MASTER DATA FOR

ROADS FOR THE YEAR 2014-15


Name of Work :: Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from Km 3/450 to 4/200(Right side Only) and 3/650 to 3/800(Left side Only) in Komanpally
village in Nizamabad District.
(It is linked throughout
Estimate )

Hyper Link Rates Rates


CONVEYANCE & RATES OF MATERIALS S.No Specification in Brief to DATA Exact Rounded
12/9/2015 1 2 5 3 4
Date (mm/dd/yy)
of Preparation of Estimate 9-Dec-15 V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in
Details Amount Leads EARTH WORKS FOR ROADS
Embankment Earth 73.77 5.00 1 Forming embankment with Side Earth PAGE_70 114.06 114.00
HMP 261.67 22.00 2 Forming embankment with Borrowed Soils 1000 m Lead PAGE_68 152.64 153.00
Crusher 261.67 22.00 3 Forming embankment with Borrowed Soils 5 KM Lead PAGE_68 204.46 204.00
Metal/ Stone Qry 261.67 22.00 4 E/W for Trench cutting PAGE_50 20.02 20.00
Gravel 73.77 5.00 5 Removal of soils by Mechanical means & carting 1000 M PAGE_58 65.79 66.00
Sand 217.46 18.00 6 Removal of soils by Manual Means & carting 1000 M PAGE_48 222.49 222.00
Hume Pipes Varies with pipe dia. 0.00 GRANULAR BASES and SUB BASES
BITUMEN Rates 7 Granular Sub-base with Grade I (Table 400 -1) type material PAGE_94 1647.43 1647.00
LEAD 701.00 8 Granular Sub-base with Grade II (Table 400 -1) type material-NEW PAGE _94 1600.59 1601.00
Grade 80/100 28868.22 9 Granular Sub-base with Grade III (Table 400 -1) type material PAGE_95 1349.26 1349.00
Grade 60/70 29780.22 10 Granular Sub-base with Grade I (Table 400-2) type material PAGE_95 1716.12 1716.00
CRMB 55 Grade 0.00 11 Granular Sub-base with Grade II (Table 400-2) type material PAGE_96 1712.99 1713.00
Emulsion (MS) 33523.00 12 Granular Sub-base with Grade III (Table 400-2) type material PAGE_96 1383.15 1383.00
CEMENT / STEEL Rates 13 Scarifying the existing granular surface PAGE_67 18.48 18.00
CEMENT 4300.00 14 Scarifying the existing BT surface PAGE_67 7.71 8.00
HYSD Steel 33000.00 15 WBM Gr II with MC metal 22.4 mm & below and PRR PAGE_104 1846.21 1846.00
6 mm Mild Steel 36000.00 16 WBM Gr III with MC metal 22.4 mm & below and PRR PAGE_104 2077.38 2077.00
MS STEEL 375000.00 17 WBM Gr II with MC metal 45 mm & below and PRR PAGE_104 1940.71 1941.00
ALLOWANCES 18 WBM Gr III with MC metal 45 mm & below and PRR PAGE_104 2245.84 2246.00
Place ITEM Name Value 19 WBM Gr II with MC metal 22.4 mm & below and VRR PAGR_104 1853.62 1854.00
DATA Labour Municipal Area Allowance 20.00 % 20 WBM Gr III with MC metal 22.4 mm & below and VRR PAGE_104 2084.79 2085.00
RMR Metal % 21 WBM Gr II with MC metal 45 mm & below and VRR PAGE_104 1948.12 1948.00
RMR Gravel % 22 WBM Gr III with MC metal 45 mm & below and VRR PAGE_104 2253.25 2253.00
RMR Sand % 23 Wet Mix Macadam PAGE_110 1904.60 1905.00
Overhead Charges ( R) 5.00 % BITUMINOUS SUB BASES, BASES and SURFACING
Overhead Charges ( B) 15.00 % 24 Single coat surface dressing with VG 10 grade Bitumen PAGE_141 #REF! #REF!
Contractors Profit 10.00 % 25 Single coat surface dressing with VG 30 grade Bitumen PAGE_141 #REF! #REF!
VAT 0.00 % 26 Prime Coat with BT Emulsion (MS) PAGE_123 #REF! #REF!
Centering Charges Local Entry % 27 Tack Coat with BT Emulsion (MS) PAGE_124 #REF! #REF!
28 Tack Coat with BT VG 10 Grade APRDC #REF! #REF!
29 Mix seal 20 mm with BT VG 30 Grade PAGE_146 #REF! #REF!
30 Mix seal 25 mm with BT VG 30 Grade NABARD #REF! #REF!
31 Mix seal 25 mm with BT CRMB NABARD #REF! #REF!
32 Macadam 50 mm with BT VG 30 Grade PAGE_125 #REF! #REF!
33 Macadam 50 mm with BT VG 30 Grade (NEW- Batch Mix Plant) PAGE_125 #REF! #REF!
34 Macadam 50 mm with BT VG 10 Grade PAGE_125 #REF! #REF!
35 Dense Graded Bituminous Macadam with BT VG 30 Grade PAGE_132 #REF! #REF!
36 Dense Graded Bituminous Macadam with BT VG 30 Grade (NEW) PAGE_132 #REF! #REF!
37 SDBC 25 mm with BT VG 30 Grade PAGE_135 #REF! #REF!
38 Bituminous Concrete with BT CRMB 55 Grade PAGE_138 #REF! #REF!
39 Bituminous Concrete with BT VG 30 Grade PAGE_138 #REF! #REF!
40 Bituminous Concrete with BT VG 30 Grade (NEW-Batch Mix) PAGE_138 #REF! #REF!
41 Gravel Shoulders PAGE_95 345.25 345.00
C.C. BASE COURSE and WEARING COARSE
42 VCC(1:4:8) Base course below CC Pavement PAGE_331 3473.85 3474.00
43 VCC(1:3:6) Base course below CC Pavement PAGE_331 3811.57 3812.00
44 VCC M35 for C.C. Pavement PAGE_345 5372.26 5372.00
45 VCC(1:3:6) Base course with FLY ASH & Sand PAGE_331 3605.08 3605.00
46 VCC M35 for C.C. Pavement with FLY ASH & Sand PAGE_345 5010.77 5011.00
CULVERTS, BRIDGES Foundations, Substructures & Superstructure
47 EW for Foundation of Structures by Mechanical Means PAGE_323 30.02 30.00
48 EW for Foundation of Structures by Manual Means PAGE_321 149.80 150.00
49 Granular Bedding Below Pipes PAGE_462 562.07 562.00
50 VCC (1:3:6) for Foundations PAGE_331 4226.55 4227.00
51 VCC(1:3:6) for Body Walls PAGE_455 4649.20 4649.00
52 Cost and Conveyance of 600 mm Dia Hume pipes to Site SSR600 2188.44 2188.00
53 Cost, conveyance and Laying of 600 Dia Hume Pipes PAGE_272 2650.92 2651.00
54 Cost and Conveyance of 800 mm Dia Hume pipes to Site SSR800 3541.47 3541.00
55 Cost, conveyance and Laying of 800 Dia Hume Pipes PAGE_272 4247.92 4248.00
56 Cost and Conveyance of 1000 mm Dia Hume pipes to Site SSR1000 5506.87 5507.00
57 Cost, conveyance and Laying of 1000 Dia Hume Pipes PAGE_272 6517.95 6518.00
58 Cost and Conveyance of 1200 mm Dia Hume pipes to Site SSR1200 7619.01 7619.00
59 Cost, conveyance and Laying of 1200 Dia Hume Pipes PAGE_272 9047.00 9047.00
60 Filling between Body walls with Gravel PAGE_462 562.07 562.00
61 Rough Stone Revetment with 300 mm HBG Stone PAGE_522 1142.30 1142.00
62 Filter Material with Gravel underneath Pitching PAGE_523 801.48 801.00
63 VCC M15 Grade CC with 40 mm metal for Raft Foundation PAGE_335 4865.94 4866.00
64 VCC M15 Grade CC with 40 mm metal for Sub Structure PAGE_335 5146.67 5147.00
65 VCC M20 Grade CC with 40 mm metal for Raft Foundation PAGE_336 5326.62 5327.00
66 VCC M20Grade CC with 40 mm metal for Sub Structure PAGE_336 5633.93 5634.00
67 VRCC M20 Grade CC for Bed blocks & Backing walls PAGE_472 5246.14 5246.00
68 VRCC M20 Grade CC with 20 mm metal for Deck Slab PAGE_472 6295.37 6295.00
69 VRCC M30 Grade CC with 20 mm metal for Wearing Coat PAGE_477 5688.75 5689.00
70 VRCC M25 Grade CC with 20 mm metal for Approach Slab PAGE_501 5695.06 5695.00
71 VRCC M20 Grade CC with 12 mm metal for Railing PAGE_472 326.55 327.00
-- DO -- -- DO -- PAGE_472 302.12 302.00
72 VCC M15 Grade CC with 40 mm metal for leveling course PAGE_500 4271.94 4272.00
73 Grouted Revetment with 300 mm HBG stone + CC(1:4:8) PAGE_522 1766.23 1766.00
74 Back filling behind Abutments with gravel PAGE_462 562.07 562.00
75 Providing and laying of filter media using 150 mm IRC stone PAGE_463 1288.33 1288.00
76 Providing HYSD ( Fe-415 ) for Super structure of R.C.C items. PAGE_489 46056.04 46056.00
77 Providing HYSD ( Fe-415 ) for Sub structure of R.C.C items. PAGE_490 44282.43 44282.00
78 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items. PAGE_448 44106.68 44107.00
79 Providing MS ( Fe-250 ) for all RCC Items PAGE_460 47244.03 47244.00
MISCELLANEOUS ITEMS
80 Sand filling in foundation PAGE_422 902.85 903.00
81 Providing 100 mm dia AC Weep holes in VCC Abutment PAGE_461 71.45 71.00
82 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers PAGE_455 4442.82 4443.00
83 VRCC M 20 Grade for Cover Slabs over Side Drains PAGE_472 5016.04 5016.00
84 Plastering in CM(1:5) 12 mm thick ( Rate per 10 sqm ) PAGE_452 86.21 86.00
85 Painting two coats to new plastered surface PAGE_220 77.98 78.00
86 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade PAGE_130 #REF! #REF!
87 Providing BT Patch work using 40 mm metal & BT 80/100 EinC #REF! #REF!
88 Providing BT Patch work using 9.5 to11.2mm metal & BT 80/100 EinC #REF! #REF!
89 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT EinC #REF! #REF!
90 Patch work 25 - 35 mm depth using 25-10 mm metal & 80/100 BT EinC #REF! #REF!
91 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT EinC #REF! #REF!
92 RR Masonry in CM(1:3) for Foundation. PAGE_334 3578.62 3579.00
93 RR Masonry in CM(1:3) for Substructure PAGE_453 3498.44 3498.00
94 Dismantling culverts & bridges in CC M15- M20 PAGE_23 606.11 606.00
95 Dismantling culverts & bridges in Ruble Masonry in CM Temp 360.34 360.00
96 25.4 mm Mastic pad for Longitudinal & Transversal Expansion joints EinC 991.00 991.00
97 12.7 mm Mastic pad for Transversal Contraction joints. EinC 568.00 568.00
98 Penetration macadam 50 mm thick PAGE_128 #REF! #REF!
99 Penetration macadam 75 mm thick PAGE_129 #REF! #REF!
100 Open-graded premix carpet of 20 mm thick with 80/100 BT PAGE_5_23 #REF! #REF!
101 Providing and laying type B seal coat simultaneously with 80/100 BT PAGE_5_39 #REF! #REF!
102 Hot Applied Thermoplastic Compound Page_225 832.67 833.00

