Вы находитесь на странице: 1из 113

7/21/2019 5S Implementation Manual 07

http://slidepdf.com/reader/full/5s-implementation-manual-07 1/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

http://slidepdf.com/reader/full/5s-implementation-manual-07 2/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Catherine Parrill
Robert Rosinski

5S
Implementation

Manual

http://slidepdf.com/reader/full/5s-implementation-manual-07 3/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

http://slidepdf.com/reader/full/5s-implementation-manual-07 4/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Anitech.net Press

5S Implementation Manual

Copyright 2007 by Catherine Parrill and


Robert Rosinski

This title is also available from Anitech.net at


http://www.anitech.net

Requests for information should be addressed to:


Anitech.net
9030 W. Sahara #125
Las Vegas, NV 89117

Library of Congress Cataloging-in-Publication Data

Parrill, Catherine, 1948-


Rosinski, Robert, 1948-
5S Implementation Manual / Rosinski, Parrill p. cm.
Includes bibliographical references
ISBN: 0-9679593-2-2
1. Lean Manufacturing 1. Title.
BV4503.1 .W73 2000
284.4 – dc 21 2000011417
CIP

This edition printed on acid-free paper

All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted in any form or by any means – electronic, mechanical, photocopy,
recording, or any other – except for brief quotations in printed reviews, without the prior
permission of the publisher.

Illustrations by Anitech.net, Copyright 2007

Interior design by Catherine Parrill

Editing by Adrienne Cole and Angela Senicz


Printed in the United States of America

05 06 07 08 09 10 11 – 50 49 48 47 46 45 44 43

http://slidepdf.com/reader/full/5s-implementation-manual-07 5/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

http://slidepdf.com/reader/full/5s-implementation-manual-07 6/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Contents

Preface……………………………………...9

Chapter 1 – Getting Started……………….15

Chapter 2 – What is 5S……………………21

Chapter 3 – The First S, Sort……………..31


Chapter 4 – The Second S, Straighten……67

Chapter 5 – The Third S, Shine…………..93

Chapter 6 – The Forth S, Standardize……99

Chapter 7 – The Fifth S, Sustain………..105

http://slidepdf.com/reader/full/5s-implementation-manual-07 7/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

http://slidepdf.com/reader/full/5s-implementation-manual-07 8/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

5S

Preface

The 5S process is the cornerstone to achieving a successful


lean transformation. It is the mechanism by which management can
sustain an enterprise-wide cost reduction and improvement program
that will directly translate to the bottom line.

What is 5S? 5S is a systematic approach that streamlines the


work environment, helping companies achieve and maintain a
competitive edge in today’s global economy. It is highly cost
effective, can be implemented in virtually all work situations and
locations. 5S is a way of displaying and maintaining the new
corporate culture.

Many company cost reduction and quality improvement


programs have been launched in an effort to obtain quick savings
and/or capitalize on current trends and thinking within the
improvement community. A well-executed 5S program can become
the glue that solidifies those various programs and properly
deployed, it will become the foundation that all other initiatives are
launched from.

http://slidepdf.com/reader/full/5s-implementation-manual-07 9/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

10

http://slidepdf.com/reader/full/5s-implementation-manual-07 10/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

This book is a fast-read, how-to manual for those forward-


thinking decision makers that need to improve the bottom line today.

Throughout this book you will encounter some new ideas, as


well as some tried and true methods that have been found to be
indispensable by forward thinking managers embarking down the 5S
path.

Over the last decade that Anitech has been assisting client
companies install lean manufacturing cost reduction initiatives, the
one common element that has differentiated the successful from the
not so, has been the degree to which management has bought into
and enthusiastically deployed a meaningful 5S program and
sustained it throughout their transformation process.

Client companies such as Allied Signal, United


Technologies, Boshe, Ford and Johnson Controls have all deployed
successful 5S programs as the initial jumping off point for their
legendary lean initiatives. Most significant of all is the fact that
companies deploying 5S as the cornerstone of their lean
transformation have all dramatically improved their bottom line as a
direct result.
They’ve learned that a 5S implementation strategy should be
a primary focus of company management and decision makers in
order to form the critical mass necessary to drive change,
profitability and prominence in their marketplaces.

5S can, and is, being successfully applied in companies of all


sizes, product types and process flows. 5S applies to much more
than just manufacturing production floors. It also is being
successfully deployed in many business system process flows,
engineering department flows and even in such wide and varying
service industry operations such as finance, marketing, hospitality
and food service.

11

http://slidepdf.com/reader/full/5s-implementation-manual-07 11/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

12

http://slidepdf.com/reader/full/5s-implementation-manual-07 12/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

How can you successfully implement or revitalize a company


5S program? First, read and understand the basic principles of 5S
deployment. Then learn and understand the complete 5-step process
of implementation. 5S is deceivingly simple, yet powerful when
fully understood, effectively communicated to company personnel
and then applied.

As an option, this training material is offered on-line and you


can accompany it with on-line testing and certification.

Once you understand the basic concepts and deployment


strategies, 5S will become as standard a part of how your company
approaches all improvement strategies as the concept of computing a
ROI is today prior to embarking on any new project.

5S is about organization, standard process and on-going


sustaining and alignment with all company lean initiatives and
strategies. Every company we know that has correctly deployed 5S
has attained significant improvements in profitability and market
share.

Let us know how your deployment proceeds.

13

http://slidepdf.com/reader/full/5s-implementation-manual-07 13/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

14

http://slidepdf.com/reader/full/5s-implementation-manual-07 14/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter One

Getting Started
What is 5S?
5S is a systematic approach that streamlines the work
environment, helping companies achieve and maintain a competitive
edge in today’s global economy. It is highly cost effective, can be
implemented in virtually all work situations and locations.
5S is foundational for today’s companies that need to

function
flow, cell,inanda pull
real-time manufacturing
production techniques,environment. Just-in-time,
for example, require a 5S
foundation to ensure success.
The 5S’s stand for: Sort, Straighten, Shine, Standardize and
Sustain. They are a stepwise, sequential method for organizing the
workplace to improve quality and efficiency, meet deadlines, reduce
waste, and create a safer and more pleasant working environment.

What is the most effective way to implement 5S?


For 5S to be most successful, its implementation will be
done with the assistance of a specialist, trained in 5S deployment,

who will initiate


a company the simultaneously
while 5S system in a department, division,personnel
training company or office ofto
carry the initiative into other departments and divisions themselves.
Sometimes companies opt to use the external specialist’s
services in multiple divisions because their own personnel are
already fully committed, they see the benefits and don’t want to lose
momentum, and desire to make an immediate impact in many or all
areas of the company.
Many companies that cannot utilize an external specialist
have chosen to train and certify members of a 5S team through train-
the-trainer 5S training or even on-line 5S courses. Some specialists

offer discounted
registrants site-licenses
in a single for 5S
company. on-line
Team coursesquestions
discussion for multiple
and
suggested projects should always be included in a good site license
package.

15

http://slidepdf.com/reader/full/5s-implementation-manual-07 15/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

16

http://slidepdf.com/reader/full/5s-implementation-manual-07 16/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

How can you get the most benefit from this book?
Learning in the same environment where the initial pilot
deployment will occur is ideal. The pilot implementation of this
system should be made in the actual environment in which the full
5S system will be eventually deployed. After pilot deployment,
continue with the next chapter.
Budget constraints sometimes prevent a company from
utilizing the expertise of an external specialist. In such cases, an
“internal specialist” who has learned the concepts of the 5S system
and has gained an understanding of how to apply them through this
book and possibly the accompanying 5S on-line course Anitech
offers, can be certified through the accompanying assessment tests.

This internal specialist will then lead the 5S effort. If a


company is not using the services of an external specialist, it is
highly recommended that a 5S Team be established for each division
or department, and that one or more 5S Leaders in the company be
designated. Each of these personnel should consider taking an on-
line 5S course and achieve at least 85% proficiency on each
assessment exam. Team members can all become certified through
this type of on-line course too.

How can you get even more benefits from this training
material?
Read, learn, assess and deploy a chapter at a time. After
reading a chapter, for a complete learning experience, go on-line and
take the accompanying 5S assessment test associated with that
chapter. If your score is 85% or higher, undertake the activities
outlined. Do not continue with the second chapter until pilot area
implementation has been made. If your score is under 85%, study
those areas in which your performance indicates more attention and
then retake the test. Completing this process will result in 5S
certification of expertise.

