COMMERCIAL TENDER

OML 58 FIELD ON-SHORE (PRODUCTION)


Location: OFS - OBAGI GRA.
CONSTRUCTION OF CONCRETE BUNDWALL AND LIGHT PAVING
Job Title AT OFS Rev. no
Date:
Reference: CFT/2019/006
Prepared by:
Requester : ONSHORE INSTALLATION MANAGER
S/N DESCRIPTION UNIT QTY RATE
1.0 WORK SCOPE
This scope of work defines the minimium
requirements for the Costruction of bundwall
and light paving at OFS, Obagi GRA. The work
include but not limited to excavation ,
concreting, formwork, reinforcement, laying of
concrete kerbs etc as directed by OML58, Site
Works Engineer(s)
1.1
2.0 PRELIMINARIES
Mobilisation-: personnel, tools, equipment
(concrete mixer, poker vibrator, 20 tons mack
truck, concrete cutter etc), materials (sharp sand,
cements, granite, reinforcement etc) PPEs, etc as
directed by Site Works Engineer(s).
2.1 L/S 1
Demobilisation of all equipment on site and clear
site ( proper house keeping) of all debris etc.
2.2 L/S 1
PRELIMINARIES

3.0 Survey/Setting Out


Provide for all necessary materials,equipment and
personnel for pre-survey, setting-out and post-
3.1 survey works at the site. LS 1.00
Survey/Setting Out

Constructon of Concrete Bundwall around 81-


4.0 DS-565 Gas Scrubber
Provide materials, tools and equipment and
excavate for construction of concrete bund-wall
around perimeter of existing bundwall to 81-DS-
565 Gas scrubber drum. (Excavation Details:
0.20m width, 0.5m depth, 24m length); Equiment
shall include metal detector for probing of buried
4.1 services. m³ 2.40 1,000
Provide tools and equipment to cart-away all spoils,
top soils and excavated soils from site (0.20m
4.2 width, 0.5m depth, 24.0m length) m³ 2.40 1,000
Compact bottom of excavation to receive high
4.3 density polyethylene sheet (0.20m x 24.0m ) m² 4.80 500

Provide and cast 50mm thick G20 concrete as


blinding to bundwall on 81-DS-565 Gas scrubber.
4.4 m³ 0.24 38,000
Provide and install Y8mm rebar at 200mm centres
for both runners and stirrups as per BS 4483 to
receive bundwall concrete as directed by Site
4.5 Works Engineer. Kg 10.40 200

Provide formwork to sides of shuttering including


bracing of same to average height of 500mm at
the outer face and 250mm at the inner face.
4.6 (Angled battern to be used for chamfered edge) m² 20.00 2,000
Provide and place high density polyethylene
sheet (150µ) on compacted bottom of bundwall
excavation alignment to receive GRADE G20 mix
4.7 concrete. m² 4.80 200
Provide and cast 200mm thick vibrated G20
concrete as bundwall to 81-DS-565 Gas
scrubber. (Contractor shall use Poker Vibrator
and concrete Mixer for concrete mixing and
4.8 compaction) m³ 2.40 38,000
4.9 Allow sum for striking of formwork as required. m² 20.00 1,000
Constructon of Concrete Bundwall around 81-
DS-565 Gas Scrubber

Constructon of Sand trap, light duty pavement


and Conc bundwall for 81-DS-564B/567 Gas
5.0 Scrubber
5.1 Sand Trap Construction

Excavate for 1no sand trap and cart away to spoil


(Details: 0.7m width x 0.7m length x 0.7m depth.
5.2 m³ 0.34 2,000
Compact bottom of excavation to receive high
5.3 density polyethylene sheet (0.7m x 0.7m ) m² 0.49 500
Provide and cast 50mm thick G20 concrete as
5.4 blinding to sand trap. m³ 0.025 38,000
Provide and place high density polyethylene
sheet (150µ) on compacted bottom of sand trap
excavation to receive GRADE G20 mix floor
5.5 concrete to sand trap. m² 0.49 200
Provide and install Y8mm rebar at 200mm centres
for both longitudinal and transverse bars as per
BS 4483 to receive sand-trap concrete as directed
5.6 by Site Works Engineer. kg 1.17 200