V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in


PREPARED on 10-12-2014
#REF!
or road via Kuknoor, Komanpally road from Km 3/450 to 4/200(Right side Only) and 3/650 to 3/800(Left side Only) in Komanpally
NAME OF WORK: Providing Drains to Armoor - Nandipet road from Km 0/530 to 0/860 and 0/860
to 1/150(Right side Only) in Nizamabad District.

General Abstract
S.NO Description Amount

Part-A

1 Drain 5,735,237.00

sub total 5,735,237

Part-B
AMENITIES

2 Provision towards VAT at 5% 286,762

3 Provision for Price Escalation @5% 286,762

4 Provision for Seigniorage Charges 127,902

5 Provision for Avagahana Sadasu LS 5,000

6 Provision for NAC 0.1% 5,735

7 Unforeseen like variation in designs LS 12,591

Grand Total Rs. 6,459,989

Asst Engineer Dy. Executive Engineer


(R&B) Section, Armoor (R&B) Sub-Division Armoor

Executive Engineer Superintedning Engineer


(R&B) Division Nizamabad (R&B) Circle Nizamabad
Name of Work ::- Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from Km 3/450
to 4/200(Right side Only) and 3/650 to 3/800(Left side Only) in Komanpally village in
Nizamabad District.

Detailed Cum Abstract Estimate for side drains


MEASUREMENTS
Sno Description Quantity Rate Per Amount
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9 10
1 Earthwork excavation in soils up to SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation
earth to the extent required etc., complete including (excluding seigniorage) charges for finished
item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-
Charge

0/530 to 0/860 1 X 1 330.00 3.00 1.35 1336.50


0/860 to 1/150 1 X 1 290.00 2.50 1.35 978.75
2315.3
2316.0 Cum 30.0 1.00 69,480.00

2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed
by the Engineer-in-Charge for foundations

0/530 to 0/860 1 X 1 330.00 3.00 0.150 148.50


0/860 to 1/150 1 X 1 290.00 2.50 0.150 108.75
257.3
258.0 Cum 4,227.0 1.00 1,090,566.00

3
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to
table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all
labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing
including all other incidental and all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure .

0/530 to 0/860 1 X 1 330.00 2.70 0.300 267.30


0/860 to 1/150 1 X 1 290.00 2.10 0.300 182.70
0/530 to 0/860 1 X 2 330.00 0.45+0.3/2 0.900 222.75 0.75 0.375
0/860 to 1/150 1 X 2 290.00 0.45+0.3/2 0.900 195.75
868.5
868.5 Cum 5,147.0 1.00 4,470,170.00

4 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, seigniorage conveyance of all materials to site
and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other
incidental hire and operational charges of all T&P as per approved drawings and as
directed during execution but excluding cost of steel and its fabrication charges for finished
item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed
by the Engineer-in-Charge for Cover slabs over Side drains

1 x 3 6.00 3.00 0.15 8.10


1 x 3 4.00 3.00 0.15 5.40
13.50
13.50 Cum 5,016.0 1.00 67,716.00
5 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for
fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing
them in position etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over lapping welding if
required etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 & 2200, 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of
R.C.C items.

Covers 13.50 60.00 810.00


Kg/cum
KG 810.00
0.81 MT 46,056.0 1.00 37,305.00
RS 5735237.0

Asst. Executive Engineer ( R&B ) Dy.Executive Engineer ( R&B ) Executive Engineer ( R&B )
Section :: Balkonda Sub division :: Armoor Division :: Nizamabad

Superintending Engineer
(R&B) Circle :: Nizamabad
Name of work:- Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from Km 3/450
to 4/200(Right side Only) and 3/650 to 3/800(Left side Only) in Komanpally village in
Nizamabad District.
1.20m
0.225 0.75 0.225

1.20m M15 M15

0.30m 0.60m 0.30m

0.20
1.20m
0.15m VCC (1:3:6)

1.40
Name of Work ::- Providing Drains to NH-16 to Vailpoor road via Kuknoor,
Komanpally road from Km 3/450 to 4/200(Right side Only) and
3/650 to 3/800(Left side Only) in Komanpally village in
Nizamabad District.
Seiginorage Charges (drains)

S No Description of Item Qty Coefficeint Cum. Qty Rate Amount

1 Earthwork 2316.00 1.00 2316 22.00 50952.0


Cum
2 VCC (1:3:6) foundations 258.00 0.90 232.2 50.00 11610.0
Cum 0.45 116.1 50.00 5805.0
3 VCC M15 Bodywalls 868.50 0.90 781.65 50.00 39082.5
Cum 0.45 390.825 50.00 19541.3
4 M20 13.50 0.90 12.15 50.00 607.5
Cum 0.45 6.075 50.00 303.8
Total Rs 127902.0

Asst Engineer Dy. Executive Engineer


R&B Section,Armoor R&B Division Armoor

Executive Engineer (R&B) Superintenidng Engineer


Division, Nizamabad (R&B) Circle, Nizamabad
Name of Work:- Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from Km 3/450 to
4/200(Right side Only) and 3/650 to 3/800(Left side Only) in Komanpally village in Nizamabad
District.

(A) .WEIGHTED AVERAGE LEAD FOR CRUSHER


a) Cart Track 1.10 x 0.50 = 0.55 km
1) On NH 16 road km 56.60 to km 38.60 = 18.00 km
2) On same road road km 0.00 to km 3.45 = 3.45 km
4) a Site Spreads in km 3.45 to km 4.20
Site average Lead (4.2 - 3.45) /2 = 0.38 km
Total Lead = 22.38 km
.WEIGHTED AVERAGE LEAD SAY = 22.00 km

(B) .WEIGHTED AVERAGE LEAD FOR SAND


1 Cart Track 1.10 x 2.00 = 2.20 km
2 Morthad - Bheemgal road road km 0.00 to km 6.00 = 6.00 km
3 On NH16 road km 44.40 to km 38.60 = 5.80 km
2) On same road road km 0.00 to km 3.45 = 3.45 km
6 a Site Spreads in km 3.45 to km 4.20
Site average Lead (4.2 - 3.45) /2 = 0.38 km
17.83 km
.WEIGHTED AVERAGE LEAD SAY = 18.00 km

Asst. Exe. Engineer Dy. Executive Engineer


R&B Section, Balkonda R&B Division,Armoor

Executive Engineer (R&B) Superintenidng Engineer


Division, Nizamabad (R&B) Circle, Nizamabad
Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from Km 3/450 to 4/200(Right side Only) and 3/650 to
Name of Work :: 3/800(Left side Only) in Komanpally village in Nizamabad District.
RMR.
Date :: 9-Dec-15 SSR :: 2014-15