If you don’t remember all of the material the first time you
read a chapter, you can obtain a one-year license that allows you to

17

http://slidepdf.com/reader/full/5s-implementation-manual-07 17/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

18

http://slidepdf.com/reader/full/5s-implementation-manual-07 18/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

re-read chapters and re-take the assessment tests on-line, at will.


Anitech encourages you to take a refresher course 3-6 months after
the initial course, and another 9-12 months after the initial course.
The second and third time you take the course will serve to reinforce
5S principles and provide renewed motivation for leaders and team
members, helping them to better promote adherence throughout the
company.

This optional training is based on an individual user license.


Only the individual who has purchased the license is authorized to
use it. Company site licenses are also available

Do most companies have a 5S “champion” or leader


even if they’re using an external specialist?
Companies that use the services of an external specialist to
implement a 5S system usually designate a 5S Team within each
division or department. The team, or selected individuals are trained
by the external specialist, assist in making initial improvements, and
then oversee ongoing implementation and follow-through. These
members receive training during the external specialist’s on-site
workshop and pilot implementation training, and assist in all phases
of deployment.

19

http://slidepdf.com/reader/full/5s-implementation-manual-07 19/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

20

http://slidepdf.com/reader/full/5s-implementation-manual-07 20/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Two

What is 5S?

What do the 5S’s stand for?


The 5S’s stand for the five steps in a systematic
organizational process: Sort, Straighten, Shine, Standardize and
Sustain. The steps should be implemented sequentially. The last step
requires an on-going process to maintain and update each of the first
five steps.

Sort: “When in doubt, throw it out”


In this first step of the process, needed and unneeded items
are separated and all unneeded items are removed. Although
seemingly a simple step, it normally requires input from several
people in the work area to determine what is actually currently
needed and the best method of dealing with unneeded items.
Examples of sort include removing jigs that are no longer used for
production from the workplace, discarding from desk drawers old
pens and markers that no longer write, or removing extra wrenches
from a pile on a worktable, keeping only as many as needed.
There is often a tendency to keep too much in the workplace.
The challenge is to see the area through “new eyes” so that unneeded
items become more readily apparent.

Straighten: “A place for everything, and everything in


its place”
In this step items are arranged so that they’re easily
accessible, easy to find and easy to return to their correct place.
Labels and other visual indicators are devised and deployed. Painting
outlines of tools where they are to be hung, color coding tools and

parts
places,of and
like placing
sizes, numbering toolssupplies
small office and theirinto
corresponding storage
compartmentalized
caddies are examples of Straighten.
The tendency is for workers to become accustomed to using
poorly placed materials, tools, equipment, etc. and the wasted time

21

http://slidepdf.com/reader/full/5s-implementation-manual-07 21/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

22

http://slidepdf.com/reader/full/5s-implementation-manual-07 22/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

and effort this causes. The challenge is to discover which


items are causing inefficiency, and where to store them so that they
will be most easily available when and where they are needed.

Scrub: “Clean as you go”


The third step in the 5S process initiates a work ethic of
keeping everything clean and in order at all times. The connection
between cleanliness, quality and safety are emphasized. Examples of
Scrub include wiping machinery, sweeping, tightening loose belts or
bolts, cleaning gauges and indicators, tracking the source of leaks,
overheating or undue noise, and organizing papers and books on
office desks and shelves.
The tendency is for personnel to clean their areas
periodically, letting clutter, debris and dirt collect between cleanings,
rather than to clean as-they-go, at all times. The challenge is to
combat the attitude that “I don’t have time right now – I’ll do it
later” until it becomes clear that daily scrubbing is both easier and
more effective.

Standardize: “A method to our madness”


The first three steps will slip unless standardized procedures,
schedules and expectations are clearly identified and regularly
measured. During this step, a customized standardization method is
devised and implemented. Standardization examples include use of
checklists, institution of preventative measures to keep unneeded
items from entering the workspace, and job charts that delineate
responsibilities for maintaining various aspects of the 5S system.
The tendency, after the first 3 S’s have been deployed in an
area, is for them to slowly begin to erode. The challenge is to create
clear, concise and complete standardized measures that prevent this
from happening and to institute a system that guarantees they will be
followed

Sustain: “Old habits die hard”


In order to sustain improvements made during deployment of
the first 4S’s old habits will have to die. Changing the culture and
instituting new habits takes time and attention. It doesn’t happen by
itself. Examples of Sustain include scheduling time for 5S Teams to

23

http://slidepdf.com/reader/full/5s-implementation-manual-07 23/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

24

http://slidepdf.com/reader/full/5s-implementation-manual-07 24/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

do periodic reviews and improvements, prominently displaying


posters or other visual reminders in the workplace, and offering
rewards and recognition.
The tendency is for 5S leaders and team members,
management, and/or operational personnel to expect changes to stay
in place once they’re made and not to notice they’re slipping. The
challenge is for 5S leaders and team members to take refresher
courses, and conduct refresher 5S deployment activities periodically
to ensure the necessary cultural change, and for management to offer
continually strong support.

How does 5S help you?


The 5S system makes work easier and more pleasant, results
in higher quality and efficiency, and creates a safer work
environment. It makes time on the job more satisfying, reduces
frustrations, fatigue, and contributes to pride among the workforce.
A company that has successfully implemented the 5S system is one
that can proudly and successfully showcase itself to customers and
suppliers. 5S results in increased profit. It’s a critical component of
good business practices that must be maintained in order stay
competitive in today’s market.

Using this system will result in a significant elimination of


waste in many categories, including overproduction, unneeded
inventory or transportation, lost time spent waiting, unnecessary
motion, over-processing products, correction of needless errors,
obstacles to efficiency caused by unnecessary parts, equipment, etc.
and under-utilization of human resources. It will reduce delays,
customer dissatisfaction, injuries and defects. It will improve
throughput, ROI, on-time delivery and profitability.

What obstacles may you encounter?


You may be among those fortunate implementers of the 5S
system who don’t run into any problems - everyone’s on board from
day one, and deployment goes like clockwork. If you find some
reluctance to embrace the 5S system, though, don’t be surprised.
Resistance from personnel may appear for a variety of reasons. They
may believe they don’t have time to implement and adhere to 5S, or

25

http://slidepdf.com/reader/full/5s-implementation-manual-07 25/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

26

http://slidepdf.com/reader/full/5s-implementation-manual-07 26/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

that they don’t need it. They may not initially see the benefits. They
may have tried this or another system in the past and failed to sustain
it -“we tried it and it doesn’t work”. A less apparent obstacle may
be the belief that this is “somebody else’s problem”.

What do you need in order to overcome obstacles?


There needs to be management buy-in to make 5S succeed
100%. Later, when all personnel have experienced its benefits and
the culture has changed to make the 5S System part of daily routine,
those most directly affected will become its biggest supporters. To
gain support initially, it’s important that as many people as possible
become involved from the start. Management should enthusiastically
announce the launching of this new effort, explaining why it is going
to be deployed, how, when, with whom, and what the expected
benefits will be.

Teams should work together at each stage of deployment.


Everyone, at all levels throughout the company, should be
encouraged to seek areas for improvement and find creative
solutions. Before and after pictures may be displayed prominently
throughout the company. Suggestion boxes or boards may be used.
Periodic ratings may be made and posted, with rewards for those
meeting all criteria (pizza brought in one day at lunch for a
department, division or office, for example). Other larger rewards
may occasionally be made for individual excellence for suggested
improvements.

If 5S has so many benefits, why hasn’t every company


instituted it?
Many companies globally have 5S Systems in place. All
World Class companies have systematically organized through this
or a similar system. Companies who haven’t yet implemented a 5S
System, either don’t know about it, haven’t tried it, or have tried it
unsuccessfully. Whichever category your company fits into, this
book will provide you with the principles of 5S, and provide
techniques for implementation.

How can I get buy-in from management?

27

http://slidepdf.com/reader/full/5s-implementation-manual-07 27/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

28

http://slidepdf.com/reader/full/5s-implementation-manual-07 28/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Benchmarking is the best way to show management how 5S


works, and why. Anitech, Inc. can provide case studies and
benchmarking opportunities upon request. Click here for further
information about how your company can set up a benchmarking
tour, or for assistance in determining your individualized course of
action.

Deciding whether to use an external specialist


By the end of this book, and the completion of your pilot area
implementation, you will need to decide whether you alone will be
responsible for leading your company in the 5S deployment, whether
a team will take the course and together undertake the project, or
whether you and/or a team will work with an external specialist to
implement 5S.

