2019

BERNARDO D. CARPIO NATIONAL HIGH SCHOOL


Pioneer Village, Buhangin, Davao City

COMMUNITY-BASED
DISASTER AND RISK
MANAGEMENT PLAN
of Pioneer Village,
Buhangin, Davao City

PROJECT IN ARALING PANLIPUNAN 10 – TEAM NDRRMC


GRADE 10 - MAGSAYSAY
BY: PODADOR MINNIE & SABANDAL GRACE ANN

FIRST QUARTER PERIOD PROJECT PERFORMANCE TASK | 2019 - 2020


INTRODUCTION

Community Based Disaster Management plan is a plan which is


the basis on what to do on a calamity. We made this Community
Based Disaster Risk Management Plan because we want to
determine every hazards, risk and disaster that may be experience
of a place specially to those place which is prone to disasters. With
this we will know that preparedness is important. As it is the
community which is going to face the disaster, it is very important
that community should be part of the complete disaster
management process in all three phases- pre, during, post.
Community knows itself, its environment better. Many times, senior
citizens are aware of incidences that have happened in the past,
which others may not be aware of. One just needs to make
community aware, and provide necessary inputs to identify hazards
and risks. Also in case of any disaster, community itself acts as a first
responder before the external help reaches to victims. So if the
capacity building of community is done, community will be ready to
face disaster and it will reduce the work load on external agencies
coming to help. This will be a guide to all of us and this will help us to
know that in a place that is prone to a floods or whatever hazards or
disaster it is we should always be ready and prepared at all times so
that we can have our safeness. And since we learned to this CBDRM
plan that we should be prepared we are now prepared in our lives
as well as our community. We also made this Community Based
Disaster Management Plan so that we can help the people from the
place we tested and they can make a way to mitigate every risk
they might experience and they will be prepared for the risk that
they might experience and there will be so much damage
happened. We know we help anyone to be prepared specially to
those who are weak and the one who need to be the most
prepared at this kind of situation.

Page 1 of 10
COMMUNITY-BASED DISASTER AND RISK MANAGEMENT PLAN OF PIONEER VILLAGE,
BUHANGIN, DAVAO CITY

I. OBJECTIVES

a. identify or determine every hazards,


b. determine the best solution,
c. make a best plan to prevent and mitigate the risk,
d. and be consistent to do what the plan had been told.

II. COMMUNITY PPROFILE

A. Environmental Profile

Jade Valley, Davao City-- Mindanao at about 95,000 square


kilometers (36,680 sq mi) in Philippines is a longitude geographical in earth. Its
geographical coordinates are 12.8797° N, 121.7740° E It’s a land which is an river from
before.

B. Demographic Profile

1. Number of residents in community (population)

2,000 people

2. Number of houses and buildings in community

345 houses, 13 buildings

3. Number of commercial establishments in community (stores, malls or


business establishments)

102 stores
4.

Page 2 of 10
III. COMMUNITY DISASTER MANAGEMENT COMMITTEE/ TEAMS

PERSONS ASSIGNED ROLES RESPONSIBILITIES


INVOLVED
1. MINNIE PODADOR LEADER DRRM PLANNER
2.GRACE ANN SABANDAL ASST. LEADER SPEAKER
3.KYLA TORREON SECRETARY TAKING NOTES
4.JAN DARELL AMORIN MEMBER FOOD INCHARGE
5.OGIE ABADIA MEMBER HAZARD INVESTIGATOR
6.RONILA ABONG MEMBER RISK INVESTIGATOR
7.BRYNT PONAYO MEMBER DISASTER INVESTIGATOR

IV. Community Disaster Management Organization Structure – Roles and Responsibilities

LEADER

ASST. LEADER

SECRETARY MEMBER MEMBER MEMBER


MEMBER

V. COMMUNITY DISATERS PROFILE

A. Potential hazard

Jade Valley, Davao City is one of the most prone place when it comes to
floods. If the floods will continuously showered in this place, this place might be
erase in the map and turn into a river which is it’s form from before.

Page 3 of 10
B. Historical Hazard Assessment

Hazard Frequency Duration Speed of Forewarning Force When


Type Onset (Month)
Flood 5times a 2 to 3 days 30 mins. 2 to 3 meters Sickness, July
after per hr mud, water,
month
determine woods
the hazard
Drought
Earthquake Twice a 30secs/1 3-4 mg. N/A cracks April
year min
Landslide
Civil War
Pollution everyday 24 hrs. N/A People Ashes, January-
sickness December
Volcanic
eruption
Tsunami
Storm
Surge

VI. HAZARD IDENTIFICATION/ ASSESSMENT

A. Vulnerability Assessment

Place/ Area: Jade Valley Type of Hazards:


Floods/Landslide/Earthquake
Elements at risk: Causes:
Houses, People, Properties These are the elements that get damage first
by the identified hazards.