Initial Rate of Material

Machine Crushing
(-) Stacking Charges
Conveyance rate (-)
unloading charges

Stacking Charges

Blasting Charges
Average Lead

Initial Rate
Conveyance

Charges

Seigniorage
Loading &

of Material
Charging

Charges
Weighted
TOTAL RATE

Stacking

0
rate
S.No Nature of Metal

25% On (6+9) SUM of


(4-5) (7-5) on (9) % Value ( 8 to12&14 )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

IRC and MORT&H HBG/HBT METALS ( HMP LEADS )


1 40 mm to 45 mm M.C Metal 22.00 261.67 0.00 120.90 588.00 261.67 588.00 70.00 147.00 0.00 0.0 0.00 1066.67
2 25 mm to 27 mm M.C Metal 22.00 261.67 0.00 120.90 944.00 261.67 944.00 70.00 236.00 0.00 0.0 0.00 1511.67
3 19 mm to 22 mm M.C Metal 22.00 261.67 0.00 120.90 984.00 261.67 984.00 70.00 246.00 0.00 0.0 0.00 1561.67
4 12 mm to 14 mm M.C chips 22.00 261.67 0.00 120.90 780.00 261.67 780.00 70.00 195.00 0.00 0.0 0.00 1306.67
5 9.5 mm to 11.2 mm M.C chips 22.00 261.67 0.00 120.90 656.00 261.67 656.00 70.00 164.00 0.00 0.0 0.00 1151.67
6 5 mm to 7 mm M.C chips 22.00 261.67 0.00 120.90 504.00 261.67 504.00 70.00 126.00 0.00 0.0 0.00 961.67
7 2.36 mm to 5 mm 22.00 261.67 0.00 120.90 308.00 261.67 308.00 70.00 77.00 0.00 0.0 0.00 716.67
8 Below 2.36 mm (Dust) 22.00 261.67 0.00 120.90 340.00 261.67 340.00 -- -- 0.00 0.0 0.00 601.67

IRC and MORT&H HBG/HBT METALS ( CRUSHER LEADS )


10 50 mm to 55 mm Metal 22.00 261.67 0.00 120.90 456.00 261.67 456.00 70.00 114.00 0.00 0.0 0.00 901.67
11 40 mm to 45 mm M.C Metal 22.00 261.67 0.00 120.90 588.00 261.67 588.00 70.00 147.00 0.00 0.0 0.00 1066.67
12 25 mm to 27 mm M.C Metal 22.00 261.67 0.00 120.90 944.00 261.67 944.00 70.00 236.00 0.00 0.0 0.00 1511.67
13 19 mm to 22 mm M.C Metal 22.00 261.67 0.00 120.90 984.00 261.67 984.00 70.00 246.00 0.00 0.0 0.00 1561.67
14 12 mm to 14 mm M.C chips 22.00 261.67 0.00 120.90 780.00 261.67 780.00 70.00 195.00 0.00 0.0 0.00 1306.67
15 9.5 mm to 11.2 mm M.C chips 22.00 261.67 0.00 120.90 656.00 261.67 656.00 70.00 164.00 0.00 0.0 0.00 1151.67
16 5 mm to 7 mm M.C chips 22.00 261.67 0.00 120.90 504.00 261.67 504.00 70.00 126.00 0.00 0.0 0.00 961.67
17 2.36 mm to 5 mm 22.00 261.67 0.00 120.90 308.00 261.67 308.00 70.00 77.00 0.00 0.0 0.00 716.67
18 Below 2.36 mm (Dust) 22.00 261.67 0.00 120.90 340.00 261.67 340.00 -- -- 0.00 0.0 0.00 601.67
IRC and MORT&H HBG/HBT METALS ( QUARRY LEADS )
12 40 mm to 45 mm Metal 22.00 261.67 0.00 120.90 588.00 261.67 588.00 70.00 -- 0.00 0.0 0.00 919.67
13 50 mm to 55 mm Metal 22.00 261.67 0.00 120.90 456.00 261.67 456.00 70.00 -- 0.00 0.0 0.00 787.67
14 60 mm to 63 mm Metal 22.00 261.67 0.00 120.90 419.00 261.67 419.00 70.00 -- 0.00 0.0 0.00 750.67
15 SS 300mm (HBG) for revetment 22.00 261.67 0.00 120.90 164.00 261.67 164.00 70.00 -- 0.00 0.0 0.00 495.67
Quarry spall( Field picked metal) 22.00 261.67
16 Av. Of rate 25mm & 40mm 22.00 261.67 0.00 120.90 45.00 261.67 45.00 -- -- 0.00 0.0 0.00 306.67
17 150 mm soling stone HBG metal 22.00 261.67 0.00 120.90 95.00 261.67 95.00 70.00 -- 0.00 0.0 0.00 426.67

HBG/HBT SS 5 METALS ( CRUSHER LEADS )


1 6 mm size M.C. Chips 22.00 261.67 0.00 120.90 532.00 261.67 532.00 70.00 133.00 0.00 0.0 0.00 996.67
2 10 mm size M.C. Chips 22.00 261.67 0.00 120.90 692.00 261.67 692.00 70.00 173.00 0.00 0.0 0.00 1196.67
3 12 mm size M.C. Chips 22.00 261.67 0.00 120.90 822.00 261.67 822.00 70.00 205.50 0.00 0.0 0.00 1359.17
4 20 mm size M.C. Metal 22.00 261.67 0.00 120.90 1036.00 261.67 1036.00 70.00 259.00 0.00 0.0 0.00 1626.67
5 25 mm size M.C. Metal 22.00 261.67 0.00 120.90 994.00 261.67 994.00 70.00 248.50 0.00 0.0 0.00 1574.17
6 40 mm size M.C. Metal 22.00 261.67 0.00 120.90 620.00 261.67 620.00 70.00 155.00 0.00 0.0 0.00 1106.67

HBG/HBT SS 5 METALS ( QUARRY LEADS )


1 CRS Stone 22.00 261.67 0.00 120.90 262.00 261.67 262.00 74.00 -- 0.00 0.0 0.00 597.67
2 Rough stone 22.00 261.67 0.00 120.90 252.00 261.67 252.00 70.00 -- 0.00 0.0 0.00 583.67
3 SS 225 mm 22.00 261.67 0.00 120.90 144.00 261.67 144.00 70.00 -- 0.00 0.0 0.00 475.67
4 Bond Stones(600x200x200) 42 No 22.00 261.67 0.00 120.90 1260.00 261.67 1260.00 0.00 -- 0.00 0.0 0.00 1521.67
Cost of each Bond Stone 36.23
1 Gravel 5.00 73.77 0.00 68.40 103.00 73.77 103.00 -- -- 0.00 0.0 0.00 176.77

2 Sand for Mortar 18.00 217.46 0.00 68.40 606.00 217.46 606.00 -- -- 0.00 0.0 0.00 823.46
3 Sand for Concrete 18.00 217.46 0.00 68.40 462.00 217.46 462.00 -- -- 0.00 0.0 0.00 679.46
4 Sand for Filling 18.00 217.46 0.00 68.40 342.00 217.46 342.00 -- -- 0.00 0.0 0.00 559.46

5 Cement 4300.00 4300.00


6 HYSD Steel 33000.00 33000.00
7 MS Steel 375000.00 375000.00
8 6 mm Mild Steel 36000.00 36000.00
0
0
uknoor, Komanpally road from Km 3/450 to 4/200(Right side Only) and 3/650 to
zamabad District.

TOTAL RATE

SUM of
( 8 to12&14 )
15
Name of Work ::- Providing Drains to NH-16 to Vailpoor road via Kuknoor, Komanpally road from
Km 3/450 to 4/200(Right side Only) and 3/650 to 3/800(Left side Only) in
Komanpally village in Nizamabad District.
DATA for Drains
SSR :: 2015-16 Municipal Area Allowance :: 20.0%

SNo Quantity Unit Description of Item Rate per Amount


1 2 3 4 5 6 7

3
1
1 Earthwork excavation in soils up to SDR by mechanical means for foundations of structures as
per drawing and technical specification including setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling
the excavation earth to the extent required etc., complete including (excluding seigniorage)
charges for finished item of work as per MoRT&H specification 304(5th Revision) and as
directed by the Engineer-in-Charge

1 By MECHANICAL MEANS
1 Page 323 of MoRT&H SDB
1 Unit : Cum
1 Taking out put = 240 Cum
1 (A) Labour
1 0.32 day Mate 370.00 1.00 118.40
1 8.00 day Mazdoor unskilled 310.00 1.00 2480.00
1 2598.40
1 20.0 % Municipal Area Allowance 2598.40 519.68
1 TOTAL A= 3118.08
1 (B) Machinery
1 240.00 cum Rate as per G.I. Ms. No 10, Dt 26/7/2005 13.00 1.00 3120.00
1 TOTAL B= 3120.00
1 (A + B) 6238.08
1
1 5.00 % (C) Over Head Charges on (A+B) 6238.08 311.90
1
1 10.00 % (D) Contractors Profit on (A+B+C) 6549.98 655.00
1
1 (E ) Seigniorage charges
1 240.00 cum Earth 0.00 1.00 0.00
1
1 240.00 cum TOTAL Cost for 240 cum = (A+B+C+D+E) 7204.98
1 Rate per 1 cum 30.02
1 Rate per 1 cum 30.00
1
1 2 3 4 5 6 7
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
(excluding seigniorage) conveyance of all materials to site and labour charges, centering,
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundations

0 Page 331 of MoRT&H SDB


0 Unit = cum
0 Taking output = 15 cum
0 (A) Labour
0 0.64 no Mate 370.00 1.00 236.80
0 1.00 no Mason 383.50 1.00 383.50
0 15.00 no Mazdoor 310.00 1.00 4650.00
0 5270.30
0 20.0 % Municipal Area Allowance 5270.30 1054.06
0 TOTAL A= 6324.36
0 (B) Material
0 13.80 cum Cost of 40mm HBG M/C metal 1017.60 1.00 14042.88
0 6.90 cum Sand at site 872.29 1.00 6018.80
0 3.30 MT Cement at site 5900.00 1.00 19470.00
0 TOTAL B= 39531.68
0 (C ) Machinery
0 6.00 hour Concrete mixer 0.4/0.28 cum 459.30 1.00 2755.80
0 6.00 hour Generator set 35 KVA 838.40 1.00 5030.40
0 2.00 hour Water tanker 6 KL capacity 624.00 1.00 1248.00
0 TOTAL C= 9034.20
0 (A + B +C) 54890.24
0
0 5.00 % (D) Over Head Charges on (A+B+C) 54890.24 2744.51
0
0 10.00 % (E) Contractors Profit on (A+B+C+D) 57634.75 5763.48
0
0 (F ) Seigniorage charges
0 13.80 cum METAL 0.00 1.00 0.00
0 6.90 cum SAND 0.00 1.00 0.00
0
0 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F) 63398.23
0 Rate per 1 cum 4226.55
0 Rate per 1 cum 4227.00
0
Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding
seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing,
laying, vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th
Revision) and as directed by the Engineer-in-Charge for body walls

0 Page331,455 of MoRT&H SDB


0 Unit = cum
0 Taking output = 15 cum
1 2 3 4 5 6 7
0 (A) Labour
0 0.64 no Mate 370.00 1.00 236.80
0 1.00 no Mason 383.50 1.00 383.50
0 15.00 no Mazdoor 310.00 1.00 4650.00
0 5270.30
0 20.0 % Municipal Area Allowance 5270.30 1054.06
0 TOTAL A= 6324.36
0 (B) Material
0 13.80 cum Cost of 40mm HBG M/C metal 1017.60 1.00 14042.88
0 6.90 cum Sand at site 872.29 1.00 6018.80
0 3.30 MT Cement at site 5900.00 1.00 19470.00
0 TOTAL B= 39531.68
0 (C ) Machinery
0 6.00 hour Concrete mixer 0.4/0.28 cum 459.30 1.00 2755.80
0 6.00 hour Generator set 35 KVA 838.40 1.00 5030.40
0 2.00 hour Water tanker 6 KL capacity 624.00 1.00 1248.00
0 TOTAL C= 9034.20
0 (A + B +C) 54890.24
0
0 10.00 % (D) Form Work on (A+B+C) 54890.24 5489.02
0
0 5.00 % (E) Over Head Charges on (A+B+C+D) 60379.26 3018.96
0
0 10.00 % (F) Contractors Profit on (A+B+C+D+E) 63398.22 6339.82
0
0 (G ) Seigniorage charges
0 13.50 cum METAL 0.00 1.00 0.00
0 6.750 cum SAND 0.00 1.00 0.00
0
0 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 69738.04
0 Rate per 1 cum 4649.20
0 Rate per 1 cum 4649.00

1 Cost of NP3 class Hume pipes of 600 mm dia. including cost and conveyance to site including
loading unloading transportation and taxes etc. complete .

1 Cost of 600 mm dia NP3 class Hume Pipes


1 1.00 RM Initial Cost of Pipes as per SSR 2099.00 1.00 2099.00
1
1 1.00 RM S1 = Basic Cost of M.S. Rods a per SSR 41000.00
1 S2 = Cost of M.S. rods
1 1.00 RM at the time of preparation of Estimate 36000.00
1 Ws= Weight of M.S. Rods required
1 per meter of pipe as per IS:458/2003 (kg)
1 As per TABLE 3/5 of IS:458-2003 & Note 5
1 1.00 RM Ws = (1.18+2.20*140/125) 3.6440
1 R1= Variation (increase/ decrease) in cost
1 (Rs. Per meter) due to change in cost of M.S. Rods
1 R1 = ( S2- S1)/1000 X Ws
1 2 3 4 5 6 7
1 1.00 RM R1 = ( 36000 - 41000 )/ 1000 X 3.644 -18.22
1
1 1.00 RM C1 = Basic Cost of Cement a per SSR 4000.00
1 C2 = Cost of Cement
1 1.00 RM at the time of preparation of Estimate 4300.00
1 IS:458-2003
1 From TABLE 3 Barrel wall Thickness ( mm ) 85.00
1 Concrete Qty=π/4(0.77*0.77-0.60*0.60) (cum) 0.1829
1 From CLAUSE 5.5 Cement Content( kg/cum) 340.00
1 Wc= Weight of Cement required per meter of pipe
1 1.00 RM ( as per IS:458/2003 (kg) 0.1829*340) 62.186
1 R1= Variation (increase/ decrease) in cost
1 (Rs. Per meter) due to change in cost of Cement
1 R2 = ( C2- C1)/1000 X Wc
1 1.00 RM R2 = ( 4300 - 4000 )/ 1000 X 62.186 18.66
1
1 Revised cost = Initial cost as per Table+R1+R2
1 =2099 -18.22+18.6558 2099.44
1
1 Lead Charges For 0 KM
1 Lead 0.00 KM
1 0.00 km Lead charges for First 5 KM Distance 89.00 5.00 89.00
1 0.00 km Lead charges for balance Distance 4.13 1.00 0.00
1 Total Rate: 2188.44
1 Rate per RM 2188.44
1
2 Providing, laying Reinforced cement concrete Hume pipes of 600mm Dia., NP-3 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges
for laying, jointing of 600mm dia. R.C.C Hume pipes in position including lifting,
aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification
2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by
the Engineer-in-Charge for finished item of work.

2 Page 272,273 of MoRT&H SDB


2 Unit = meter
2 Taking output = 12.5 meter
2 600 mm Dia.,
2 (A) Labour
2 0.14 no Mate 345.00 1.00 48.30
2 0.50 no Mason 357.00 1.00 178.50
2 3.00 no Mazdoor 295.00 1.00 885.00
2 1111.80
2 20.0 % Municipal Area Allowance 1111.80 222.36
2 TOTAL A= 1334.16
2 (B) Material
2 12.50 RM Cost of 600 mm Dia pipes 2188.44 1.00 27355.50
2 TOTAL B= 27355.50
2 (A + B) 28689.66
2
1 2 3 4 5 6 7
2 5.00 % (D) Over Head Charges on (A+B) 28689.66 1434.48
2
2 10.00 % (E) Contractors Profit on (A+B+C) 30124.14 3012.41
2
2 12.50 RM TOTAL Cost for 12.5 RM = (A+B+C+D) 33136.55
2 Rate per 1 RM 2650.92
2 Rate per 1 RM 2651.00
2
3 Cost of NP3 class Hume pipes of 800 mm dia. including cost and conveyance to site including
loading unloading transportation and taxes etc. complete .

3 Cost of 800 mm dia NP3 class Hume Pipes


3 1.00 RM Initial Cost of Pipes as per SSR 3447.00 1.00 3447.00
3
3 1.00 RM S1 = Basic Cost of M.S. Rods a per SSR 41000.00
3 S2 = Cost of M.S. rods
3 1.00 RM at the time of preparation of Estimate 36000.00
3 Ws= Weight of M.S. Rods required
3 per meter of pipe as per IS:458/2003 (kg)
3 As per TABLE 3/5 of IS:458-2003 & Note 5
3 1.00 RM (2.66+6.87*140/125) (kg) 10.3544
3 R1= Variation (increase/ decrease) in cost
3 (Rs. Per meter) due to change in cost of M.S. Rods
3 R1 = ( S2- S1)/1000 X Ws
3 1.00 RM R1 = ( 36000 - 41000 )/ 1000 X 10.3544 -51.77
3 1.00 RM C1 = Basic Cost of Cement a per SSR 4000.00
3 C2 = Cost of Cement
3 1.00 RM at the time of preparation of Estimate 4300.00
3 IS:458-2003
3 From TABLE 3 Barrel wall Thickness ( mm ) 95.00
3 Concrete Qty=π/4(0.99*0.99-0.80*0.80) (cum) 0.2671
3 From CLAUSE 5.5 Cement Content( kg/cum) 340.00
3 Wc= Weight of Cement required per meter of pipe
3 1.00 RM ( as per IS:458/2003 (kg) 0.2671*340) 90.814
R2= Variation (increase/ decrease) in cost
3
3 (Rs. Per meter) due to change in cost of Cement
3 R2 = ( C2- C1)/1000 X Wc
3 1.00 RM R2 = ( 4300 - 4000 )/ 1000 X 90.814 27.24
3
3 Revised cost = Initial cost as per Table+R1+R2
3 =3447 -51.77+27.2442 3422.47
3
3 Lead Charges For 0 KM
3 Lead 0.00 KM
3 0.00 km Lead charges for First 5 KM Distance 119.00 5.00 119.00
3 0.00 km Lead charges for balance Distance 4.80 1.00 0.00
3 Total Rate: 3541.47
3 Rate per RM 3541.47
3
1 2 3 4 5 6 7
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm Dia., NP-3 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges
for laying, jointing of 800mm dia. R.C.C Hume pipes in position including lifting,
aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification
2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by
the Engineer-in-Charge for finished item of work.

