UNIVERSIDAD NACIONAL DE SAN ANTONIO ABAD DEL CUSCO


FACULTAD DE ARQUITECTURA E INGENIERÍA CIVIL
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

Tema:

RESOLUCIÓN DEL EXAMEN


TRABAJO INDIVIDUAL

Asignatura : TOPOGRAFÍA II
Docente : ING. JUAN PABLO GAMARRA GONGORA
Alumno : NINA MENDOZA JOHAN ROGER

Código : 133648

Grupo : 3

Cusco-Perú
2019
P1.- Compensar los desniveles teniendo en cuenta la Tolerancia Máxima de 𝑻𝒐𝒍 = 𝟏𝟎√𝒌 𝒎𝒎

PRIMERA ITERACION

TRIANGULO LADO DISTANCIA PRO SUMA DESNIVEL(m) TOLERANCIA(mm) ERROR(m) REPARTO DESNIVEL CORREGIDO
AB 1234.543 4565.853 42.652 -0.015 0.00405579 42.6560558
ABC BC 1407.78 4565.853 34.786 -0.015 0.00462492 34.7906249
CA 1923.53 4565.853 -77.453 21.3678567 -0.015 0.00631929 -77.4466807

SUMA 4565.853 -0.015 0.015 0

AC 1923.53 4514.517 77.4466807 -0.01331929 0.00567504 77.4523557


ACD CD 2332.262 4514.517 19.828 -0.01331929 0.00688093 19.8348809
DA 258.725 4514.517 -97.288 21.2473928 -0.01331929 0.00076332 -97.2872367

SUMA 4514.517 -0.01331929 0.01331929 0

CE 1869.184 5743.092 -8.435 0.01211907 -0.00394435 -8.43894435


CED ED 1541.646 5743.092 28.282 0.01211907 -0.00325318 28.2787468
DC 2332.262 5743.092 -19.8348809 23.9647491 0.01211907 -0.00492154 -19.8398025

