Calculation of Tin Reserve Based on Block Model and Technical Plan of Primary Tin Mining of
East Belitung Region

1 1 2, 2
Reynaldo Novian , Asti Sulastri , Friska Agustin Chalid Idham Abdullah
Reynaldo.novian@gmail.com
1
Mine Exploration Study Program, Institut Teknologi dan Sains Bandung (ITSB)
2
Geology Engineering Study Program, Faculty of Earth Sciences and Technology, Institut Teknologi Bandung

Abstract - Tin is formed as the primary deposite of granitic rock and at the metamorphic rock touch area which is usually
associated with tourmaline and quartz tin veins. The tin ore gene is derived from liquid magma containing cassiterite (SnO 2). The
intrusion of granite rock surface causes the pneumatolitic phase (F and Cl gases carrying elements of Sn react with meteoric
water) resulting in ore minerals such as tin ore. These minerals accumulate and associated in granite rocks or other rocks intruded
into primary tin ores.

Primary tin abundance has the potential to be mining in related areas. The primary tin mining plan in East Belitung Region by
open mine, the mining stage will be done by following the decrease of pit elevation. Overburden stripping method and ore taking
is planned with mechanical tools due to low material hardness level and declared economical using mechanical tools. Location
area of 224,359 m2 with overburden volume 8,129,844 m3 and tonnage ore 3,542,210 tons, then stripping ratio of 2,3 BCM / ton.
Pit mining will be done at elevation >25 to -80 mdpl with production target of 50 ton / month and production value is calculated
equal to 14,033 ton, so the life of mining for 23 years.

Paper ID: PIT18-447 Copyright PIT IAGI – 2018. All right reserved

INTRODUCTION GEOLOGICAL RESEARCH AREA

Tin is a white silvery metal which easily to Research area is in the Eastern Belitung at
formed and flexible, have a crystalline structured, but coordinates geographic 2o48’00’’LS dan
easily broken if cooled condition. Tin is formed as 108o12’17’’BT. The topography conditions at
the primary deposite in the granite rock and at the research area is flat relative around 10 – 100 m and
touching area metamorphic rocks (associated with the slope too around 2 – 15%.
tourmaline and quartz tin veins), as well as a
secondary deposite in it consists of sediment
alluvium, elluvial, and colluvium.

On the research area is located in the eastern part of


the Southeast Asian granites tin belt zone, so that it
expected as a potential area for the accurence of the
ore deposite such as iron and cassiterite associate
with monazite and other accessories minerals. The
type of primary tin deposite in this area is skarn.
Characteristics of granitic igneous rocks as a source
of primary mineralization on the research area is a
granite series ilmenit or commonly called granitic S Figure 1. Maps of Regional Accomplishments
type (Chappell and White, 1987), which is the granite
formed by melting of continental crust (crust The process and geological condition are greatly
anataxis). influences the formation of resources from the
comodities in some place. Geological process such as
PROCEEDINGS PEKAN ILMIAH TAHUNAN IAGI 2018
Hotel Pangeran, Pekanbaru, October 28th – November 1st, 2018

magma intrution, tectonic, folding, weathering, METHODOLOGY


leaching, erosion, and sedimentation. Based on the
geological of Bangka Belitung is at Paparan Sunda
and the edge of continental crust.

Regionally geologically, the research area is a contact


area between the malignant rocks of the
Kelapakampit Formation (PCKs) aged Permo Karbon
with Diorite Quartz Batubesi (Kbd) aged Cretaceous
and there are fault structure and or fractures.

Figure 2. Maps of Geological Regional

Figure 4. Methodology

DATA AND METHOD

In this research, the supporting data used such as


UAV Maps, Pit Design, Collar, Assay, and Mechine
Purchase Costs, etc.

Method for calculate the primary tin in East Belitung


Island (in this research area) used by block model
Figure 3. Correlation of Rock Unit from software Micromine. Using block model
because the sample data is taken randomly dan just a
few, so the result of data processing will be more
accurate or neares the fact.
PROCEEDINGS PEKAN ILMIAH TAHUNAN IAGI 2018
Hotel Pangeran, Pekanbaru, October 28th – November 1st, 2018

On mine planning at the research area, we have been From the data, it can be seen the ore body is shaped
seeing and prediction of the tin distribution so that it such as a breakthrough on side rocks, so that mining
can determine the location of core mining, mine road can be done simultaneously between ore and
construction, watering flow, disposal area and overburden (after clearing areas and made the road
processing site. early mining).

