Site Selection and Planning (Multi Dwelling Residential Units)
Page 2 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
The following are the list of 7 basic amenities within 1.0 km walkable distance from the building entrance.
Page 3 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
SSP credit 02 states than other than the 7 basic amenities tot-lot for children and seating area for senior
citizen should be provided within the campus which are shown in the drawing below;
4. AMBEDKAR GARDEN
KEY PLAN
From the above provided information the project is eligible for the 2 point of SSP credit 01 of multi dwelling
residential units.
| Total Points: 02
Page 4 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Page 5 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Calculations: -
Percentage 29.50
Since the area covered by vegetation on the site is 29.50% the project is eligible for 4 points of SSP
credit 02
| Total Points: 04
Narrative: -
1. The main drive way is made up of coal tar so to reduce the heat island effect deloxinregia and
cassia nadosa tree plantation are provided along the periphery of the drive way shading the area
due to its huge foliage
2. In similar manner the internal pathways have tree plantation so as to reduce the heat island effect
occurring due to material such as paver block
3. The jogging track uses material such has dirt which decreases the effect to a greater extent
Calculations
Percentage 50%
Page 6 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Site Plan Demarcating the Pathway Materials and vegetation’s on the site
As the total non-roof impervious shaded is 50% therefore the project is eligible for 1 point of SSP credit 03.
| Total Points: 01
Page 7 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Page 8 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Narrative: -
1. Measures have been taken in this project to reduce local temperature and maintain optimal micro-
climate.
2. All the roof surfaces – terraces, staircase & service shaft roofs, and watchman’s cabins are covered
with white china mosaic tiles (or khadi) for its high SRI of 90.
3. To improve the performance of this project, provisions of solar panels is done.
Calculations: -
Total roof area (sum of all roof areas from bird’s eye level) (sqm) 322.26
From the above information the project is eligible for 04 point of SSP credit 04.
| Total Points: 04
Page 9 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Page 10 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
TOTAL 60 21
(c)
From the above provided information the project is eligible for the 1 point of SSP credit 05 of multi
dwelling residential units
| Total Points: 01
Calculation: -
4- wheelers 21 4 19 Yes
Page 11 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Position of electric
car charging pit
From the above provided information the project is eligible for the 1 point of SSP credit 06 of multi
dwelling residential units
| Total Points: 01
Page 12 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
As no provision is made for the accessibility of differently abled the project is not eligible for the points under
SSP07.
Narrative: -
1. Considering 80 workers working on the site, housing for 25% of the worker is been provided on the
site. i.e. 25% of 80 workers is 20 workers.
2. The housing for workers measures 3.0m x 4.6m (internal dimension) for 4 workers with a small kitchen
in the individual house itself.
3. Two toilets of size 0.9m x 1.2m and three urinals have been provided on the site for 100 workers (one
toilet/ urinals for every 50 workers) (calculation as per IGBC user guide 2007).
4. Adequate first aid and drinking water facilities are provided which is checked on daily basis.
5. Personal protective equipment such as helmet, full body safety belt, hand mask, nose gloves
(leather) gum boots, raincoats, safety goggles, life jacket are been provided to each and every
worker on the site.
6. Water is been sprinkled on the site so there is no dust suppression while the movement of workers or
vehicular movement.
7. Work on the site is carried out only during the day.
Drinking water
facility
Image highlighting housing, first aid, toilets and drinking water facility on site
Since all the necessary facilities for construcion have been provided as per the IGBC user guide
2007 therefore the project is eligible for 2 points of SSP credit 08
| Total Points: 02
Page 13 of 14
Site Selection and Planning (Multi Dwelling Residential Units)
Narrative: -
The building has been constructed under the guide line of green homes with
appropriate use of strategy and design features.
The design feature include
1. Use of Solar panels
2. Energy efficient windows
3. Passive vents
4. Electrical Charging facilities for vehicles to promote use of electrical vehicle
5. Rain water harvesting and waste water treatment
Since all the guidelines in SSP 09 are followed the project is eligible for 1 point of SSP credit 09 of
multi dwelling units | Total Points: 01