30" RLNG GAS TRANSMISSION LINE FOTCO

Punch List
Knock Out Drum And Vent Stack System

Sr # Description

1 3"line paint remaining

2 2" ss piping welding joints need passivation

3 2" cs line need to be alligned properly

4 3/4" line paint remaining

5 Some supports paint remaining

Pig Receiver Skid


1 Support paint remaining

2 Pipe supprt clamp need rubber packing

3 3/4" ss line welding joints required passivation

4 2" ss piping welding joint required passivation

5 2" cs line need to be alligned properly and required paint

Gas Scrubber Skid


1 Pipe supprt clamp need rubber packing

2 Supports paint remaining

3 Cross over platform not installed

Gas Metering Skid


1 2" ss piping welding joints required passivation

2 3/4" cs line paint remaining

3 Some supports paint remaining


4 30" cs line is not resting on support

5 Final paint inspection remaining

Gas Heater Skid

1 3/4" ss line welding joints required passivation

2 Pipe supprt clamp need rubber packing

3 Support paint remaining

4 Gas heater platform required paint

Instrument Air Skid

1 2" ss line welding joints required passivation

Signature
Date & Time
Name of Company XPE
Date
N LINE FOTCO

tack System Rev

Signature
Status
Department ZEL/FOTCO Remarks
(Closed/Open)

Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

d
Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

d
Mechanical Open

Mechanical Open

Mechanical Open

d
Mechanical Open

Mechanical Open

Mechanical Open
Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

Mechanical Open

id

Mechanical Open

ZEL FOTCO