Load calculation for Truss

Span of Truss w = 42.50 m

Spacing of truss = 4.6 m

Length of the shed = 100.0 m

Height of the column = 13.4 m

Spacing of Purline = 1.18 m

Weight of sheeting = 0.170


= 0.035
= 0.205 Kn/m2

Live load = 0.845 Kn/m2

Angle of truss = 5.26 o

Dead load :

Dead load of AC sheet acting on Intermediate Purline

= 1.18 x 0.205 = 0.242 Kn/m

Dead load of AC sheet acting on top and end Purline

= 1.18 x 0.205 x 0.5 = 0.121 Kn/m

Live load : ( As per IS 875 - reduce livel load 0.02 Kn/m 2 for every degree > slope 10 o )

Live load on truss = 0.8448 - 0.02 x (5.26 - 10 ) = 0.9396 Kn/m2

Total live load on the truss = 0 + 0.9396 = 0.940 Kn/m2

Live load acting on Intermediate Purline = 1.18 x 0.9396 = 1.109 Kn/m2

Live load acting on top and end Purline = 1.18 x 0.9396 x 0.5 = 0.554 Kn/m2
Wind load calculations :

Wind speed Vb = 55.0 m /sec

K1 = 1.00 ( 50 Years )

K2 = 1.03 ( Terrain category - II, Class A , height - 13.0 m)

K3 = 1.00 ( Plain load )

Design wind speed Vz = Vb K1 K2 K3 = 55 x 1 x 1.03x 1 = 56.65 m /sec

Design wind pressure = Pz = 0.6 Vz 2 = 0.6 x 56.65 ^ 2 = 1925.534 N/m2

= 1.926 kN/m2
Height of shed - h = 13.4 m

h/w = 13.4 / 42.5 = 0.315 ( 1/2 < h/w )

External wind pressure coefficent -Cpe : ( Table - 5 of IS : 875 - (part-3) )

Building height Roof Wing angle q - 0o Wing angle q - 90o


ration - h/w angle a EF GH EG FH
0 -0.80 -0.40 -0.80 -0.40
5 -0.90 -0.40 -0.80 -0.40
10 -1.20 -0.40 -0.80 -0.60
1/2 < h/w < 20 -0.40 -0.40 -0.70 -0.60
3/2 30 0.00 -0.40 -0.70 -0.60
45 0.30 -0.50 -0.70 -0.60
60 0.70 -0.60 -0.70 -0.60
5.26 -1.58 -0.40 -0.85 -0.60

Internal wind pressure coefficent -Cpi = + 0.50

a) q = 0o and Cpi =+ 0.50

i) EF direction Cpe + Cpi :


-1.58
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-1.5792 - 0.5 ) x 1.926 x 1.18 = -4.725 Kn/m
Wind load action on top and end purline
= (-1.5792 - 0.5 ) x 1.926 x 1.18 x 0.5 = -2.363 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 1.926 x 1.18 = -2.045 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 1.926 x 1.18x 0.5 = -1.023 Kn/m

b) q = 90o and Cpi =+ 0.50

i) EF direction Cpe + Cpi :

-0.85
-0.60

0.50 0.50

Wind load action on Intermediate purline


= (-0.8474 - 0.5 ) x 1.926 x 1.18 = -3.062 Kn/m

Wind load action on top and end purline


= (-0.8474 - 0.5 ) x 1.926 x 1.18 x 0.5 = -1.531 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.6 - 0.5 ) x 1.926 x 1.18 = -2.5 Kn/m

Wind load action on top and end purline


= (-0.6 - 0.5 ) x 1.926 x 1.18 x 0.5 = -1.25 Kn/m

c) q = 0o and Cpi = -0.50

i) EF direction Cpe + Cpi :

-1.58
-0.40

-0.50 -0.50

Wind load action on Intermediate purline


= (-1.5792 - -0.5 ) x 1.926 x 1.18 = -2.453 Kn/m

Wind load action on top and end purline


= (-1.5792 - -0.5 ) x 1.926 x 1.18 x 0.5 = -1.226 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 1.926 x 1.18 = 0.227 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 1.926 x 1.18 x 0.5 = 0.114 Kn/m

b) q = 90o and Cpi = -0.50

i) EF direction Cpe + Cpi :

-0.85
-0.60

-0.50 -0.50

Wind load action on Intermediate purline


= (-0.8474 - -0.5 ) x 1.926 x 1.18 = -0.79 Kn/m

Wind load action on top and end purline


= (-0.8474 - -0.5 ) x 1.926 x 1.18 x 0.5 = -0.395 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.6 - -0.5 ) x 1.926 x 1.18 = -0.227 Kn/m

Wind load action on top and end purline


= (-0.6 - -0.5 ) x 1.926 x 1.18 x 0.5 = -0.114 Kn/m

Wind load on RCC column (Closed shed) :

External pressure coefficent Cpe : ( As per table - 4 of IS : 875 (part-3))

h = 13.4/42.5 = 0.315 ( 1/2 < h/w )


w
L = 100/42.5 = 2.353 ( 3/2 < L/w < 4 )
w
C Angle A B C D
0o 0.70 -0.30 -0.70 -0.70
A B 90o -0.50 -0.50 0.70 -0.10

