Compressive strength : (BS 1881 - Part 116: 1983)
Conbextra GP3 is used for precision grouting where it is essential Age (days) Compressive strength (Nmm2)
to withstand static and dynamic loads. Typical applications would 1 30
be the grouting of base plates of turbines, compressors, boiler 3 50
feed pumps etc., It can also be used for anchoring a wide range 7 60
28 75
of fixings. These include masts, anchor bolts and fence posts.
Flexural strength ( BS 4551, 1998)
Advantages Age (days) Flexural Strength(N/mm2)

 Dual Expansion systems compensate for shrinkage and 7 10


settlement both in the plastic & hardened states 28 13

 No metallic iron content to cause staining Pullout bond strength 18 N/mm2 @ 7 days
20 N/mm2 @ 28 days
 Pre-packed material overcomes onsite batching variations
Young’s modulus >28KN/mm2
 Develops high early strength without the use of chlorides (ASTM D469 - 94)

 High ultimate strength ensure the durability of the hardened Coefficient of thermal
grout expansion 11 x 10 -6/ 0 C
Unrestrained expansion Upto 2% in the plastic
 Free flow ensures high level of contact with load bearing
state enables to
area overcome shrinkage.
Description Pressure to restrain : 0.004 N/mm2 approx.
plastic expansion
Conbextra GP3 is supplied as a ready to use dry powder. The
Hardened Shrinkage Conforms to
addition of a controlled amount of clean water produces a free
compensation ASTM C1107
flowing, non-shrink grout for gap thicknesses up to 100mm.
Effective Bearing Area > 95%
Conbextra GP3 is a blend of Portland cement, graded fillers
and chemical additives which impart controlled expansion in the Time for expansion
plastic state whilst minimising water demand. The low water Plastic state Start 15 minutes
demand ensures high early strength. The graded fillers are Finish Initial set
designed to assist uniform mixing and produce a consistent grout.
Hardended state Start Initial set
Technical support Finish Up to 28 days

An experienced technical advisory team is available to give Fresh wet density Approximately 2200 kg/m3
technical service on request. depending on actual
consistency used.
Properties
Expansion characteristics : An expansion of up to 2.5%
Water powder ratio : 0.16 - 0.17
when measured according to ASTM C827 overcomes plastic
Flowability @ w/p = 0.17
settlement in the unset material. Longer term expansion in the
Dia of spread on Bs cone @ 0’: 270 mm
hardened state is designed to comply with the requirements of
Dia of spread on BS cone @15’ : 240mm
ASTM C1107-91 to compensate for drying shrinkage.
Conbextra GP3

page 1 of 4
Conbextra GP3

Specification Clauses Application instructions


Preparation
Performance specification
Foundation surface
All grouting shown on the drawing must be carried out with a
pre packed cement based product which is chloride free. The substrate surface must be free from oil, grease or any
loosely adherent material. If the concrete surface is defective
It shall be mixed with clean water to the required consistency. or has laitence, it must be cut back to a sound base. Bolt holes
The grout must not bleed or segregate. and fixing pockets must be blown clean of any dirt or debris.

A positive volumetric expansion shall occur while the grout is Pre-soaking


plastic by means of gaseous hydrogen free system. The grout
Several hours prior to placing, the concrete substrates should
must also be compensated for shrinkage in the hardened state
be saturated with fresh water.
as per ASTM C 1107-91.
Immediately before grouting takes place any free water should
Typical detail of stanchion base plate
be removed with particular care being taken to blow out all bolt
holes and pockets.

Base plate

It is essential that this is clean and free from oil, grease or scale.
Air pressure relief holes should be provided to allow venting of
any isolated high spots.

Levelling shims

If these are to be removed after the grout has hardened, they


should be treated with a thin layer of grease.

Formwork

The formwork should be constructed to be leakproof. This


can be achieved by using foam rubber strip or mastic sealant
beneath the constructed formwork and between joints.

In some cases it is practical to use a sacrificial semi-dry sand


and cement formwork. The formwork should include outlets
for pre-soaking.
The compressive strength of the grout must exceed 55 N/
mm2 at 7 days and 65 N/mm2 at 28 days. Unrestrained surface area

The flexural strength of grout must exceed 9N/mm2 @ 28 days. This must be kept to a minimum. Generally the gap width
The fresh wet density of the mixed grout must exceed 2150 kg/m3. between the perimeter formwork and the plate edge should
not exceed 150mm on the pouring side and 50mm on the op-
The storage, handling and placement of the grout must be in
posite side. It is advisable, where practical, to have no gap at
strict accordance with the manufacturer’s instructions.
the flank sides.

constructive solutions page 2 of 4


Conbextra GP3

Mixing and placing

Mixing
Typical hopper system
For best results a mechanically powered grout mixer should
Removable hopper : For large pours the grout may be hand
be used. When quantities up to 50kg are used, a heavy duty
placed or pumped into a removable hopper ( trough)
slow speed drill (400-500 rpm) fitted with a paddle is suitable..
Larger quantities will require a heavy duty mixer.