Provide and cast 100mm thick vibrated G20 mix


concrete floor and wall to sand-trap (Contractor
shall use Poker Vibrator and concrete Mixer for
concrete mixing and compaction)
5.7 m³ 2.20 38,000

Provide formwork to sides of shuttering to average


height of 700mm including bracing of same and
5.8 allow for striking of formwork as required. m² 3.50 2,000
Provide and place Galvanized presses steel ligth
duty grating (30mm thick) on installed L30 x L30
5.9 x 3 frames as directed by site works engineer. m² 1.90 45,000
6.0 Concrete Bund-wall Construction
Provide materials, tools and equipment and
excavate for construction of concrete bund-wall
around perimeter of existing bundwall to 81-DS-
564B/567 Gas scrubber drums. (Excavation
Details: 0.20m width, 0.65m depth, 24m length):
Equipment shall include metal detector for
6.1 probing of buried services. m³ 3.12 1,000
Provide tools and equipment to cart-away all spoils,
top soils and excavated soils from site (0.20m
6.2 width, 0.65m depth, 24.0m length) m³ 3.12 1,000
Compact bottom of excavation to receive high
6.3 density polyethylene sheet (0.20m x 24.0m ) m² 4.80 500
Provide and cast 50mm thick G20 concrete as
blinding to bundwall on 81-DS-564B/567 Gas
6.4 scrubber. m³ 0.24 38,000
Provide and install Y8mm rebar at 200mm centres
for both runners and stirrups as per BS 4483 to
receive bundwall concrete as directed by Site
6.5 Works Engineer. kg 12.00 200

Provide formwork to sides of shuttering including


bracing of same to average height of 500mm at
the outer face and 250mm at the inner face.
6.6 (Angled battern to be used for chamfered edge) m² 25.00 2,000
Provide and place high density polyethylene
sheet (150µ) on compacted bottom of bundwall
excavation alignment to receive GRADE 20 mix
6.7 concrete. m² 4.80 200
Provide and cast 200mm thick vibrated G20
concrete as bundwall to 81-DS-564B/567 Gas
scrubber. (Contractor shall use Poker Vibrator
and concrete Mixer for concrete mixing and
6.8 compaction) m³ 3.12 38,000
6.9 Allow sum for striking of formwork as required. m² 25.00 1,000
7.0 Light Duty Paving Construction
Excavate for light duty paving at 81-DS-564B/567
not exceeding 0.3m and cart away to spoil. (Area
7.1 bounded by the bund wall - 16m x 8.0m) m³ 35.10 1,000
Compact bottom of excavation to receive coarse
7.2 granular base material. m² 117.00 500
Provide and fill 100mm thick coarse granular
base material (Granite) of 20mm maximum size,
7.3 spread and compact to grade m³ 12.80 15,000
Provide and place high density polyethylene
sheet (150µ) on top of compacted base course to
7.4 receive grade G20 light duty concrete. m² 117.00 200

Provide and place Urethane foam to construction


7.5 joint in 4no bays of 100mm deep. m 24.00 1,000
Provide and install single layer of A67 (150mm x
150mm x 3.5 mm thick)fabric mesh as per BS
7.6 4483 to receive light duty concrete as required. m² 135.00 1,200

Provide and cast 100mm thick vibrated G20 mix


concrete floor as light duty paving with adequate
7.7 slope to run-off into existing man-hole drains m³ 8.00 38,000
Provide personnel and Desilt 3no man-hole drain
sections. Rate include cart away debris from
7.8 site. LS 1.00
Constructon of Sand trap, light duty pavement
and Conc bundwall for 81-DS-564B/567 Gas
Scrubber

Constructon of light duty pavement and


Concrete bundwall for 81-DS-563A Gas Scrubber
8.0
8.1 Concrete Bund-wall Construction
Provide materials, tools and equipment and
excavate for construction of concrete bund-wall
around perimeter of existing bundwall to 81-DS-
563A Gas scrubber drum. (Excavation Details:
0.20m width, 0.70m depth, 31m length):
Equipment shall include metal detector for
8.2 probing of buried services. m³ 4.34 1,000
Provide tools and equipment to cart-away all spoils,
top soils and excavated soils from site (0.20m
8.3 width, 0.7m depth, 31.0m length) m³ 4.34 1,000
Compact bottom of excavation to receive high
8.4 density polyethylene sheet (0.20m x 31.0m ) m² 6.20 500
Provide and cast 50mm thick G20 concrete as
blinding to bundwall of 81-DS-563A Gas
8.5 scrubber. m³ 0.31 38,000
Provide and install Y8mm rebar at 200mm centres
for both runners and stirrups as per BS 4483 to
receive bundwall concrete as directed by Site
8.6 Works Engineer. kg 22.00 350