People at Risk
Pregnant women, Old People, Young Kids They are the most weak and vulnerable people
and Disabled People who doesn’t have enough strength and capacity to
move in a calamity

Location of People at Risk


Fragile houses and residence near the river They are the first houses or things that will
experience the risk and they are easy to get
damage.

Page 4 of 10
B. Capacity Assessment

1. Resource Mapping (skilled manpower, equipment etc.)

Place/ Area:
# Materials Existing Required Remarks
(yes or no) (yes or no)
1 Flashlight Yes Yes No battery
2 First aid kit Yes Yes Incomplete
3 Whistle Yes Yes Not loud
4 Fire extinguisher Yes Yes Only few
5 Map Yes Yes Only few
6 Hard hats No Yes No budget
7 Rubber boots Yes Yes Only few

2. Capacity Mapping (critical resources of internal and external –


determine their roles)

# Resources Contact Person Contact No. Brief Details


1 Police Denise Labani 09108205786 Helping others
and leading
them
2 Nurse Ara Moradas 09103542194 The firsts aider
3 Subdivision Pres. Rizal Gerran Leading the
Community
4 Fire man Carlo Amparo 09756015602 Help other to
evacuate and
gave them water
5 Good Resident Romeo Villasib 09352701344 Helping resident
6
7

C. Risk Assessment

Structural Mitigation Non-Structural Mitigation


Orientation
Repairing damaged houses Seminars
mental preparedness
meetings

Page 5 of 10
VII. Contingency Planning/ Disaster Preparedness

A. Type of Hazards: Flood and Earthquake.


B. Objectives: to prevent the coming calamity and be safe.
C. Materials needed: first aid kit, important documents, money
D. Activities to be undertaken BEFORE the emergency

# Activities to Conduct By Whom When


1 Evacuating Barangay captain After the announcement
2 Earthquake drill Barangay sectors Before earthquake
and captain.
3 Seminars Barangay Officials Before earthquakes
and flood.
4
5
6
7

E. Activities to be undertaken DURING the emergency

# Activities to Conduct By Whom When


1 Duck, Cover and Hold Residence During earthquake
2 Sagip pamilya Residence and Barangay During earthquke
captain
3
4
5
6
7

F. Activities to be undertaken AFTER an emergency

# Activities to Conduct By Whom When


1 Tulong linis Barangay captain After flood
2 Check self first before others Community After earthquake
3
4
5
6
7

G. Disaster Preparedness Checklist/Kit

Water bottles and can goods Clothes Batteries


Important documents Safety pins Radio
Map of your place Emergency blankets
Hand sanitizers Flashlights

Page 6 of 10
VIII. DISASTER RESPONSE

SITWASYON
Uri ng disaster FLOOD

Petsa at oras AUGUST 5, 2019 ( 8:00AM-9:00PM )

Apektadong lugar BUHANGIN, EL RIO, JULIVILLE

Posibilidad ng “after effects” PAGKASIRA NG MGA KABAHAYAN

PAUNANG PAULAT NG EPEKTO


Bilang ng namatay WALA

Bilang ng nasaktan MAHIGIT KUMULANG 300 KA TAO

Bilang ng nawawala WALA

Nangangailangan ng tirahan at MAHIGIT 300 KA PAMILYA


damit
Nangangailangan ng pagkain MAHIGIT 300 KA PAMILYA

Nangangailangan ng tubig MAHIGIT 300 KA PAMILYA

Nangangailangan ng sanitasyon MAHIGIT 500 KA PAMILYA

Pinsala sa imprastraktura MAHIGIT 200 KA KABAHAYAN, 3 GUSALI

PANGANGAILANGAN NG TULONG
Search and rescue Oo
Evacuation Oo
Proteksyon Oo
Pangangailangan ng medical Oo
Pangangailangan ng tirahan at damit Oo
Pangangailangan ng pagkain Oo
Pangangailangan ng tubig Oo
Sanitasyon Oo
Pagkukumpuni sa mga imprastraktura Oo

Page 7 of 10
IX. DISASTER REHABILITATION AND RECOVERY

Suggested Disaster and recover Activities

Government
Materials Agencies/
Activities Objectives Duration Results
Needed people
Involved

Tulong Linis Paglilinis ng Mga walis, Mamamayan, 12 hrs Malinis na


paligid mop,tubig Barangay kapaligiran
captain,
janitors

Reforestation Pagtatanim ng Soil, seeds, Hardeners, 3-5 hrs Pagkakaroon


halaman at tubig, pala mamamayan, ng mga
punuan pamahalaan punuan para
di lumala
ang baha.