It is important that you outline a course of action that will


best serve your company, its needs, resources, and opportunities for
improvement. We advise that a cross functional group that includes
members from management determine a clear strategy from the start.
If you want help in defining the strategy that will work best for you,
you can always contact an external specialist. They will be happy to
discuss your particular situation, needs, budget and desired outcomes
with you and help you tailor an appropriate course of action.

29

http://slidepdf.com/reader/full/5s-implementation-manual-07 29/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

30

http://slidepdf.com/reader/full/5s-implementation-manual-07 30/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Three

The First S: Sort

“When in doubt, throw it out”

How do we know if we need 5S?


The rule of thumb is this: if you haven’t already implemented
5S or a similar system in your workplace, you probably need to! A
well-organized environment doesn’t happen by itself. And,
obviously, if you haven’t ever deployed 5S, you need to start at the
beginning, with the first step: Sort.

Even if you’ve previously implemented an organizational


system, you may need to start at the first step again. No system
maintains itself. If you currently operate with a system of visual
controls, but have not strictly adhered to them, or have not sustained
the effort 100%, you should also start with the first step.

Some signs of a work area that needs to implement the first


step, Sort, include:

Process flow or production is interrupted or delayed by
unnecessary equipment or items that get in the way

People waste time looking for parts, tools, papers or other
items

The workplace is crowded, cluttered, difficult to work in

Walls, bulletin boards, windows, shelves contain unneeded
our outdated items

Aisles, stairways, corners, areas behind, beside or under
desks, cabinets, benches, etc. contain unnecessary items

Stacks of unneeded items, or shelves, cases, cabinets, etc
housing unneeded items, are placed between employees,
hampering communication.

31

http://slidepdf.com/reader/full/5s-implementation-manual-07 31/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

32

http://slidepdf.com/reader/full/5s-implementation-manual-07 32/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Money is spent to maintain unnecessary equipment,
fixtures, tools or other items.

Storing of excess items is resulting in damage to some of
them.

Excess stock is hiding other types of problems in
production or process.

Safety hazards are created by the presence of unnecessary
items.

Unnecessary items themselves present a safety hazard
(water, oil, chemicals, machines, physical obstacles).

Duplication of items occurs because of inability to locate
items when needed

These are some of the signs that it’s time to take stock, sort
what is needed from what is not, and GET RID of everything you
don’t need.

How did things get to be such a mess around here?


Distinguishing between needed and unneeded items isn’t as
easy as it sounds. If it were, clutter wouldn’t have accumulated in the
first place. Items that have slowly built up in the workplace have
become part of the culture. People are used to seeing extra items
piled on workbenches, (wrenches, tooling, fixtures, etc.) that may be
used only once a week, or folders that may not be opened for days.
They get used to working around things. They may believe that
“somebody else needs it”, or may believe (and often rightly so) that
they do not have the authority to dispose of an article even though
they know it isn’t regularly used.

It’s human nature to keep things nearby without stopping to


think whether they’re used often enough to warrant it, or to keep
larger quantities than are really needed, “just in case”. It’s also
human nature to continue doing things the way “they’ve always been
done.” That’s how we got in this mess. Now let’s look at how we get
out it!

Who’s going to decide what we get rid of?

33

http://slidepdf.com/reader/full/5s-implementation-manual-07 33/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

34

http://slidepdf.com/reader/full/5s-implementation-manual-07 34/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Some people will be overjoyed to learn that you’ve decided to get rid
of those things they’ve been reaching over, stepping around,
searching behind or under for months or years. They’ve probably
been frustrated or annoyed more than once by unneeded items in
their work area.

Others may not know what all the fuss is about when the new
5S campaign is announced. They’re so used to the clutter that they
don’t even see it any more. They may be less enthusiastic about the
launching of the new 5S campaign, however. They’ll want to know
what it’s all about, how it affects them, and how it’s going to benefit
them. They’ll become convinced through good communication
before and during the 5S implementation, by becoming involved in
the improvement process themselves, and by experiencing the
improvements first hand.

After the initial effort, everybody in the work area should be


involved, working together to identify unneeded items, gaining a
new mindset and determining to see through “new eyes” in order
eliminate all unneeded items in the sorting process. Everyone will
need to adhere relentlessly to the same criteria. First, though, for the
5S deployment, you will form a team to initiate the project.

Try to get both types on your implementation team - those


who find unneeded items an annoyance, and those who don’t see
what the big fuss is all about. But if possible, don’t put like numbers
of the two types on the team. You’ll need more of those who find
unneeded items an annoyance than those who are used to
overlooking the clutter. In addition, you should include in your team
some members from outside the division, depart or office where 5S
is being implemented, to offer fresh eyes.

You’ll need input from all people involved in the particular


work area under study, not just team members, in order to determine
what is actually currently needed and in what quantity they are
required. Remember, too, that it’s critical to have support of
management in the implementation and sustaining of the 5S system.

35

http://slidepdf.com/reader/full/5s-implementation-manual-07 35/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

36

http://slidepdf.com/reader/full/5s-implementation-manual-07 36/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Note: It is vital to maintain all required facilities during and


after your 5S implementation. Team members and activities must be
planned with this foremost in mind.

Once you’ve formed your team and are ready to take the first
step, how do you decide what to do with all those things
accumulated in the workplace?

Ask yourselves: Do we need this today?


This will be the key criterion throughout the 5S process. If
you don’t need it today, you probably don’t need it on the production
floor, or the top of the desk. Although there are exceptions, this is
the mentality you need to use in the evaluation and implementation
of upcoming stages.

Step by step, you’ll determine whether items are ever used, if


so how often and where, and in what quantity. From these
determinations you’ll devise handy, efficient, visually controlled
storage for everything you’re going to keep. You’ll provide a
convenient place right on the production line or desktop for what
you need today. You’ll prepare adequate, appropriate, clearly
marked storage for the things you need tomorrow, or the next day, or
next week. You’ll get rid of everything you no longer need and
excess quantities of the things you need.

You will be taking an uncompromising look at everything


from floor to ceiling, wall to wall, under and above, beside and
inside, asking the same questions of everything you see: Do we ever
need this here? Do we need this many of them?

In the next steps, we’ll ask of what remains in the work area,
do we need it today?

Do we EVER need this here?


Examples of items that may be placed in the unneeded
category include:

37

http://slidepdf.com/reader/full/5s-implementation-manual-07 37/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

38

http://slidepdf.com/reader/full/5s-implementation-manual-07 38/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Obsolete equipment, tools, fixtures, files, books or other
items

Infrequently used equipment, tools, fixtures, files, books, or
other items

Any item about which there is a question in terms of how,
where or when it is used

Items stored in one area but used in another area

Excess quantities of items

Items not needed for the current process, production,
project or schedule

Defective items

Worn-out items

Old memos, manuals, visual displays, notices, etc.

Do we need this many?


If there are more of the items in the work area than are
needed for the current production cycle, shift, day’s work, etc. there
are probably too many. Extra quantities should be stored off-line or
off the desktop.

Divide and conquer


When you know which items you need, and in what quantity,

you’re ready toand


divide needed separate the unneeded
unneeded, items.
you’ll have As soon
begun as you
to gain begin
control to
over
the workplace. If you scrupulously follow this first step, eliminating
everything from the workplace that is unneeded, there will be an
immediate sense of accomplishment, and immediate improvement to
build upon. Success breeds success.

A word to those who are concerned that if they throw


something away today, they’ll be sure to need it tomorrow: never
fear. Items declared unneeded are going to be placed in a temporary
holding area, evaluated by all relevant personnel, and only finally

permanently disposed
Those items that of whenof all
aren’t disposed mayappropriate
be placed inpersonnel agree.
a less obtrusive
storage area, freeing the work environment from unnecessary items
while at the same time staying prepared for that “just in case” event
in the future.

39

http://slidepdf.com/reader/full/5s-implementation-manual-07 39/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

40

http://slidepdf.com/reader/full/5s-implementation-manual-07 40/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

What will you do with items you’ve decided may be


unneeded? First, they’ll be red tagged and placed in a separate
location.

Red Tagging
The red tagging process identifies and clears out all unneeded
items that have collected. During the 5S implementation, methods
will be instituted to keep this kind of clutter from building up again
in the future. There may be items in the work area that are
unidentified. Workers may not know what they are, how or when (if
ever) they are used, or why they were placed there in the first place.
To find the answers to those questions, personnel from the entire
facility, division, department, or office need to be involved. A simple
and effective way to obtain their input is through the red tagging
system.