To enable the grouting operation to be carried out continu-


ously, it is essential that sufficient mixing capacity and labour
are available. The use of a grout holding tank with provision
to gently agitate the grout may be required.

Consistency of grout mix

The quantity of clean water required to be added to a 25kg bag


to achieve the desired consistency is given below :

Pourable (@ w/p=0.16) : 4 litres

Flowable (@ w/p=0.17) : 4.25 litres

The selected water content should be accurately measured


into the mixer. The total content of the Conbextra GP3 bag
should be slowly added and continuous mixing should take Pouring should be from one side of the void to eliminate any air
place for 5 minutes. This will ensure that the grout has a or presoaked water becoming trapped under the base plate. It
smooth even consistency. is advisable to pour the grout across the shortest distance of
travel. The grout head must be maintained at all times so that
Placing
a continuous grout front is achieved.
At 300C place the grout within 20 minutes of mixing to gain
Where large volumes have to be placed Conbextra GP3 may
full benefit of the expansion process.
be pumped. A heavy duty diaphragm pump is recommended
Conbextra GP3 can be placed in thicknesses up to 100mm in for this purpose. Screw feed and piston pumps may also be
a single pour when used as an underplate grout. suitable.

For thicker sections it is necessary to fill out Conbextra GP3 Curing


with well graded silt free aggregate to minimise heat build up.
On completion of the grouting operation, exposed areas should
Typically a 10mm aggregate is suitable. 50 - 100% aggregate
be thoroughly cured. This should be done by the use of Con-
weight of Conbextra GP3 can be added.
cure WB curing membrane, continuous application of water
Any bolt pockets must be grouted prior to grouting between and/or wet hessian.
the substrate and the base plate.
Limitations
Continuous grout flow is essential. Sufficient grout must be
Low temperature working
prepared before starting. The time taken to pour a batch must
be regulated to the time to prepare the next one. When the air or contact surface temperatures are 100C or below
on a falling thermometer, warm water ( 30 - 400C) is recom-
mended to accelerate strength development.

For ambient temperature below 100C the formwork should be


kept in place for at least 36 hours.

Normal precautions for winter working with cementitious materi-


als should then be adopted.

constructive solutions page 3 of 4


Conbextra GP3

High temperature working Precautions


At ambient temperatures above 400 C, cool water ( below 200C) Health and Safety instructions
should be used for mixing the grout prior to placement.
Conbextra GP3 is alkaline and should not come into contact
Estimating with skin and eyes. Inhalation of dust during mixing should
be avoided.
Packaging
Gloves, goggles and dust mask should be worn.
Conbextra GP3 is supplied in 25 kg moisture resistant bags.
If contact with skin occurs, it shall be washed with water.
Yield (considering density @ 2.3 gm/cc)
Splashes to eyes should be washed immediately with plenty
Allowance should be made for wastage when estimating of clean water and medical advice sought.
quantities required. The approximate yield per 25 kg bag for
Fire
different consistency is :
Conbextra GP3 is non flammable.
Consistency Pourable Flowable
Additional information
Yield ( litres) 12.6 12.7
For further details about the use and selection of grouts refer
Storage
to the Fosroc Information module entitled ‘Precision grouting
Shelf life in the Construction industry’.

Conbextra GP3 has a shelf life of 6 months if kept in a dry store


in sealed bags. If stored in high temperature and high humidity
locations, the shelf life may be reduced.

Important note :
Fosroc products are guaranteed against defective materials and manufacture and are sold
subject to its standard terms and conditions of sale, copies of which may be obtained on
request. Whilst Fosroc endeavours to ensure that any advice, recommendation specification
or information it may give is accurate and correct, it cannot, because it has no direct or
continuous control over where or how its products are applied, accept any liability either
Fosroc Chemicals directly or indirectly arising from the use of its products whether or not in accordance with
any advice, specification, recommendation or information given by it.
(India) Pvt. Ltd.
Head Office telephone fax e-mail
Embassy Point, No. 150,
2nd Floor, Infantry Road, +91 80-42521900 +91 80-22281510 enquiryindia@fosroc.com
Bangalore 560 001,
Karnataka

Regional Offices

Chennai Mumbai Noida Kolkata


Hills Centre,Old No 5, MBC Park, 12th floor, Office No.12B, Unit No. 601, Highway Tower-II 304, Jodhpur Park
New No 9, 3rd Cross Street, ‘D’ Block, Near G Corp/Hyper City A-13/2, 6th Floor, Sector– 62 Kolkata 700 068
Jeth Nagar, Raja Annamalaipuram, Kasarwadawali, Ghodbunder Road, Gautam Buddha Nagar, Ph:+91 33-65343188
Chennai 600 028. Thane (West) 400 615 Noida 201 309, Uttar Pradesh Fax: 033-2499-0280
Ph: +91 44 61304500 Ph: +91 22 6229 6800 Ph: +91 120 6121900
Fax: 022 62296809 Fax: 0120-4270622

www.fosroc.com

page 4 of 4 INDIA/2019/0307/A

Вам также может понравиться