Академический Документы
Профессиональный Документы
Культура Документы
SEQUENCE of EVENTS:
0954H - alert level CODE 2 was raised at 9th floor by CCTV control.
0959H - Fire uncontainable, CSO raised alert status from level CODE 2 to alert
Level CODE 3.
- CSO ordered and advised for complete evacuation.
1002H - Control inform all radio units and alert ERT members.
- COMMUNICATION TEAM called the assistance of the following:
LOCAL AUTHORITY CALL TIME CALL ANSWER CALL
TIME DURATION
MAKATI FIRE STATION 1002.30H 1003.00H 30 seconds
MAKATI POLICE STATION 1003.30H 1004.00H 30 seconds
MAKATI RESCUE 1004.00H 1004.50H 50 seconds
City Garden Makati Hotel 1005.00H 1005.50H 50 seconds
Fire Drill activity was participated by local police and City Garden Makati Hotel’s security.
Overall, the conducted Fire Drill was done smoothly. All lapses and mishaps are noted and will be
subject for improvement and development.
6. PHOTOS
ASSUMED INJURED EMPLOYEE RESCUE BY RESCUE AND EVACUATION TEAM TOGETHER WITH FIRST
AID TEAM MEMBER FO JC.