Академический Документы
Профессиональный Документы
Культура Документы
: 72-1136-951
KADANWARI PWS
EVALUATION PROJECT
BASIS OF DESIGN
TABLE OF CONTENTS
1 INTRODUCTION................................................................................................................................................3
2 SYSTEM CONFIGURATION............................................................................................................................4
3 PROCESS INPUTS..............................................................................................................................................6
3.1 GAS ANALYSIS ............................................................................................................................................6
3.2 CONDENSATE ANALYSIS .............................................................................................................................6
3.3 PRODUCTION FLOW RATES ........................................................................................................................7
3.4 OPERATING CONDITIONS ...........................................................................................................................8
3.5 DISSOLVED GASES ......................................................................................................................................8
3.6 SLUGGING FLOW RATES ............................................................................................................................8
3.7 RE-INJECTION PRESSURE ...........................................................................................................................8
4 SYSTEM OF UNITS............................................................................................................................................9
4.1 REFERENCE STATES ...................................................................................................................................9
5 SITE & ENVIRONMENTAL DESIGN DATA...............................................................................................10
1 INTRODUCTION
OMV (Pakistan) Exploration G.m.b.H. engaged ENAR Petrotech Services
(Pvt.) Limited for the evaluation of Kadanwari plant produced water system
for the forecasted produced water production of 12,000 BPD.
This document presents the basis of design to be taken for the evaluation of
produced water system.
2 SYSTEM CONFIGURATION
The produced water system of Kadanwari Central Processing Facility
comprises of two independent produced water trains: Kadanwari and Miano
Produced water train. Both trains combine at a common produced water
storage tank. From the tank produced water is re-injected into the well through
a high pressure produced water disposal pump. Slugging flows are routed to
produced water storage tank by dump valve.
The Miano produced water system receives liquid from following equipments:
1. Miano Upstream Slug catcher (V-0340)
2. Miano Slug Catcher (V-0330)
3. Condensate Separator Blowcase (V-1215)
4. Train-1 Inlet Separator (V-0320)
5. Train-2 Inlet Separator (V-0325)
In the second arrangement liquid from degasser is routed to a storage tank (T-
2021) from where the produced water is pumped to either produced water
storage tank (T-2040) or to oily-water separator. For the system evaluation
arrangement-1 will be followed.
3 PROCESS INPUTS
The following process inputs have been provided by OMV and will be used
for system evaluation purpose:
IBP 248
10 300.2
30 350.6
50 399.2
70 478.4
90 631.4
FBP 658.4
SG 60/60°F 0.7938
Miano Finger Type Slug Catcher Gas Flow Rate 116 MMSCFD
Condensate Flow from Blow Case (intermittent) 580 litres in 3 minutes ***
Front End Stage-1 Compressor Suction Drums (V-1120) 590 psig at 120°F
Front End Stage-2 Compressor Suction Drums (V-1130) 700 psig at 120°F
4 SYSTEM OF UNITS
Following measurement units will be used for this project.
Parameter Units
o
Temperature F
Gauge Pressure psig
Absolute Pressure psia
Standard Gas Flow MMSCFD
Actual Gas Flow ft3/hr
Mass Flow lb/hr
US GPM or
Liquid flow
Barrels per day (BPD)
Heat flow MMBtu/hr
Enthalpy Btu/lb
Mass lb
Volume ft3
Length ft or inch
Long Lengths km
Density lb/ft3
Viscosity cP
Kinematic Viscosity cSt
Surface tension dyne/cm
Thermal Conductivity Btu/hr.ft.oF
Specific Heat Btu/lb.oF
Heating Value Btu/lb or Btu/SCF
Power hp
1
1
2
2
3
3
Train-1 Inlet
Recycle Inlet Separator (V-0620) Separator (V-0320)
4
4
5
5
6
6
7
THREE PHASE
Scrubber (V-1120)
8
nd
Front End Compr. 2
V-2031
9
KADANWARI PRODUCED WATER SYSTEM
DEGASSER
To Incinerator
V-2010
To T-1011 & T-1010
T-2021
A-2000
OILY WATER
T-2030
T-2020
DISPOSAL
SETTLING TANK
PRODUCED WATER
P-2020
TRANSFER PUMPS
PRODUCED WATER
TANK
T-2040
PRODUCED
WATER STORAGE
P-2050
F-2070
F-2060
FILTER
Figure-1: Overall System Configuration
TO
WELL
MIANO PRODUCED WATER SYSTEM
E-0320
Metering TRAIN-1
V-0320
Train-1
E-0310
INLET
SEPARATOR
Figure-2: Active System Configuration
E-0325
MIANO MIANO Train-2
SLUG CATCHER E-0315 TRAIN-2
V-0325
NNF
UPSTREAM SLUG INLET
CATCHER SEPARATOR
(INDICATIVE)
To Incinerator
DUMP
PRODUCED
VALVE
V-2031 WATER STORAGE
TANK
To Inlet
Cooler E-1215
Metering
To Incinerator
PRODUCED WATER
DISPOSAL TANK
V-0310
OILY WATER
DEGASSER
HIGH PRESSURE
V-2010
SLUG CATCHER
A-2000 T-2020 P-2020
PRODUCED WATER
FRONT END COMPRESSION
Stage -1 Stage -2 TRANSFER PUMPS
V-1130
T-2030
V-0410 R R
C-1110 C-1120
LOW PRESSURE T-2021
SLUG CATCHER
P-2021