Red tagging procedure is as follows:

1. Select the red tag area


In selecting the area where the first S (Sort) will be
implemented through the red tagging process, ask yourselves these
questions: Will the effort be company-wide or confined to a
department, division, office, etc? Will there be a pilot area
implementation first before a larger effort is undertaken? Which area
and staff do we expect to have the greatest success in the initial
effort? Management and the 5S Team must answer these questions
before the initiative begins, select the initial 5S deployment area, and
choose members for the 5S Red Tag team. It is wise to select an area
where greatest success can be expected for the initial deployment.

A pilot area implementation, with a scheduled red-tagging


effort to follow in each additional area of the facility is
recommended unless the facility is small enough to do a company-
wide deployment initially. The red tagging effort should be
completed in 1-2 days or less. If the area selected is too large it may
result in overlooking some items that should be tagged.

41

http://slidepdf.com/reader/full/5s-implementation-manual-07 41/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

42

http://slidepdf.com/reader/full/5s-implementation-manual-07 42/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

In addition, it is important to remember that this is a new


undertaking for the team. They need to have sufficient time to
discuss and agree upon criteria, items selected, etc. Don’t choose an
area that is so large it prevents them from being effective during this
part of their learning curve.

2. Organize the Red Tag team


The Red Tag team should include all members of the 5S team, as
well as additional appropriate parties such as representatives from
maintenance, engineering, tool room, production control, etc. in a
factory. In an office, additional personnel might include staff from
maintenance or other departments, and other support staff. It is
recommended that at least one person be involved in red tagging
who is in not a part of the division, department or office being red
tagged, in order to bring a set of “fresh eyes” to the event from the
start. The Red Tag team will function only in this first step of the 5S
process, which should last 1-2 days per deployment.

3. Prepare the Red Tag team for deployment


Use a Red Tag Team Informational Form
First, the Red Tag team (which includes all members of the
5S Team), led by the 5S leader and/or external specialist, should be
given an overview of the 5S System, and of the part they will play in
its first step: Sort. Included in the information they are given should
be the following:

Duration and scope of the entire 5S implementation

Duration and scope of pilot Red tagging in relation to the
entire 5S pilot implementation (1-2 days per area)

Number of 5S deployment phases, dates and areas for
which they are scheduled

Goal of 5S implementation – expected results and benefits

The part they will play in following phases of the
company-wide 5S deployment.

Ideally, all Red Tag team members will receive the complete
5S training, and participate at some level in its full pilot deployment.
The Red Tag team’s attitude and success will be invaluable to the
efforts of the overall 5S implementation. Their enthusiasm and news

43

http://slidepdf.com/reader/full/5s-implementation-manual-07 43/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

44

http://slidepdf.com/reader/full/5s-implementation-manual-07 44/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

of benefits from their initial effort will help build momentum and
support for 5S among all company personnel.

A key to creating a successful experience from the start is for


Red Tag team members to be given ample time, information and
incentive to do a thorough, deliberate and yet quick blitz of the
assigned area. Leadership from the external specialist or internal
leader and from management is also an essential agreement.

4. Determine types of items to be evaluated


Use a Red Tag Criteria, Documentation and Notification Form
The Red Tag team should make a list of every type of item that is
found in the targeted area. Included are the following examples:

Equipment
o Tools
o Gauges
o Carts
o Dies
o Fixtures
o Machines
o Other

Inventory
o Raw material
o Parts
o Products
o Work in process (WIP)
o Excess inventory
o Defective inventory
o Other

Furniture and / or Storage (one or two categories, depending
upon your asset tracking procedures)
o Desks
o Cabinets
o Chairs
o Shelving
o Partitions
o Cupboards
o Boxes
o Misc. and other

45

http://slidepdf.com/reader/full/5s-implementation-manual-07 45/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

46

http://slidepdf.com/reader/full/5s-implementation-manual-07 46/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Fixtures and Fittings
o Wires
o Tubs
o Pipes
o Misc. and other

OSHA and Safety violations

Bulletin Boards, Production Boards, Scheduling Boards etc
o Newsletters
o Memos
o Notices
o Flyers
o Misc. and other

Documents, files, etc
o Stacks of papers, file folders etc
o Magazines, catalogues, etc
o Schedules
o Misc. and other

Space – miscellaneous clutter:
o On floors, stairways, in aisles, etc.
o That blocks access to electrical panels, gauges, etc
o Behind cabinets, desks, shelves, etc
o Under desks, in drawers, etc.

5. Set red tag criteria


In a production area, a simple and effective red tagging
criterion is the upcoming month’s (week’s, day’s, shift’s) production
schedule. All items needed in that schedule are kept in the area. All
items not needed in that schedule are removed from the area.

Another way to determine whether an item is needed or not,


is to ask these types of questions:


Is this item within arm’s reach of the work it is used for?


Is this item used daily? (or is it used on this shift; during this
production schedule, etc.)

47

http://slidepdf.com/reader/full/5s-implementation-manual-07 47/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

48

http://slidepdf.com/reader/full/5s-implementation-manual-07 48/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Is this quantity of this item used daily? (or on this shift,
during this production schedule, etc.)

Each company will need to devise its own specific questions


and metrics, based upon their particular circumstances. Rules of
thumb are:
Items that are used several times a day (shift, hour,
production cycle, etc.) should be stored within arm’s reach whenever
possible.

Items that are used less than once per day (shift, hour,
production cycle, etc) should be stored off-line, or off the desktop.

Surplus items should be stored off line, or off the desktop.


Only keep the number needed for that day’s (or shift’s, hour’s,
production cycle’s, etc.) work within arm’s reach.

6. List and gather needed supplies


For this event supplies are minimal. They include the
following:

a. Red Tags or material from which the red tags will be


made, markers and ties. A way to gauge the average
number of red tags needed is to multiply the number of
employees who work in the area to be red tagged by 4 or
5. This will give an approximate number of tags and ties
(or tape) needed.

b. Colored tape, rope, or other material to delineate the red


tag holding area

That’s it! No other supplies are necessary, although you will


want to have adequate garbage bags or cans on hand.

Note: Tags should be purchased or made prior to the 5S


deployment. Although red tags are available from many sources,
companies sometimes prefer to individualize information contained
on them. If you are going to use customized tags, the Red Tag team,
the 5S team, and/or 5S leader should meet in advance to determine

49

http://slidepdf.com/reader/full/5s-implementation-manual-07 49/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

50

http://slidepdf.com/reader/full/5s-implementation-manual-07 50/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

criteria to be contained on the tags and authorize printing. Suggested


criteria includes any of the following:

Name of person who red-tagged the item

Date

Department (division; office, etc)

Name of item (or description)

Identification number of item (where applicable)

Quantity

Category
o Equipment
o Furniture or storage
o Fixtures or fittings
o Inventory
o Documents
o Maintenance supplies
o Other

Frequency of Use
o Never
o Seldom
o Less than once per month
o Once a week
o Once per day or more (but not in this area)

Suggested Action
o Discard
o Store in distant place
o Store in factory (office)
o Store near area
o Store in area in which it is used

7. Create a red tag holding area


Set aside an area for storing red-tagged items while they
await final evaluation and disposition. This area needs to be centrally
easily accessible, close to the area being red-tagged, but not in the
way of work flow. Size will vary depending upon types of items that
may be red-tagged. The Red Tag team should estimate size and
number of items they may be removing from an area and set the size
of the red tag holding area accordingly.

51

http://slidepdf.com/reader/full/5s-implementation-manual-07 51/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

52

http://slidepdf.com/reader/full/5s-implementation-manual-07 52/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

8. Set and announce the red tagging schedule


It should be announced in advance to all staff concerned that
the Red Tag team is going to move items in their area during the first
and possibly second days of 5S deployment. Announce days and
times affected, purpose and procedure of the Red Tag event, and
amount of time items will be held in the red tag holding area.
(Usually from 10-20 days; never more than 30 days) Announce that
during the holding time any interested or affected individuals or
departments should schedule a walk through the area with the Red
Tag holding area manager to make recommendations for final
disposition.

After the event, one day per month should be scheduled for a
walk through the area for the purpose of red tagging any items that
have accumulated since the initial activity. It is not necessary to use
the entire team for these follow up efforts. Generally, this is a three-
person exercise.

When effective counter measures have been put into place,


these periodic red tagging walk-throughs should uncover a minimal
number of items to be red tagged. If this is not the case, the 5S team
needs to review the newly devised standards and enforcement policy
that were instituted during the 5S campaign as counter measures to
the collection of unneeded items.