4 Page 272,273 of MoRT&H SDB


4 Unit = meter
4 Taking output = 12.5 meter
4 800 mm Dia.,
4 (A)
4 0.18 no Mate 345.00 1.00 62.10
4 0.50 no Mason 357.00 1.00 178.50
4 4.00 no Mazdoor 295.00 1.00 1180.00
4 1420.60
4 20.0 % Municipal Area Allowance 1420.60 284.12
4 TOTAL A= 1704.72
4 (B) Material
4 12.50 RM Cost of 800 mm Dia pipes 3541.47 1.00 44268.38
4 TOTAL B= 44268.38
4 (A + B) 45973.10
4
4 5.00 % (D) Over Head Charges on (A+B) 45973.10 2298.66
4
4 10.00 % (E) Contractors Profit on (A+B+C) 48271.76 4827.18
4
4 12.50 RM TOTAL Cost for 12.5 RM = (A+B+C+D) 53098.94
4 Rate per 1 RM 4247.92
4 Rate per 1 RM 4248.00
4
5 Cost of NP3 class Hume pipes of 1000 mm dia. including cost and conveyance to site
including loading unloading transportation and taxes etc. complete .

5 Cost of 1000 mm dia NP3 class Hume Pipes


5 1.00 RM Initial Cost of Pipes as per SSR 5379.00 1.00 5379.00
5
5 1.00 RM S1 = Basic Cost of M.S. Rods a per SSR 41000.00
5 S2 = Cost of M.S. rods
5 1.00 RM at the time of of
Ws= Weight M.S. Rods
preparation ofrequired
Estimate 36000.00
5
5 per meter of pipe as per IS:458/2003 (kg)
5 As per TABLE 3/5 of IS:458-2003& Note5
5 1.00 RM (2.66+15.70*140/125) 20.2440
R1= Variation (increase/ decrease) in cost
5
5 (Rs. Per meter) due to change in cost of M.S. Rods
5 R1 = ( S2- S1)/1000 X Ws
5 1.00 RM R1 = ( 36000 - 41000 )/ 1000 X 20.244 -101.22
5
5 1.00 RM C1 = Basic Cost of Cement a per SSR 4000.00
1 2 3 4 5 6 7
5 C2 = Cost of Cement
5 1.00 RM at the time of preparation of Estimate 4300.00
5 IS:458-2003
5 From TABLE 3 Barrel wall Thickness ( mm ) 115.00
5 Concrete Qty=π/4(1.23*1.23-1.0*1.0) (cum) 0.4028
5 From CLAUSE 5.5 Cement Content( kg/cum) 340.00
5 Wc= Weight of Cement required per meter of pipe
5 1.00 RM ( as per IS:458/2003 (kg) 0.4028*340) 136.952
5 R2= Variation (increase/ decrease) in cost
5 (Rs. Per meter) due to change in cost of Cement
5 R2 = ( C2- C1)/1000 X Wc
5 1.00 RM R2 = ( 4300 - 4000 )/ 1000 X 136.952 41.09
5
5 Revised cost = Initial cost as per Table+R1+R2
5 =5379 -101.22+41.0856 5318.87
5
5 Lead Charges For 0 KM
5 Lead 0.00 KM
5 0.00 km Lead charges for First 5 KM Distance 188.00 5.00 188.00
5 0.00 km Lead charges for balance Distance 9.05 1.00 0.00
5 Total Rate: 5506.87
5 Rate per RM 5506.87
5
6 Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges
for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting,
aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification
2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by
the Engineer-in-Charge for finished item of work.

6 Page 272,273 of MoRT&H SDB


6 Unit = meter
6 Taking output = 12.5 meter
6 1000 mm Dia.,
6 (A) Labour
6 0.18 no Mate 345.00 1.00 62.10
6 0.50 no Mason 357.00 1.00 178.50
6 4.00 no Mazdoor 295.00 1.00 1180.00
6 1420.60
6 20.0 % Municipal Area Allowance 1420.60 284.12
6 TOTAL A= 1704.72
6 (B) Material
6 12.50 RM Cost of 1000 mm Dia pipes 5506.87 1.00 68835.88
6 TOTAL B= 68835.88
6 (A + B) 70540.60
6
6 5.00 % (D) Over Head Charges on (A+B) 70540.60 3527.03
6
6 10.00 % (E) Contractors Profit on (A+B+C) 74067.63 7406.76
6
1 2 3 4 5 6 7
6 12.50 RM TOTAL Cost for 12.5 RM = (A+B+C+D) 81474.39
6 Rate per 1 RM 6517.95
6 Rate per 1 RM 6518.00
6
7 Cost of NP3 class Hume pipes of 1200 mm dia. including cost and conveyance to site
including loading unloading transportation and taxes etc. complete .

7 Cost of 1200 mm dia NP3 class Hume Pipes


7 1.00 RM Initial Cost of Pipes as per SSR 7477.00 1.00 7477.00
7
7 1.00 RM S1 = Basic Cost of M.S. Rods a per SSR 41000.00
7 S2 = Cost of M.S. rods
7 1.00 RM at the time of preparation of Estimate 36000.00
7 Ws= Weight of M.S. Rods required
7 per meter of pipe as per IS:458/2003 (kg)
7 As per TABLE 3/5 of IS:458-2003 & Note5
7 1.00 RM (3.55+21.25*140/125) 27.3500
7 R1= Variation (increase/ decrease) in cost
7 (Rs. Per meter) due to change in cost of M.S. Rods
7 R1 = ( S2- S1)/1000 X Ws
7 1.00 RM R1 = ( 36000 - 41000 )/ 1000 X 27.35 -136.75
7
7 1.00 RM C1 = Basic Cost of Cement a per SSR 4000.00
7 C2 = Cost of Cement
7 1.00 RM at the time of preparation of Estimate 4300.00
7 IS:458-2003
7 From TABLE 3 Barrel wall Thickness ( mm ) 120.00
7 Concrete Qty=π/4(1.44*1.44-1.2*1.2) (cum) 0.4976
7 From CLAUSE 5.5 Cement Content( kg/cum) 340.00
7 Wc= Weight of Cement required per meter of pipe
7 1.00 RM ( as per IS:458/2003 (kg) 0.4976*340) 169.184
7 R2= Variation (increase/ decrease) in cost
7 (Rs. Per meter) due to change in cost of Cement
7 R2 = ( C2- C1)/1000 X Wc
7 1.00 RM R2 = ( 4300 - 4000 )/ 1000 X 169.184 50.76
7
7 Revised cost = Initial cost as per Table+R1+R2
7 =7477 -136.75+50.7552 7391.01
7
7 Lead Charges For 0 KM
7 Lead 0.00 KM
7 0.00 km Lead charges for First 5 KM Distance 228.00 5.00 228.00
7 0.00 km Lead charges for balance Distance 9.85 1.00 0.00
7 Total Rate: 7619.01
7 Rate per RM 7619.01
7
1 2 3 4 5 6 7
8 Providing, laying Reinforced cement concrete Hume pipes of 1200mm Dia., NP-3 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 1200mm dia. R.C.C Hume pipes in position including lifting, aligning,
lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and
2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-
Charge for finished item of work.

8 Page 272,273 of MoRT&H SDB


8 Unit = meter
8 Taking output = 12.5 meter
8 1200 mm Dia.,
8 (A) Labour
8 0.28 no Mate 345.00 1.00 96.60
8 1.00 no Mason 357.00 1.00 357.00
8 6.00 no Mazdoor 295.00 1.00 1770.00
8 2223.60
8 20.0 % Municipal Area Allowance 2223.60 444.72
8 TOTAL A= 2668.32
8 (B) Material
8 12.50 RM Cost of 1200 mm Dia pipes 7619.01 1.00 95237.63
8 TOTAL B= 95237.63
8 (A + B) 97905.95
8
8 5.00 % (D) Over Head Charges on (A+B) 97905.95 4895.30
8
8 10.00 % (E) Contractors Profit on (A+B+C) 102801.25 10280.13
8
8 12.50 RM TOTAL Cost for 12.5 RM = (A+B+C+D) 113081.38
8 Rate per 1 RM 9046.51
8 Rate per 1 RM 9047.00
8
9 Filling in between body walls with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per
MoRT&H Specification No. 2200 & 2907(5th Revision) and as per Drawing and technical
specifications for finished item of work

