.00
Sand ****************************
40.00
Labour Rates
1st Class Mason 470.00 1/6 done , new
2nd Class Mason 450.00 44/8 done , new
Mate 456.00 71/8 done , new
Mason (considered as) 470.00 done , new
Mazdoor unskilled 425.00 73/8 done , new
Mazdoor skilled 456.00 done , new
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour 2661.20 done , new
Motor grader 3.35M Blade @50 cum/Hr 3601.92 done
Hydralic excavator 2821.50 done , new
Front end loader 1 cum capacity 1843.52 done
Tipper 5.5 cum, per Hour 1004.40 done , new
Vibratory roller 8T 2878.90 done , new
smooth wheeled roller 8 Ton 1131.00 done , new
Water tanker 6 KL 698.88 done
Tractor 464.88 done
Tractor with Rotavator 472.80 done
Tractor with ripper attachment @ 60 cum per hour 1843.52 done , new
Air compressor 250 cfm 588.40 done , new
Wet mix plant of 60 tonne hr. capacity 1843.52 done
Mechanical broom @ 1250 sqm/hr. 399.84 done
Bitumen pressure distributor @1750 sqm/hr 1677.76 done
Emulsion pressure distributor @1750 sqm/hr 963.20 done
Hot mix plant 40 to 60 TPH 21414.40 done
Hot mix plant 100TPH 27071.52 done
Paver finisher hydrostatic with sensor control @ 75 cum per hour 3426.65 done
Mechanical Paver finisher 100 TPH 2518.88 done
Hydraulic self propelled chip spreader @ 1500 sqm/hr. 3426.65 done
Finish rolling with 6-8 tonne smooth wheeled tandem roller. 1131.00 done
Pneumatic road Roller 1436.96 done
GSB Plant 50 Cum 1280.16 done
Generator 250 KVA 234.08 done
Generator set 125 KVA 1478.40 done
Generator set 35 KVA 842.20 30KVA done , new
Concrete mixer 0.4/0.28 cum 472.60 done , new
Tipper 5.50 cum capacity per 10 Tonnes per tkm ****************************
1004.40
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix 1004.40
Plate compactor/Power rammer 53.76 done
Crane with Grab bucket 0.75 CuM done
Crane with 3.0 tonnes capacity(per hour) done
LEAD CHARGES
Earth/Gravel/S Metal
and
loading 48.85 97.35
unloading 15.23 15.23
stacking 0.00 0.00
0.25 30.10 29.05
0.50 30.10 29.05
1.00 30.10 29.05
2.00 38.68 37.37
3.00 51.67 51.67
4.00 62.72 62.72
5.00 73.77 73.77
6.00 85.17 84.77
7.00 96.57 95.77
8.00 107.97 106.77
9.00 119.37 117.77
10.00 130.77 128.77
11.00 142.17 139.77
12.00 153.57 150.77
13.00 164.97 161.77
14.00 176.37 172.77
15.00 187.77 183.77
16.00 199.17 194.77
17.00 210.57 205.77
18.00 221.97 216.77
19.00 233.37 227.77
20.00 244.77 238.77
21.00 256.17 249.77
22.00 267.57 260.77
23.00 278.97 271.77
24.00 290.37 282.77
25.00 301.77 293.77
26.00 313.17 304.77
27.00 324.57 315.77
28.00 335.97 326.77
29.00 347.37 337.77
30.00 358.37 348.77
31.00 367.61 358.01
32.00 376.85 367.25
33.00 386.09 376.49
34.00 395.33 385.73
35.00 404.57 394.97
36.00 413.81 404.21
37.00 423.05 413.45
38.00 432.29 422.69
39.00 441.53 431.93
40.00 450.77 441.17
41.00 460.01 450.41
42.00 469.25 459.65
43.00 478.49 468.89
44.00 487.73 478.13
45.00 496.97 487.37
46.00 506.21 496.61
47.00 515.45 505.85
48.00 524.69 515.09
49.00 533.93 524.33
50.00 543.17 533.57
51.00 552.41 542.81
52.00 561.65 552.05
53.00 570.89 561.29
54.00 580.13 570.53
55.00 589.37 579.77
56.00 598.61 589.01
57.00 607.85 598.25
58.00 617.09 607.49
59.00 626.33 616.73
60.00 635.57 625.97
61.00 644.81 635.21
62.00 654.05 644.45
63.00 663.29 653.69
64.00 672.53 662.93
65.00 681.77 672.17
66.00 691.01 681.41
