Daily Log Book Craft

Asset Job
Date Plant / Area Asset no. Descripti Receivi
Sr.No. on ng Date
1 Utility west GTG 3
2 NHO3 SCR/B
3 Utility west
4 Workshop BFW/CAP
5 1/1/2019 NH3
6 NHO3 Line C
7 Urea P02-OAS-AM2
8 Urea 23 C Line
9 UTW RGG-0111
01/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 NHO3 Line C
3 NH3 103 D
4 10/2/2019 Workshop EMD
5 NH3
6 UTW GTG 3
7 Workshop Maintowaoc
02/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 NHO3 Line C
3 NH3 103 D
4 1/3/2019 NH3 113 C
5 RTG Motor
6
7 OAST Penaflex
8 NH3 107 JT
03/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 NH3 103 D
3 NHO3 SCR
1/4/2019
4 NAST
5 NHO3 Compressor
6 NHO3
04/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 1/5/2019 Urea
3 CAN
4 Manag Club
05/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 NHO3 CRC
3 NHO3 Line A
4 1/7/2019 NH3 102 C
5 Urea E7
6 Urae E17
7 UTW 12 C 3
07/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 NH3 103 D
2 Urea P02-OAS-AM2
3 NP
4 Urea Cylinder
1/8/2019
5 Power house
6 NH3 102 B
7 NHO3 Line C
8 CAN
08/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 NP 1185
3 HNO3 203 A
4 1/9/2019 HNO3 BFW
5 UTW GTG 1-2-3
6 HNO3 SCR
7 HNO3 BFW
09/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Urea P02-OAS-AM2
2 HNO3 BFW
3 1/10/2019 Urea Near PSO pump
4 Urea E 17 line spool
1/10/2019

5 NH3 120 JT
10/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Colonoy Motor 8 no 1 no
2 NHO3 BFW
3 Staff club Civil
4 1/14/2019 Power h GTG 2
5 NH3 103 D
6 Urea
7
14/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOURS
UTILIZE MAN HOURS PERCENTAG
1 Colonoy NRV
2 NH3 103 D
3 Urea E7
4 Urea E17
5 1/15/2019 AN/Line C Line C
6 UTY GTG2
NP
7 NAST
8 CAN
15/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
1 Colonoy NRV
2 Urea E17
3 NHO3 BFW
4 Maintowoc Maintowoc
5 1/16/2019 Urea P02-OAS-AM2
6 NH3 103 D
7 CAN Crystlyzer
CAN VFB-C rooler
8 NH3 Control valve
16/01/2 12/21/1900
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
1 NHO3
2 NP
3 CAN
4 HNO3
1/17/2019
5 Urea P02-OAS-AM2
6 NH3 103 D
1/17/2019

7 UTE BCT/P/A/Motor
8 NHO3
17/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Main store
Lab
NH3 103 J
HNO3
1/18/2019 HNO3
18/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG

Urea P02-OAS-AM2
NH3 107 D
1/19/2019 HNO3
19/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Main store
AN/Plant
NH3
HNO3 E17
NP
1/21/2019 HNO3
21/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Electrical/W/S
UTW
NH3
Garage/W/S PS8 + PS12

1/22/2019
CAN
NH3 106 F
1/22/2019 Common work
22/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Electrical/W/S
AN/Plant
1/23/2019 NP Crystlyzer
UREA E7
UTE
Common work
NH3 113-C-105-C
23/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Electrical/W/Over head crane
AN/Plant
1/24/2019 NHO3 BFW
Compressor
Ladies Park
Common work
HNO3 Tower 2
24/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea/Sphare P02-OAS-AM2
NH3 103 D
UTY
1/25/2019 CAN
Common work
Common work
HNO3 Tower 2
25/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
AN
NH3
NNA
NH3
NHO3
NNA
26/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
27/01/2019 (Sunday Off)
Urea P02-OAS-AM2
NH3 103 D
NHO3 Absorption -T-2
UTW GTG2
1/28/2019
UTY Chemiccal
NH3 103 J+control v/v
Common
HNO3
28/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea P02-OAS-AM2
NH3 103 D
Urea C-2
NH3 105 J
1/29/2019
UTW GTG2
CAN/staff-c Can/staff-c
Common
NH3
29/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea C-23
NH3 103 D
NH3 120 J
UTW GTG2
1/30/2019 CAN Can Handling
LAB Lab shed
Instrument
HNO3 BFW
Common
30/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea C-23
NH3 120 J
UTW GTG2
CAN Can Handling
1/31/2019 Instrument W/S
HNO3 Bleacher line
HNO3 Absorption/02
Urea afuelin
Common
31/01/2019 UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
NH3 105 F
Urea C-23
UTW GTG2
2/1/2019 NH3 Psv
NH3 (106-F/121-T)
HNO3 Absorption/02
CAN Can Handling
Common
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Workshop
2/2/2019
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
3/2/2019 Sunday Off
UTW GTG2
HNO3 Absorption/02
NH3 101 C
CAN Can Handling
2/4/2019
Urea Prilling tower
UTY FCR
NH3 103 D
Common
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
05/02/2019 Off
Urea
Urea E17
UTW GTG2
NH3
2/6/2019 Admin
Garage
NH3 103 D
NH3
Common
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Urea E17
Urea P02-OAS-AM2
NH3 102 C
Garage
HNO3 603 A
Urea R2
2/7/2019 UTW 2001-JB
UTW GTG2
UTE
Common
NH3 101-F
UTW 2001-JB
UTE
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
UTW GTG2
NH3 103 J
Garage
NH3 101 F/st/drum
2/8/2019 NH3 Anaylzer
NH3 120 J
Urea R2
Common
UTW 2001-JB
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
C/Week HNO3 Bleacher line
2/9/2019
HNO3/NH3
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Sunday Off
UTW GTG2
NH3 101 F/st/drum
Urea E33+34
Colony
2/11/2019
Garage
Can handling
Urea
Urea
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
UTW GTG2
Urea PSV-55
NH3 105 B
2/12/2019 NH3 113-C
NH3 105-C
UTW
HNO3
Urea C-23 line
NH3
Common
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
UTW GTG2
Urea C-23 line
Urea C-23 line
9/13/2019
NH3 105 B
Common
UTW
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
UTW GTG2
Urea C-23 line
NH3 105 B
HNO3 Tower 1
2/14/2019 UTW GTG 1
UTW
G / store
Garage Garage
Common
UTILIZE MAN HOURS
AVALIBALE MAN HOUR
UTILIZE MAN HOURS PERCENTAG
Daily Log Book Craft Section. (Jan-2019)
Plan in
Job description month