9 Page 462 of MoRT&H SDB


9 Unit = cum
9 Taking output = 10 cum
9 (A) Labour
9 0.28 no Mate 345.00 1.00 96.60
9 7.00 no Mazdoor 295.00 1.00 2065.00
9 2161.60
9 20.0 % Municipal Area Allowance 2161.60 432.32
9 TOTAL A= 2593.92
9 (B) Material
9 12.00 cum Cost of Gravel 176.77 1.00 2121.24
9 TOTAL B= 2121.24
9 (C ) Machinery
9 2.50 hour Plate compactor/Power rammer/road roller 48.00 1.00 120.00
1 2 3 4 5 6 7
9 0.05 hour Water tanker 6 KL capacity 624.00 1.00 31.20
9 TOTAL C= 151.20
9 (A + B +C) 4866.36
9
9 5.00 % (D) Over Head Charges on (A+B+C) 4866.36 243.32
9
9 10.00 % (E) Contractors Profit on (A+B+C+D) 5109.68 510.97
9
9 (F ) Seigniorage charges
9 12.00 cum GRAVEL 0.00 1.00 0.00
9
9 10.00 cum TOTAL Cost for 10 cum = (A+B+C+D+E+F) 5620.65
9 Rate per 1 cum 562.07
9 Rate per 1 cum 562.00
9
10 Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm
size including cost, (excluding seigniorage) charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item
of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-
Charge for Pitching of slopes

10 Page 522 of MoRT&H SDB


10 Unit = cum
10 Taking out put = 1 cum
10 (A) Labour
10 0.04 no Mate 345.00 1.00 13.80
10 0.35 no Mason 357.00 1.00 124.95
10 0.75 no Mazdoor for laying stones, filling quarry spalls 295.00 1.00 221.25
10 360.00
10 20.0 % Municipal Area Allowance 360.00 72.00
10 TOTAL A= 432.00
10 (B) Material
10 1.00 cum Cost of Rough stone HBG 300mm thick 495.67 1.00 495.67
10 0.20 cum Cost of stone spalls 306.67 1.00 61.33
10 TOTAL B= 557.00
10 (A + B ) 989.00
10
10 5.00 % (C) Over Head Charges on (A+B) 989.00 49.45
10
10 10.00 % (D) Contractors Profit on (A+B+C) 1038.45 103.85
10
10 (E ) Seigniorage charges
10 1.20 cum METAL 0.00 1.00 0.00
10
10 1.00 cum TOTAL Cost for 1 cum = (A+B+C+D+E) 1142.30
10 Rate per 1 cum 1142.30
10 Rate per 1 cum 1142.00
10
1 2 3 4 5 6 7
11 Providing and laying filter material with Gravel underneath pitching in slopes including cost,
(excluding seigniorage) charges and conveyance of materials to site including labour charges
etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and
as directed by the Engineer-in-Charge

11 Page 523 of MoRT&H SDB


11 Unit = cum
11 Taking output = 1 cum
11 (A) Labour
11 0.05 no Mate 345.00 1.00 17.25
11 0.25 no Mazdoor skilled 357.00 1.00 89.25
11 1.00 no Mazdoor for laying stones, filling quarry spalls 295.00 1.00 295.00
11 401.50
11 20.0 % Municipal Area Allowance 401.50 80.30
11 TOTAL A= 481.80
11 (B) Material
11 1.20 cum Cost of gravel 176.77 1.00 212.12
11 TOTAL B= 212.12
11 (A + B ) 693.92
11
11 5.00 % (C) Over Head Charges on (A+B) 693.92 34.70
11
11 10.00 % (D) Contractors Profit on (A+B+C) 728.62 72.86
11
11 (E ) Seigniorage charges
11 1.20 cum GRAVEL 0.00 1.00 0.00
11
11 1.00 cum TOTAL Cost for 1 cum = (A+B+C+D+E) 801.48
11 Rate per 1 cum 801.48
11 Rate per 1 cum 801.00
11
12 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges ,centering, machine mixing, laying in position,
Compacting , Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th
Revision) for footings and Raft foundation .

12 Page 335 of MoRT&H SDB


12 Unit = cum
12 Taking output = 15 cum
12 (A) Labour
12 0.86 no Mate 345.00 1.00 296.70
12 1.50 no Mason 357.00 1.00 535.50
12 20.00 no Mazdoor 295.00 1.00 5900.00
12 6732.20
12 20.0 % Municipal Area Allowance 6732.20 1346.44
12 TOTAL A= 8078.64
12 TOTAL
1 2 3 4 5 6 7
12 (B) Material
12 8.10 cum Cost of 40mm HBG metal 1106.67 1.00 8964.03
12 4.05 cum Cost of 20mm HBG metal 1626.67 1.00 6588.01
12 1.35 cum Cost of 10mm HBG metal 1196.67 1.00 1615.50
12 6.75 cum Sand at site 679.46 1.00 4586.36
12 4.13 MT Cement at site 4300.00 1.00 17759.00
12 TOTAL D= 39512.90
12 (C ) Machinery
12 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
12 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
12 TOTAL C= 7888.20
12 7888.20
12 (A + B +C) 55479.74
12
12 4.00 % (D) Form Work on (A+B+C) 55479.74 2219.19
12
12 15.00 % (E) Over Head Charges on (A+B+C+D) 57698.93 8654.84
12
12 10.00 % (F) Contractors Profit on (A+B+C+D+E) 66353.77 6635.38
12
12 (G ) Seigniorage charges
12 13.50 cum METAL 0.00 1.00 0.00
12 6.750 cum SAND 0.00 1.00 0.00
12
12 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 72989.15
12 Rate per 1 cum 4865.94
12 Rate per 1 cum 4866.00
12
13 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges , centering, machine mixing, laying in position,
Compacting, Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Sub structure .

13 Page 336,455 of MoRT&H SDB


13 Unit = cum
13 Taking output = 15 cum
13 (A) Labour
13 0.86 no Mate 345.00 1.00 296.70
13 1.50 no Mason 357.00 1.00 535.50
13 20.00 no Mazdoor 295.00 1.00 5900.00
13 6732.20
13 20.0 % Municipal Area Allowance 6732.20 1346.44
13 TOTAL A= 8078.64
13 (B) Material
13 8.10 cum Cost of 40mm HBG metal 1106.67 1.00 8964.03
13 4.05 cum Cost of 20mm HBG metal 1626.67 1.00 6588.01
1 2 3 4 5 6 7
13 1.35 cum Cost of 10mm HBG metal 1196.67 1.00 1615.50
13 6.75 cum Sand at site 679.46 1.00 4586.36
13 4.13 MT Cement at site 4300.00 1.00 17759.00
13 TOTAL B= 39512.90
13 (C ) Machinery
13 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
13 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
13 TOTAL C= 7888.20
13 (A + B +C) 55479.74
13
13 10.00 % (D) Form Work on (A+B+C) 55479.74 5547.97
13
13 15.00 % (E) Over Head Charges on (A+B+C+D) 61027.71 9154.16
13
13 10.00 % (F) Contractors Profit on (A+B+C+D+E) 70181.87 7018.19
13
13 (G ) Seigniorage charges
13 13.50 cum METAL 0.00 1.00 0.00
13 6.750 cum SAND 0.00 1.00 0.00
13
13 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 77200.06
13 Rate per 1 cum 5146.67
13 Rate per 1 cum 5147.00
13
14 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges ,centering, machine mixing, laying in position,
Compacting , Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th
Revision) for footings and Raft foundation .

14 Page 335 of MoRT&H SDB


14 Unit = cum
14 Taking output = 15 cum
14 (A) Labour
14 0.86 no Mate 345.00 1.00 296.70
14 1.50 no Mason 357.00 1.00 535.50
14 20.00 no Mazdoor 295.00 1.00 5900.00
14 6732.20
14 20.0 % Municipal Area Allowance 6732.20 1346.44
14 TOTAL A= 8078.64
14 TOTAL
14 (B) Material
14 5.40 cum Cost of 40mm HBG metal 1106.67 1.00 5976.02
14 5.40 cum Cost of 20mm HBG metal 1626.67 1.00 8784.02
14 2.70 cum Cost of 10mm HBG metal 1196.67 1.00 3231.01
14 6.75 cum Sand at site 679.46 1.00 4586.36
14 5.16 MT Cement at site 4300.00 1.00 22188.00
1 2 3 4 5 6 7
14 TOTAL D= 44765.41
14 (C ) Machinery
14 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
14 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
14 TOTAL C= 7888.20
14 7888.20
14 (A + B +C) 60732.25
14
14 4.00 % (D) Form Work on (A+B+C) 60732.25 2429.29
14
14 15.00 % (E) Over Head Charges on (A+B+C+D) 63161.54 9474.23
14
14 10.00 % (F) Contractors Profit on (A+B+C+D+E) 72635.77 7263.58
14
14 (G ) Seigniorage charges
14 13.50 cum METAL 0.00 1.00 0.00
14 6.750 cum SAND 0.00 1.00 0.00
14
14 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 79899.35
14 Rate per 1 cum 5326.62
14 Rate per 1 cum 5327.00
14
15 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges , centering, machine mixing, laying in position,
Compacting, Vibrating and curing including all other incidental and all other operational
charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Sub structure .

