Академический Документы
Профессиональный Документы
Культура Документы
S-01
S-02
A B C E-02
D E F
250
30,500
250
1 pv pv pv pv pv
1
250
250
400
1,600
1,600
800
400
400
800
RETAIL SPACE
75
75
High level steel casement
800
200 200 75 250
windows with grille to 850 764 1,800
Granite tiles floor f.
75
4,724
shedule
800
-1,700
75
ffl to match existing
800
fulbora sewer line level +500
7,580
pv pv
200
200
7,055
7,055
7,055
5,375
5,376
fall
1,100
steps up
1,800
tread=300
riser=150
200
pv
200
-1,700
RETAIL SPACE
75
fall
pv
200
2,500
250 61
4,200
100 200
850
200
830
75
830
75
830
250
pv
1,600
1,600
2 2
650
1
9
200
650
650
18 x 167 = 3,000
250 200 250
Cable 4,361 1,539 2,150
termination
19,142
room
10 pv
ACESS
9,926
FROM
GROUND RETAIL SPACE
FLOOR
18
17
16
15
14
13
12
11
51 No. COLD WATER
5,872
5,871
7,470
7,470
STORAGE TANK lobby
7,000
6,820
7,000
pv
SERVICE
200 200 200
2,200 2,200
Granite tiles floor f. -2,700 -2,700
750 900 1,700 900 750
200
E-03
27,500
E-03
400 400
1,950
896 2,400 7,127 2,400 4,031
LIFT PIT
2,423 pv 7,127 2,400 896
LIFT PIT
250
1,600
1,600
3 pv
3
200
650
fall to sump
650
650
4,730
3,900
powerfloated RC ff.
3,900
pv
5,650
2,400 4,054 2,400 7,127 2,400 896
6,800
4 4
25
650
1,
60
650
RETAIL SPACE
11,900
0
2,520
2,520
-1,700
High level steel casement
1,
1,600
5 5 Written dimensions to be followed in
1,
60
650
10,750 8,250
pv discrepancies to be confirmed with
2,700
2,700
6,800
6,800
2,603
19,250
on site.But to be not less than
,8
20
6 6
1200mm deep.
3. D.P.C to be 3 ply bituminus felt. ARCHITECT :
6,
2,150
with cabro work.Tiles sloping towards
8
1,600
main road.
5. All walls less than 200 thick to be
7 7
250
400
A B C D E F regulations.
S-02
9. Where drainage pipes pass under JOB : PROPOSED FLATS AND OFFICES
building ON LR 209/66/19
E-04 driveways and carparks,pipes to be MUTHITHI ROAD, WESTLANDS
encased in 150 conc. surround or
to be of cast iron.
S-01
DRAWING TITLE :
10. N.C.C water meters to be positioned lower ground floor, groundfloor
at least 300mm above ground level.
11. All dimensions to be in MM Scale : as shown DATE : 1/14/2019
±0.000 30,500
S-01
450x300m wide drain with
S-02
GENERATOR ROOM
MS grating cover
5,000
5,000
A B
350mm high masonry planter box C D E F
50 200
7 6 5 4 3 2 1
1 1
sentry box
Granite tiles floor f.
EXIT
+300
14,902
2 2
fall
18,646
FROM LOWER
PARKING FLOOR
Tread=300
Riser=150
PARKING
1
Ribbed concrete floor f.
6m wide driveway
lift lobby
2 Granite tiles floor f.
void to retail below
27,500
E-01
E-03
3
200
3 3
+300
pv
12,148
preference to scaled dimensions.Any
High level glass discrepancies to be confirmed with
block windows to the lead consultant.
schedule 2. Depth of foundation to be determined
5 5
8,654
7 7
200
engineer,s specifications.
8. All sanitary,s work to be in
accordance with M.O.H.rules and CLIENT'S SIGNATURE:
200 200 regulations.
8,300 21,800 9. Where drainage pipes pass under
building
200 driveways and carparks,pipes to be
8,300 22,000 encased in 150 conc. surround or
A B C D E F to be of cast iron.
10. N.C.C water meters to be positioned
DRAWING TITLE :
S-01
S-02
GROUND FLOOR to
WM denotes water meter for NCC and
S-01
S-02
A B C D E F
30,500
50 200
1 1
14,902
2 2
18,646
FROM LOWER
PARKING FLOOR
Tread=300
Riser=150
PARKING
lift lobby
5 Granite tiles floor f.
void to retail below
27,500
E-01
E-03
6
200
3 9
3
7
8
12,148
preference to scaled dimensions.Any
discrepancies to be confirmed with
the lead consultant.
2. Depth of foundation to be determined
5 5
8,654
pv
RAMP FROM LOWER on site.But to be not less than
1200mm deep.
PARKING LEVEL 3. D.P.C to be 3 ply bituminus felt. ARCHITECT :
20.00 % 4. Concrete driveways to be finished
with cabro work.Tiles sloping towards
main road.
5. All walls less than 200 thick to be
6 6 reinforced with hoop iron at every
alternate course.