Provide formwork to sides of shuttering including


bracing of same to average height of 700mm at
the outer face and 400mm at the inner face.
8.7 (Angled battern to be used for chamfered edge) m² 34.10 2,000
Provide and place high density polyethylene
sheet (150µ) on compacted bottom of bundwall
excavation alignment to receive grade G20 mix
8.8 concrete. m² 6.20 200
Provide and cast 250mm thick vibrated G20
concrete as bundwall to 81-DS-563A Gas
scrubber. (Contractor shall use Poker Vibrator
and concrete Mixer for concrete mixing and
8.9 compaction) m³ 4.34 38,000
Allow sum for striking of formwork as required.
8.10 m² 34.10 1,000
9.0 Light Duty Paving Construction
Excavate for light duty paving at 81-DS-563A not
exceeding 0.3m and cart away to spoil. (Area
9.1 bounded by the bund wall - 7.0m x 8.0m) m³ 16.80 1,000
Compact bottom of excavation to receive coarse
9.2 granular base material. m² 52.00 500
Provide and fill 100mm thick coarse granular
base material (Granite) of 20mm maximum size,
9.3 spread and compact to grade m³ 5.60 38,000

Provide and place high density polyethylene


sheet (150µ) on top of compacted base course to
9.4 receive grade G20 light duty concrete. m² 52.00 200

Provide and place Urethane foam to construction


9.5 joint in 4no bays of 100mm deep. m 12.00 1,000
Provide and install single layer of A67 fabric mesh
as per BS 4483 to receive light duty concrete as
9.6 required. m² 52.00 1,200

Provide and cast 100mm thick vibrated G20 mix


concrete floor as light duty paving with adequate
9.7 slope to run-off into existing man-hole drains m² 5.60 2,500
Provide sum for demolition and removal of
9.8 concrete kerbs to low-lying man-holes. LS 1.00
Provide personnel and Desilt 1no man-hole drain
sections. Rate include cart away debris from
9.9 site. LS 1.00
Constructon of light duty pavement and
Concrete bundwall for 81-DS-563A Gas Scrubber

10.0 West Manifold skid floor section repairs

Scrape floor of west manifold skid to expose existing


concrete floor and cart-away earth waste to spoil.
(Dimension Details: 8m width; 55m length; width
covers for propose concrete area for run-off into
existing parallel drain to west manifold.
10.1 m² 440.00 1,000
Provide and cast 75mm thick floor of G20
concrete mix with adequate slope to run-off into
existing parallel drain. (2m width; 55m length;
10.2 0.075m thickness) m³ 8.25 38,000
Provide sum for cracking of existing parallel
drain and installation of 3inch x 8 bar x 18ft long
PVC pipe including accessories elbows, sockets,
connectors, TEE etc for run-off at 10no
designated positions as shall be directed by Site
10.3 Works Engineer. LS 1.00
West Manifold skid floor section repairs

Repair of failed concrete drain section opposite


11.0 new pit
Crack and expose drain rebar n.e 250mm on
failed existing drain section opposite new pit and
cart away generated waste. Details; 0.25m x 0.15m
11.1 x 8m m³ 0.30 2,200
Provide formwork to sides of shuttering including
bracing of same to average height of 350mm at
11.2 the outer face and 350mm at the inner face. m² 5.60 2,000

Provide and cast 150mm thick vibrated G20 mix


concrete to failed drain section. (Contractor shall
use Poker Vibrator and concrete Mixer for
concrete mixing and compaction)
11.3 m³ 0.30 38,000
Allow for striking and removal of formwork as
11.4 required. m² 5.60 1,000
Repair of failed concrete drain section opposite
new pit