Case - I : Cpe - (q - 90 o ) - (+x) (+Cpi) Cpi =+ 0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A & B Plane :
Intermediate column = {-0.5 - (0.5 ) } x 4.55 x 1.926 = -8.7633 Kn/m

End column = {-0.5 - (0.5 ) } x 4.55 x 1.926 x 0 = -4.38165 Kn/m

C Plane :
Intermediate column = {0.7 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= 2.240 Kn/m
End column = {0.7 - (0.5 ) } x (6.37 x 0.5) x 1.926
= 1.227 Kn/m
D Plane :
Intermediate column = {-0.1 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= -6.720 Kn/m
End column = {-0.1 - (0.5 ) } x (6.37 x 0.5) x 1.926
= -3.681 Kn/m
Case - II : Cpe - (q - 90 o ) - (+x) (-Cpi) Cpi =+ -0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A & B Plane :
Intermediate column = {-0.5 - (-0.5 ) } x 4.55 x 1.926 = 0 Kn/m
End column = {-0.5 - (-0.5 ) } x 4.55 x 1.926 x = 0 Kn/m

C Plane :
Intermediate column = {0.7 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= 13.440 Kn/m
End column = {0.7 - (-0.5 ) } x (6.37 x 0.5) x 1.926
= 7.361 Kn/m
D Plane :
Intermediate column = {-0.1 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= 4.480 Kn/m
End column = {-0.1 - (-0.5 ) } x (6.37 x 0.5) x 1.926
= 2.454 Kn/m

Case - III : Cpe - (q - 90 o ) - (+z) (+Cpi) Cpi =+ 0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A Plane :
Intermediate column = {0.7 - (0.5 ) } x 4.55 x 1.926 = 1.75266 Kn/m

End column = {0.7 - (0.5 ) } x 4.55 x 1.926 x 0. = 0.87633 Kn/m

B Plane :
Intermediate column = {-0.3 - (0.5 ) } x 4.55 x 1.926 = -7.01064 Kn/m

End column = {-0.3 - (0.5 ) } x 4.55 x 1.926 x 0 = -3.50532 Kn/m

C Plane :
Intermediate column = {-0.7 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= -13.440 Kn/m
End column = {-0.7 - (0.5 ) } x (6.37 x 0.5) x 1.926
= -7.361 Kn/m
D Plane :
Intermediate column = {-0.7 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= -13.440 Kn/m
End column = {-0.7 - (0.5 ) } x (6.37 x 0.5) x 1.926
= -7.361 Kn/m
Case - IV : Cpe - (q - 90 o ) - (+x) (-Cpi) Cpi =+ -0.50
Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A Plane :
Intermediate column = {0.7 - (-0.5 ) } x 4.55 x 1.926 = 10.51596 Kn/m

End column = {0.7 - (-0.5 ) } x 4.55 x 1.926 x 0 = 5.25798 Kn/m

B Plane :
Intermediate column = {-0.3 - (-0.5 ) } x 4.55 x 1.926 = 1.75266 Kn/m

End column = {-0.3 - (-0.5 ) } x 4.55 x 1.926 x = 0.87633 Kn/m


C Plane :
Intermediate column = {-0.7 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= -2.240 Kn/m
End column = {-0.7 - (-0.5 ) } x (6.37 x 0.5) x 1.926
= -1.227 Kn/m
D Plane :
Intermediate column = {-0.7 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 1.926
= -2.240 Kn/m
End column = {-0.7 - (-0.5 ) } x (6.37 x 0.5) x 1.926
= -1.227 Kn/m
Load calculation for Truss

Span of Truss w = 12.75 m

Spacing of truss = 5.00 m

Length of the shed = 47.5 m

Height of the column = 3.05 m

Spacing of Purline = 1.28 m

Weight of sheeting = 0.100 Kn/m2


Miscellaneous loads = 0.035 Kn/m2
Weight of Dust = 0.000 Kn/m2

= 0.135 Kn/m2

Live load = 0.750 Kn/m2

Angle of truss = 4.50 o

Dead load :

Dead load of AC sheet acting on Intermediate Purline

= 1.28 x 0.135 = 0.173 Kn/m

Dead load of GI sheet acting on top and end Purline

= 1.28 x 0.135 x 0.5 = 0.086 Kn/m

Live load : ( As per IS 875 - reduce livel load 0.02 Kn/m 2 for every degree > slope 10 o )

Live load on truss = 0.75 - 0.02 x (4.5 - 10 ) = 0.86 Kn/m2

Total live load on the truss = = 0.750 Kn/m2

Live load acting on Intermediate Purline = 1.28 x 0.75 = 0.960 Kn/m2

Live load acting on top and end Purline = 1.28 x 0.75 x 0.5 = 0.480 Kn/m2
Wind load calculations :

Wind speed Vb = 39.0 m /sec

K1 = 1.00 ( 50 Years )

K2 = 1.00 ( Terrain category - II, Class A , height - 3.0 m)

K3 = 1.00 ( Plain load )

