CHAPTER 7:
CONTENTS
1. Introduction
2. AON method
3. AOA method
4. Assignments
2
1
4/16/2018
INTRODUCTION
2
4/16/2018
3
4/16/2018
AOA METHOD
4
4/16/2018
10
5
4/16/2018
11
12
6
4/16/2018
13
14
7
4/16/2018
Activity-on-Arrow Network
15
16
8
4/16/2018
17
18
9
4/16/2018
19
AON METHOD
20
10
4/16/2018
1. Terminology
Activity: an element of the A
project that requires time.
Merge Activity: an activity that B D
has two or more preceding
activities on which it depends.
Parallel (Concurrent) C
Activities: Activities that can
occur independently and, if
desired, not at the same time.
21
1. Terminology
Path: a sequence of connected, dependent activities.
Critical path: the longest path through the activity
network that allows for the completion of all project-
related activities. Delays on the critical path will delay
completion of the entire project.
A B D
22
11
4/16/2018
1. Terminology
Event: a point in time when an activity is started or
completed. It does not consume time.
Burst Activity: an activity that has more than one
activity immediately following it (more than one
dependency arrow flowing from it). B
2. Two Approaches
Activity-on-Node (AON) A C
• Uses a node to depict an activity.
Activity-on-Arrow (AOA)
• Uses an arrow to depict an activity. D
23
12
4/16/2018
Activity-on-Node Fundamentals
25
26
13
4/16/2018
Network Information
27
28
14
4/16/2018
29
30
15
4/16/2018
Network Information
31
Activity-on-Node Network
32
16
4/16/2018
33
34
17
4/16/2018
35
36
18
4/16/2018
37
38
19
4/16/2018
39
40
20
4/16/2018
1. Laddering
Activities are broken into segments so the following
activity can begin sooner and not delay the work.
2. Lags
The minimum amount of time a dependent activity
must be delayed to begin or end.
• Lengthy activities are broken down to reduce the delay in the
start of successor activities.
• Lags can be used to constrain finish-to-start, start-to-start,
finish-to-finish, start-to-finish, or combination relationships.
41
42
21
4/16/2018
Use of Lags
Finish-to-Start Relationship
FIGURE 6.13
Start-to-Start Relationship
43
44
22
4/16/2018
New Product
Development Process
45
Finish-to-Finish
Relationship
Start-to-Finish
Relationship
Combination
Relationship
46
23
4/16/2018
47
48
24