Circuit-Breakers 3AP1/2
72.5 kV up to 550 kV
Answers for energy.
The 3AP1/2
High-Voltage Circuit-Breakers
Now Applicable for 550 kV
3AP2 FI 420 kV
Live-tank circuit-breaker
in operation at a major
power transmission and
distribution company
2
With High-Voltage Circuit-Breakers
from Siemens you are always on
the Economically Safe Side
3
The Modular Design
The self compression arc-quenching The stored-energy spring mechanism
principle is applied in our 3AP circuit- The compact design of this operating
breakers. mechanism allows to place the stored-en-
The arc-assisted interrupter unit of the ergy spring mechanism within the control
3AP circuit-breaker utilises the energy cubicle. The main components such as
of the arc during opening for an optimal the interrupter unit and the operating
arc quenching, allowing to reduce the mechanism of our 3AP1/2 high-voltage
operating energy to a minimum. Our circuit-breakers, are identical to the ones
circuit-breakers for the voltage range in our 3AP deadtank circuit-breaker fami-
72.5 kV up to 300 kV have one inter- ly. By applying this proven modular design
rupter unit per pole and up to 245 kV the we can fulfill the highest expectation with
circuit-breakers are available with a com- regard to availability, reliability, as well as
mon or a single-pole operating mecha- economical performance. This results in
nism. 3AP high-voltage circuit-breakers continuously high customer satisfaction.
from 362 kV up to 550 kV are equipped
with two interrupter units per pole.
1
1
2
2
4,5
3
3
4,5
3AP1 FG up to 72.5 kV 3AP1 FG up to 245 kV
One interrupter unit per pole. One interrupter unit per pole.
1
1
6/7
2
2
5
5 3
4
4 3
Stored-energy spring mechanism, three-pole breaker with Stored-energy spring mechanism, circuit-breaker
seperate breaker base for one or three-pole operation with separate breaker base for one or three-pole operation
The Quenching
Principle
Closed position
Open position
1 Contact carrier
2 Main contact
3 Arcing contact
4 Nozzle
5 Contact cylinder
6 Base
5
The Stored-Energy
Spring Mechanism
Control cabinet
with the stored-
energy spring
mechanism
The control system includes all the sec- Compact variant protection). They are resistant to switch-
ondary components required for oper- In addition to the basic variant, this vari- ing vibrations, and meet the require-
ating the circuit-breaker, most of them ant includes: ments for electromagnetic compatibility
are located in the control cabinet. (EMC).
The control, tripping, motor and heat- Spring monitoring by motor run time
ing power supplies are, to a great monitoring The circuit-breaker documentation in-
extend, selectable. Depending on Heating monitoring (current cludes the wiring diagram of the control
customer requirements, two standard measuring relay) configuration. This diagram comprises
control variants are available. Light and socket with a the following documents:
common circuit-breaker
Basic variant Overvoltage attenuation Location diagram
The basic variant includes all control and Motor circuit-breaker Circuit diagram
monitoring elements that are needed for Heating circuit-breaker Technical data equipment part list
operation of the circuit-breaker. In addi- Connection diagram
tion to the elementary actuation func- Special features
tions, it includes: Above and beyond these two standard The circuit diagram documentation is bi-
variants, a great number of further com- lingual in one common customer specific
19 auxiliary switch contacts ponents and options are at our custom- language and in German.
(9 normally open, 9 normally closed, ers’ disposal. Every control configuration
1 wiper contact) of a circuit-breaker can therefore be
Switching operation counter designed individually. All control com-
Local actuator ponents have been type-tested for use on
our circuit-breakers and are all located in
a weatherproof cubicle (IP 55 degree of
7
Quality
Right from the Start
9
Installation –
Simply Easy
Installation and commissioning The 3AP circuit breakers can be installed The first visual inspection of the circuit-
The circuit-breaker is dismantled into few by a single installation fitter. breaker is not necessary within 12 years,
subassemblies for transportation. Trans- and the first maintenance is recom-
portation costs are minimized by using a No special tools are required. mended after 25 years.
very compact transport unit and by pack-
ing several circuit breakers together into Service offered by the manufacturer to Depending on customer requests, differ-
one transportation unit. the operator ent diagnostic tools can be offered.
The subassemblies can be quickly assem- Throughout the entire service life of
bled into a complete circuit-breaker on the circuit-breaker we provide installa- A worldwide 24 hours service is availa-
site. tion and commissioning and any other ble, which immediately sends out service
services on request. personnel and/or delivers spare parts as
needed.
3
Install double
interrupter head
2
2 1 3
Install post insulator
Install pole Install pole Install pole with operating rod
column A column B column C
1
Install breaker base with
operating mechanism
and control cubicle
3AP1 3AP2
one working day two working days
10