Design wind speed Vz = Vb K1 K2 K3 = 39 x 1 x 1x 1 = 39.0 m /sec

Design wind pressure = Pz = 0.6 Vz 2 = 0.6 x 39 ^ 2 = 912.6 N/m2

= 0.913 kN/m2
Height of shed - h = 3.05 m

h/w = 3.05 / 12.75 = 0.239 ( 1/2 < h/w )

External wind pressure coefficent -Cpe : ( Table - 5 of IS : 875 - (part-3) )

Building height Roof Wing angle q - 0o Wing angle q - 90o


ration - h/w angle a EF GH EG FH
0 -0.80 -0.40 -0.80 -0.40
5 -0.90 -0.40 -0.80 -0.40
10 -1.20 -0.40 -0.80 -0.60
20 -0.40 -0.40 -0.70 -0.60
h/w < 1/2
30 0.00 -0.40 -0.70 -0.60
45 0.30 -0.50 -0.70 -0.60
h/w < 1/2

60 0.70 -0.60 -0.70 -0.60


4.50 -0.87 -0.40 -0.80 -0.38

Internal wind pressure coefficent -Cpi = + 0.50

a) q = 0o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + Z direction )

-0.87
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-0.87 - 0.5 ) x 0.913 x 1.28 = -1.601 Kn/m

Wind load action on top and end purline


= (-0.87 - 0.5 ) x 0.913 x 1.28 x 0.5 = -0.801 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 0.913 x 1.28 = -1.052 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 0.913 x 1.28x 0.5 = -0.526 Kn/m

b) q = 90o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + X direction )

-0.80
-0.38

0.50 0.50

Wind load action on Intermediate purline


= (-0.8 - 0.5 ) x 0.913 x 1.28 = -1.519 Kn/m
Wind load action on top and end purline
= (-0.8 - 0.5 ) x 0.913 x 1.28 x 0.5 = -0.76 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.38 - 0.5 ) x 0.913 x 1.28 = -1.028 Kn/m

Wind load action on top and end purline


= (-0.38 - 0.5 ) x 0.913 x 1.28 x 0.5 = -0.514 Kn/m

c) q = 0o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - Z direction )

-0.87
-0.40

-0.50 -0.50

Wind load action on Intermediate purline


= (-0.87 - -0.5 ) x 0.913 x 1.28 = -0.432 Kn/m

Wind load action on top and end purline


= (-0.87 - -0.5 ) x 0.913 x 1.28 x 0.5 = -0.216 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 0.913 x 1.28 = 0.117 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 0.913 x 1.28 x 0.5 = 0.058 Kn/m

b) q = 90o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - X direction )

-0.80
-0.38

-0.50 -0.50
Wind load action on Intermediate purline
= (-0.8 - -0.5 ) x 0.913 x 1.28 = -0.351 Kn/m

Wind load action on top and end purline


= (-0.8 - -0.5 ) x 0.913 x 1.28 x 0.5 = -0.175 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.38 - -0.5 ) x 0.913 x 1.28 = 0.14 Kn/m

Wind load action on top and end purline


= (-0.38 - -0.5 ) x 0.913 x 1.28 x 0.5 = 0.07 Kn/m
Load on Intermideat Load on end Puline - Load on Intermideat Load on end Puline
Direction Puline - EF EF Puline - GH - GH
+Z -1.601 -0.801 -1.052 -0.526
-Z -0.432 -0.216 -0.117 -0.058
+X -1.519 -0.76 -1.028 -0.514
-X -0.351 -0.175 0.14 0.07

Wind load on RCC column (Closed shed) :

External pressure coefficent Cpe : ( As per table - 4 of IS : 875 (part-3))

h = 3.05/12.75 = 0.239 ( 1/2 < h/w )


w
L = 47.5/12.75 = 3.725 ( 3/2 < L/w < 4 )
w
C Angle A B C D
0 o
0.70 -0.25 -0.60 -0.60
A B 90o -0.50 -0.50 0.70 -0.10

Case - I : Cpe - (q - 90 o ) - (+x) (+Cpi) Cpi =+ 0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A & B Plane :
Intermediate column = {-0.5 - (0.5 ) } x 5 x 0.913 = -4.565 Kn/m

End column = {-0.5 - (0.5 ) } x 5 x 0.913 x 0.5 = -2.2825 Kn/m

C Plane :
Intermediate column = {0.7 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= 1.062 Kn/m
End column = {0.7 - (0.5 ) } x (6.37 x 0.5) x 0.913
= 0.582 Kn/m
D Plane :
Intermediate column = {-0.1 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= -3.185 Kn/m
End column = {-0.1 - (0.5 ) } x (6.37 x 0.5) x 0.913
= -1.745 Kn/m
Case - II : Cpe - (q - 90 o ) - (+x) (-Cpi) Cpi =+ -0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A & B Plane :
Intermediate column = {-0.5 - (-0.5 ) } x 5 x 0.913 = 0.00 Kn/m

