Академический Документы
Профессиональный Документы
Культура Документы
REINFORCING STEEL
7.3.1(7) Manufactured test certificate.
PAVEMENT WIDENING
5.1.(1) AGGREGATE BASE CLASS A
QUANTITY = M3 = M3 = M3 = M3
Laboratory test
4.1.2 Job Mix Formula
5.1.2(5) Gradation
5.1.2(5) Los Angeles Abration
5.1.2(5) Plasticity Index (PI)
5.1.2(5) Liquid Limit
5.1.2(5) Soft Fragments
5.1.2(5) CBR
5.1.2(4) Modified Proctor Test (MDD & OMC)
Control Testing
4.1.4(1)(a) 500 m3 : Routine Test
4.1.4(1)(a) Plasticity Index (PI)
4.1.4(1)(a) Gradation
4.1.4(1)(a) Modified Proctor Test (MDD & OMC)
4.1.4(1)(a) CBR
4.1.4(1)(c) Max. 50 M'; Routine Test
4.1.4(1)(c) Field Density
4.1.4(1)(c) Moisture Content Tests
GRANULAR PAVEMENT
5.1.(1) AGGREGATE BASE CLASS A
QUANTITY = M3 = M3 = M3 = M3
Laboratory test
5.1.2 Job Mix Formula
5.1.2(5) Gradation
5.1.2(5) Los Angeles Abration
5.1.2(5) Plasticity Index (PI)
5.1.2(5) Liquid Limit
5.1.2(5) Soft Fragments
5.1.2(5) CBR
5.1.2(5) Modified Proctor Test (MDD & OMC)
5.1.1(4) Control Testing
5.1.3(4)(c) 1000 m3 : Routine Test
5.1.3(4)(c) Plasticity Index (PI)
5.1.3(4)(c) Gradation
5.1.3(4)(c) Modified Proctor Test (MDD & OMC)
5.1.3(4)(c) CBR
5.1.3(4)(d) Max. 200 M' : Routine Test
5.1.3(4)(d) Field Density
5.1.3(4)(d) Moisture Content
PAVEMENT WIDENING
5.1.(2) AGGREGATE BASE CLASS B
QUANTITY = M3 = M3 = M3 = M3
Laboratory test
4.1.2 Job Mix Formula
5.1.2(5) Gradation
5.1.2(5) Los Angeles Abration
5.1.2(5) Plasticity Index (PI)
5.1.2(5) Liquid Limit
5.1.2(5) Soft Fragments
No.
Up to Last Month This Month Up to This Month
Pay Item
Kind of Test
Spec
Total Pass Fail Retest Total Pass Fail Retest Total Pass Fail Retest
Section
5.1.2(5) CBR
5.1.2(4) Modified Proctor Test (MDD & OMC)
No.
Up to Last Month This Month Up to This Month
Pay Item
Kind of Test
Spec
Total Pass Fail Retest Total Pass Fail Retest Total Pass Fail Retest
Section
Control Testing
4.1.4(1)(a) 500 m3 : Routine Test
4.1.4(1)(a) Plasticity Index (PI)
4.1.4(1)(a) Gradation
4.1.4(1)(a) Modified Proctor Test (MDD & OMC)
4.1.4(1)(a) CBR
4.1.4(1)(c) Max 50 M'; Routine Test
4.1.4(1)(c) Field Density
4.1.4(1)(c) Moisture Content Tests
GRANULAR PAVEMENT
5.1.(2) AGGREGATE BASE CLASS B
QUANTITY = M3 = M3 = M3 = M3
Laboratory test
5.1.2 Job Mix Formula
5.1.2(5) Gradation
5.1.2(5) Los Angeles Abration
5.1.2(5) Plasticity Index (PI)
5.1.2(5) Liquid Limit
5.1.2(5) Soft Fragments
5.1.2(5) CBR
5.1.2(5) Modified Proctor Test (MDD & OMC)
5.1.1(4) Control Testing
5.1.3(4)(c) 1000 m3 : Routine Test
5.1.3(4)(c) Plasticity Index (PI)
5.1.3(4)(c) Gradation
5.1.3(4)(c) Modified Proctor Test (MDD & OMC)
5.1.3(4)(c) CBR
5.1.3(4)(d) Max. 200 M' : Routine Test
5.1.3(4)(d) Field Density
5.1.3(4)(d) Moisture Content
5.4.(2) SOIL CEMENT BASE
QUANTITY = M3 = M3 = M3 = M3
5.4.3 Job Mix Formula
5.4.6(2) Sieve Analysis
5.4.6(3) Moisture Content Test
5.4.6(4) Lab. Compaction Soil-cement Mixture
(MDD & OMC)
5.4.6(4) CBR
5.4.6(4) Unconfined Compressive Strength.
5.4.6(4) Field Density Test
5.1.2(5)&(6) Scala Dynamic Cone Penetrometer Test
ASPHALT PAVEMENT
6.1.(1) PRIME COAT
QUANTITY = Litre = Litre = Litre = Litre
Control Testing
6.1.1(6) Manufactured test certificate
Field Test
6.1.3(6) Aplication Rate
6.1.4(2) Temperature control