Note : Some 5S proponents say that the red tag event is a one-
time only occurrence, and that implementation of counter measures
for the build up of unneeded items will make it unnecessary to hold
any follow up red tag walk-throughs, Anitech does not recommend
following this advice. It is typically necessary to schedule periodic
red tag walk-throughs. A good plan is to schedule them monthly for
3-6 months. If at least two of these walk-throughs have uncovered no
items that need to be red tagged, go to a bi-monthly or quarterly
schedule. It is important that the schedule be set, communicated and
adhered to, whether monthly, bi-monthly, or quarterly. Keeping this
a regularly scheduled event helps re-enforce the cultural changes
necessary to sustain the 5S system once it’s in place.

53

http://slidepdf.com/reader/full/5s-implementation-manual-07 53/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

54

http://slidepdf.com/reader/full/5s-implementation-manual-07 54/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

9. Inspect and sort the work area


Speed is key to success in the inspection and sorting of
needed and unneeded items during the 1-2 day Red Tag blitz. The
team should move quickly through the area designated to be red
tagged. Unless the area is large, one day should be enough time to
complete the event. The maximum time for red tagging should be
two days.

Move through the red tagging area checking each against the
criteria you have established. Be relentless. When in doubt, move it
out! Remember, the red tagging area is a holding area, not a landfill.
If someone else in the company discovers a needed item has been
red tagged it can easily be reclaimed.

Some items may be clearly disposable: outdated notices or


irreparably damaged items, for example. Don’t red tag them. Get rid
of them. All other items, after being inspected by team members and
found questionable, should be tagged with all known relevant
information, and taken to the holding area.

Use a form similar to the Anitech Red Tag Criteria,


Documentation and Notification Form ( A5S.2)

10. Attach red tags to relevant items


Tie or tape a red tag to each item in question. Guidelines are:

Fill out all known relevant information before attaching
red tag to item

Each team members should look at items tagged by
another member, verify that they are unneeded, and add
to relevant information on tag if applicable

Tag all items that thought to be unneeded

Tag excessive quantities of needed items

Tag each item individually (boxes or shelves full of items
should not be tagged as one item)

11. Place all red-tagged items in holding area


All red-tagged items should be moved to the holding area for
the agreed upon amount of time. If an item is too large to remove

55

http://slidepdf.com/reader/full/5s-implementation-manual-07 55/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

56

http://slidepdf.com/reader/full/5s-implementation-manual-07 56/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

from the work area, it should be red tagged, and the red tag
manager should make arrangements for inspection and disposition.
During the holding period (from 10-30 days) all affected staff should
do a walk-through of the red tag holding area. They should add all
available relevant information to tags and notify Red tag manager of
any items that should be returned to the work area or placed in a
different work area. All suggestions for disposition must be made
within the stated holding time.

Company-wide announcements for appropriate personnel to


inspect items in the pilot red-tag holding area serve a dual function.
First, their feedback is necessary before final disposition of items
occurs. Secondly, the communication will familiarize personnel in
other areas with the red tagging process and its benefits. Support for
the initiative will build. An understanding of the 5S System, its
methods, techniques and rewards, will grow as implementation
spreads from area to area.

Note: Management can help build awareness and buy-in for


the 5S deployment at this stage by immediately calling attention to
progress made. Prominently displayed Before and After photos,
announcements, memos, division, team or individual rewards, etc.
can be used quite effectively in conjunction with red tagging.

12. Designate a red tag holding area manager


Management needs to participate in selection of this person.
The candidate will most likely come from the 5S Red Tag team.

13. Conduct a “fresh eyes” inspection with outside


personnel
At this point it is helpful if two or more team members walk
through the red-tagged area with two or three people from outside
that area, giving it one last look. Fresh eyes may locate additional
questionable items that the Red Tag team overlooked.

14. Tag additionally identified items and move them to


holding area

57

http://slidepdf.com/reader/full/5s-implementation-manual-07 57/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

58

http://slidepdf.com/reader/full/5s-implementation-manual-07 58/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Follow the same procedure as above for all items additionally


identified.

15. Evaluate each red-tagged item


Be sure that all relevant department, division, office,
manager, staff members, etc. are informed that they must inspect the
holding area and evaluate each red-tagged item before the specified
cut-off date. Persons evaluating items will need to arrange inspection
with the red tag manager and make their recommendations to him or
her. All additional recommendations and information must be added
to red tags before final disposition.

At the specified cut-off date, the red tag event is finished and
the red tag manager is responsible for immediate disposition of all
items in the holding area.

16. Create a system of documentation


The Red Tag team will need a thorough and easy-to use
system of documentation for red-tagged items. This may be
produced from the Anitech Red Tag Criteria, Documentation and
Notification Form ( A5S.2.) It keeps a record of all items tagged, all
information entered regarding each item, and generates necessary
tracking documentation. If the Anitech form is not used, the Red Tag
team will need to create its own documentation form and system.

Documentation to be logged and tracked should include the


following:

Category of red-tagged item
o Equipment
o Furniture or Storage
o Fixtures or Fittings
o Inventory
o Documents
o Maintenance supplies
o Other

Disposition
o Discarded
o Returned to supplier

59

http://slidepdf.com/reader/full/5s-implementation-manual-07 59/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

60

http://slidepdf.com/reader/full/5s-implementation-manual-07 60/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

o Moved to ______ (stored in another location in


company)
o Distributed to _______ (for use in another
location in company)
o Sold

Value

Depreciation

Notification of appropriate personnel

Person who carried out disposition

Date of disposition

Area covered

Dates of Red Tag event

Names of Red Tag Team members

Name of Red tag manager

Categories and numbers of items red-tagged

Copy of communication that went to all relevant
personnel for evaluation

Date for final evaluation before holding area is cleared

Schedule for Red Tag events to be held during the year

Recommendations

Authorization for disposition, including date and
signature

Other

17. Document results of red tagging initiative


The Red Tag team should prepare a concise document, using
their form, the Anitech form or another, compiling results of their
completed initiative as a report-out to management.

18. Devise a plan for disposition of red tagged items


Red Tag team recommendations form the basis of the
disposition plan. Each item needs to be accounted for in the plan.
Personnel responsible for each type of disposition, method of
disposition and date need to be included in the plan.

61

http://slidepdf.com/reader/full/5s-implementation-manual-07 61/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

62

http://slidepdf.com/reader/full/5s-implementation-manual-07 62/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

19. Notify appropriate personnel to make final


disposition
After other personnel have completed inspection and
evaluation the Red Tag manager should obtain authorization for final
disposition, make arrangements, notate on red tags and document on
the updated report-out form. Strict adherence to the cut-off date is
important. Final disposition of all items should occur on that date.

20. Temporary red tag holding area


A temporary Red Tag holding area should be set up for
placement of any questionable items in the future that need to be
inspected for possible disposition. Red Tag holding area manager
should oversee this process and area. This may be a portion of the
original red tag holding area.

A Red Tag Criteria, Documentation, and Notification Form


can automatically notify all appropriate personnel of disposition. If
this form has not been used, the Red Tag manager should make
notification.

21. Layout evaluation and re-design of area from which


red-tagged items were removed
Removal of unneeded items in the targeted work area may
have cleared enough space that layout can be changed for a more
efficient workflow. Evaluation and possible re-design of the space
will be done in the second step: Straighten.

22. Analyze reason unneeded items have built up


Find the root cause for build up for each category of item that
was red-tagged, and if necessary for individual items within each
category. Some causes might include:

Defective products are produced, not disposed of
properly, and reason for defect is not determined and
corrected

Inadequate storage locations in work area and off line

63

http://slidepdf.com/reader/full/5s-implementation-manual-07 63/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

64

http://slidepdf.com/reader/full/5s-implementation-manual-07 64/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


No standardized procedures for regularly purging excess
items

Overproduction causing inventory build ups

Inadequate transportation of items in and out of work
area

No time included in daily routine for workplace
organization

23. Develop counter measures (standards) to prevent


reoccurrence
Each cause discovered during analysis should be documented
for use in the second step: Straighten. During this step organizational
techniques will be deployed. Standardized procedures and reporting
systems will be developed during the fourth step: Standardize

24. Create and communicate summary of Red Tag


analysis results
If a Red Tag Form has been used during this process, you
should use it to generate a summary of results and send them to all
appropriate personnel by email. If this form has not been used, the

team should create and communicate this summary.

65

http://slidepdf.com/reader/full/5s-implementation-manual-07 65/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

66

http://slidepdf.com/reader/full/5s-implementation-manual-07 66/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Four

The Second S: Straighten


A place for everything, and everything in its place”

What’s the big deal?