End column = {-0.5 - (-0.5 ) } x 5 x 0.913 x 0.5 = 0.00 Kn/m

C Plane :
Intermediate column = {0.7 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= 6.371 Kn/m
End column = {0.7 - (-0.5 ) } x (6.37 x 0.5) x 0.913
= 3.489 Kn/m
D Plane :
Intermediate column = {-0.1 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= 2.124 Kn/m
End column = {-0.1 - (-0.5 ) } x (6.37 x 0.5) x 0.913
= 1.163 Kn/m

Case - III : Cpe - (q - 0 o ) - (+z) (+Cpi) Cpi =+ 0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A Plane :
Intermediate column = {0.7 - (0.5 ) } x 5 x 0.913 = 0.913 Kn/m

End column = {0.7 - (0.5 ) } x 5 x 0.913 x 0.5 = 0.457 Kn/m

B Plane :
Intermediate column = {-0.25 - (0.5 ) } x 5 x 0.913 = -3.424 Kn/m

End column = {-0.25 - (0.5 ) } x 5 x 0.913 x 0.5 = -1.712 Kn/m

C Plane :
Intermediate column = {-0.6 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= -5.840 Kn/m
End column = {-0.6 - (0.5 ) } x (6.37 x 0.5) x 0.913
= -3.199 Kn/m
D Plane :
Intermediate column = {-0.6 - (0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= -5.840 Kn/m
End column = {-0.6 - (0.5 ) } x (6.37 x 0.5) x 0.913
= -3.199 Kn/m
Case - IV : Cpe - (q - 0 o ) - (+z) (-Cpi) Cpi =+ -0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 5.26 and 6.37

A Plane :
Intermediate column = {0.7 - (-0.5 ) } x 5 x 0.913 = 5.478 Kn/m

End column = {0.7 - (-0.5 ) } x 5 x 0.913 x 0.5 = 2.739 Kn/m

B Plane :
Intermediate column = {-0.25 - (-0.5 ) } x 5 x 0.913 = 1.141 Kn/m

End column = {-0.25 - (-0.5 ) } x 5 x 0.913 x 0.5 = 0.571 Kn/m


C Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= -0.531 Kn/m
End column = {-0.6 - (-0.5 ) } x (6.37 x 0.5) x 0.913
= -0.291 Kn/m
D Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (5.26x 0.5 + 6.37 x 0.5) x 0.913
= -0.531 Kn/m
End column = {-0.6 - (-0.5 ) } x (6.37 x 0.5) x 0.913
= -0.291 Kn/m
L /w = 3.725 <4
Load calculation for Truss

Span of Truss w = 11.35 m

Spacing of truss = 4.70 m

Length of the shed = 45.6 m

Height of the column = 3.35 m

Spacing of Purline = 1.27 m

Weight of sheeting = 0.100 Kn/m2


Miscellaneous loads = 0.035 Kn/m2
Weight of Dust = 0.000 Kn/m2

= 0.135 Kn/m2

Live load = 0.750 Kn/m2

Angle of truss = 5.00 o

Dead load :

Dead load of AC sheet acting on Intermediate Purline

= 1.266 x 0.135 = 0.171 Kn/m

Dead load of GI sheet acting on top and end Purline

= 1.266 x 0.135 x 0.5 = 0.085 Kn/m

Live load : ( As per IS 875 - reduce livel load 0.02 Kn/m 2 for every degree > slope 10 o )

Live load on truss = 0.75 - 0.02 x (5 - 10 ) = 0.85 Kn/m2

Total live load on the truss = = 0.750 Kn/m2

Live load acting on Intermediate Purline = 1.266 x 0.75 = 0.950 Kn/m2

Live load acting on top and end Purline = 1.266 x 0.75 x 0.5 = 0.475 Kn/m2
Wind load calculations :

Wind speed Vb = 50.0 m /sec

K1 = 1.00 ( 50 Years )

K2 = 1.00 ( Terrain category - II, Class A , height - 3.0 m)

K3 = 1.00 ( Plain load )

Design wind speed Vz = Vb K1 K2 K3 = 50 x 1 x 1x 1 = 50.0 m /sec

Design wind pressure = Pz = 0.6 Vz 2 = 0.6 x 50 ^ 2 = 1500 N/m2

= 1.5 kN/m2
Height of shed - h = 3.35 m

h/w = 3.35 / 11.35 = 0.295 ( 1/2 < h/w )

External wind pressure coefficent -Cpe : ( Table - 5 of IS : 875 - (part-3) )

Building height Roof Wing angle q - 0o Wing angle q - 90o


ration - h/w angle a EF GH EG FH
0 -0.80 -0.40 -0.80 -0.40
5 -0.90 -0.40 -0.80 -0.40
10 -1.20 -0.40 -0.80 -0.60
20 -0.40 -0.40 -0.70 -0.60
h/w < 1/2
30 0.00 -0.40 -0.70 -0.60
45 0.30 -0.50 -0.70 -0.60
h/w < 1/2

60 0.70 -0.60 -0.70 -0.60


5.00 -0.90 -0.40 -0.80 -0.40

Internal wind pressure coefficent -Cpi = + 0.50

a) q = 0o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + Z direction )

-0.90
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-0.9 - 0.5 ) x 1.5 x 1.266 = -2.659 Kn/m

