Вы находитесь на странице: 1из 1

0.

40mm THK PRE-PAINTED


RIBTYPE METAL SHEET
(LONG SPAN)
1 2 3 4 5 1 2 3 4 5

2 FRONT ELEVATION 4 LONGITUDINAL SECTION


A 1 SCALE 1:90 M A 1 SCALE 1:90 M

0.40mm THK PRE-PAINTED

1 2 3 4 5
RIBTYPE METAL SHEET
(LONG SPAN)
5 4 3 2 1

3 REAR ELEVATION
A 1 SCALE 1:90 M

SCHEDULE OF FLOOR FINISHES:

1 FLOOR PLAN
A 1 SCALE 1:90 M

NAME OF PROJECT PREPARED BY: CHECKED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.

PINS
A-1 1
ONE STOREY TWO CLASSROOM
SCHOOL BUILDING W/ TOILET
AS-BUILT
CONSTRUCTION ATTACHED AT DANAN ES
NORHIDA S. PANTARAN
CONTRACTOR
ABDULCADER P. IMPO
PROJECT INSPECTOR
EDWIN L. EGAMA
PROJECT ENGINEER
RICARDO L. PANONG
CHIEF, CONSTRUCTION SECTION
MANUEL J. INOFERIO
ASST. DISTRICT ENGINEER
AMINODIN P. MANIRI
DISTRICT ENGINEER
PLAN
14