Granted, some people are better than others at making an
office or shop neat and tidy. But nearly anyone can do a passable job
of straightening up the place. If that’s all there was to the second step
you could skip to the next chapter now.
The Second S, Straighten, is at the heart of creating a
maintainable and efficient system that can be used by anyone. It
entails much more than making the office or shop neat and tidy.
When properly executed, this second step creates an organizational
system that can be standardized and sustained, providing substantial
improvements that translate to significant increases in ROI.

What happens in the Second Step: Straighten?


All needed items (those left after red tagging has been
completed) are arranged for efficient and easy use. Then they and
their storage areas are marked or labeled so that anyone can easily
locate them and anyone can easily put them away.

Two key components of this step are determining best


placement of all items in order to reduce waste, and marking in such
a way that anyone can immediately find and return the item.

What kinds of problems does Step 2 eliminate?


Some examples of the kinds of waste or problems that occur
when items are not arranged for efficient use, or are not marked to
guarantee proper storage at all times, include:


Each time an office worker needs to punch holes in a paper,
he has to go to the workroom to use the three-hole punch.

67

http://slidepdf.com/reader/full/5s-implementation-manual-07 67/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

68

http://slidepdf.com/reader/full/5s-implementation-manual-07 68/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Most office personnel use the punch once a week or less. One
person, however, uses it more than once a day. Yet, the hole-
punch is no closer to his workstation than to the ones of those
workers who need to use it only once a week.


Certain sets of files are kept in the workstation of one
secretary, at the back of a large office area. When others need
one of those files, they have to get the key from the woman at
that workstation. Unfortunately, her work takes her away
from her desk often, and others regularly waste time looking
for her so they can get a needed file.


A worker searches for a needed assembly aid that he left in
the production area just before going to lunch. It isn’t there
when he returns and he wastes twenty minutes looking for it
before the co-worker who used it returns from his break and
locates the missing production aid.


A worker takes a box of parts from a shelf, to be used in the
production line, not realizing that the wrong box of parts has
been placed in the spot where he usually gets the needed
item. The switched part isn’t noticed by the operator until
after he’s already made a defective product. Then, the line is
shut down while the correct parts are located and brought in.


A worker trips over a box of items left in a walkway, falls
and is injured. He is off the job for three days.

Often, the problems that arise from poor arrangement of


items in the work place, or failure to properly replace items, are
overlooked or fail to be attributed to the root cause. Many kinds of
waste, or problems, in the production area or office have become so
habitual that they’re taken for granted. Others may a source of
frustration for workers, yet sustainable solutions have not been
found. Sometimes a co-worker is blamed when, in fact, the system
itself is at fault.

When considered individually many of these problems may


seem inconsequential. When added together throughout the course of

69

http://slidepdf.com/reader/full/5s-implementation-manual-07 69/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

70

http://slidepdf.com/reader/full/5s-implementation-manual-07 70/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

a day, however, and multiplied by the number of workers


experiencing the same wasted motion or other difficulty, they can in
fact be very significant.

What are the areas of waste reduced by Step 2?


All waste reduced by the second step could fit into the
st
category of wasted time. In the real-time environment of the 21
century enterprise, a company cannot long remain competitive if it is
wasting production or process time. Three main areas of wasted time
(and with it the associated waste of energy and effort) that the
second step improves are:

1. Lost time spent looking for items


2. Lost time due to difficulty in using items
3. Lost time in returning items

What are the benefits of the Second Step: Straighten?


When time lost from unnecessary searching, returning and
difficult usage is reduced you will receive the following benefits:
1. Improved quality
2. Improved productivity
3. Improved safety
4. Improved satisfaction among workers

How do we know which items need to be relocated or


marked differently?
Ask these questions:
1. Is the item easy for anyone to find?
2. Is the item easy to use?
3. Is the item easy for anyone to return?
4. Is equipment involved standardized?
5. Would the standardization be clear to anyone?
6. Have limits been set?
7. Are the limits clearly understandable by anyone?

A good guideline is this: Ask whether a new employee would


be able to find, use and return the item the first day on the job. If the

71

http://slidepdf.com/reader/full/5s-implementation-manual-07 71/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

72

http://slidepdf.com/reader/full/5s-implementation-manual-07 72/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

answer is no, in nearly all cases the item has either not been located
or labeled as well as it needs to be.

Considerations
There are three main considerations in determining the
location of items are:

1. Frequency of use
Rule of thumb: The more often it is used, the closer it is
kept
2. Safety
If it in any way presents a safety hazard, it is not properly
stored and/or marked
3. Process flow
Consider each of the following characteristics to determine
whether items are located for optimal process flow:
a. Weight
b. Height
c. Space
d. Availability
e. Proximity
f. Visibility
g. Standard indicators
h. Its use in conjunction with other items

Items used together should be stored together

Items used together should be stored in the sequence
in which they are used
1. Categorize all items

Those that should be replaced after each use
o Place in order of use
o Place as close as possible to point of use
o Place where least motion, and most efficient
motion, is used in removing and replacing

Those that are not replaced after each use

2. Map the area


1. Map the workspace layout. Include all equipment, tools,
furniture, parts, supplies, inventory, machinery, etc. in

73

http://slidepdf.com/reader/full/5s-implementation-manual-07 73/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

74

http://slidepdf.com/reader/full/5s-implementation-manual-07 74/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

2. this area map. It may be done in the form of a floor plan,


area diagram, or other.

3. Indicate work flow among all items on the map. Use one
arrow for each operation or task. Draw the arrows
sequentially, in order the tasks are performed, and
number each arrow.
3. Analyze the map
1. Study the area map – sometimes called spaghetti diagram
– to discover areas of congestion.

2. Highlight or in some way mark the areas of congestion.


These areas will contain your highest degrees of waste.
3. Analyze all motion to discover waste, using the following
industrial engineering style principles:


Start and end each motion with both hands moving at
once

Both arms should move symmetrically and in
opposite directions

Keep trunk motions to a minimum

Use gravity instead of muscle

Avoid zigzagging motions and sudden changes in
direction

Move with a steady rhythm

Maintain a comfortable posture with comfortable
motions

Use the feet to operate on and off switches for
machines where practical

Keep materials and tools close and in front

Arrange materials and tools in the order of their use

Use inexpensive methods for feeding in and sending
out materials

Keep operators at a proper height for the work to be
done

Make materials and parts easy to pick up

75

http://slidepdf.com/reader/full/5s-implementation-manual-07 75/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

76

http://slidepdf.com/reader/full/5s-implementation-manual-07 76/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Make handles and grips in efficient, easy-to-use
shapes and positions

4. On the map, indicate where all known wasted motion


occurs

4. Evaluate use of tools



Eliminate as many jigs, tools, dies, templates, etc as
possible by making them serve multiple functions.

5. Look for following types of problems that can create wasted


motion

Workbenches or tables that are too wide

Parts that require turning, twisting, bending or
reaching behind

Items that are hard to see or reach because they are
laid out horizontally rather than vertically or on a
slant

Items that are too far above or below eye level to be
seen well

Items placed too high to be reached in normal
working position

Items arranged so that crossover of hands is necessary
(not in order of use)

6. Look for areas of congestion and wasted motion in the new


area layouts

7. Create a new area map


Design and map new layouts, drawing and numbering arrows
to show sequence of work flow, refining until as much wasted
motion as possible has been eliminated.

8. Design new storage


1. Storage should be enough larger than the item so that it
can be easily removed and returned
2. Store tools according to function if they are used in job
shop production

77

http://slidepdf.com/reader/full/5s-implementation-manual-07 77/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

78

http://slidepdf.com/reader/full/5s-implementation-manual-07 78/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

3. Store tools according to their product base if they are used


in repetitive production
4. Create suspended storage for tools where possible

9. Continue to improve your layout design until you have


eliminated all waste that you can at this time.

10. Deploy the new layout


1. Implement the new design as a pilot project, moving all
equipment, tools, furniture, parts, supplies, inventory,
machinery, etc to their new locations
2. Evaluate actual work flow undertaken in the newly
designed layout
3. Make improvements in accordance with evaluation

Signboard Strategy
Remember – the goal is for anyone to be able to determine at
any place and any time in a factory what goes where. Use of
signboards is a key strategy for this.

What information should a signboard convey? What, where,


and how many.