Wind load action on top and end purline


= (-0.9 - 0.5 ) x 1.5 x 1.266 x 0.5 = -1.329 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 1.5 x 1.266 = -1.709 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 1.5 x 1.266x 0.5 = -0.855 Kn/m

b) q = 90o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + X direction )

-0.80
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-0.8 - 0.5 ) x 1.5 x 1.266 = -2.469 Kn/m
Wind load action on top and end purline
= (-0.8 - 0.5 ) x 1.5 x 1.266 x 0.5 = -1.234 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 1.5 x 1.266 = -1.709 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 1.5 x 1.266 x 0.5 = -0.855 Kn/m

c) q = 0o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - Z direction )

-0.90
-0.40

-0.50 -0.50

Wind load action on Intermediate purline


= (-0.9 - -0.5 ) x 1.5 x 1.266 = -0.76 Kn/m

Wind load action on top and end purline


= (-0.9 - -0.5 ) x 1.5 x 1.266 x 0.5 = -0.38 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 1.5 x 1.266 = 0.19 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 1.5 x 1.266 x 0.5 = 0.095 Kn/m

b) q = 90o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - X direction )

-0.80
-0.40

-0.50 -0.50
Wind load action on Intermediate purline
= (-0.8 - -0.5 ) x 1.5 x 1.266 = -0.57 Kn/m

Wind load action on top and end purline


= (-0.8 - -0.5 ) x 1.5 x 1.266 x 0.5 = -0.285 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 1.5 x 1.266 = 0.19 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 1.5 x 1.266 x 0.5 = 0.095 Kn/m
Load on Intermideat Load on end Puline - Load on Intermideat Load on end Puline
Direction Puline - EF EF Puline - GH - GH
+Z -2.659 -1.329 -1.709 -0.855
-Z -0.76 -0.38 -0.19 -0.095
+X -2.469 -1.234 -1.709 -0.855
-X -0.57 -0.285 0.19 0.095

Wind load on RCC column (Closed shed) :

External pressure coefficent Cpe : ( As per table - 4 of IS : 875 (part-3))

h = 3.35/11.35 = 0.295 ( 1/2 < h/w )


w
L = 45.62/11.3 = 4.019 ( 3/2 < L/w < 4 )
w
C Angle A B C D
0 o
0.70 -0.25 -0.60 -0.60
A B 90o -0.50 -0.50 0.70 -0.10

Case - I : Cpe - (q - 90 o ) - (+x) (+Cpi) Cpi =+ 0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 3.5 and 11.35

A & B Plane :
Intermediate column = {-0.5 - (0.5 ) } x 4.7 x 1.5 = -7.05 Kn/m

End column = {-0.5 - (0.5 ) } x 4.7 x 1.5 x 0.5 = -3.525 Kn/m

C Plane :
Intermediate column = {0.7 - (0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= 2.228 Kn/m
End column = {0.7 - (0.5 ) } x (11.35 x 0.5) x 1.5
= 1.703 Kn/m
D Plane :
Intermediate column = {-0.1 - (0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= -6.683 Kn/m
End column = {-0.1 - (0.5 ) } x (11.35 x 0.5) x 1.5
= -5.108 Kn/m
Case - II : Cpe - (q - 90 o ) - (+x) (-Cpi) Cpi =+ -0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 3.5 and 11.35

A & B Plane :
Intermediate column = {-0.5 - (-0.5 ) } x 4.7 x 1.5 = 0.00 Kn/m

End column = {-0.5 - (-0.5 ) } x 4.7 x 1.5 x 0.5 = 0.00 Kn/m

C Plane :
Intermediate column = {0.7 - (-0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= 13.365 Kn/m
End column = {0.7 - (-0.5 ) } x (11.35 x 0.5) x 1.5
= 10.215 Kn/m
D Plane :
Intermediate column = {-0.1 - (-0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= 4.455 Kn/m
End column = {-0.1 - (-0.5 ) } x (11.35 x 0.5) x 1.5
= 3.405 Kn/m

Case - III : Cpe - (q - 0 o ) - (+z) (+Cpi) Cpi =+ 0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 3.5 and 11.35

A Plane :
Intermediate column = {0.7 - (0.5 ) } x 4.7 x 1.5 = 1.410 Kn/m

End column = {0.7 - (0.5 ) } x 4.7 x 1.5 x 0.5 = 0.705 Kn/m

B Plane :
Intermediate column = {-0.25 - (0.5 ) } x 4.7 x 1.5 = -5.288 Kn/m

End column = {-0.25 - (0.5 ) } x 4.7 x 1.5 x 0.5 = -2.644 Kn/m

C Plane :
Intermediate column = {-0.6 - (0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= -12.251 Kn/m
End column = {-0.6 - (0.5 ) } x (11.35 x 0.5) x 1.5
= -9.364 Kn/m
D Plane :
Intermediate column = {-0.6 - (0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= -12.251 Kn/m
End column = {-0.6 - (0.5 ) } x (11.35 x 0.5) x 1.5
= -9.364 Kn/m
Case - IV : Cpe - (q - 0 o ) - (+z) (-Cpi) Cpi =+ -0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 3.5 and 11.35

