Ref: EM-1011/19 QUOTATION 23-Jul-19

Attention: Mr. Sreevalsan


Manager - Facilty Commercial Services

Subject: Quotation for the construction of soil platform at Al Bidda Park

As per your enquiry and Site visit, we would like to submitt our best price for the above
mentioned project.

Our Offer

Our offer for the above said Project shall be Two Hundred Seventy Five Thousand
Qatari Riyal Only (275000.00 QAR). Offer will be strictly based on the BOQ Attached
along with the Quotation and subjected to sub -contract agreement/LPO.

Project Duration

1. Project will be completed within 20 days from the date of starting the work.

Terms and Conditions


1. All permits ahall be client Responsibility
2. All works will be under the supervision of Project Engineer and Safety Officer
3. Works related with the irrigation lines will be excluded from the scope
Payment Terms

1. Material and equipment mobilization Cahrge : 40% of the total amount


2. After Completion : 60% of the total cost

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Item Description Unit Qty Rate Total
Item No: 1
PRELIMINARIES

1.1 Site Management Cost

Allow for all on and off site management


cost including costs of Site Engineers,
(a) foreman and assistants, temporary
services, telephone,fax,hoardings and
similar

1.2 Sign Board

Allow for installation of temporory


hoardings and sign boards and safety
(a) barricades and completed as per the
direction of Engineer in charge.

1.3 Clean Up
Allow for clean - up proposed site in a
specific intervel of time and cleaning of
(a) the proposed project before the
handover.

Item No: 2

2.1 Construction of Soil Platform

Allow for the surveying of the proposed


(a) site to make surw that the proposed
platform will be level and completed as
per the direction of Engineer in charge

Allow for the escavation of the proposed


site for constructing the foundation for
(b) boundary wall and completed as per the
direction of Engineer in charge

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Allow for the supply and lying of concrete
for foundation of the boundary wall and
(c.) rate shall include the cost for form work
and completed as per the direction of
Engineer in charge

Allow for the supply and lying of the


blocks in position by using the mortar
(d) and completed as per the direction of
Engineer in charge

Allow for the supply and levelling of the


soil which is suitable for the site and
completed as per the dorection of
(e) Engineer in charge. Quality of the soil will
be closely monitored by the Quality
controller.

Allow for the compaction of soil layer by


layer ( Minimum 3 layer compaction) for
achieving the maximum compaction and
(f) to achieve the required Load Bearing
capacity for the platform and will be done
under the strict direction of Engineer in
charge.

Allow for the supply and installation of


temporory protection covering mat
( Polytheen sheet) to protect from the
(g) bad environment conditions and
completed as per the instructions of
Engineer in charge

Allow for the restoration of the site in the


same as before and completed as per the
direction of Engineer in charge and rate
shall include the cost for grass plantation,
(h) material removal from the site, removal
of concrete foundation and block works
and disposal of all the waste from the
site.

Summery of Rates
Sl No Item No Rate
1 Item No 1
2 Item No 2 275000.00
Total 275000.00

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
We hope that above price and BOQ is in lane with your requirement and if any
clarification required about the proposed BOQ and Quotation, please feel free to
contact Mr. Muhammed Noufal (Project Engineer) through 77943996

Thanks and Best Regards


ANEESH CHANDRAN
BUSINESS MANAGER
Eminent General Contracting WLL

Technical Aspects of the Project


1. Load Bearing Capacity Of Soil

The maximum load per unit area which the soil can carry without any yeilding,
displacement or deformation is termed as bearing capacity of Soil. The resistance to
deformation of the soil depends upon the factors like water content, bulk density, angle of
internal friction and manner in which load is applied on the soil.

Soil properties like shear strength, density, permeability etc affect the bearing capacity
of the soil. Dense sand will have more bearing capacity than the loose sand as unit wieght of
dense sand is more than the loose sand.

Methods to improve the bearing capacity of soil


1. Compacting the soil

If we compact soil using appropiate method, then there will be increase in density and shear
strength. As a result bearing capacity also increase. There are many methods of compacting
soil on site
a. By spreading broken stones, gravel or sand and thereafter ramming well in bed of trenches
b. Using an appropiate roller as per the soil type to move at specified speed.
Typical values of soil bearing capacity

Dense garvel or dense sand and gravel ˃600 kPa


Dense garvel or meduim dense sand and garvel 200 - 600 kPa
loose gravel or loose sand and gravel ˂200 kPa

Selection of Material

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Identification of unsuitable material is a defficult task, requiring not only physical inspection
and possibly testing of material but also great deal of judgement on a part of the decision
make. For any perticular material, variation in moisture content will provide diifrences in the
strength of the material. some material will lose strength rapidly with increased moisture
content, whilst other will not.

As per QCS instructions the material used for filling should be free from the below mentioned
items
1. Material from marshes
2. Trees and plant slumps
3. Perishable Material
4. Deposits of sabkha with more than 5 % water soluble salts
5. Material subject to spontanous combuston

6. The minimum particle size of the fill material shall be 75 mm unless the material is classified
as rock as per the part of the specification and the placing and compaction are carried
according to the requirement of fill

7. Unit weight moisture content of the soil containing more than 5 % by mass of the over size
fraction tested in accordance with ASTM D1557 should be corrected following ASTMD4718

8. Water : Potable or brackish water shall be used for all earthwork operations exept that only
potable water shall be used for compaction of backfill material.

Standard method of compaction for getting maximum load bearing capacity

Compaction is the densification of soil material by the use of mechanical energy. Soil is
compacted by removing air and water from its pore space.

Compacting Equipment
a. Steel wheeled Rollers shall be of the following types

Three wheeled rollers shall be self propelled and equipped with reversing clutch, a diffrential
drive and with adjustable scrapes to keep wheel surface clean

Factors affecting Compaction


a. Water Content: At optimum water content, amount of compaction will increase

b. Amount of Compaction: The compaction of Soil increases with the increase in amount of
compaction effort. The compaction of soil depends upon the type of soil

c. Type of soil
d. Method of Soil Compaction

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Work Proceedure

1. Site will be protected by using the safety barriers and all the safety equipment will be
installed at the site.
2.Foundation for the boundary wall will be constructed after escavating up to the required dept

3. Block will be layed over the foundation after determining the height required. Height will be
same as the highest level of the ground.

4. Selected material will dump and leveled up to the required height as per the design.

5. The material will be compacted in three layers, each layer will be compacted by using the
compacting equipment and Engineer will ensure proper moisture content is available in the
soil at the time of compaction and required amount of compaction is achieved in each layer of
soil by using the laboratary tests. Optimum Moisture content of the soil will be tested if it is
required before the compaction.

6. The Engineer in charge will ensure that 90% compaction will be achieved in each layer so
that the soil will get maximum load bearing capacity after compaction.

7. The contractor will do the laboratary tests for testing the compaction achieved and the load
bearing capacity of the compacted soil and completed as per the direction of Engineer in
charge

8. After the time period, all the constructed platform will demolished and disposed from the site
9. Proposed site will be remake into the original situation as before the construction and all
facilities except irrigation lines will be restored

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com

Вам также может понравиться