GTG 3 / rigging job for CCI+use lift truruck for shifting DEC
SCR line B scaffold planks for protection DEC
Afuelin treatment plant erect 02 scaffold for monkey ladder replacement DEC
BFW/ cap position rotate use over head crane shawel loader bucket rotate DEC
Ammonia plant 103 D internal access resscue+Rigging job DEC
NHO3 line C 1 person for resscue purpose DEC
safear tank use crane resscue team (Short section rigger 05) DEC
23 Line C scaff comp (scaffolder short section) DEC
Cooling tower fan no * 02 RGG*3 motor remove and shift to workshop DEC

safear tank use crane resscue team (Short section rigger 06) JAN
NHO3 line C 1 person for resscue purpose JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
RTG motor shift truck gate to EMD workshop+scaffold+material different area JAN
Erect scaffold at 103 C ,104 C, 111 C , for insulation cladding work JAN
GTG 3 / cold box remove to shift workshop over hall JAN
Maintowaoc crane erect scaffold at boom repair work JAN

safear tank use crane resscue team (Short section rigger 06) JAN
NHO3 line C 1 person for resscue purpose JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Erect scaffold at 113 C , for insulation cladding work JAN
RTG motor shift at workshop to location and refix use boom truck JAN
Use lift truck for UTW 12 inch valve shift workshop to pump+metal scrap shift JAN
Use two crane with rigger for replacement of wheat paneflex near OAST plant JAN
Nnear 107 JT+120 J remove scaffold JAN

safear tank use crane resscue team (Short section rigger 06) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
SCR line person for resscue purpose JAN
NAST plant erect scaffold for number of 08 PSv overhaulling JAN
13 Ton crane install of 2W1-JA compressor went line use crane with rigging team JAN
Use crane with rigger for line c remove slab and old pipe civil work JAN
safear tank use crane resscue team (Short section rigger 06) JAN
Use Maintowoc crane for Urea E7 chemical washing tank shifting work JAN
PWHT machien shifting workshop to CAN plant JAN
A type ladder shift craft to management club use boom truck JAN

safear tank use crane resscue team (Short section rigger 06) JAN
CRC line b for resscue purpose JAN
SCR line A person for resscue purpose JAN
Erect scaffold at 102 C for bottom cap removal work+103 D houskeeping material JAN
Use Maintowoc crane for Urea E7 chemical tank direction change+hose refix work JAN
Erect scaffold at E17 line at urea plant for cap fiting job JAN
Erect scaffold at HRSS* 12C3 for line check JAN

Ammonia plant 103 D internal access resscue+Rigging job JAN


safear tank use crane resscue team (Short section rigger 06) JAN
Erect scaffold at CRYSTLYZER A 4 job JAN
Cholryen cylinder swap afualien plant to power house+load unload truck JAN
Erect scaffold at GTG 2 for j box inspection job+2 scaffold remove GTG 1 JAN
Use crane+cradle at 102 C converter for insulation install JAN
Use crane for line C old pipe remove work JAN
Can plant filter rooler C off load truck JAN

safear tank use crane resscue team (Short section rigger 06) JAN
Use boom truck for 1185 motor workshop to location+refix on bed JAN
Use 13 ton crane at HNO3 plant for PSN/NRV valve 203 A refix JAN
Use boom truck+13 ton crane + rigging job at HNO3 BFW machien shifting job JAN
Erect scaffold at GTG 1,2,3 for j box testing + inspection JAN
SCR line A person for resscue purpose JAN
BFW tank scaffold extend for adjust faceing machien+remove scaffold control valve JAN

safear tank 02 remove scaffold +use crane for resscue (Short section rigger 12 ) JAN
BFW tank rigging for adjust faceing machien JAN
Use 13 ton crane at front of PSO pump raw water line refix JAN
Provide scaffold at urea top of E 17 exchanger for spoool piece remove JAN
NH3 / 120JT for refixing cap rigging job JAN