6. Pv denotes permanent vent. CLIENT: KALYAN RAVJI HIRANI
7. All reinforced concrete works to
be in accordance with structural
7 7
200
engineer,s specifications.
8. All sanitary,s work to be in
accordance with M.O.H.rules and CLIENT'S SIGNATURE:
200 200 regulations.
8,300 21,800 9. Where drainage pipes pass under
building
200 driveways and carparks,pipes to be
8,300 22,000 encased in 150 conc. surround or
A B C D E F to be of cast iron.
10. N.C.C water meters to be positioned
DRAWING TITLE :
S-01
S-02
S-01
S-02
A B C 30,500 D E F
1 1
7,625
RAMP FROM LOWER PARKING LEVEL 20.00 %
Ribbed concrete floor f.
2
3
2 2
9
electrical/telecom. duct
FROM LOWER
PARKING FLOOR
Tread=300 10
Riser=150
PARKING
18
17
16
15
14
13
12
11
7,250
fall
LIFT LOBBY
5
+1,800
27,500
E-01
E-03
Ribbed concrete floor f.
3 6
3
6M WIDE DRIVEWAY
PARKING
300X900mm
Reinforced
4,925
concrete upstand 13
7
beam plastered
and painted
4 8
4 1. All dimensions to be checked on site.
Written dimensions to be followed in
2,525
preference to scaled dimensions.Any
discrepancies to be confirmed with
PARKING
RAMP TO UPPER PARKING LEVEL 1200mm deep.
Ribbed concrete floor f. 3. D.P.C to be 3 ply bituminus felt.
2,725
ARCHITECT :
20.00 % 20.00 % 4. Concrete driveways to be finished
with cabro work.Tiles sloping towards
10 main road.
5. All walls less than 200 thick to be
11
alternate course.
2,150
38
7 7
150
engineer,s specifications.
8. All sanitary,s work to be in
accordance with M.O.H.rules and CLIENT'S SIGNATURE:
regulations.
9. Where drainage pipes pass under
building
driveways and carparks,pipes to be
encased in 150 conc. surround or
A B C D
22,000 E F to be of cast iron. DRAWING TITLE :
S-01
S-02
S-01
S-02
A B C200 S-57
400 200
D E F
3,300 2,900
2,800 8,580 7,570 8,950
pv pv
200
pv pv
400
S-59
200
200
200
1,200
1,200
pv
yard yard
2,550
3,700
3,500
LOUNGE LOUNGE
4,250
MASTER MASTER
BEDROOM ceramic tiles ceramic tiles BEDROOM
pv
4,315
150
ceramic tiles ceramic tiles
5,500
600
850 150 2,600 600
8,129
pv
200
200
pv
200 4,800 150 600 150
150
KITCHEN KITCHEN
150 600 150
1,800
ceramic tiles ceramic tiles
6,675
6,672
2,251
2,600 600
wc/sh 2,250
1,185
1,100
3,550
ceramic tiles 750
wc/sh
150
150
150
3,750
150
wc/sh
1,100
1,100
1,100
1,575
FOYER
ceramic tiles
wc/sh
71 129
600
150
150
200
2 2
pv
200
electrical/telecom. duct
136.7 m2 136.7 m2
3,625
2,950
S-58
3,475
3,475
BEDROOM BEDROOM
2,100
2,100
2,725
ceramic tiles
DINING DINING
ceramic tiles ceramic tiles
200 3,600 600 150
200
200
975
975
200
200
200
200
200
7,471
1,200
7,400
200 9,147 200 1,500 200 1,200 3,000 1,200 200
2,430
200 1,800 200
LIFT LOBBY
S-60
200
3,000
3,000
4,325
4,325
4,325
LOUNGE DINING LOUNGE
27,855
27,505
ceramic tiles ceramic tiles
200
2,927
DINING
LIFT 1 LIFT 2
2,150
1,200 1,301
1,200 1,302
fire hose reel
3 3
150
E-01
E-03
150
150
150
1,656
1,500
STORE STORE
200 2,201 200 4,700 150 1,200 150 3,350 200 2,800 200 2,800 200 3,350 150 1,200 150 4,700 200 2,199 200
2,806
F
BEDROOM BEDROOM
200
3,100
KITCHEN KITCHEN
F
4,730
4,730
4,404
2,455
2,000
2,000
wc/sh
600
wc/sh
3,073
FOYER
150
150 200
pv
1,350
pv
yard yard
850
850
4 4
pv
3,350
150
150
200
2,000
1,998
2,520
2,520
wc/sh pv wc/sh
2,800
10,653
BEDROOM
150
150
5 150 630 970 150 2,950
MASTER
200 5 NOTES REVISION DATE DESCRIPTION SIGN
2,700
pv M
MASTER preference to scaled dimensions.Any
0
discrepancies to be confirmed with
40
BEDROOM
1,
5,150
5,150
the lead consultant.
0
10
150 4,700 200
2,
1200mm deep.
2,150
2,150
3. D.P.C to be 3 ply bituminus felt. ARCHITECT :
849
9
pv
13
1,
with cabro work.Tiles sloping towards
7 7
200
451
main road.
