Вы находитесь на странице: 1из 1

20 19 18 17 16 15 14 13 12 11 10

FLAT ROOF BUILD UP - TIMBER CLADDING TO WHITE ALUMINIUM EDGE


WHITE METAL STANDING SEAM SINGLE PLY ROOF MEMBRANE, TIMBER CLADDING TO SOFFIT WHITE METAL CLADDING SOFFIT PROFILE
ROOF SHEET STRUCTURAL STEEL / CONCRETE DECK,
STEEL STRUCTURE
+ 11.250 + 11.250

+ 10.650 + 10.650

+ 9.650 + 9.650

TUBULAR STEEL COLUMNS

GLASS BALUSTRADE
+ 8.850 + 8.850

+ 8.230 FFL + 8.230 FFL

BRONZE SHEET CLADDING ON


STEEL FRAME
+ 7.330 + 7.330
+ 7.230 + 7.230

STEEL COLUMNS STEEL COLUMN


+ 6.510 + 6.510

+6.220 SSL +6.220 SSL


6.130 FFL 6.130 FFL

+ 5.930 SSL + 5.930 SSL


+ 5.695

D.01
G.03 G.04 G.06
3710

3215

PRE-CAST CONCRETE STAIR WITH GLASS


BALUSTRADE - SEE DWG D-18, D-19
+ 3.580 + 3.580

+ 2.620 TIMBER DECKING


2.480 FFL 2.480 FFL

2.170 EXISTING SLAB LEVEL 2.170 EXISTING SLAB LEVEL

0m 1m 5m
W-01 LIMESTONE CLADDING ON FIXED DOUBLE GLAZING WITH W-01 LIMESTONE CLADDING ON ALUMINIUM FRAMED WINDOW
REINFORCED CONCRETE WALL LOW E COATING REINFORCED CONCRETE WALL DOUBLE GLAZED WITH 'LOW E' COATING
NORTH ELEVATION 1:50

REVISIONS CHECKED BY JOB TITLE


DO NOT SCALE. SCHEMATIC DRAWING  ONLY. NO  MONTENEGRO LIDO Studio RHE
DIMENSIONAL CHECKS HAVE BEEN MADE. FULL 
MEASURED SURVEY REQUIRED. 36/37 FEATHERSTONE STREET
A 30.11.2010 DRAWING TITLE LONDON
B 07.12.2010 ELEVATION 04 ‐ NORTH  ELEVATION EC1Y 8QZ
C 17.12.2010
D 07.02.2011 SCALE DATE TELEPHONE 020 7253 5358
1:50 FACSIMILE 020 7253 5359
OCTOBER 2010
architect@rhe.uk.com
DRAWING AND DESIGN REMAIN COPYRIGHT © OF THE  JOB NO. DRAWING NO.
AUTHOR, ACTION WILL BE TAKEN AGAINST UNAUTHORISED 
USE. 5001 019

Вам также может понравиться