Академический Документы
Профессиональный Документы
Культура Документы
Mohit Kumar
Years’ Experience: 4
My name is G. Mohit Kumar and am an Electrical Engineer. I have done my Masters in Electrical engineering from GITAM
University. Currently am working as a BIM Modeller in Fujita Co from the past 2 months. I have 4 years in Revit MEP
Modelling. I have experience in various types of projects (METRO RAIL, INDUSTRIAL, and RESIDENTIAL
BUILDINGS).
Additional Knowledge:
Revit
Navisworks
Autocad
Dialux ANNEXES FOLLOWING PAGE
PS cad
MS office
1
Redline Depots As-Built (Fujita co & MHI)
Realisations: Results:
The main challenging aspect of this project is it was Ensured smooth Workflow to maintain the level of details
an LOD 300. So, there is less detailing in the model and took at most interest to ensure any discrepancies in
and the models have lots of issues. the model.
In this project I have worked on the Electrical The Submitted models are clash free with the other
services like Small power, BMS, Lighting, cable tray services. This was a very challenging task in this project.
and ELV equipment’s.
Submitted the shop drawings on time to the client for the
Coordinated with the other services to maintain first revision of As-built.
clash free model and to ensure smooth work flow.
Ensured there are no issues in the model and worked as
Needed to prepare schedules after updating of per the standards which are required by the client.
redline markups.
Currently we are working on generation of COBie data for
In this project I newly learned about how to work submission.
and generate COBie data for future maintenance
purpose.
2
QATAR INTEGRATED RAILWAY PROJECT DOHA GOLD LINE
METRO- SPORTS CITY STATION
Realisations: Results:
As we need to generate LOD 500 we get constant Modifications in the model is done as per the markups
changes in the model, we need to cope up with the received from the site.
issues such as coordination with the other services and
updating of families as per the site installation. Submitted the shop drawings before the deadline and
got approved from the design team with minimum
There are lots of technical issues with the model when comments.
compared to the approved 2-D Drawings. So playing as
a team to solve the technical issues. Submitted the project with the standard’s as per the
project standards.
Daily different issues raise up and those were solved in
supervision of our coordinator. Redline markups have been done and as-built will be
starting in the upcoming days.
In Electrical service there are different sub services
such as Small power, Lighting, Fire alarm and detection, The Submitted models are clash free with the other
Earthing, BACS, Cable trays and Low voltage services.
Equipment’s.
3
NSP COMMERCIAL BUILDING-UK
Realisations: Results:
As this was my first major project I have gained lots Ensured smooth Workflow to maintain the level of details
of experience since I have been in the project right and took at most interest to ensure any discrepancies in
from scratch. the model.
There used to be lots of coordination issues The Submitted models are clash free with the other
because of the less clearance to run services, it is a services. This was a very challenging task in this project.
very challenging task.
Submitted the shop drawings on time to the client for the
In this project I have worked on the Electrical approval from the design team.
services like Small power, Fire alarm, BMS,
Lighting, Earthing, cable tray and ELV equipment’s. Ensured there are no issues in the model and worked as
per the standards which are required by the client.
The shop drawings has to be submitted as per the
UK standards which was our client requirement. Successfully managed to complete the project as per the
given time.
This project is an LOD 350 which is the client
requirement and the model has been developed as
per the LOD 350 standards.
4
MILAHA LOGISTICS WAREHOUSE- QATAR
Realisations: Results:
The main challenging aspect of this project is Ensured smooth Workflow to maintain the level of details
lighting. As it was a warehouse and lighting was a and took at most interest to ensure any discrepancies in
major aspect. Few technical issues have arise and the model.
they are solved with coordinating with the design
engineers. The Submitted models are clash free with the other
services. This was a very challenging task in this project.
This project is an LOD 350 which is the client
requirement and the model has been developed as Submitted the shop drawings on time to the client for the
per the LOD 350 standards. approval from the design team.
The Modelling and shop drawings are to be Ensured there are no issues in the model and worked as
submitted as per the client’s requirements and per the standards which are required by the client.
project standards.
Successfully managed to complete the project as per the
In this project I have worked on the Electrical given time.
services like Small power, Fire alarm, BMS,
Lighting, Earthing, cable tray and ELV equipments.