Use boom truck for 08 NO + 01 NO tube well motor shift site to workshop JAN
Ammonia plant 103 D Exzast fan install JAN
Provide scaffold at staff club washroom roof repair work JAN
Provide scaffold at GTG2 for MI (Short section rigger 05) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Chemical washing tank removed use maintowoc crane JAN
Use lifttruck for scaffold material + HNO3 sheet +old material shift scrap yard JAN

Colony motor 01+08+NRV shift location to workshop JAN


Ammonia plant 103 D internal access resscue+Rigging job JAN
Erect scaffold at E7 exchanger JAN
Chemical washing tank move on E17 site use 30 ton crane JAN
AN plant cap shifting + line C rental boiler pump shift location to workshop JAN
Provide scaffold at GTG2 for MI (Short section rigger 04) JAN
Pole light direction change use crane+caradle JAN
Use crane + cardle at NAST tank scrubber vessel inspection work JAN
Can prilling tower work for wall reparing us + winch shifting(Short section 06) JAN

Colony NRV + pump rotation job shift location to workshop JAN


Chemical washing tank shift on E17 site use 30 ton crane+E17 spool piece remove JAN
BFW cap refix + remove facing machine use 30 ton crane + rigging job JAN
Number of 03 Remove scaffold at Maintowoc crane for boom repair job JAN
safear tank use crane resscue team (Short section rigger 05) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Crystlyzer job scaffolding support CAN JAN
CAN 116 floor filter drum VFB-C rooler replacment use 30 ton crane + rigging job JAN
Provide rigging support control valve V-106+MIC-124 JAN

Provide scaffold at Castic soda tank for roof repair work JAN
NP plant store SS sheet relocate provide 13 ton crane JAN
Can bulk store gate refix job provide 13 ton crane JAN
Provide scaffold at pre heater line A+B for PSV and thermowell inspection JAN
safear tank use crane resscue team (Short section rigger 05) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Old cooling tower provide Crane+boom truck for shift bolcke motor A+B JAN
BFW tank for inside inspection entery resscue purpose JAN

safear tank use crane resscue team (Short section rigger 05) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Main Store old scrap material shit to scrap yard JAN
Erect scaffold Outside the lab for protection gas clyinder shed+slab refix on roof JAN
Use liftruck + boom truck for 103 J lube oil motor shift location to workshop JAN
Hno3 line B erect scaffold for PSV line reroot JAN
Use liftruck for 103 J control valve+scaffold material+Facing machine shifting job JAN

1~18 Jan-2019 TOTAL UTI


1~18 Jan-2019 TOTAL AVALIB
1~18 Jan-2019 UTILIZE MAN HO
safear tank use crane resscue team (Short section rigger 10) JAN
Ammonia plant 107 D internal + external remove scaffold JAN
Use liftruck + boom truck for NH3+HNO3+UREA scaffold material shifting JAN

Resscue team+remove scaffold after inspection (Short section rigger 11) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Main Store old scrap material shit to scrap yard JAN
An plant gas cylinder+gas cutter shifting use 13 ton crane+Rigging job JAN
BFW box up cap refixing job use 30 ton crane + Rigging job JAN
Urea E17 cap remving+scaffold remove rigging job JAN
Acid tank motor removed use 13 ton crane+rigging work JAN
Use liftruck for control valve Facing machine+scaffold material+store material JAN

Resscue team+remove scaffold after inspection (Short section rigger 11) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
Erect scaffold at Electrical workshop overhead crane for limit switch repair JAN
Scaffold material shift at Near TTC compressor for overhauling JAN
BFW box up cap refixing job use 30 ton crane + Rigging job JAN
Use 13 ton crane for crane boom position cahnge at Grage JAN
Provide crane for gear motor shift 60-1262/60-1269/60-1270+chanel JAN
To provide scaffold at demin line PSV 106F JAN
Use liftruck bowlke motor shift+NHO3 cooler shift workshop to site JAN

Resscue team+remove scaffold after inspection (Short section rigger 11) JAN
Ammonia plant 103 D internal access resscue+Rigging job JAN
To provide scaffold at workshop over head crane for limit switch JAN
Provide scaffold at AN plant for barometer condenser gasket replacement JAN
NP plant scaffold support for crystlyzer job JAN
Provide 30 ton crane + rigger for argon set shift to E7 platform JAN
Provide 30 ton crane + rigger+boom truck for boalcke pump remove and shift to w/s JAN
Provide liftruck for portable pump+store no6 material box+scaffold material shift JAN
Provide scaffold at 113-C - 105-C for insulation work JAN