0
20
200
250
1,
reinforced with hoop iron at every
3
22
alternate course.
3,813 1,487 1,765 849 16,103 849 805 1,485 1,245 900 1,199 6. Pv denotes permanent vent. CLIENT: KALYAN RAVJI HIRANI
7. All reinforced concrete works to AND
2,800 8,580 7,570 8,950 2,275
be in accordance with structural
30,500 RAVJI SHANTABEN KALYAN
engineer,s specifications.
A B C S-61
D E F 8. All sanitary,s work to be in
accordance with M.O.H.rules and
regulations.
CLIENT'S SIGNATURE:
9. Where drainage pipes pass under JOB : PROPOSED FLATS AND OFFICES
building ON LR 209/66/19
driveways and carparks,pipes to be MUTHITHI ROAD, WESTLANDS
encased in 150 conc. surround or
to be of cast iron. DRAWING TITLE :
10. N.C.C water meters to be positioned
at least 300mm above ground level.
RESIDENTIAL FLOOR PLAN: LEVEL 7 TO 12 615.5M2 11. All dimensions to be in MM
WM denotes water meter for NCC and
Scale : as shown DATE : 1/14/2019
Scale: 1:100
to Drawn :C.M.O. Checked :
be above 300mm above ground
Job NO. 01/2016
A B C D E F
30,500
1 C4 C3 C3 C4 1
1,600
1,600
400
400
400
C4
C4
7,580
7,580
7,055
7,055
7,055
5,375
5,376
400 896 2,400 7,127 2,400 4,031 2,423 7,127 2,400 896 400
1,600
2 2
650
650
650
C4
C4
19,142
5,872
5,871
7,470
7,470
6,820
7,000
7,000
200 2,200 200 2,200 200
27,500
1,950 200
400 896 2,400 7,127 2,400 4,031 2,423 7,127 2,400 896 400
C2A C2A
1,600
1,600
3 200
3
650
C4 C1A C1A
650
650
C4
3,113
4,730
4,730
3,900
3,900
2,400 4,054 2,400 7,127 2,400 896
5,650
6,800
NOTES REVISION DATE DESCRIPTION SIGN
4 4
25
650
650
discrepancies to be confirmed with
0
2,520
2,520
the lead consultant.
2. Depth of foundation to be determined
1,
76
1200mm deep.
1,600
5 5
C2A
C4 3. D.P.C to be 3 ply bituminus felt. ARCHITECT :
1,
650
C4 main road.
2,700
2,700
6,800
6,800
2,603
alternate course.
,8
engineer,s specifications.
82
2,150
2,150
8. All sanitary,s work to be in
8
CLIENT'S SIGNATURE:
1,600
accordance with M.O.H.rules and
regulations.
C3 C3 C4
7 7
9. Where drainage pipes pass under JOB : PROPOSED FLATS AND OFFICES
C4 building ON LR 209/66/19
400
400
+62.000 +62.000
18 Story 18 Story
+58.500 +58.500
17 roof terrace 17 roof terrace
+55.000 +55.000
16 office 12 16 office 12
+51.500 +51.500
15 office 11 15 office 11
+48.000 +48.000
14 office 10 14 office 10
+44.500 +44.500
13 office 9 13 office 9
+41.000 +41.000
12 office 8 12 office 8
+37.500 +37.500
11 office 7 11 office 7
+34.000 +34.000
10 office 6 10 office 6
NOTES
1. All dimensions to be checked on site.
Written dimensions to be followed in
preference to scaled dimensions.Any
+30.500 +30.500 discrepancies to be confirmed with
9 office 5 9 office 5 the lead consultant.
2. Depth of foundation to be determined
on site.But to be not less than
1200mm deep.
3. D.P.C to be 3 ply bituminus felt.
+27.000 +27.000 4. Concrete driveways to be finished
8 office 4 8 office 4 with cabro work.Tiles sloping towards
main road.
5. All walls less than 200 thick to be
reinforced with hoop iron at every
alternate course.
6. Pv denotes permanent vent.
+23.500 +23.500 7. All reinforced concrete works to
7 office 3 7 office 3 be in accordance with structural
engineer,s specifications.
8. All sanitary,s work to be in
accordance with M.O.H.rules and
regulations.
+20.000 +20.000 9. Where drainage pipes pass under
6 office 2 6 office 2 building
driveways and carparks,pipes to be
encased in 150 conc. surround or
to be of cast iron.
10. N.C.C water meters to be positioned
at least 300mm above ground level.
+16.500 +16.500
5 office 1 5 office 1 11. All dimensions to be in MM
WM denotes water meter for NCC and
to
be above 300mm above ground
F E D C B A
+9.000 +9.000
3 parking 3 3 parking 3
ARCHITECT :
+6.000 +6.000
2 parking 2 2 parking 2
CLIENT'S SIGNATURE:
±0.000 ±0.000
0 ground 0 ground
DRAWING TITLE :
Drawn : Checked :
Scale: 1:100
Job NO. 01