SUMA 5743.092 0.01211907 -0.01211907 0


SEGUNDA ITERACION

TRIANGULO LADO DISTANCIA PRO SUMA DESNIVEL(m) TOLERANCIA(mm) ERROR(m) REPARTO DESNIVEL CORREGIDO

CE 1869.184 5743.092 -8.435 0.01211907 -0.00394435 -8.43894435


CED
ED 1541.646 5743.092 28.282 0.01211907 -0.00325318 28.2787468

DC 2332.262 5743.092 -19.8348809 23.9647491 0.01211907 -0.00492154 -19.8398025

SUMA 5743.092 0.01211907 -0.01211907 0

AC 1923.53 4514.517 77.4523557 0.00492154 -0.00209695 77.4502588


ACD
CD 2332.262 4514.517 19.8398025 0.00492154 -0.00254253 19.8372599

DA 258.725 4514.517 -97.2872367 21.2473928 0.00492154 -0.00028205 -97.2875187

SUMA 4514.517 0.00492154 -0.00492154 0

AB 1234.543 4565.853 42.6560558 -0.00357809 0.00096746 42.6570233


ABC
BC 1407.78 4565.853 34.7906249 -0.00357809 0.00110322 34.7917281

CA 1923.53 4565.853 -77.4502588 21.3678567 -0.00357809 0.0015074 -77.4487514

SUMA 4565.853 -0.00357809 0.00357809 0


TERCERA ITERACION

TRIANGULO LADO DISTANCIA PRO SUMA DESNIVEL(m) TOLERANCIA(mm) ERROR(m) REPARTO DESNIVEL CORREGIDO

AB 1234.543 4565.853 42.6560558 -0.00357809 0.00096746 42.6570233


ABC
BC 1407.78 4565.853 34.7906249 -0.00357809 0.00110322 34.7917281

CA 1923.53 4565.853 -77.4502588 21.3678567 -0.00357809 0.0015074 -77.4487514

SUMA 4565.853 -0.00357809 0.00357809 0

AC 1923.53 4514.517 77.4487514 -0.0015074 0.00064227 77.4493937


ACD
CD 2332.262 4514.517 19.8372599 -0.0015074 0.00077874 19.8380387

DA 258.725 4514.517 -97.2875187 21.2473928 -0.0015074 8.6388E-05 -97.2874323

SUMA 4514.517 -0.0015074 0.0015074 0

CE 1869.184 5743.092 -8.43894435 0.00176379 -0.00057406 -8.43951841


CED
ED 1541.646 5743.092 28.2787468 0.00176379 -0.00047346 28.2782734

DC 2332.262 5743.092 -19.8380387 23.9647491 0.00176379 -0.00071627 -19.8387549

SUMA 5743.092 0.00176379 -0.00176379 0


CUARTA ITERACION

TRIANGULO LADO DISTANCIA PRO SUMA DESNIVEL(m) TOLERANCIA(mm) ERROR(m) REPARTO DESNIVEL CORREGIDO
CE 1869.184 5743.092 -8.43894435 0.00176379 -0.00057406 -8.43951841
CED ED 1541.646 5743.092 28.2787468 0.00176379 -0.00047346 28.2782734
DC 2332.262 5743.092 -19.8380387 23.9647491 0.00176379 -0.00071627 -19.8387549

SUMA 5743.092 0.00176379 -0.00176379 0

AC 1923.53 4514.517 77.4493937 0.00071627 -0.00030519 77.4490885


ACD CD 2332.262 4514.517 19.8387549 0.00071627 -0.00037004 19.8383849
DA 258.725 4514.517 -97.2874323 21.2473928 0.00071627 -4.1049E-05 -97.2874734

SUMA 4514.517 0.00071627 -0.00071627 0

AB 1234.543 4565.853 42.6570233 -0.00033708 9.1142E-05 42.6571144


ABC BC 1407.78 4565.853 34.7917281 -0.00033708 0.00010393 34.7918321
CA 1923.53 4565.853 -77.4490885 21.3678567 -0.00033708 0.00014201 -77.4489465

SUMA 4565.853 -0.00033708 0.00033708 0

LADO DIST-PRO DESNIVEL


AB 1234.543 42.6571144
BC 1407.78 34.7918321
CA 1923.53 -77.448946
CD 2332.262 19.8383849
DA 258.725 -97.287473
ED 1541.646 28.2782734
CE 1869.184 -8.4395184
P2.- Calcular las cotas ya corregidas del terreno de los diferentes vértices, del problema
anterior, si la cota del vértice A es 3000.000 msnm.

Usando los desniveles compensados en la tabla anterior, se calculó las cotas comprobando en
sentido horario y anti horario

En Sentido Anti Horario En Sentido Horario

PUNTO COTA PUNTO COTA


A 3000 A 3000
B 3042.65711 D 3097.28747
C 3077.44895 E 3069.0092
E 3069.00943 C 3077.44872
D 3097.2877 B 3042.65689
A 3000.00023 A 2999.99977

COTAS CORRECTAS
(msnm)
PUNTO COTA
A 3000.000
B 3042.657
C 3077.449
D 3097.288
E 3069.009

P3.- Calcular la Temperatura con el que se calibro una Estación Total marca TOPCON, si las
PPM son de 19 a una presión de 700 mmHg.
106.033
𝐾𝑎 = (276.66 − ∗ 𝑃) ∗ 10−6
273.15 + 𝑇
P=Presión
T=Temperatura en °C

106.033
19∗ 10−6 = (276.66 − 273.15+𝑇 ∗ 700) ∗ 10−6

106.033
19= (276.66 − 273.15+𝑇 ∗ 700)

106.033
257.66 = ( ∗ 700)
273.15 + 𝑇
106.033
273.15 + 𝑇 = ( ∗ 700)
257.66
273.15 + 𝑇 = 288.066
𝑇 = 14.91°𝐶
P4.- Calcular la Precisión de la Estación Total anterior si se trabajó con una Hoja Reflectante,
si se ha medido una distancia de 1746.285 m.

𝒑 = ±(𝒆 + 𝒏 ∗ 𝑷𝑷𝑴 ∗ 𝑫)𝒎𝒎

e= 3 (por ser trabajo con hoja reflectante)

n= 2

PPM=19

D=1746.285M

REEPLAZANDO:

𝒑 = ±(𝒆 + 𝒏 ∗ 𝑷𝑷𝑴 ∗ 𝑫)𝒎𝒎

𝒑 = ±(𝟑 + 𝟐 ∗ 𝟏𝟗 ∗ 𝟏𝟎−𝟔 ∗ 𝟏𝟕𝟒𝟔. 𝟐𝟖𝟓)𝒎𝒎

𝒑 = ±(𝟑 + 𝟎. 𝟔𝟔𝟑𝟓𝟖𝟖𝟑)𝒎𝒎

𝒑 = ±(𝟑. 𝟕)𝒎𝒎