Resscue team+removel of scaffold after inspection (Short section rigger 11) JAN
Ammonia plant 103 D +102 C internal access Resscue+Rigging job JAN
To provide scaffold at workshop over head crane for limit switch JAN
Provide rigging support at AN plant for barometer condenser cap refix JAN
Provide resscue person BFW internal final inspection JAN
Erect scaffold at Near TTC spare GTG compressor for overhaulling JAN
Provide 13 ton crane + rigger at ladies park for foot well pump*3 cleaning job JAN
Use liftruck +boom truck for scaffold material shifting at HNO3+TTC compressor JAN
To provide scaffold at absorption tower-2 for bowel entry (Short section rigger 04) JAN

Internal scaffold has been removed now final houskeeping+C 23 line (Short sec rigger 11) JAN
Ammonia plant 103 D +102 C internal access Resscue+Rigging job JAN
Erect scaffold at HNO3 acid line leak repair work near new cooling tower JAN
Provide boom truck for main gate removal work+scaffold material shit saphear tank to NH3 JAN
Use boom truck for scaffold materal shifting different location JAN
Use lift ruck for scaffold material shifting craft to HNO3 + Furnace spring support paint shift JAN
To provide scaffold at absorption tower-2 for bowel entry (Short section rigger 04) JAN

Provide Resscue team + C 23 line rigging job (Short section rigger 04 ) JAN
Provide boom truck for shift and refix of rentel boiler pump workshop to site JAN
Scaffold has been removed at NAST numer of 08 psv JAN
Scaffold has been removed at ammonia sepraetor 02-2008 line A JAN
Scaffold has been removed at 145-CC/145-CD JAN
Scaffold has been removed at 104 C JAN
Scaffold adjust at tg heater line A for insulation work JAN

To Provide Resscue person team + C 23 line rigging job (Short section 04 Rigger ) JAN
To provide Resscue person ammonia plant 103 D +102 C internal access job JAN
To provide Resscue person at absorption tower-2 for bowel entry JAN
To provide scaffold at GTG 2 for MI work with (Short section 04 Rigger) JAN
Provide mobile tower scaffold at chemical store JAN
Provide boom truck for 103 J lube oil motor and control v/v shift workshop to site JAN
Scaffold material shift+GTG spare part shift+ JAN
Maintowoc shifting HNO3 for resscue purpose JAN

To Provide rigging support for C 23 line.(Short section 04 Rigger) JAN


To provide Resscue person+Rigging support for 103 D final box up. JAN
Scaffold adjustment at Urea C-2 steaper. JAN
To provide scaffold at near 120 j drain line for conection. JAN
To provide scaffold at GTG 2 for MI work with (Short section 04 Rigger). JAN
To remove scaffold at 60-1266 behind CAN handling+staff club new washroom. JAN
Provide liftruck for balcke motor shift+2 no v/v oct to w/s+ GTG2 for mi material shift. JAN
Provide crane+rigger for MIC - 124 Control valve refix and argon cylinder shift 102 C JAN

Provide rigging support for C 23 line.(Short section 04 Rigger). JAN


provide Resscue person+Rigging support for 103 D final box up. JAN
provide scaffold at near 120 j drain line for conection. JAN
provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). JAN
Provide crane cradle+Rigger at Can handling bulk store for concreat de attach. JAN
Adjust scaffold at outside lab cylinder shed for roof repair work. JAN
Provide rigging support at instrument workshop for sound proof triangle refix job. JAN
Adjust scaffold at BFW tank + absorption tower-2 resscue person JAN
Provide liftruck support cradle shift can plant+scaffold material shift different side. JAN
Provide rigging support for C 23 line.(Short section 04 Rigger). JAN
provide scaffold at near 120 j drain line for conection. JAN
provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). JAN
Provide crane cradle+Rigger at Can handling bulk store for concreat de attach. JAN
Provide scaffold at instrument workshop for sound proof triangle refix job. JAN
Provide crane+rigging team at bleacher line seperator for final box up JAN
Absorption tower-2 Resscue person JAN
Scaffold has been removed at afuelin treatment plant rejection unit 01 JAN
Provide liftruck support at HNO3 portable pump shift+scaffold material shift+Urea JAN

Provide scaffold at PSV 105 F for overhauling FEB


Provide crane + rigging support for C - 23 line. FEB
provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Provide crane + rigger at PSV 1 F for refixing. FEB
Provide rigging support at RV-1of dismentle and shift (106-F/121-T) FEB
Absorption tower-2 Resscue person FEB
Provide crane cradle+Rigger at Can handling bulk store for concreat de attach. FEB
Scaffold material shift GTG2+furnce+ can handling cradle shift+ FEB

