Вы находитесь на странице: 1из 14

Site Selection and Planning (Multi Dwelling Residential Units)

WE Credits Description Points available Points Scored


SSP Mandatory Local building regulation Required Achived
Requirement 01
SSP Mandatory Soil Erosion control Required Achived
Requirement 02
SSP Credit 01 Basic House – hold Amenities 02 02
SSP Credit 02 NATURAL TOPOGRAPHY AND 04 04
VEGETATION
SSP Credit 03 HEAT ISLAND EFFECT, NON-ROOF 02 01
SSP Credit 04 HEAT ISLAND EFFECT, ROOF 04 04
SSP Credit 05 PARKING FACILITIES FOR VISITORS 01 01

SSP Credit 06 ELECTRIC CHARGING FACILITIES FOR 01 01


VEHICLES.

SSP Credit 07 DESIGN FOR DIFFERENTLY ABLED. 02 0


SSP Credit 08 BASIC FACILITIES FOR CONSTRUCTION 02 02
WORKFORCE.
SSP Credit 09 BASIC FACILITIES FOR CONSTRUCTION 01 01
WORKFORCE.
TOTAL 19 16

Page 1 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Page 2 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP|CR 01: - Basic House – hold Amenities

Map highlighting basic amenities

The following are the list of 7 basic amenities within 1.0 km walkable distance from the building entrance.

1. N. G. Acharya College 2. Subash Nagar Bus stop


3. Chembur Station

4. Ambedkar garden 5. Tea villa 6. Chembur Gymkhana 7. St. marry church

Page 3 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP credit 02 states than other than the 7 basic amenities tot-lot for children and seating area for senior
citizen should be provided within the campus which are shown in the drawing below;

Seating area for senior citizen

Tot-lot for children


5. TEA VILLA

PIC 02 : - diagram showing children play area and


seating area

4. AMBEDKAR GARDEN

KEY PLAN

From the above provided information the project is eligible for the 2 point of SSP credit 01 of multi dwelling
residential units.

| Total Points: 02

Page 4 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP|CR 02: - NATURAL TOPOGRAPHY AND VEGETATION

Lavender Dirt Grass Cassia nodosa Delonix Regia

Page 5 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Calculations: -

Total site area sqm 5120

Total area retained with natural topography / or vegetation sqm 1290

Area with vegetation sqm 1290

Percentage 29.50

Meet or Exceed credit requirement (yes / no) YES

Since the area covered by vegetation on the site is 29.50% the project is eligible for 4 points of SSP
credit 02

| Total Points: 04

SSP|CR 03: - HEAT ISLAND EFFECT, NON-ROOF

Narrative: -

1. The main drive way is made up of coal tar so to reduce the heat island effect deloxinregia and
cassia nadosa tree plantation are provided along the periphery of the drive way shading the area
due to its huge foliage
2. In similar manner the internal pathways have tree plantation so as to reduce the heat island effect
occurring due to material such as paver block
3. The jogging track uses material such has dirt which decreases the effect to a greater extent

Calculations

Total Exposed non roof impervious area 2251sqm

Driveway 1851 sqm

Internal Walkways 400 sqm

Total non-roof impervious area shaded 1126.5 sqm

Shade from trees 895.5sqm

Porosity due to dirt 231sqm

Percentage 50%

Exceed or meet credit requirement Yes

Page 6 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Site Plan Demarcating the Pathway Materials and vegetation’s on the site

As the total non-roof impervious shaded is 50% therefore the project is eligible for 1 point of SSP credit 03.

| Total Points: 01

Page 7 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP|CR 04: - HEAT ISLAND EFFECT, ROOF

Terrace plan Showing services and utilities

Page 8 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Narrative: -

1. Measures have been taken in this project to reduce local temperature and maintain optimal micro-
climate.
2. All the roof surfaces – terraces, staircase & service shaft roofs, and watchman’s cabins are covered
with white china mosaic tiles (or khadi) for its high SRI of 90.
3. To improve the performance of this project, provisions of solar panels is done.