Types of signboards:
1. Inventory, showing items needed for current-charge
2. Machine’s acquisition date production purposes.
3. Machine/equipment: (to be hung from ceiling over
machine, posted against a wall or on machine itself).
a. Name of machine
b. Process name
c. Operator or other person-in
4. Shop: display plant name, line name, cell name, etc.
Steps in signboard deployment:
1. Determine locations
a. Develop a floor plan from previous area layout
b. Map the applicable process in sequence, showing
direction of product or process flow
c. Identify bottlenecks and flow congestion

79

http://slidepdf.com/reader/full/5s-implementation-manual-07 79/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

80

http://slidepdf.com/reader/full/5s-implementation-manual-07 80/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

d. Develop and draw an improved flow map


e. Simulate and optimize the new flow
f. Deploy the new layout in the workspace.
g. Continue to revisit and improve the new layout
2. Prepare locations
3. Make and post signboards and/or labels that show what,
where and how
4. Determine how to recognize when items are out of place
using location limit

Use of signboards and other visual controls


Signboards are a way to identify what goes where and how
many belong in each location.
Three main types of signboards:

Location indicators (show where items go)

Item indicators (show what specific items go in those
places)

Amount indicators (show how many belong there)
Signboards are often used to identify:

Names of work areas

Inventory locations

Equipment storage locations

Standard procedures

Machine layout

Visual Controls
Visual controls are used to make out-of-control items
obvious. They are used to communicate in set and recognizable
visual standards, and to identify:

Waste

Deviations

Normal vs. Abnormal (problems)

Opportunities for continuous improvement (kaizen)

Location
o limits
Red = exceeds limits
o Yellow = limit lines
o White = location lines
o Tiger stripe = hazardous area

81

http://slidepdf.com/reader/full/5s-implementation-manual-07 81/113
7/21/2019 5S Implementation Manual 07

http://slidepdf.com/reader/full/5s-implementation-manual-07 82/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Methods of visual control:



Flow diagrams

Color coding

Signs

Labels

Audio

Touch

Other

Examples of Visual control



Workplace metrics chart
o Inputs needed (customer)
o Outputs generated (supplier)

U.S. Highway signs

Six Levels of Visual Control


1. Share information and/or results of control activities
o The visual display of all information helpful
to activities and goals of all individuals related
to a given area
o Specific emphasis given to information related
to targets and expectations
2. Share established standards
o Display of information and use of established
standards so that non-conformance can be
easily detected and everyone can easily
identify and correct abnormalities
3. Build standards into workplace
o Make the work environment itself
communicate established standards
Use space, demarcations, containers,
equipment, barriers, etc. to
communicate
Use sized and height limits, signs,
colors, etc.
4. Warn about abnormalities
o Build in lights, alarm bells and buzzers and
other devices that can easily be seen or heard

83

http://slidepdf.com/reader/full/5s-implementation-manual-07 83/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

84

http://slidepdf.com/reader/full/5s-implementation-manual-07 84/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

o when signaling a warning about an


abnormality or need (as for parts or
assistance)
5. Detect abnormalities
o Devices are installed to immediately detect
and stop abnormalities at their source before
they move on to the next step or process
6. Prevent abnormalities
o A mistake-proofing device is installed (once
the exact cause of a defect is discovered) to
ensure that the abnormality or defect cannot
re-occur. Redesign of a section of the
equipment may be necessary at this level).
Steps in developing visual controls
1. Brainstorm ideas and document
2. Evaluate level and potential effectiveness of ideas
3. Choose which controls to use for each element
4. Prepare material for visual controls
5. Implement control

Information to be Displayed on Visual Control Charts



Identify storage, operation, equipment or safety
condition not in control

Record specific information relevant to element not in
control

Record ideas for visually controlling each element

Painting Strategy:
This is a method for identifying locations on floors
and walkways. Although it is called painting, you can use
tape, acrylic, or other materials to create divider lines in order
to mark off walkways, etc. Divider lines include such uses as:

Cart storage locations

Aisle direction

Door ranges

Place markers for worktables

85

http://slidepdf.com/reader/full/5s-implementation-manual-07 85/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

86

http://slidepdf.com/reader/full/5s-implementation-manual-07 86/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Tiger marks to show where inventory and equipment
should not be placed or to show hazardous areas.
In designing layout, remember:

U shaped cell designs are generally more efficient
than straight production lines

In-process inventory should be positioned carefully
for best production flow

Floors should be leveled or repaired if possible before
divider lines are laid down

Walkways should allow for safety and a smooth flow
of goods by being wide enough and avoiding twists
and turns

Divider lines should between 2 and 4 inches wide

Paint colors should be standardized and the colors
should be bright

Location map is a signboard showing location of parts, tools,


jigs, dies, equipment and machinery. It does not use areas
showing work flow

Color Coding Strategy can be used to show which parts,


tools, jigs and dies are to be used for which purpose. For
example, parts used in making a particular product can all be
coded with the same color.

Outlining strategy: Drawing outlines of jigs and tools in their


proper storage positions show where they should be placed.

Steps of Sign boarding:


1. Set up training for signboards.
2. Organize signboard-strategy promotion teams
a. Include shop floor supervisors, group leaders,
section and department managers.
3. Draft a schedule (each team should draft its own daily
schedule and display it.)
4. List all needed items, including inventory items
a. Page number
b. Relevant line, work group or process

87

http://slidepdf.com/reader/full/5s-implementation-manual-07 87/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

88

http://slidepdf.com/reader/full/5s-implementation-manual-07 88/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

c. Categories are: raw materials, secondary


materials, in-process inventory and products
d. Use common names in that category.
Specifications should be in separate column
e. Amounts in terms of unites in which they are
stored (pallets, boxes, drums, etc.)
f. Note maximum number that should be stored in
the designated area.
5. Equipment lists
a. Public (for each factory, department, workshop or
line)
b. Personal (each set of equipment used by an
individual worker, such as tools, jigs, supplies,
etc.)
c. Equipment list should include machines, jigs and
dies, measuring tools and gauges, work vehicles
and conveyance vehicles and work supplies.
6. Designate Storage Sites
a. From current layout diagram
7. Install place markers and signboards
a. If storage place is on the floor, mark off and
identify the space
b. If storage space is on carts, pallets, etc mark off
areas where those devices are stored.
c. Mark off all related walkways
d. Use standard area divisions
8. Once all target items have been listed, make signboards
a. Use metal, acrylic, adhesive-backed paper, coated
board – etc.
b. Attach signboards
c. Fill in signboards
9. Maintain ongoing improvement activities
a. Take photos to document organization and
orderliness
b. Use memos to keep people aware of problems that
need to be addressed
c. Set up suggestion system to continue
improvements
d. Draft improvement case study reports

89

http://slidepdf.com/reader/full/5s-implementation-manual-07 89/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

90

http://slidepdf.com/reader/full/5s-implementation-manual-07 90/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

10. Evaluate
a. Create evaluation system
b. Maintain list of essentials for maintaining Step 2
c. Report on activity results

91

http://slidepdf.com/reader/full/5s-implementation-manual-07 91/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

92

http://slidepdf.com/reader/full/5s-implementation-manual-07 92/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Five

The Third S: Shine


“Clean as you go”

The purpose of this step is to clean everything , and then keep


it clean. This, too, sounds like an obvious step in creating a safe and
efficient workplace. But, in fact, far too many work environments
are not effectively cleaned, and kept clean. Keys are an initial
thorough scrubbing, then adopting a clean as you go philosophy,

building
schedules,cleaning intocleaning
and using preventative
as a maintenance assignments
form of inspection and
to expose
abnormal conditions.

Examples of how an unclean work area can affect efficiency


include:

Poorly lit areas are hazardous, and can contribute to
sloppy or defective work

Customers will have less confidence in a supplier whose
work area is unclean

Dirt such as grease, oil, etc can create hazards for the
worker

It is harder to detect problems in dirty equipment or
machinery, leading to breakdowns rather than quick
prevention/repairs

Unclean equipment is more likely to produce defective
products

Clutter leads to inefficiency

Morale can be lowered by working in a cluttered or
unclean environment

1. Determine target areas for scrubbing



Warehouse
o Raw materials, parts, components, finished
products, etc.

Equipment

93

http://slidepdf.com/reader/full/5s-implementation-manual-07 93/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

94

http://slidepdf.com/reader/full/5s-implementation-manual-07 94/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

o Machines, tools, dies, worktables, cabinets, desks,


chairs, etc.

Space
o Floors, work areas, walkways, walls, ceilings,
windows, shelves, closets, lights, etc.
2. Assign scrubbing responsibilities

Divide factory into areas

Assign individuals or teams to each area

Schedule cleaning times
3. Determine each item to be cleaned in targeted area
4. Determine and acquire supplies and equipment needed
5. Try to limit regular cleaning tasks to 5-minutes (assign tasks
accordingly)
6. Undertake initial scrubbing – thorough scrubbing of entire
area. This may take more time than subsequent
“maintenance” cleaning, which should be done in 5 minute
blocks
7. Make periodic cleaning a habit – build it into the regular
daily work schedule
8. Incorporate inspection procedures into the cleaning schedule.
Operators, not maintenance staff, should be in charge of their
own machines.