Weight shift workshop to crane yard FEB


Scaffold material houskeeping NH3 + NHO3 plant FEB

provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Absorption tower-2 internal scaffold remove FEB
Provide scaffold at 101 C for H2O line repair work FEB
Provide crane cradle+Rigger at Can handling bulk store for concreat de attach. FEB
Scaffold removed at prilling tower stairs for light repair work FEB
Provide rigging support a/c shift to top of fcr FEB
Scaffold removed at 103 D bottom cap FEB
liftruck Can handling cardle shift+Absorption tower2+grating shift for bleacher line FEB
Erect and remove scaffold at prilling tower bucket room FEB
Provide rigging support for Cap refix job at E17 FEB
provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Provide scaffold for support refix (MSA point) (Short section 04 Rigger). FEB
Pole shift at plant to housing colonoy FEB
Provide crane and rigging support at garage for 13 ton crane boom position change FEB
Provide rigging and crane support for gas cylinder trolloy shift at 103 D FEB
Provide scaffold at 104 C outlet line near 102 C FEB
Provide liftruck for stand shifting+Vomo jet macheine shift+scaffold material 104 C FEB

Provide rigging support for bottom Cap refix at E17 . FEB


To Provide rigging support for saphear tank 2 final box up + C 23 line. FEB
Provide scaffold for support refix near 102 C (MSA point).(Short section 04 Rigger). FEB
Provide crane and rigging support at garage for 13 ton crane boom refix work. FEB
Provide crane+rigging support for 603 A control valve refix. FEB
Scaffold erected at R2 hydrolyzer for inspection work. FEB
Provide number of 02 scaffold at 2001 j /2001-JB. FEB
provide scaffold and Rigging support at GTG 2 for MI work with (Short section 03 Rigger). FEB
Provide crane and rigger for hot water pump motor. FEB
Provide liftruck for stand shift oct area+centifuge 101-J / 103-J+scaffold material shift 101-F FEB
Arrange scaffold material steam drum near 101-F (MSA point) (Short section 04 Rigger). FEB
Provide boom truck +rigger at 2001 j /2001-JB shift site to workshop. FEB
Provide 13 ton crane + rigger for reostate shift FEB

provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Provide boom truck+rigger for 103 J lube oil motor shift from site to workshop. FEB
Provide 13 ton crane and rigging support at garage for 13 ton crane boom refix work. FEB
Provide scaffold at steam drum near 101-F (MSA point) (Short section 04 Rigger). FEB
Remove number of 02 scaffold at near reforming room anaylzer + material houskeeping. FEB
Remove scaffold at 120 J suction line FEB
Scaffold extend at R2 hydrolyzer for inspection work. FEB
Provide liftruck for stand + argon clyender +unload drain chanel cleaning machein. FEB
Provide boom truck + rigger at 2001 j /2001-JB shift workshop to site and refix. FEB
Remove scaffold at HNO3 bleacher line with material houskeeping (Short section 03 Rigger). FEB
Scaffold Material housekeeping different site + scaffold coupler repair work. FEB

Provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Provide scaffold at steam drum near 101-F (MSA point) (Short section 05 Rigger). FEB
Erect scaffold at E33 + 34 line for inspection. FEB
Provide crane + rigger at colony for pole refix and light repair work. FEB
Remove scaffold at garage for 13 ton crane boom refix job. FEB
Provide crane at can handling for bulk store gate refix job. FEB
Provide crane for argon cylinder remove. FEB
Readjust scaffold at E7 FEB

Provide scaffold and Rigging support at GTG 2 for MI work with (Short section 04 Rigger). FEB
Carry out scaffold erection on PSV -55 of urea hydrolyzer. FEB
Carry out scaffold erection at 105 B transfer line main hole. FEB
Remove scaffold at 113 C of insulation cladding work ( Short section 04 rigger). FEB
Remove scaffold at 105 C of insulation cladding work ( Short section 04 rigger). FEB
Balcke cooling water pump shift workshop to site and refix. FEB
Provide crane+rigger for catylast weight remove. FEB
Provide rigging support at C 23 line for gas cylinder +material remove FEB
Provide crane + rigging support at drain line refixing job FEB
Provide liftruck for catylast weight+oil drum shift+scaffoold material+GTG 2 oil pump shift. FEB

Provide scaffold and Rigging support at GTG 2 for MI work with(Short section 04 Rigger)(Project) FEB
Scaffold remove at C -23 line . (Short section 04 Rigger). FEB
C-23 line scaffold material load on rental truck for FFL. FEB
Provide crane +rigger for remove man hole cover 105 b transfer line. FEB
Scaffold material load+ +GTG spare shift+ FEB
Erect scaffold at Near TTC spare GTG compressor for rotor removal FEB
Provide scaffold and Rigging support at GTG 2 for MI work with(Short section 04 Rigger)(Project) FEB
Provide crane+rigging at Sapher tank 2 final box up job FEB
Provide rescue team at 105 b transfer line for internal inspection. FEB
To arrange scaffold material at absorption tower-1 for bowel entry (Short section rigger 04) FEB
Provide scaffold at GTG1 common steam header NRV FEB
Balcke cooling water motor shift workshop to site and refix. FEB
Provide crane and rigging team for falling tree removing. FEB
Remove scaffold at garage for 13 ton crane hook shave wire reviving job. FEB
Garage hoist load test arrange load+shift control v/v+scaffold material shift+ FEB