A Plane :
Intermediate column = {0.7 - (-0.5 ) } x 4.7 x 1.5 = 8.460 Kn/m

End column = {0.7 - (-0.5 ) } x 4.7 x 1.5 x 0.5 = 4.230 Kn/m

B Plane :
Intermediate column = {-0.25 - (-0.5 ) } x 4.7 x 1.5 = 1.763 Kn/m

End column = {-0.25 - (-0.5 ) } x 4.7 x 1.5 x 0.5 = 0.881 Kn/m


C Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= -1.114 Kn/m
End column = {-0.6 - (-0.5 ) } x (11.35 x 0.5) x 1.5
= -0.851 Kn/m
D Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (3.5x 0.5 + 11.35 x 0.5) x 1.5
= -1.114 Kn/m
End column = {-0.6 - (-0.5 ) } x (11.35 x 0.5) x 1.5
= -0.851 Kn/m
L /w = 4.019 <4
Load calculation for Truss

Span of Truss w = 13.35 m

Spacing of truss = 5.00 m

Length of the shed = 18.6 m

Height of the column = 3.65 m

Spacing of Purline = 1.22 m

Weight of sheeting = 0.100 Kn/m2


Miscellaneous loads = 0.035 Kn/m2
Weight of Dust = 0.000 Kn/m2

= 0.135 Kn/m2

Live load = 0.750 Kn/m2

Angle of truss = 4.00 o

Dead load :

Dead load of AC sheet acting on Intermediate Purline

= 1.217 x 0.135 = 0.164 Kn/m

Dead load of GI sheet acting on top and end Purline

= 1.217 x 0.135 x 0.5 = 0.082 Kn/m

Live load : ( As per IS 875 - reduce livel load 0.02 Kn/m 2 for every degree > slope 10 o )

Live load on truss = 0.75 - 0.02 x (4 - 10 ) = 0.87 Kn/m2

Total live load on the truss = = 0.750 Kn/m2

Live load acting on Intermediate Purline = 1.217 x 0.75 = 0.913 Kn/m2

Live load acting on top and end Purline = 1.217 x 0.75 x 0.5 = 0.456 Kn/m2
Wind load calculations :

Wind speed Vb = 50.0 m /sec

K1 = 1.00 ( 50 Years )

K2 = 1.00 ( Terrain category - II, Class A , height - 3.0 m)

K3 = 1.00 ( Plain load )

Design wind speed Vz = Vb K1 K2 K3 = 50 x 1 x 1x 1 = 50.0 m /sec

Design wind pressure = Pz = 0.6 Vz 2 = 0.6 x 50 ^ 2 = 1500 N/m2

= 1.5 kN/m2
Height of shed - h = 3.65 m

h/w = 3.65 / 13.35 = 0.273 ( 1/2 < h/w )

External wind pressure coefficent -Cpe : ( Table - 5 of IS : 875 - (part-3) )

Building height Roof Wing angle q - 0o Wing angle q - 90o


ration - h/w angle a EF GH EG FH
0 -0.80 -0.40 -0.80 -0.40
5 -0.90 -0.40 -0.80 -0.40
10 -1.20 -0.40 -0.80 -0.60
20 -0.40 -0.40 -0.70 -0.60
h/w < 1/2
30 0.00 -0.40 -0.70 -0.60
45 0.30 -0.50 -0.70 -0.60
h/w < 1/2

60 0.70 -0.60 -0.70 -0.60


4.00 -0.84 -0.40 -0.80 -0.36

Internal wind pressure coefficent -Cpi = + 0.50

a) q = 0o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + Z direction )

-0.84
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-0.84 - 0.5 ) x 1.5 x 1.217 = -2.446 Kn/m

Wind load action on top and end purline


= (-0.84 - 0.5 ) x 1.5 x 1.217 x 0.5 = -1.223 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 1.5 x 1.217 = -1.643 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 1.5 x 1.217x 0.5 = -0.821 Kn/m

b) q = 90o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + X direction )

-0.80
-0.36

0.50 0.50

Wind load action on Intermediate purline


= (-0.8 - 0.5 ) x 1.5 x 1.217 = -2.373 Kn/m
Wind load action on top and end purline
= (-0.8 - 0.5 ) x 1.5 x 1.217 x 0.5 = -1.187 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.36 - 0.5 ) x 1.5 x 1.217 = -1.57 Kn/m

Wind load action on top and end purline


= (-0.36 - 0.5 ) x 1.5 x 1.217 x 0.5 = -0.785 Kn/m

c) q = 0o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - Z direction )

-0.84
-0.40

-0.50 -0.50

Wind load action on Intermediate purline


= (-0.84 - -0.5 ) x 1.5 x 1.217 = -0.621 Kn/m

Wind load action on top and end purline


= (-0.84 - -0.5 ) x 1.5 x 1.217 x 0.5 = -0.31 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 1.5 x 1.217 = 0.183 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 1.5 x 1.217 x 0.5 = 0.091 Kn/m

b) q = 90o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - X direction )

