Per package 2% of total piles

10 Sonic Logging Per package 5% of total piles


PDA Per package 5% of total piles
JKR / SPJ / 2010 - Spun Pile Maintained Load Test N/A 1 no. on working pile
S10 PDA 32
250x250 RC Pile PDA N/A 78

Prestressing for Prestress/Post- High Tensile Strand TBA TBA TBA


11 Structures Tension
Grout TBA TBA TBA
Structural
12 Steelworks
Bearing Elastometric Bearing Performance (Non-destructive) Every 200pcs 2
13 Bridge Bearing Material (Destructive) Once per type 1
Pot Bearing Static Load Test Random sampling test 1
JKR / SPJ / 2013 - Static horizontal load test
S13
Friction Test
Epoxy Plinth Cube Compression (70mm) TBA TBA
Bridge Expansion
14 Joints
JKR / SPJ / 2013 -
S14
15 Damp Proofing &
Membrane
16 Waterproofing
Parapet
JKR / SPJ / 2013 -
S15
Services Water Water Pipes 'Test End' unit @ Leakage Test for 24 hours per 300m sections 1
Preassure Test at 200 psi fro 10 mins.
17
Cabling Works Visual observation to be laid as per Spec's NA NA

18 Retaining Structures
19 Rock Stabilization Works
20 Crash Cushion
Environmental Earthwork -Piling works Ambient Air Quality Quarterly (every 3 months) 10 location
Protection & Transportation of material -PM10, CO
Enhancements -NO2 , SO2
Transportation, Piling works Noise Level Quarterly (every 3 months) 15 location
-Leq
Water Quality: Monthly 12 location
Bridges & associated works, -pH,temp
-Road & ancillary works, -BOD,COD
21