1~Jan To 14 Feb-2019 TOTAL UTI


1~Jan To 14 Feb-2019 TOTAL AVALIB
1~Jan To 14 Feb-2019 UTILIZE MAN HO
No. of Resource Job Performed Remarks
Status Duration resource Hrs By
Scaff / Erection
COMP 4 4 16 Faizan+team
COMP 4 3 12 Tanveer+team 1
COMP 4 4 16 Ramzan+Team 2
COMP 3 2 6 Riaz+Team
I/P 5 4 20 Tanveer+team
I/P 7 1 7 Khalid pervaz
I/P 12 7 84 Nasir+Team
COMP 12 5 60 Short section 1
COMP 4 3 12 Faizan+team
233 Total-04 Erect
264
88
I/P 12 8 96 Shehyrar+team
I/P 8 1 8 Khalid pervaz
I/P 7 2 14 Riaz+Team
COMP 7 1 7 Riaz OP (Lifter)
COMP 7 3 21 Ramzan+Team 2
I/P 4 4 16 Faizan+team
COMP 4 4 16 Faizan+team 1
172 Total-03 Erect
184
93
I/P 12 8 96 Raees+team
COMP 7 1 7 khalid+Team
I/P 7 2 14 Khalid pervaz
COMP 4 4 16 Ramzan+Team 1
COMP 1 1 1 Khalid Tanveer
COMP 7 1 7 Riaz OP (Lifter)
COMP 8 3 24 Riaz+Team
COMP 4 4 16 Ramzan+Team
181 Total-01 Erect
184
98
I/P 11 8 88 Shehyrar+team
I/P 5 2 10 khalid+Team
COMP 5 1 5 Khalid pervaz
I/P 6 4 24 Ramzan+team 1
COMP 3 3 9 Faizan+team
I/P 3 3 9 Riaz+team
145 Total-01 Erect
156
93
I/P 11 8 88 Raees+team
COMP 6 3 18 Shehryar+Team
COMP 2 1 2 Khalid pervaz
COMP 2 2 4 Azher+team
112
118
95
I/P 12 8 96 Raees+team
I/P 7 1 7 Riaz
I/P 8 1 8 Khalid pervaz
COMP 5 3 15 Ramzan+team 1
COMP 4 3 12 Shehryar+Team
COMP 3 3 9 Tanveer+team 1
COMP 5 4 20 Tanveer+team 1
165 Total-03 Erect
168
98
I/P 5 1 5 Khalid tanveer
I/P 8 8 64 Raees+Team
COMP 4 2 8 Riaz+Team 1
COMP 4 2 8 Shehryar+Team
I/P 8 4 32 Ramzan+Team 1
COMP 4 3 12 Azher+Team
COMP 2 3 6 Shehryar+Team
COMP 2 1 2 Azher
137 Total-02 Erect
144
95
I/P 8 8 64 Raees+Team
COMP 5 3 15 Shehryar+Team
COMP 3 3 9 Shehryar+Team
I/P 3 3 3 Azher+Team
COMP 8 3 24 Ramzan+Team 3
I/P 7 8 8 Khalid tanveer
COMP 5 3 15 Faizan+team 1
138 Total-04 Erect
144
96
I/P 11.5 15 172.5 Raees+Team
COMP 3 4 12 Faizan+team
I/P 8 3 24 Shehryar+Team
COMP 5 4 20 Faizan+team 1
COMP 8 1 8 Khalid pervaz
237 Total-01 Erect
244
97
COMP 5 3 15 Riaz+Team
COMP 3 3 9 Faizan+Team
COMP 7 4 28 Ramzan+Team 1
COMP 7 6 42 Raees+Team 1
I/P 3 4 12 Khalid+Team
I/P 4 4 16 Ramzan+Team
COMP 7 1 7 Riaz
129 Total-02 Erect
136
95
COMP 5 3 15 Shehryar+Team
I/P 8 3 24 Riaz+Team
COMP 4 3 12 Ramzan+Team 1
I/P 4 3 12 Khalid+Team
I/P 3 3 9 Ramzan+Team
I/P 7 4 28 Faizan+team
I/P 4 3 12 Azher+Team
COMP 4 3 12 Ghaznfer+Team
I/P 7.5 6 45 Raees+Team
157 Total-01 Erect
176
89
COMP 3 3 9 Shehyrar+team
COMP 4 3 12 Faizan+team
COMP 4 3 12 Khalid+Team
COMP 3 3 9 Khalid+Team
I/P 8 6 48 Raees+Team
I/P 7 2 14 Riaz+Team 1
I/P 7 1 7 Safder
I/P 3 3 9 Azher+Team
COMP 4 3 12 Nasir +Team
132 Total-01 Erect
136
97
COMP 7 4 28 Faizan+team 1
COMP 2 1 2 Ghaznfer
COMP 3 1 3 Ghaznfer
COMP 3 4 12 Khalid+Team 2
I/P 8 6 48 Raees+Team
I/P 7 2 14 Riaz+Team
I/P 4 4 16 Safder
I/P 3 1 3 Azher+Team
126 Total-03 Erect
136
92
I/P 6 5 30 Raees+Team
I/P 6 2 12 Riaz+Team
I/P 5 3 15 Shehyrar+team
COMP 6 3 18 Faizan+team 1
COMP 3 3 9 Riaz+Team
COMP 3 3 9 Khalid+Team 1
COMP 5 1 5 Riaz lift
98 Total-2 Erect
102
96