Calculations: -

Total roof area (sum of all roof areas from bird’s eye level) (sqm) 322.26

Terrace area (sqm) 290


Area of staircase block (sqm) 20.54
Area of shafts (lifts + electrical and fire-fighting shafts) (sqm) 11.82
Area of watchman’s cabin & toilets for service staff (sqm) 0
Roof area covered with services & utilities (sqm) 0
Roof area covered with skylights & other surfaces (sqm) 0
Net exposed roof area (sqm) 290
Total roof area covered with high reflective material and/or vegetation 290
(sqm)
White colored china mosaic tiles or Khadi (sqm) 290
Other high reflective materials (sqm) 0
Vegetation (sqm) 0
Percentage 100

From the above information the project is eligible for 04 point of SSP credit 04.

| Total Points: 04

Page 9 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP|CR 05: - PARKING FACILITIES FOR VISITORS

Resident car park Visitor car park

Page 10 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Description No of car parks Total no of flats total car parks required


(a) (b) (axb)

CA <= 45 sqm 0.25 per flat 36 9

CA > 45sqm and , 60 sqm 0.50 per flat 24 12

TOTAL 60 21
(c)

Visitors car park 10 % or more of total 4


(as per IGBC User guide) resident car park
(d)
TOTAL car parks 25
(c + d)

Image showing Parking requirements image


from DCPR 2034

From the above provided information the project is eligible for the 1 point of SSP credit 05 of multi
dwelling residential units

| Total Points: 01

SSP|CR 06: - ELECTRIC CHARGING FACILITIES FOR VEHICLES.

Calculation: -

Vehicle type Resident Parking Percentage Meet or Exceed


Credit
(Yes / No)
Total no of car park No of car park
space provided space provided
(excluding visitor with electric
car parking) charging facility

4- wheelers 21 4 19 Yes

Page 11 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

Position of electric
car charging pit

From the above provided information the project is eligible for the 1 point of SSP credit 06 of multi
dwelling residential units

| Total Points: 01

Page 12 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP|CR 07: - DESIGN FOR DIFFERENTLY ABLED.

As no provision is made for the accessibility of differently abled the project is not eligible for the points under
SSP07.

SSP 08: - BASIC FACILITIES FOR CONSTRUCTION WORKFORCE.

Narrative: -

1. Considering 80 workers working on the site, housing for 25% of the worker is been provided on the
site. i.e. 25% of 80 workers is 20 workers.
2. The housing for workers measures 3.0m x 4.6m (internal dimension) for 4 workers with a small kitchen
in the individual house itself.
3. Two toilets of size 0.9m x 1.2m and three urinals have been provided on the site for 100 workers (one
toilet/ urinals for every 50 workers) (calculation as per IGBC user guide 2007).
4. Adequate first aid and drinking water facilities are provided which is checked on daily basis.
5. Personal protective equipment such as helmet, full body safety belt, hand mask, nose gloves
(leather) gum boots, raincoats, safety goggles, life jacket are been provided to each and every
worker on the site.
6. Water is been sprinkled on the site so there is no dust suppression while the movement of workers or
vehicular movement.
7. Work on the site is carried out only during the day.

Workers camp First Aid Toilets

Drinking water
facility

Image highlighting housing, first aid, toilets and drinking water facility on site

Since all the necessary facilities for construcion have been provided as per the IGBC user guide
2007 therefore the project is eligible for 2 points of SSP credit 08

| Total Points: 02

Page 13 of 14
Site Selection and Planning (Multi Dwelling Residential Units)

SSP 09: - BASIC FACILITIES FOR CONSTRUCTION WORKFORCE.

Narrative: -

 The building has been constructed under the guide line of green homes with
appropriate use of strategy and design features.
 The design feature include
1. Use of Solar panels
2. Energy efficient windows
3. Passive vents
4. Electrical Charging facilities for vehicles to promote use of electrical vehicle
5. Rain water harvesting and waste water treatment

Since all the guidelines in SSP 09 are followed the project is eligible for 1 point of SSP credit 09 of
multi dwelling units | Total Points: 01

Page 14 of 14