Train operators to look for minor or sporadic
malfunctions or abnormalities
o Oil leaks, wear, warping, color changes, etc.
o Changes in sound of machine
o Unusual odors
o Unusual or excessive wobbling, vibration, heat,
etc.

Write cleaning/inspection assignments on signboard, or
on sign attached to each machine. Inspections should be
done systematically and routinely. Establish regular
routines for cleaning and inspecting all systems, such as
hydraulic systems, pneumatic systems, lubrication
systems, etc.

Create inspection checklist

Train operators to correct problems revealed during
inspection whenever possible

95

http://slidepdf.com/reader/full/5s-implementation-manual-07 95/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

96

http://slidepdf.com/reader/full/5s-implementation-manual-07 96/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


Create maintenance request form and system for
problems operator cannot fix. A flag or other indicator
should be attached to the machine, visible to all
concerned.

97

http://slidepdf.com/reader/full/5s-implementation-manual-07 97/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

98

http://slidepdf.com/reader/full/5s-implementation-manual-07 98/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Six

The Fourth S: Standardize


“Get a system and stick to it.”

The purpose of the fourth S, Standardize, is to create a


system that will systematically maintain and monitor the first three
S’s in a predictable and organized manner. Standardization includes
the following steps:

Post required information so there is no searching
o Production schedules
o Delivery dates
o Destinations
o Lot size
o Downtime
o Other

Standardize information requirement

Make information requirements visual

Devise methods/controls that:
o Cause deviations from standard to surface
o Keep re-accumulation from occurring
o Indicate danger
o Communicate ideas generated
o Set limits

Assign 3S responsibilities: area, schedule, 3S job
descriptions, and schedules, with appropriate
checklists and/or forms
o Each staff member needs to know his/her job
assignment, responsibility for the maintaining
the first 3 S’s in his/her workspace
o Delivery sites should likewise be marked and
job assignments made for maintaining the first
3S’s.

Integrate 3S duties into regular work assignments.
o Visual controls – anyone should be able to
determine what is normal or abnormal at first
look.

99

http://slidepdf.com/reader/full/5s-implementation-manual-07 99/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

100

http://slidepdf.com/reader/full/5s-implementation-manual-07 100/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

o Make all 3S activities short and efficient –


each should be accomplished in 5 minutes.

Use standardized checklists to evaluate effectiveness
of 3S activities.

Determine which problems are happening repeatedly
o Floors are dirty in spite of regular cleaning,
tools are replaced incorrectly, unneeded items
continue to accumulate, etc.

By asking the 5 Why’s, determine source of problem

Address source of the problem, and find a suitable
improvement.

Standardize the improved method, technique,
placement, etc.

Prevent unneeded items from entering the workplace
o Find a way to procure and produce only those
materials that are needed, when they’re
needed, in the amount they’re needed
o Moving to just-in-time production, rather than
storing large amounts of parts or inventory
eliminates accumulation, damage, etc., by
moving toward one-piece flow, pull
production, load leveling, and standardizing
operations and processes.

Standardize control of items
o Make it difficult to put things in the wrong
place
Visual controls and discipline – clearly
marked storage areas, incentives to
make practicing 3S a habit
o Make it impossible to put things in the wrong
place
Ask the 5 Why’s
Identify underlying causes
If possible, eliminate the need to return
items

Suspension - suspend tools just
above, and within reach, of the
operator. Operator releases tool

101

http://slidepdf.com/reader/full/5s-implementation-manual-07 101/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

102

http://slidepdf.com/reader/full/5s-implementation-manual-07 102/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual


when finished using it, and it returns
automatically to its storage place.

Incorporation – Create a flow of
goods or operations that smoothly
integrates jigs, tools, etc. into the
process and stores them where they
are used.

Use elimination – Three techniques:
o Tool unification – combines
functions of two or more tools
into a single tool
o Tool substitution – uses
something other than a tool to
serve the tool’s function
o Method substitution – improving
efficiency by replacing one
method with another

103

http://slidepdf.com/reader/full/5s-implementation-manual-07 103/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

104

http://slidepdf.com/reader/full/5s-implementation-manual-07 104/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Chapter Seven

The Fifth S: Sustain


“Keep it simple”

5S is not an event. It is a continued way of life in the


workspace. It requires a cultural change in workers and worker
techniques on an on-going basis. Unless your organization is
committed to sustaining the benefits of its 5S program, it will
backslide. How can you prevent this from happening? By creating a
th
system of rewards to ensure that the 5 S, Sustain, is adhered to.
o Create conditions or structures that help sustain the 5S’s
o Awareness – make sure workers understand the 5S’s
and why they’re important
o Time – make time in the work schedule for
performing 5S’s
o Structure – have a schedule, work assignments, etc
that make it clear how and when 5S activities will be
implemented
o Support – management support is imperative,

o including
Rewards acknowledgement,
– need to be made leadership and Recognize
regularly. resources
successful efforts
o Satisfaction – Make following 5S’s enjoyable.
Communicate satisfaction, generate enthusiasm.
Complaining and criticism are not effective ways to sustain
the 5S’s. If conditions slip, the cause should be identified and
corrected. Supervisors should take immediate action when a slippage
is discovered.
Develop a disciplined approach through:
1. The Visual 5S’s (visual controls)

2. Take immediate
deterioration action when
in 5S conditions an abnormality or
are discovered
3. Use instructive rather than destructive criticism
4. Promote and develop 5S company-wide – with
managers visibly involved

105

http://slidepdf.com/reader/full/5s-implementation-manual-07 105/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

106

http://slidepdf.com/reader/full/5s-implementation-manual-07 106/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

5. Use promotion tools


o Management role
o Educate workforce in 5S concepts, tools and
techniques
o Create teams for implementation
o Allow time for implementation and create schedules
o Provide resources for 5S implementation, such as
supplies
o Acknowledge and support 5S efforts
o Encourage creative involvement by all workers, listen
to and incorporate their ideas
o Create rewards for 5S efforts
o Promote ongoing 5S efforts
o Improve quality and efficiency of their own work
o Teach by example
o Demonstrate the company’s commitment to 5S
implementation
o 5S Team’s role
o Continue to learn more about 5S implementation
o Help educate coworkers about 5S
o Be enthusiastic about 5S implementation
o Help promote 5S implementation efforts
o Find ways to implement 5S in their daily work
o Ask supervisor for support or resources needed
o Participate fully in company 5S efforts
o Bring creative ideas to manager or supervisor for
promoting or implementing 5S

o Tools and techniques to Sustain 5S Implementation


o 5S Slogans – communicate themes of the 5S
campaign
Can be suggested by workers
May have a contest to choose slogan
Can be displayed on buttons, stickers, flags,
posters, etc
o 5S Posters
Post throughout the workplace
Can give slogans, or descriptions of 5S
activities

107

http://slidepdf.com/reader/full/5s-implementation-manual-07 107/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

108

http://slidepdf.com/reader/full/5s-implementation-manual-07 108/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Communicate results or status of 5S activities

109

http://slidepdf.com/reader/full/5s-implementation-manual-07 109/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

110

http://slidepdf.com/reader/full/5s-implementation-manual-07 110/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

o Storyboards, or photo exhibits


Show before and after pictures
Show status of 5S activities
o Newsletters
Give reports on 5S conditions and activities
Most effective when issued regularly
o 5S Maps
Hang in central location
Have suggestion cards so all workers can
suggest improvements
o 5S Manuals
Small pocket manuals for easy reference
Larger manuals at workstations
o 5S Department Tours
Have tours of a model area in a company so
other areas can “benchmark”
o 5S Month
Designate particular months for additional 5S
activities, such as contests, benchmarking
field trips, seminars, etc.

5S is an on-going and continually improving process. Learn from the


process. Find ways in your particular situation to make changes that
make the most sense for your plant, personnel, product line, etc.
Communication, follow up and focus are your keys to continued
success with 5S.

111

http://slidepdf.com/reader/full/5s-implementation-manual-07 111/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

Notes

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________

______________________________________
______________________________________

112

http://slidepdf.com/reader/full/5s-implementation-manual-07 112/113
7/21/2019 5S Implementation Manual 07

Anitech 5S Implementation Manual

http://slidepdf.com/reader/full/5s-implementation-manual-07 113/113

Вам также может понравиться