18 Jan-2019 TOTAL UTILIZE MAN HOURS 2423


Jan-2019 TOTAL AVALIBALE MAN HOURS 2570
2019 UTILIZE MAN HOURS PERCENTAGE 94
I/P 11 12 132 Raees+Team
I/P 4 3 12
I/P 3 3 9
153
160
96
I/P 8 14 112 Raees+Team
I/P 8 2 16 Riaz+Team
I/P 8 3 24 Shehyrar+team
COMP 3 3 9 Faizan+team
i/P 4 3 15 Riaz+Team
COMP 4 2 6 Khalid+Team
I/P 3 2 6 Azher+Team
COMP 8 1 8 Riaz lift
196 Total-0 Erect
200
98
I/P 11.5 14 161 Raees+Team
I/P 7 2 14 Riaz+Team
I/P 4 3 12 Faizan+team
I/P 4 3 12 Faizan+team
COMP 4 3 12 Riaz+Team
COMP 3 3 9 Shehyrar+team
COMP 4 3 12 Shehreyar
I/P 4 3 12 Azher+Team 1
COMP 8 1 8 Riaz lift
252 Total-1 Erect
264
95
I/P 11.5 14 161 Raees+Team
I/P 8 1 8 Safder
COMP 4 3 12 Tanveer+team
COMP 4 3 12 Tanveer+team 1
I/P 8 1 8 Rabnawaz 1
COMP 2 3 6 Azher+Team
COMP 4 3 12 Shehryar+Team
COMP 8 1 8 Riaz liftruck
COMP 8 2 16 Faizan+team 1
243 Total-3 Erect
256
95
I/P 11.5 12 138 Raees+Team
I/P 8 2 16 Safder+Khalid P
COMP 4 3 12 Tanveer+team 1
COMP 4 3 12 Tanveer+team
I/P 8 1 8 Rabnawaz
COMP 4 4 16 Reamzan+Team 1
COMP 3 4 12 Azher+Team
COMP 8 1 8 Riaz liftruck
I/P 8 5 40 Faizan+team 1
262 Total-3 Erect
273
95
I/P 5.5 13 72 Raees+Team 1
I/P 6 2 12 Riaz+Khalid P
COMP 4 3 12 Ramzan+Team 1
COMP 5 1 5 Azher
COMP 5 1 5 Shehryar
COMP 5 1 5 Riaz liftruck
COMP 5.5 6 33 Faizan+team 1
144 Total-3 Erect
150
96
I/P 8 7 56 Raees+Team
COMP 3 3 9 Tanveer+team
COMP 3 3 9 Tanveer+team
COMP 2 3 6 Tanveer+team
COMP 2 3 6 Sarfraz+Team
COMP 3 3 9 Sarfraz+Team
COMP 2 3 6 Sarfraz+Team 1
101 Total-1 Erect
104
97

I/P 7.5 6 Raees+Team


I/P 8 2 16 Sarfraz+Team
I/P 7 2 14 Rabnawaz
I/P 7.5 4 30 Faizan+Team 1
COMP 7 3 21 Ramzan+Team 1
COMP 4 3 12 Tanveer+team
COMP 7 1 7 Riaz liftruck
COMP 3 2 6 Ghaznfer+Team
151 Total-2 Erect
152
99
I/P 7.5 4 26 Nasir+team
I/P 8 2 16 Tanveer+team
COMP 3 4 12 Ramzan+Team 1
I/P 4 4 16 Ramzan+Team 1
I/P 7.5 4 30 Faizan+Team 1
COMP 8 5 40 Raees+Team
COMP 7 1 7 Riaz liftruck 1
I/P 3 3 9 Azher+Team
153 Total-4 Erect
160
96
I/P 7.5 4 30 Raees+Team
COMP 7 2 14 Tanveer+team
I/P 4 3 12 Ramzan+Team 1
I/P 8 4 32 Nasir+team 1
I/P 7 3 21 Shehryar+Team
COMP 4 3 12 Ramzan+Team 1
I/P 3 6 18 Riaz+team
COMP 4 3 12 Riaz+team 1
COMP 8 1 8 Riaz liftruck
159 Total-4 Erect
160
99
I/P 7.5 4 30 Raees+Team
COMP 4 3 12 Tanveer+team 1
I/P 8 4 32 Nasir+team 1
I/P 7 3 21 Shehryar+Team
COMP 4 3 12 Ramzan+Team 1
COMP 4 3 12 Riaz+team
I/P 8 2 16 Khalid+Safder
COMP 4 3 12 Ramzan+Team
COMP 8 1 8 Riaz liftruck
155 Total-3 Erect
160
97
COMP 3 3 9 Ramzan+Team
I/P 6 2 12 Tanveer+team
I/P 6 4 24 Nasir+team
COMP 3 3 9 Shehryar+Team
COMP 5 3 15 Ramzan+Team
I/P 5 1 5 khalid pervaz
I/P 6 2 12 Shehryar+Team
COMP 5 1 5 Riaz liftruck
91 Total-3 Erect
96
95
COMP 4 3 12 Shehryar+Team
COMP 4 3 12 Shehryar+Team
24 Total-3 Erect
24
100

