mjb 90 10 1

mjb 221 13 1
mjb 96.6 7 1

mnb 8.2 1 1
mnb 6.4 1 1
mnb 7.6 1 1
mnb 23.6 4 1
mnb 12.4 2 1
mnb 6.5 1 1
mnb 46 5 1
mnb 7.6 1 1
mnb 8.7 3 1
mnb 9.4 2 1
mnb 18.6 3 1
mnb 24.4 4 1
mnb 27.3 3 1
61 16
77
1. Rebound Hammer Test ( RH Test )
Sl No. Part of Structure Minimum Test reqired Remarks
1.a Abutment Height Upto 2.0m. above GL 2 sets (Single Face)
1.b Abutment height from 2.0m. To 5.0m. 2 sets (Single Face)
1.c Abutment height from 5.0m. To 8.0m. 4 sets (Single Face)
Structure width upto
1.d Abutment height from 8.0m. To 10.0m. 4 sets (Single Face) 10m. If the width of
1.e Pier Height Upto 2.0m. above GL 2 X 2= 4 sets (Both Faces) the structure
1.f Pier height from 2.0m. To 5.0m. 2 X 2= 4 sets (Both Faces) increases more than
1.g Pier height from 5.0m. To 8.0m. 3 X 2= 6 sets (Both Faces) 10m. then no of tests
to be increased
1.h Pier height from 8.0m. To 10.0m. 3 X 2= 6 sets (Both Faces) propostionately.
1.i Slab Top Upto span length of 6.0m 2 sets
1.j Slab Top Upto span length of 15.0m 4 sets
1.k Slab Top Upto span length of 20.0m 6 Sets

2. Ultrasonic Pulse Velocity Test ( UPV Test )


2.a Abutment 1 No
2.b Pier 1 No
2.c Slab Top Upto span length of 20.0m 1 No
2.d Girder Upto span length of 20.0m 1 No ( Random) for every 8
nos of girder

3. Core Extraction for Compressive Strength Test


3.a Abutment ( If required) 1 set ( 3 Cores) For MJB - 1 core in
3.b Pier ( If required) 1 set ( 3 Cores) every 60m for all
3.c Slab ( If required) 1 set ( 3 Cores) components.

4. Pull Out Test


4.a Abutment ( If required)
4.b Pier ( If required)
4.c Slab ( If required)

5. Ingredient Analysis Test of Concrete Core


5.a Abutment ( If required)
5.b Pier ( If required)
5.c Slab ( If required)

6. Expert Visit
6.a Major Bridge ( MJB ) 1 Time
6.b Minor Bridge ( MNB ) 1 Time
6.c Cross Drainage Works ( HPC, BC, SC) 1 Time

7. Expert's Report
7.a Major Bridge ( MJB ) 1 Booklet
7.b Minor Bridge ( MNB ) 1 Booklet
7.c Cross Drainage Works ( HPC, BC, SC) 1 Booklet
Name of Project : PN – 45 improvement to vita peth palkapur Anuskura Satavali Pavas SH – 150 ( section district border to Anuskura District
Border) km. 0/00 to 84/00 Dist: Sangli ( km. 0/00 to 83/700 dist – Sangli) (Section – vita to Kokrud km 0/000 to km 83.700) on Hybrid Annuity
Basis
Client : Veteran Consulting Engineers , Bhopal, Madhya Pradesh
Abstract of Tests
Structure Details NDT Tests ( On the basis of good industry practice )
Sl.
Location Span Arrangement No of pier No of Ultrasonic Core Extraction for Pull Out Ingredient
No Type Rebound
& Pulse Compressive Analysis Test of
(Existing) abutment slabs Hammer Test
Velocity Strength Test Concrete Core
1 MJB 15.100 10x9.0=90.0 m. 11 10 54 6 3 0 0
2 MJB 31.500 13x17.0=221.0 m. 14 13 69 12 6 0 0
3 MJB 83.000 7x13.8=96.6 m. 8 7 39 6 3 0 0
4 MNB 8.200 1x8.2=8.2 m. 2 1 5 1 0 0 0
5 MNB 10.700 1x6.4=6.4 m. 2 1 5 1 0 0 0
6 MNB 12.300 1x7.6=7.6 m. 2 1 5 1 0 0 0
7 MNB 53.900 4x5.9 = 23.6 m. 5 4 12 3 2 0 0
8 MNB 63.100 2x6.2=12.4 m. 3 2 7 2 0 0 0
9 MNB 63.500 1x6.4=6.5 m. 2 1 5 1 0 0 0
10 MNB 65.200 5x9.2 = 46.0 m. 6 5 15 5 3 0 0
11 MNB 69.400 1x7.6=7.6 m. 2 1 5 1 0 0 0
12 MNB 71.900 3x2.9=8.7 m. 4 3 6 2 0 0 0
13 MNB 74.500 2x4.7 = 9.4 m. 3 2 5 2 0 0 0
14 MNB 75.500 3x6.2=18.6 m. 4 3 7 2 2 0 0
15 MNB 75.600 4x6.1=24.4 m. 5 4 9 3 2 0 0
16 MNB 78.400 3x9.1=27.3 m 4 3 7 2 2 0 0
17 CD Cross Drainage Structures If required If required 0 0 0
18 structures having girders As required As required 0 0 0
Tentatively Average Total Tests 255 50 23 0 0

53.6

Structure Details NDT Tests ( On the basis of good industry practice )


Sl.
No
Sl.
Location Span Arrangement No of pier No of Ultrasonic Core Extraction for Pull Out Ingredient
No Type Rebound
& Pulse Compressive Analysis Test of
(Existing) abutment slabs Hammer Test
Velocity Strength Test Concrete Core
1 MJB 11.867 9x16.4=147.6 m. 10 9 49 10 4 0 0
2 MJB 35.412 8x18.1=144.8 m. 9 8 44 9 4 0 0
3 MJB 36.310 8x6.7=53.6 m. 9 8 44 5 4 0 0
4 MNB 3.300 1x8.8=8.8 m. 2 1 5 1 0 0 0
5 MNB 4.300 2x3.2 = 6.4 m. 3 2 8 1 0 0 0
6 MNB 6.500 2x3 = 6 m. 3 2 8 1 0 0 0
7 MNB 16.500 2x3.6 = 7.2 m. 3 2 8 1 0 0 0
8 MNB 33.600 1x8.6=8.6 m. 2 1 5 1 0 0 0
9 MNB 56.600 1x6.8=6.8 m. 2 1 5 1 0 0 0
10 MNB 57.400 2x3.2 = 6.4 m. 3 2 8 1 0 0 0
11 MNB 57.900 2x4.9 = 9.8 m. 3 2 8 1 0 0 0
12 MNB 62.600 2x6 = 12 m. 3 2 8 2 2 0 0
13 CD Cross Drainage Structures If required If required 0 0 0
14 structures having girders As required As required 0 0 0
Tentatively Average Total Tests 200 34 14 0 0

Total Scope 455 84 37


1150 5550 10000
523250 466200 370000 1359450 1559450