Considering the economic value of tin mining, the Calculate of reserve primary tin in this research area
moning method used by open pit. as much as 14,033 tons from the 3,542,210 tons ore
deposit.
RESULT AND DISCUSSION

From the collar and assay data processing (as well


as some other supporting data) using micromine
software it is seen that tin ore is not far from the
surface.

Table 1. PDH Data

Corresponding with the mining method used than the


mining stage will be following the decrease of the pit
elevation. Mining areas of 224,359 m2, with an
overburden volume of 8,129,833 m3 an ore volume
for 1,123,723 m3. Method of stripping overburden
and taking ore planned with a mechanical device due
Figure 5. Borehole Pit Block 1 to the degree of material hardness that not too loud
and otherwise economical using mechanical devices.

Figure 6. Section Model A-B

Figure 7. Section Model C-D Figure 8. Pit Mining (top side)


PROCEEDINGS PEKAN ILMIAH TAHUNAN IAGI 2018
Hotel Pangeran, Pekanbaru, October 28th – November 1st, 2018

The beginning of mining activities is carried out by


land inspection and land clearing at pit locations and
then removal of top soil and overburden and ore
mining. The planned disposal area and processing
equipment are in the Northest mining pit deep 1.4 km
from the front of the initial mining. Mining carried
out from the Northest because there is access and
coverage to ore processing area and disposal area.

Placement of the disposal area takes into account the


condition below the ground surface. Where there is
tin and other levels of tin or minerals are considered
not the economy doesn’t allow the next mining
process. Similarly the placement of processing
equipment, settling pond and working water pools
where the area is close to the air valley. This will
make it easier work of processing equipment that Figure 10. Tin Ore Processing Scheme Plan
requires a lot of air.

Determination of the pool to drain air from the CONCLUSIONS


processing equipment to the air pond work, status can
return for production. Five settling ponds made to The conclusions from this research such as:
circulate air during production, now towards the air 1. The mining plan starts from the northeast in
pool, the circulation of clean air can be accordance with the placement of the
accommodated and reproduction for production. disposal area and the tin ore processing area.
The determination of the disposal area and
the treatment area is determined from the
area containing the least tin or other
minerals, so as not to disrupt the further
mining process.
2. Placement of the disposal area, processing
area, settling pond, and water pool takes into
account the condition below the ground
surface. Where there is tin and other
minerals are considered not economical.
3. The result showing overburden volume
8,129,844 m3 and tonnage ore 3,542,210
Figure 9. Block Working Plan tons, stripping ratio of 2,3 BCM/ton.
4. Pit mining will be done at elevation >25 to -
Planned tin ore processing activities are carried out 80 mdpl with production target of 50
directly at field due to tin ore separation process with ton/month.
easy follow up minerals and doesn’t require a 5. Production value is calculated equal to
chemical fluid just utilizing the process of gravity, 14,033 ton, so the life of mining for 23
where tin density of 7.31 g/cm3 is heavier than years.
overburden density.
PROCEEDINGS PEKAN ILMIAH TAHUNAN IAGI 2018
Hotel Pangeran, Pekanbaru, October 28th – November 1st, 2018

REFERENCES

B.W. Chappell, A.J.R. White & D. Wyborn. 1987.


The Importance of Residual Source Material
(Restetite) in Granite Petrogenesis. J. Petrol.
Angga Widya. 2017. Characteristic Of Primary Tin
Deposits. Universitas Sriwijaya dan PT. Timah
Tbk.
Angga Widya. 2017. Technical Planning Of Primary
Tin Exploration. Universitas Sriwijaya dan PT.
Timah Tbk.
Azwardi Ichwan. 2007. Pedoman Teknis
Penambangan Timah Alluvial di Darat. PT.
Tambang Timah Tbk.
Heriawan M, Syafrizal. 2013. Short Course On
Applied Mining Geostatistics: Resources
Evaluation and Estimation. Bandung. LAPI
ITB.
Ngadenin, Indrastomo, dkk. 2017. Geology and Ore
Deposits Identification In Batubesi Area,