I/P 8 4 32 Faizan+team
COMP 8 6 48 Raees+Team
COMP 3 3 9 Saleem+Team 1
I/P 7 3 21 Shehryar+Team
COMP 4 3 12 Tanveer+team
COMP 4 3 12 Tanveer+team
COMP 3 3 9 Ramzan+Team
COMP 8 1 8 Riaz liftruck
151 Total-1 Erect
160
94

COMP 4 4 16 Tanveer+team 1
COMP 3 4 12 Tanveer+team
I/P 8 4 32 Faizan+team
I/P 8 5 40 Nasir+team 1
COMP 4 3 12 Azher+Team
COMP 4 3 12 Shehryar+Team
COMP 3 3 9 Azher+Team
COMP 4 3 12 Riaz+team 1
COMP 7 1 7 Riaz liftruck
152 Total-3 Erect
160
95
COMP 4 3 12 Riaz+team
COMP 4 3 12 Riaz+team
COMP 4 4 16 Nasir+team 1
COMP 3 3 9 Tanveer+team
COMP 4 3 12 Tanveer+team
COMP 4 3 12 Ramzan+Team 1
COMP 4 3 12 Ramzan+Team 1
I/P 8 3 24 Sarfraz+team 1
COMP 3 2 6 Shehryar+Team
COMP 7 1 7 Riaz liftruck
I/P 4 4 16 Nasir+team
COMP 2 2 4 Shehryar+Team
COMP 2 2 4 Azher+Team
146
152
96
I/P 6 4 24 Faizan+team
COMP 2 3 6 Azher+Team
COMP 5 3 15 Shehryar+Team
I/P 6 5 30 Nasir+team 1
COMP 3 5 15 Tanveer+team
COMP 2 3 6 Tanveer+team
COMP 3 5 15 Ramzan+Team 1
COMP 5 1 5 Riaz liftruck
COMP 3 3 9 Azher+Team
125
126
99
COMP 7.5 4 30 Faizan+team
COMP 7.5 2 15 Ali+Qaiser
45
48
94

I/P 11 4 44 Faizan+team
COMP 8 5 40 Nasir+team 1
COMP 7 4 28 Tanveer+team 2
COMP 3 3 9 Shehryar+Team
COMP 4 3 12 Shehryar+Team 1
COMP 4 2 8 Azher+Team
COMP 3 3 9 Saleem+team
COMP 4 4 16 Ramzan+Team 1
166
176
94
I/P 11 5 55 Faizan+team
COMP 4 4 16 Tanveer+team 1
COMP 3 4 12 Tanveer+team 1
COMP 4 4 16 Ramzan+Team
COMP 4 4 16 Ramzan+Team
COMP 4 3 12 Azher+Team
COMP 4 3 12 Saleem+team
COMP 4 4 16 Shehryar+Team
COMP 4 4 16 Shehryar+Team
COMP 7 1 7 Riaz liftruck
178
188
95
I/P 11 5 55 Faizan+team 1
I/P 8 8 64 Raees+Team
COMP 8 4 32 Nasir+team
COMP 3 3 9 Azher+Team
COMP 8 1 8 Riaz liftruck
COMP 4 3 12 Tanveer+team 1
180
188
96
I/P 11 4 44 Faizan+team
COMP 8 4 32 Raees+Team
COMP 7 2 14 Riaz+khalid
COMP 6 4 24 Faizan+team
COMP 4 4 16 Nasir+team 1
COMP 4 4 16 Azher+Team
COMP 4 3 12 Ramzan+Team
COMP 4 3 12 Tanveer+team
COMP 7 1 7 Riaz liftruck
177
184
96

14 Feb-2019 TOTAL UTILIZE MAN HOURS 5639


Feb-2019 TOTAL AVALIBALE MAN HOURS 5815
2019 UTILIZE MAN HOURS PERCENTAGE 97 Total------70
Erect 01 JAN TO 14 FEB
Scaff / Removal

2
Total-Remove 02
1
Total-Remove 01

2
Total-Remove 02

Total-Remove 03
2

Total-Remove 2

Total-Remove 2

2
Total-Remove 2
1
3
2
1

Total-Remove 7

Total-Remove 2
Total-Remove

Total-Remove 1

Total-Remove 1

Total-Remove 1

Total-Remove 3
1

Total-Remove 1

2
1
2

1
1

1
1

Total-------39
Removed---39