67.00 700.25 690.65
68.00 709.49 699.89
69.00 718.73 709.13
70.00 727.97 718.37
71.00 737.21 727.61
72.00 746.45 736.85
73.00 755.69 746.09
74.00 764.93 755.33
75.00 774.17 764.57
76.00 783.41 773.81
77.00 792.65 783.05
78.00 801.89 792.29
79.00 811.13 801.53
80.00 820.37 810.77
81.00 829.61 820.01
82.00 838.85 829.25
83.00 848.09 838.49
84.00 857.33 847.73
85.00 866.57 856.97
86.00 875.81 866.21
87.00 885.05 875.45
88.00 894.29 884.69
89.00 903.53 893.93
90.00 912.77 903.17
91.00 922.01 912.41
92.00 931.25 921.65
93.00 940.49 930.89
94.00 949.73 940.13
95.00 958.97 949.37
96.00 968.21 958.61
97.00 977.45 967.85
98.00 986.69 977.09
99.00 995.93 986.33
100.00 1005.17 995.57
101.00 1014.41 1004.81
102.00 1023.65 1014.05
103.00 1032.89 1023.29
104.00 1042.13 1032.53
105.00 1051.37 1041.77
106.00 1060.61 1051.01
107.00 1069.85 1060.25
108.00 1079.09 1069.49
109.00 1088.33 1078.73
110.00 1097.57 1087.97
111.00 1106.81 1097.21
112.00 1116.05 1106.45
113.00 1125.29 1115.69
114.00 1134.53 1124.93
115.00 1143.77 1134.17
116.00 1153.01 1143.41
117.00 1162.25 1152.65
118.00 1171.49 1161.89
119.00 1180.73 1171.13
120.00 1189.97 1180.37
121.00 1199.21 1189.61
122.00 1208.45 1198.85
123.00 1217.69 1208.09
124.00 1226.93 1217.33
125.00 1236.17 1226.57
126.00 1245.41 1235.81
127.00 1254.65 1245.05
128.00 1263.89 1254.29
129.00 1273.13 1263.53
130.00 1282.37 1272.77
131.00 1291.61 1282.01
132.00 1300.85 1291.25
133.00 1310.09 1300.49
134.00 1319.33 1309.73
135.00 1328.57 1318.97
136.00 1337.81 1328.21
137.00 1347.05 1337.45
138.00 1356.29 1346.69
139.00 1365.53 1355.93
140.00 1374.77 1365.17
141.00 1384.01 1374.41
142.00 1393.25 1383.65
143.00 1402.49 1392.89
144.00 1411.73 1402.13
145.00 1420.97 1411.37
146.00 1430.21 1420.61
147.00 1439.45 1429.85
148.00 1448.69 1439.09
149.00 1457.93 1448.33
150.00 1467.17 1457.57
151.00 1476.41 1466.81
152.00 1485.65 1476.05
153.00 1494.89 1485.29
154.00 1504.13 1494.53
155.00 1513.37 1503.77
156.00 1522.61 1513.01
157.00 1531.85 1522.25
158.00 1541.09 1531.49
159.00 1550.33 1540.73
160.00 1559.57 1549.97
161.00 1568.81 1559.21
162.00 1578.05 1568.45
163.00 1587.29 1577.69
164.00 1596.53 1586.93
165.00 1605.77 1596.17
166.00 1615.01 1605.41
167.00 1624.25 1614.65
168.00 1633.49 1623.89
169.00 1642.73 1633.13
170.00 1651.97 1642.37
171.00 1661.21 1651.61
172.00 1670.45 1660.85
173.00 1679.69 1670.09
174.00 1688.93 1679.33
175.00 1698.17 1688.57
176.00 1707.41 1697.81
177.00 1716.65 1707.05
178.00 1725.89 1716.29
179.00 1735.13 1725.53
180.00 1744.37 1734.77
181.00 1753.61 1744.01
182.00 1762.85 1753.25
183.00 1772.09 1762.49
184.00 1781.33 1771.73
185.00 1790.57 1780.97
186.00 1799.81 1790.21
187.00 1809.05 1799.45
188.00 1818.29 1808.69
189.00 1827.53 1817.93
190.00 1836.77 1827.17
191.00 1846.01 1836.41
192.00 1855.25 1845.65
193.00 1864.49 1854.89
194.00 1873.73 1864.13
195.00 1882.97 1873.37
196.00 1892.21 1882.61
197.00 1901.45 1891.85
198.00 1910.69 1901.09
199.00 1919.93 1910.33
200.00 1929.17 1919.57
CY AREA ALLOWANCE = 0%
LEAD CHARGES
Earth/Gravel/ Metal
Sand
loading 10.00 12.80
unloading 8.50 8.70
stacking 5.50 8.70
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Hea
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Hea
r Profit and Over Hea
r Profit and Over Hea