15 Page 335,455 of MoRT&H SDB


15 Unit = cum
15 Taking output = 15 cum
15 (A) Labour
15 0.86 no Mate 345.00 1.00 296.70
15 1.50 no Mason 357.00 1.00 535.50
15 20.00 no Mazdoor 295.00 1.00 5900.00
15 6732.20
15 20.0 % Municipal Area Allowance 6732.20 1346.44
15 TOTAL A= 8078.64
15 (B) Material
15 5.40 cum Cost of 40mm HBG metal 1106.67 1.00 5976.02
15 5.40 cum Cost of 20mm HBG metal 1626.67 1.00 8784.02
15 2.70 cum Cost of 10mm HBG metal 1196.67 1.00 3231.01
15 6.75 cum Sand at site 679.46 1.00 4586.36
15 5.16 MT Cement at site 4300.00 1.00 22188.00
15 TOTAL B= 44765.41
15 (C ) Machinery
15 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
1 2 3 4 5 6 7
15 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
15 TOTAL C= 7888.20
15 (A + B +C) 60732.25
15
15 10.00 % (D) Form Work on (A+B+C) 60732.25 6073.23
15
15 15.00 % (E) Over Head Charges on (A+B+C+D) 66805.48 10020.82
15
15 10.00 % (F) Contractors Profit on (A+B+C+D+E) 76826.30 7682.63
15
15 (G ) Seigniorage charges
15 13.50 cum METAL 0.00 1.00 0.00
15 6.750 cum SAND 0.00 1.00 0.00
15
15 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 84508.93
15 Rate per 1 cum 5633.93
15 Rate per 1 cum 5634.00
15
16 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental
hire and operational charges of all T&P as per approved drawings and as directed during
execution but excluding cost of steel and its fabrication charges for finished item as per
MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the
Engineer-in-Charge

16 Page 472,457 of MoRT&H SDB


16 Unit = cum
16 Taking output = 15 cum
16 (A) Labour
16 0.86 no Mate 345.00 1.00 296.70
16 1.50 no Mason 357.00 1.00 535.50
16 20.00 no Mazdoor 295.00 1.00 5900.00
16 6732.20
16 20.0 % Municipal Area Allowance 6732.20 1346.44
16 TOTAL A= 8078.64
16 (B) Material
16 8.10 cum Cost of 20mm HBG metal 1626.67 1.00 13176.03
16 5.40 cum Cost of 10mm HBG metal 1196.67 1.00 6462.02
16 6.75 cum Sand at site 679.46 1.00 4586.36
16 5.12 MT Cement at site 4300.00 1.00 22016.00
16 TOTAL B= 46240.41
16 (C ) Machinery
16 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
16 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
16 TOTAL C= 7888.20
16 (A + B +C) 62207.25
16
16 0.00 % (D) Form Work on (A+B+C) 62207.25 0.00
1 2 3 4 5 6 7
16
16 15.00 % (E) Over Head Charges on (A+B+C+D) 62207.25 9331.09
16
16 10.00 % (F) Contractors Profit on (A+B+C+D+E) 71538.34 7153.83
16
16 (G ) Seigniorage charges
16 13.50 cum METAL 0.00 1.00 0.00
16 6.750 cum SAND 0.00 1.00 0.00
16
16 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 78692.17
16 Rate per 1 cum 5246.14
16 Rate per 1 cum 5246.00
16
17 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental
hire and operational charges of all T&P etc., complete as per approved drawings and as directed
during execution but excluding cost of steel and its fabrication charges for finished item as per
MoRT&H specification 1500,1600,1700 & 2300 (5th revision ) and as directed by the
Engineer-in-Charge for Deck slab

17 Page 472 of MoRT&H SDB


17 Unit = cum
17 Taking output = 15 cum
17 (A) Labour
17 0.86 no Mate 345.00 1.00 296.70
17 1.50 no Mason 357.00 1.00 535.50
17 20.00 no Mazdoor 295.00 1.00 5900.00
17 6732.20
17 20.0 % Municipal Area Allowance 6732.20 1346.44
17 TOTAL A= 8078.64
17 (B) Material
17 8.10 cum Cost of 20mm HBG metal 1626.67 1.00 13176.03
17 5.40 cum Cost of 10mm HBG metal 1196.67 1.00 6462.02
17 6.75 cum Sand at site 679.46 1.00 4586.36
17 5.12 MT Cement at site 4300.00 1.00 22016.00
17 TOTAL B= 46240.41
17 (C ) Machinery
17 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
17 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
17 TOTAL C= 7888.20
17 (A + B +C) 62207.25
17
17 20.00 % (D) Form Work on (A+B+C) 62207.25 12441.45
17
17 15.00 % (E) Over Head Charges on (A+B+C+D) 74648.70 11197.31
17
17 10.00 % (F) Contractors Profit on (A+B+C+D+E) 85846.01 8584.60
17
1 2 3 4 5 6 7
17 (G ) Seigniorage charges
17 13.50 cum METAL 0.00 1.00 0.00
17 6.750 cum SAND 0.00 1.00 0.00
17
17 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 94430.61
17 Rate per 1 cum 6295.37
17 Rate per 1 cum 6295.00
17
18 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental
and operational charges of all T&P etc., complete for finished item of work as per drawing
BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H
specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-
Charge for Wearing coat over Deck slab.

18 Page 477,492 of MoRT&H SDB


18 Unit = cum
18 Taking output = 15 cum
18 (A) Labour
18 0.90 no Mate 345.00 1.00 310.50
18 1.50 no Mason 357.00 1.00 535.50
18 21.00 no Mazdoor 295.00 1.00 6195.00
18 7041.00
18 20.0 % Municipal Area Allowance 7041.00 1408.20
18 TOTAL A= 8449.20
18 (B) Material
18 8.10 cum Cost of 20mm HBG metal 1626.67 1.00 13176.03
18 5.40 cum Cost of 10mm HBG metal 1196.67 1.00 6462.02
18 6.75 cum Sand at site 679.46 1.00 4586.36
18 6.10 MT Cement at site 4300.00 1.00 26230.00
18 TOTAL B= 50454.41
18 (C ) Machinery
18 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
18 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
18 TOTAL C= 7888.20
18
18 2.25 no (D) Labour for cleaning deck slab concrete 295.00 1.00 663.75
18 TOTAL D= 663.75
18 (A + B +C + D) 67455.56
18
18 15.00 % (E) Over Head Charges on (A+B+C+D) 67455.56 10118.33
18
18 10.00 % (F) Contractors Profit on (A+B+C+D+E) 77573.89 7757.39
18
18 (G ) Seigniorage charges
18 13.50 cum METAL 0.00 1.00 0.00
18 6.750 cum SAND 0.00 1.00 0.00
18
1 2 3 4 5 6 7
18 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 85331.28
18 Rate per 1 cum 5688.75
18 Rate per 1 cum 5689.00
18
19 Vibrated reinforced cement concrete M.25 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental
and operational charges of all T&P etc., complete for finished item of work as per Approved
drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification
1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for
Approach slab.

19 Page 340,501 of MoRT&H SDB


19 Unit = cum
19 Taking output = 15 cum
19 (A) Labour
19 0.86 no Mate 345.00 1.00 296.70
19 1.50 no Mason 357.00 1.00 535.50
19 20.00 no Mazdoor 295.00 1.00 5900.00
19 6732.20
19 20.0 % Municipal Area Allowance 6732.20 1346.44
19 TOTAL A= 8078.64
19 (B) Material
19 8.10 cum Cost of 20mm HBG metal 1626.67 1.00 13176.03
19 5.40 cum Cost of 10mm HBG metal 1196.67 1.00 6462.02
19 6.75 cum Sand at site 679.46 1.00 4586.36
19 6.05 MT Cement at site 4300.00 1.00 26015.00
19 TOTAL B= 50239.41
19 (C ) Machinery
19 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
19 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
19 TOTAL C= 7888.20
19 (A + B +C) 66206.25
19
19 2.00 % (D) Form Work on (A+B+C) 66206.25 1324.13
19
19 15.00 % (E) Over Head Charges on (A+B+C+D) 67530.38 10129.56
19
19 10.00 % (F) Contractors Profit on (A+B+C+D+E) 77659.94 7765.99
19
19 (G ) Seigniorage charges
19 13.50 cum METAL 0.00 1.00 0.00
19 6.750 cum SAND 0.00 1.00 0.00
19
19 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F) 85425.93
19 Rate per 1 cum 5695.06
19 Rate per 1 cum 5695.00
19
1 2 3 4 5 6 7
20 Construction of pre cast VRCC Railing of M20 grade using HBG crushed stone aggregate of
size not exceeding 12 mm and fine aggregate conforming to table 1000-2 true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical
posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion
including cost, (excluding seigniorage) conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges as per approved drawings and technical
specifications for finished item of work as per MoRT&H Specification 2703, 1500, 1600,
1700(5th Revision)