Construction of Bundwall and sump pit for


12.0 Compressor 81-UB-870A/B

Provide personnel, equipment/ hand tools and tool


existing floor concrete section to a bonding depth
of 50mm to recieve incoming bundwall concrete
and cart-away rubbles as required. (Tooling Details:
12.1 0.05m Depth, 0.2m width, 30.m Length) m³ 0.30 1,200

Provide formwork to sides of shuttering including


bracing of same to average height of 350mm at
the outer face and 300mm at the inner face.
(Angled battern to be used for chamfered edge)
12.2 and allow for striking of formwork as required. m² 24.00 2,000
Provide and install Y12mm rebar at 200mm
centres for runners as per BS 4483 to receive
bundwall concrete as directed by Site Works
12.3 Engineer. kg 9.35 400
Provide and install Y10mm rebar at 150mm
centres for stirrups/200mm on longitudinal
direction as per BS 4483 to receive bundwall
12.4 concrete as directed by Site Works Engineer. kg 6.48 350
Provide and cast 200mm thick vibrated G20 mix
concrete to failed drain section. Bundwall
section to cast is 200mm width, 250mm depth
and 30m length (Contractor shall use Poker
Vibrator and concrete Mixer for concrete mixing
12.5 and compaction) m³ 1.50 38,000
Provide personnel, equipment/ hand tools and
tool/excavate existing floor concrete for 1no sump
pit construction of 0.7m length/width and 0.7m
depth and cart-away rubbles/earth waste as
12.6 required. m³ 0.34 2,000
Compact bottom of excavation to receive high
12.7 density polyethylene sheet (0.7m x 0.7m ) m² 0.49 500
Provide and cast 50mm thick G20 concrete as
12.8 blinding to sump pit. m³ 0.025 38,000
Provide and place high density polyethylene
sheet (150µ) on compacted bottom of sump pit
excavation to receive grade G20 mix floor
12.9 concrete to sump pit. m² 0.49 200
Provide and install Y8mm rebar at 200mm centres
for both longitudinal and transverse bars as per
BS 4483 to receive sand-trap concrete as directed
12.10 by Site Works Engineer. kg 1.17 300
Provide and cast 100mm thick vibrated G20 mix
concrete floor and wall to sump pit (Contractor
shall use Poker Vibrator and concrete Mixer for
12.11 concrete mixing and compaction) m³ 2.20 38,000
Provide formwork to sides of shuttering to average
height of 700mm including bracing of same and
12.12 allow for striking of formwork as required. m² 3.50 2,000
Allow for striking and removal of all formwork as
12.13 required. m² 5.60 1,000
Construction of Bundwall and sump pit for
Compressor 81-UB-870A/B

13.0 HSES
Provide for ALL necessary PPEs, safety signs,
retainers clinic facilities, Anual Medical
Certificate of all personnel on site, eye wash, 1st
aid box,water etc for Health, Safety,
Environmental and Security (HSES) provisions
and personnel for HSE documentation & supervision
during the project execution.
13.1 L/S 1
HSES

SUMMARY
2 PRELIMINARIES 500,000.00
3 Survey/Setting Out 300,000.00
Constructon of Concrete Bundwall around 81-DS-565 Gas
4 170,560.00
Scrubber
Constructon of Sand trap, light duty pavement and Conc
5 1,281,987.00
bundwall for 81-DS-564B/567 Gas Scrubber
2019/006
8/4/2019
SITE WORKS
ENGR.
AMOUNT

400,000

100,000
500,000

300,000
300,000

2,400

2,400
2,400

9,120

2,080

40,000

960

91,200
20,000

170,560

680

245

950

98

234

83,000

7,000
85,500

3,120

3,120

2,400

9,120

2,400

50,000

960

118,560
25,000

35,100

58,500

192,000

23,400

24,000
162,000

304,000

90,000

1,281,987

4,340

4,340

3,100

11,780

7,700

68,200

1,240

164,920

34,100
16,800

26,000

212,800

10,400

12,000

62,400

14,000

30,000

30,000

714,120

440,000

313,500

100,000
853,500

660
11,200

11,400

5,600

28,860

360

48,000

3,740

2,268

57,000

680

245

950

98
351

83,600

7,000

5,600

209,892

200,000
200,000

500,000.00
300,000.00

170,560.00

1,281,987.00