Вы находитесь на странице: 1из 5

Nationality: INDIAN Name: G.

Mohit Kumar

Age: 27 Position: BIM MODELLER

Years’ Experience: 4
My name is G. Mohit Kumar and am an Electrical Engineer. I have done my Masters in Electrical engineering from GITAM
University. Currently am working as a BIM Modeller in Fujita Co from the past 2 months. I have 4 years in Revit MEP
Modelling. I have experience in various types of projects (METRO RAIL, INDUSTRIAL, and RESIDENTIAL
BUILDINGS).

CAREER OBJECTIVE: Seeking a Responsible & challenging position


which will offer me professional growth as well as future career advancements the
CLIENTS WORKED FOR : organization which I work for. I am a talented and ambitious individual with
depth knowledge in the AEC field. I will be consistently contributing to the best
 Fujita Co- Redline metro of my potential to the success of the organization which I serve for.
Depots (As-Built)
 ALYSJ JV-Qatar Gold line
Metro
 NSP Commercial Building- Most Relevant Experiences
UK
 Milaha logistics ware
house-QATAR ANNEX
Duration Title
Page
EDUCATION : BIM MODELLER- As-Built for Redline Depots
2 Months 2
(Client: Fujita Co.)
 M.Tech (Electrical)
BIM MODELLER- Studio Parametric 3
GITAM UNIVERSITY 4 MONTHS
Architects (Client: ALYSJ JV)
 B.E (Electrical)
BIM MODELLER-Winrar Software Pvt ltd
ANDHRA UNIVERSITY 2 YEARS 4
NSP Commercial Building-UK
LANGUAGES:
BIM MODELLER-Winrar Software Pvt ltd
1.6 YEARS 5
 ENGLISH Milaha logistics ware house-QATAR
 HINDI

Additional Knowledge:

 Revit
 Navisworks
 Autocad
 Dialux ANNEXES FOLLOWING PAGE
 PS cad
 MS office

1
Redline Depots As-Built (Fujita co & MHI)

BIM MODELLER JULY 2018 TO TILL DATE

Context & Objectives:

Our Responsibility in this project is to update the model as per


the received redline mark-ups and submit the model for As-
built.

After submission of the As-built we need to generate COBie


data as per the client’s requirement.

Realisations: Results:

 The main challenging aspect of this project is it was  Ensured smooth Workflow to maintain the level of details
an LOD 300. So, there is less detailing in the model and took at most interest to ensure any discrepancies in
and the models have lots of issues. the model.

 In this project I have worked on the Electrical  The Submitted models are clash free with the other
services like Small power, BMS, Lighting, cable tray services. This was a very challenging task in this project.
and ELV equipment’s.
 Submitted the shop drawings on time to the client for the
 Coordinated with the other services to maintain first revision of As-built.
clash free model and to ensure smooth work flow.
 Ensured there are no issues in the model and worked as
 Needed to prepare schedules after updating of per the standards which are required by the client.
redline markups.
 Currently we are working on generation of COBie data for
 In this project I newly learned about how to work submission.
and generate COBie data for future maintenance
purpose.

2
QATAR INTEGRATED RAILWAY PROJECT DOHA GOLD LINE
METRO- SPORTS CITY STATION

BIM MODELLER FROM MAR 2018 TO TILL DATE.

Context & Objectives:

My Main Responsibilities are generation of shop drawings


as per the client requirement.

Updating of standard families from Non-standard families


as per the site installations.

Updating of Revit models with respect to the approved 2-


D Drawings.

Modifications in the modeling as per the markups


received from the site

Generated layouts and shop drawings for Electrical


services like SMALL POWER, LIGHTING, CONTAINMENT,
EARTHING, BACS AND LV EQUIPMENT for approvals.

Generation of Utility and telecom retail Shop drawings.

Realisations: Results:

 As we need to generate LOD 500 we get constant  Modifications in the model is done as per the markups
changes in the model, we need to cope up with the received from the site.
issues such as coordination with the other services and
updating of families as per the site installation.  Submitted the shop drawings before the deadline and
got approved from the design team with minimum
 There are lots of technical issues with the model when comments.
compared to the approved 2-D Drawings. So playing as
a team to solve the technical issues.  Submitted the project with the standard’s as per the
project standards.
 Daily different issues raise up and those were solved in
supervision of our coordinator.  Redline markups have been done and as-built will be
starting in the upcoming days.
 In Electrical service there are different sub services
such as Small power, Lighting, Fire alarm and detection,  The Submitted models are clash free with the other
Earthing, BACS, Cable trays and Low voltage services.
Equipment’s.

 In this project I newly learned about the Utility


drawings for telecom retail service and worked on this
service shop drawings.

3
NSP COMMERCIAL BUILDING-UK

BIM MODELLER JULY 2014 TO JUL 2016

Context & Objectives:

The main Objective was to work on Electrical services right


from the scratch, From modelling to final submission of the
shop drawing.

Modelling of electrical services like Small power, Lighting,


Cable tray, Bus Ducts, Earthing and BMS.

Co-coordinating with other main services for the smooth flow


of the project.

Generation Of quantities and schedules for sending them to


the site for purchases and execution.

Modelling and submissions are done as per the UK standards


as per the client requirement.

Realisations: Results:

 As this was my first major project I have gained lots  Ensured smooth Workflow to maintain the level of details
of experience since I have been in the project right and took at most interest to ensure any discrepancies in
from scratch. the model.

 There used to be lots of coordination issues  The Submitted models are clash free with the other
because of the less clearance to run services, it is a services. This was a very challenging task in this project.
very challenging task.
 Submitted the shop drawings on time to the client for the
 In this project I have worked on the Electrical approval from the design team.
services like Small power, Fire alarm, BMS,
Lighting, Earthing, cable tray and ELV equipment’s.  Ensured there are no issues in the model and worked as
per the standards which are required by the client.
 The shop drawings has to be submitted as per the
UK standards which was our client requirement.  Successfully managed to complete the project as per the
given time.
 This project is an LOD 350 which is the client
requirement and the model has been developed as
per the LOD 350 standards.

4
MILAHA LOGISTICS WAREHOUSE- QATAR

BIM MODELLER JULY 2016 TO FEB 2018

Context & Objectives:

This was a warehouse project and mainly we focused on


lighting part.

Modelling of electrical services like Small power, Lighting,


Cable tray, Earthing and BMS.

Co-coordinating with other main services for the smooth flow


of the project.

Generation of quantities and schedules for sending them to


the site for purchases and execution.

Generation of shop drawings and submission for the approval


from the design team.

Modelling and submissions are done as per the standards


required by the client.

Realisations: Results:

 The main challenging aspect of this project is  Ensured smooth Workflow to maintain the level of details
lighting. As it was a warehouse and lighting was a and took at most interest to ensure any discrepancies in
major aspect. Few technical issues have arise and the model.
they are solved with coordinating with the design
engineers.  The Submitted models are clash free with the other
services. This was a very challenging task in this project.
 This project is an LOD 350 which is the client
requirement and the model has been developed as  Submitted the shop drawings on time to the client for the
per the LOD 350 standards. approval from the design team.

 The Modelling and shop drawings are to be  Ensured there are no issues in the model and worked as
submitted as per the client’s requirements and per the standards which are required by the client.
project standards.
 Successfully managed to complete the project as per the
 In this project I have worked on the Electrical given time.
services like Small power, Fire alarm, BMS,
Lighting, Earthing, cable tray and ELV equipments.

 Coordinated with the other services to maintain


clash free model and to ensure smooth work flow.