-0.80
-0.36

-0.50 -0.50
Wind load action on Intermediate purline
= (-0.8 - -0.5 ) x 1.5 x 1.217 = -0.548 Kn/m

Wind load action on top and end purline


= (-0.8 - -0.5 ) x 1.5 x 1.217 x 0.5 = -0.274 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.36 - -0.5 ) x 1.5 x 1.217 = 0.256 Kn/m

Wind load action on top and end purline


= (-0.36 - -0.5 ) x 1.5 x 1.217 x 0.5 = 0.128 Kn/m
Load on Intermideat Load on end Puline - Load on Intermideat Load on end Puline
Direction Puline - EF EF Puline - GH - GH
+Z -2.446 -1.223 -1.643 -0.821
-Z -0.621 -0.31 -0.183 -0.091
+X -2.373 -1.187 -1.57 -0.785
-X -0.548 -0.274 0.256 0.128

Wind load on RCC column (Closed shed) :

External pressure coefficent Cpe : ( As per table - 4 of IS : 875 (part-3))

h = 3.65/13.35 = 0.273 ( 1/2 < h/w )


w
L = 18.64/13.3 = 1.396 ( 3/2 < L/w < 4 )
w
C Angle A B C D
0 o
0.70 -0.25 -0.60 -0.60
A B 90o -0.50 -0.50 0.70 -0.10

Case - I : Cpe - (q - 90 o ) - (+x) (+Cpi) Cpi =+ 0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 3.5 and 13.35

A & B Plane :
Intermediate column = {-0.5 - (0.5 ) } x 5 x 1.5 = -7.5 Kn/m

End column = {-0.5 - (0.5 ) } x 5 x 1.5 x 0.5 = -3.75 Kn/m

C Plane :
Intermediate column = {0.7 - (0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= 2.528 Kn/m
End column = {0.7 - (0.5 ) } x (13.35 x 0.5) x 1.5
= 2.003 Kn/m
D Plane :
Intermediate column = {-0.1 - (0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= -7.583 Kn/m
End column = {-0.1 - (0.5 ) } x (13.35 x 0.5) x 1.5
= -6.008 Kn/m
Case - II : Cpe - (q - 90 o ) - (+x) (-Cpi) Cpi =+ -0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 3.5 and 13.35

A & B Plane :
Intermediate column = {-0.5 - (-0.5 ) } x 5 x 1.5 = 0.00 Kn/m

End column = {-0.5 - (-0.5 ) } x 5 x 1.5 x 0.5 = 0.00 Kn/m

C Plane :
Intermediate column = {0.7 - (-0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= 15.165 Kn/m
End column = {0.7 - (-0.5 ) } x (13.35 x 0.5) x 1.5
= 12.015 Kn/m
D Plane :
Intermediate column = {-0.1 - (-0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= 5.055 Kn/m
End column = {-0.1 - (-0.5 ) } x (13.35 x 0.5) x 1.5
= 4.005 Kn/m

Case - III : Cpe - (q - 0 o ) - (+z) (+Cpi) Cpi =+ 0.50

Com. pressure

0.50

Spacing of columns in gable wall direction = 3.5 and 13.35

A Plane :
Intermediate column = {0.7 - (0.5 ) } x 5 x 1.5 = 1.500 Kn/m

End column = {0.7 - (0.5 ) } x 5 x 1.5 x 0.5 = 0.750 Kn/m

B Plane :
Intermediate column = {-0.25 - (0.5 ) } x 5 x 1.5 = -5.625 Kn/m

End column = {-0.25 - (0.5 ) } x 5 x 1.5 x 0.5 = -2.813 Kn/m

C Plane :
Intermediate column = {-0.6 - (0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= -13.901 Kn/m
End column = {-0.6 - (0.5 ) } x (13.35 x 0.5) x 1.5
= -11.014 Kn/m
D Plane :
Intermediate column = {-0.6 - (0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= -13.901 Kn/m
End column = {-0.6 - (0.5 ) } x (13.35 x 0.5) x 1.5
= -11.014 Kn/m
Case - IV : Cpe - (q - 0 o ) - (+z) (-Cpi) Cpi =+ -0.50

Com. pressure
0.50

Spacing of columns in gable wall direction = 3.5 and 13.35

A Plane :
Intermediate column = {0.7 - (-0.5 ) } x 5 x 1.5 = 9.000 Kn/m

End column = {0.7 - (-0.5 ) } x 5 x 1.5 x 0.5 = 4.500 Kn/m

B Plane :
Intermediate column = {-0.25 - (-0.5 ) } x 5 x 1.5 = 1.875 Kn/m

End column = {-0.25 - (-0.5 ) } x 5 x 1.5 x 0.5 = 0.938 Kn/m


C Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= -1.264 Kn/m
End column = {-0.6 - (-0.5 ) } x (13.35 x 0.5) x 1.5
= -1.001 Kn/m
D Plane :
Intermediate column = {-0.6 - (-0.5 ) } x (3.5x 0.5 + 13.35 x 0.5) x 1.5
= -1.264 Kn/m
End column = {-0.6 - (-0.5 ) } x (13.35 x 0.5) x 1.5
= -1.001 Kn/m
L /w = 1.396 <4
Load calculation for Truss