Basura mo, Pagsegregated Basurahan, Mamamayan 12 hrs Pagkaubos


tapon mo at pagtapon walis, at barangay ng
ng basura captain nagkakalat
na basura

Page 8 of 10
X. RUBRIC FOR SCORING

Kraytirya Napakahusay Mahusay Nalilinang Nagsisimula


(10 pts.) (9 points) (8 pts.) (7 pts.)
Kaangku Naaayon ang Naaayon ang Hindi naaayon Hindi
pan nilalaman ng DRRM nilalaman ng ang nilalaman ng angkop sa
(30%) plan sa resulta ng DRRM plan sa DRRM plan sa komunidad
isinagawang resulta ng resulta ng ang
hazard mapping, isinagawang isinagawang nabuong
vulnerability hazard mapping, hazard mapping, DRRM plan.
assessment, at vulnerability vulnerability
capability assessment, at assessment, at
assessment ng capability capability
pamayanan. assessment ng assessment ng
Kumuha ng pamayanan. pamayanan. Hindi
karagdagang Nagmula ang Kumuha ng
datos mula sa mga lahat ng datos karagdagang
lokal na opisyal, mula sa mga datos mula sa
mga residente ng opisyal ng lokal na mga lokal na
lugar, at mga pamahalaan o opisyal, mga
nakaranas ng pamahalaang residente ng lugar,
nakaraang pambarangay. at mga nakaranas
kalamidad at ng nakaraang
nagamit ito ng kalamidad
maayos.
Nilalama Impormatib ang Impormatib ang Hindi malinaw na Maraming
n (30%) nabuong DRRM nabuong DRRM sinasabi ang mga nakalilitong
plan. Malinaw na plan. Malinaw na detalyeng dapat impormasyo
sinasabi ang mga sinasabi ang mga malaman ng mga n sa
detalyeng dapat detalyeng dapat mamamayan sa nabuong
malaman ng mga malaman ng mga pagharap sa mga DRRM plan
mamamayan sa mamamayan sa kalamidad. Ang
pagharap sa mga pagharap sa mga mga nakatalang
kalamidad. Ang kalamidad. Ang datos at
mga nakatalang mga nakatalang impormasyon ay
datos at datos at hindi updated at
impormasyon ay impormasyon ay reliable.
updated at hindi updated at
reliable. reliable.
Praktikali Ang mga suhestyon Ang mga Ang mga Ang mga
dad sa DRRM plan ay suhestyon sa suhestyon sa DRRM nabuong
(10%) naaayon sa DRRM plan ay plan ay naaayon suhestyon
kakayahan ng naaayon sa sa kakayahan ng ay hindi
pamayanan na kakayahan ng pamayanan na nakabatay
tugunan ang pamayanan na tugunan ang sa
kalamidad. tugunan ang kalamidad. Hindi kakayahan
Binigyang-diin ang kalamidad. malinaw na ng

Page 9 of 10
lubusan at Binigyang-diin ang natalakay ang pamayanan
episyenteng lubusan at lubusan at .
paggamit ng mga episyenteng episyenteng
kagamitan, oras, at paggamit ng mga paggamit ng
pondo ng kagamitan, oras, kagamitan, oras,
pamayanan. at pondo ng at pondo ng
Madaling pamayanan. pamayanan.
maunawaan ng Gumamit ng mga Gumamit ng mga
mga mamamayan salita at termino salita at termino
ang DRRM plan na hindi gaanong na hindi gaanong
dahil sa pagkamit maunawaan ng maunawaan ng
ng mga salita at mga mga
simbolo na angkop mamamayan. mamamayan.
sa kanilang
pamayanan.
Pagsuno Kumpleto ang Kumpleto ang Mayroong mga Hindi
d sa lahat ng bahagi ng lahat ng bahagi bahagi ng DRRM sumunod sa
Proseso isang DRRM plan. ng isang DRRM plan ang hindi proseso ng
(20%) Binuo ito batay sa plan. Binuo ito naisagawa. pagbuo ng
pagsasanib ng top- gamit ang ang isa DRRM plan
down at bottom-up sa dalawang
approach. approach.
Pankwali Naipasa sa araw Naipasa isang Naipasa Naipasa
dad ng nakatalagang araw matapos dalawang araw tatlong
(10%) petsa ang petsa ng matapos ang araw at
nakatalagang petsa ng ghigit pa
pagpasa nakatalagang matapos
pagpasa ang petsa
ng
nakatalaga
ng pagpasa
Total

Page 10 of 10