Вы находитесь на странице: 1из 1

SUNIL, ssunil@indianoil.

in,
Sr. NumberIOCL
: OISD/DOC/2018/01

OISD – STD – 235 Page No. 101


STORAGE, HANDLING, REFUELLING AND FIRE FIGHTING AT AVIATION
FUELLING STATIONS

D. Product Pump House (loading / unloading)

1 Whether electrical termination in Monthly


the JBs is apparently sound?
2 Whether earthing / bonding Monthly
connections are apparently sound?
3 Whether pressure gauges on Monthly
pumps / compressors are in
working condition?
4 Whether pump motor coupling Monthly
guards are in position?
5 Whether connected drain line Monthly
valves on strainer / line are closed
& caps in position?
6 Whether valves for product Daily
circulation are cracked open for
loading operations?
7 Whether any abnormal vibration Daily
excessive noise from pumps
motors noticed?
8 Whether any visible sign of product Daily
SD
leakage from valves / flanges /
seals or any unsafe conditions
observed?
9 Whether strainers are periodically Quarterly
cleaned and written?
10 Whether valve operating platforms Monthly
are kept free for easy movement?
11 Whether Housekeeping in order? Monthly
12 Any other observations? ----
OI
E. Laboratory

1 Whether earthing connection Monthly


terminals are apparently rigid
2 Whether laboratory electrical Quarterly
fittings are Industrial type closed /
tight metal clad fittings for plug and
socket assembly?
3 Whether main electrical circuit is Quarterly
provided with ELCB?
4 Whether samples of Class ‘A’ Daily
petroleum products are kept in
airtight containers?
5 Whether sample containers are Weekly
stacked properly?
6 Whether sample room is free from Daily
Oil spillage?
7 Check functioning of exhaust fans Weekly
in sample room.
8 Whether “No smoking” board Quarterly
displayed?
9 Whether Housekeeping in order? Daily
10 Adequate fire-fighting facilities are Daily
available or not?

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”

Вам также может понравиться