Span of Truss w = 18.27 m

Spacing of truss = 6.20 m

Length of the shed = 31.0 m

Height of the column = 15.00 m

Spacing of Purline = 1.16 m

Weight of sheeting = 0.160 Kn/m2


Miscellaneous loads = 0.035 Kn/m2

= 0.195 Kn/m2

Live load = 0.750 Kn/m2

Angle of truss = 11.00 o

Dead load :

Dead load of AC sheet acting on Intermediate Purline

= 1.16 x 0.195 = 0.226 Kn/m

Dead load of GI sheet acting on top and end Purline

= 1.16 x 0.195 x 0.5 = 0.113 Kn/m

Live load : ( As per IS 875 - reduce livel load 0.02 Kn/m 2 for every degree > slope 10 o )

Live load on truss = 0.75 - 0.02 x (11 - 10 ) = 0.73 Kn/m2

Total live load on the truss = = 0.750 Kn/m2

Live load acting on Intermediate Purline = 1.16 x 0.75 = 0.870 Kn/m2

Live load acting on top and end Purline = 1.16 x 0.75 x 0.5 = 0.435 Kn/m2
Wind load calculations :

Wind speed Vb = 44.0 m /sec

K1 = 1.00 ( 50 Years )

K2 = 1.07 ( Terrain category - II, Class A , height - 3.0 m)

K3 = 1.00 ( Plain load )

Design wind speed Vz = Vb K1 K2 K3 = 44 x 1 x 1.07x 1 = 47.1 m /sec

Design wind pressure = Pz = 0.6 Vz 2 = 0.6 x 47.08 ^ 2 = 1329.916 N/m2

= 1.33 kN/m2
Height of shed - h = 15.00 m

h/w = 15 / 18.27 = 0.821 ( 1/2 < h/w )

External wind pressure coefficent -Cpe : ( Table - 5 of IS : 875 - (part-3) )

Building height Roof Wing angle q - 0o Wing angle q - 90o


ration - h/w angle a EF GH EG FH
0 -0.80 -0.40 -0.80 -0.40
5 -0.90 -0.40 -0.80 -0.40
10 -1.20 -0.40 -0.80 -0.60
20 -0.40 -0.40 -0.70 -0.60
h/w < 1/2
30 0.00 -0.40 -0.70 -0.60
45 0.30 -0.50 -0.70 -0.60
60 0.70 -0.60 -0.70 -0.60
11.00 -1.26 -0.40 -0.80 -0.64
Internal wind pressure coefficent -Cpi = + 0.50

a) q = 0o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + Z direction )

-1.26
-0.40

0.50 0.50

Wind load action on Intermediate purline


= (-1.26 - 0.5 ) x 1.33 x 1.16 = -2.715 Kn/m

Wind load action on top and end purline


= (-1.26 - 0.5 ) x 1.33 x 1.16 x 0.5 = -1.358 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - 0.5 ) x 1.33 x 1.16 = -1.389 Kn/m

Wind load action on top and end purline


= (-0.4 - 0.5 ) x 1.33 x 1.16x 0.5 = -0.694 Kn/m

b) q = 90o and Cpi =+ 0.50

i) EF direction Cpe + Cpi : ( + X direction )

-0.80
-0.64

0.50 0.50

Wind load action on Intermediate purline


= (-0.8 - 0.5 ) x 1.33 x 1.16 = -2.006 Kn/m

Wind load action on top and end purline


= (-0.8 - 0.5 ) x 1.33 x 1.16 x 0.5 = -1.003 Kn/m
ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.64 - 0.5 ) x 1.33 x 1.16 = -1.759 Kn/m

Wind load action on top and end purline


= (-0.64 - 0.5 ) x 1.33 x 1.16 x 0.5 = -0.879 Kn/m

c) q = 0o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - Z direction )

-1.26
-0.40

-0.50 -0.50

Wind load action on Intermediate purline


= (-1.26 - -0.5 ) x 1.33 x 1.16 = -1.173 Kn/m

Wind load action on top and end purline


= (-1.26 - -0.5 ) x 1.33 x 1.16 x 0.5 = -0.586 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.4 - -0.5 ) x 1.33 x 1.16 = 0.154 Kn/m

Wind load action on top and end purline


= (-0.4 - -0.5 ) x 1.33 x 1.16 x 0.5 = 0.077 Kn/m

b) q = 90o and Cpi = -0.50

i) EF direction Cpe + Cpi : ( - X direction )

-0.80
-0.64

-0.50 -0.50

Wind load action on Intermediate purline


= (-0.8 - -0.5 ) x 1.33 x 1.16 = -0.463 Kn/m
Wind load action on top and end purline
= (-0.8 - -0.5 ) x 1.33 x 1.16 x 0.5 = -0.231 Kn/m

ii) GH direction Cpe + Cpi :

Wind load action on Intermediate purline


= (-0.64 - -0.5 ) x 1.33 x 1.16 = -0.216 Kn/m

Wind load action on top and end purline


= (-0.64 - -0.5 ) x 1.33 x 1.16 x 0.5 = -0.108 Kn/m