20 Page 472,497 of MoRT&H SDB


20 Unit = 1 RM
20 Hand rails without foot paths
20 Material
20 M20 grade VRCC
20 No. of vertical end posts = 2 x 0.30x 0.20 x0.77 = 0.0924 cum
20 Internal vertical posts = 3x0.18x0.20x0.77 = 0.0832 cum
20 hand rail in2 tier =6.74-(2x0.3+3x0.18)=5.60 RM
20 quantity of RCC = 2x5.60x0.115x0.165 = 0.2125 cum
20 TOTAL Concrete = 0.3881 cum
20 VRCC M 20 Grade
20 (A) Labour
20 0.86 no Mate 345.00 1.00 296.70
20 1.50 no Mason 357.00 1.00 535.50
20 20.00 no Mazdoor 295.00 1.00 5900.00
20 6732.20
20 20.0 % Municipal Area Allowance 6732.20 1346.44
20 TOTAL A= 8078.64
20 (B) Material
20 8.10 cum Cost of 12mm HBG metal 1359.17 1.00 11009.28
20 5.40 cum Cost of 10mm HBG metal 1196.67 1.00 6462.02
20 6.75 cum Sand at site 679.46 1.00 4586.36
20 5.12 MT Cement at site 4300.00 1.00 22016.00
20 TOTAL B= 44073.66
20 (C ) Machinery
20 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
20 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
20 TOTAL C= 7888.20
20 (A + B +C) 60040.50
20
20 12.00 % (D) Form Work on (A+B+C) 60040.50 7204.86
20
20 15.00 % (E) Over Head Charges on (A+B+C+D) 67245.36 10086.80
20
20 10.00 % (F) Contractors Profit on (A+B+C+D+E) 77332.16 7733.22
20
20 (G ) Seigniorage charges
20 13.50 cum METAL 0.00 1.00 0.00
20 6.750 cum SAND 0.00 1.00 0.00
1 2 3 4 5 6 7
20
20 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D++F+G+E) 85065.38
20 Rate per 1 cum 5671.03
20
20 Cost of Railing for one side
20 0.3881 cum Cost per = 6.74 M 5671.03 1.00 2200.92
20 Cost per 1 RM = 326.55
20 Cost per 1 RM = 327.00
20
20 Hand rails without foot paths (Output =12.719 RM)
20 Material
20 M20 grade VRCC
20 No. of vertical end posts = 2 x 0.30x 0.20 x0.77 = 0.0924 cum
20 Internal vertical posts = 6x0.18x0.20x0.77 = 0.1663 cum
20 hand rail in2 tier =12.719-(2x0.3+6x0.18)=11.04 RM
20 quantity of RCC = 2x11.04x0.115x0.165 = 0.4189 cum
20 0.6776 cum
20 Cost of Railing for one side
20 0.6776 cum Cost per =12.719 5671.0253 1.00 3842.69
20 Cost per 1 RM = 302.12
20 Cost per 1 RM = 302.00
20
21 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all
materials to site and all labour charges for machine mixing, laying in position, Compacting ,
Vibrating and curing including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2100 ,2700 (5th Revision)
for leveling course

21 Page 335,500 of MoRT&H SDB


21 Unit = cum
21 Taking output = 15 cum
21 (A) Labour
21 0.86 no Mate 345.00 1.00 296.70
21 1.50 no Mason 357.00 1.00 535.50
21 20.00 no Mazdoor 295.00 1.00 5900.00
21 6732.20
21 20.0 % Municipal Area Allowance 6732.20 1346.44
21 TOTAL A= 8078.64
21 (B) Material
21 8.10 cum Cost of 40mm HBG metal 1106.67 1.00 8964.03
21 4.05 cum Cost of 20mm HBG metal 1626.67 1.00 6588.01
21 1.35 cum Cost of 10mm HBG metal 1196.67 1.00 1615.50
21 6.75 cum Sand at site 679.46 1.00 4586.36
21 4.13 MT Cement at site 4300.00 1.00 17759.00
21 TOTAL B= 39512.90
21 (C ) Machinery
21 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
21 6.00 hour Generator set 35 KVA 861.70 1.00 5170.20
1 2 3 4 5 6 7
21 TOTAL C= 7888.20
21 (A + B +C) 55479.74
21
21 5.00 % (D) Over Head Charges on (A+B+C) 55479.74 2773.99
21
21 10.00 % (E) Contractors Profit on (A+B+C+D) 58253.73 5825.37
21
21 (F ) Seigniorage charges
21 13.50 cum METAL 0.00 1.00 0.00
21 6.750 cum SAND 0.00 1.00 0.00
21
21 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F) 64079.10
21 Rate per 1 cum 4271.94
21 Rate per 1 cum 4272.00
21
22 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted
with 0.20 cum of CC (1:4:8) including cost, (excluding seigniorage) charges and conveyance
of materials to site and including labour charges for packing the stones for revetment etc.,
complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as
directed by the Engineer-in-Charge for quadrennial revetment.

22 Page 331,522 of MoRT&H SDB


22 Cost of CC(1:4:8)
22 Taking output = 15 cum
22 (A) Labour
22 0.64 no Mate 345.00 1.00 220.80
22 1.00 no Mason 357.00 1.00 357.00
22 15.00 no Mazdoor 295.00 1.00 4425.00
22 5002.80
22 20.0 % Municipal Area Allowance 5002.80 1000.56
22 TOTAL A= 6003.36
22 (B) Material
22 13.50 cum Cost of 40mm HBG M/C metal 1106.67 1.00 14940.05
22 6.75 cum Sand at site 679.46 1.00 4586.36
22 2.43 MT Cement at site 4300.00 1.00 10449.00
22 TOTAL B= 29975.41
22 (C ) Machinery
22 6.00 hour Concrete mixer 0.4/0.28 cum 453.00 1.00 2718.00
22 6.00 hour Generator set 33 KVA 861.70 1.00 5170.20
22 2.00 hour Water tanker 6 KL capacity 624.00 1.00 1248.00
22 TOTAL C= 9136.20
22 Cost per 15 cum (A+B+C) 45114.97
22 Rate for 1 cum 3007.66
22 Cost of Grouted Revetment
22 Unit = Cum
22 Taking output = 1 cum
22 (A) Labour
22 0.04 no Mate 345.00 1.00 13.80
22 0.35 no Mason 357.00 1.00 124.95
22 0.75 no Mazdoor for laying stones, filling quarry spalls 295.00 1.00 221.25
1 2 3 4 5 6 7
22 360.00
22 20.0 % Municipal Area Allowance 360.00 72.00
22 TOTAL A= 432.00
22 (B) Material
22 0.20 cum Cost of CC(1:4:8) 3007.66 1.00 601.53
22 1.00 cum Cost of Rough stone HBG 300mm thick 495.67 1.00 495.67
22 TOTAL B= 1097.20
22 (A + B ) 1529.20
22
22 5.00 % (C) Over Head Charges on (A+B) 1529.20 76.46
22
22 10.00 % (D) Contractors Profit on (A+B+C) 1605.66 160.57
22
22 (F ) Seigniorage charges
22 1.1800 cum METAL 0.00 1.00 0.00
22 0.090 cum SAND 0.00 1.00 0.00
22
22 1.00 cum TOTAL Cost for 1 cum = (A+B+C+D) 1766.23
22 Rate per 1 cum 1766.23
22 Rate per 1 cum 1766.00
22
23 Back filling behind Abutments with gravel including cost ,conveyance and (excluding
seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as
per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical
specifications for finished item of work

23 Page 462 of MoRT&H SDB


23 Unit = cum
23 Taking output = 10 cum
23 (A) Labour
23 0.28 no Mate 345.00 1.00 96.60
23 7.00 no Mazdoor 295.00 1.00 2065.00
23 2161.60
23 20.0 % Municipal Area Allowance 2161.60 432.32
23 TOTAL A= 2593.92
23
23 (B) Material
23 12.00 cum Cost of Granular material 176.77 1.00 2121.24
23 TOTAL B= 2121.24
23 (C ) Machinery
23 2.50 hour Plate compactor/Power rammer/road roller 48.00 1.00 120.00
23 0.05 hour Water tanker 6 KL capacity 624.00 1.00 31.20
23 TOTAL C= 151.20
23 (A + B +C) 4866.36
23
23 5.00 % (D) Over Head Charges on (A+B+C) 4866.36 243.32
23
23 10.00 % (E) Contractors Profit on (A+B+C+D) 5109.68 510.97
23
23 (E ) Seigniorage charges
1 2 3 4 5 6 7
23 12.00 cum GRAVEL 0.00 1.00 0.00
23
23 10.00 cum TOTAL Cost for 10 cum = (A+B+C+D+E) 5620.65
23 Rate per 1 cum 562.07
23 Rate per 1 cum 562.00
23
24 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40
mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H
specifications to a thickness of not less than 600mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind the abutment, wing
wall and return wall to the full height compacted to a firm condition including cost and
conveyance of all metal (excluding seigniorage) charges ,and all labour charges as directed by
the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of
IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

24 Page 463 of MoRT&H SDB


24 Unit = cum
24 Taking output = 10 cum
24 (A) Labour
24 0.32 no Mate 345.00 1.00 110.40
24 7.00 no Mazdoor for filling watering, ramming etc. 295.00 1.00 2065.00
24 1.00 no Mazdoor skilled 357.00 1.00 357.00
24 2532.40
24 20.0 % Municipal Area Allowance 2532.40 506.48
24 TOTAL A= 3038.88
24 (B) Material
24 Filter media of stone aggregate conforming
24 to clause 2504.2.2 of MoRT&H
24 6.00 cum Cost of 150mm size IRC soling stone 426.67 1.00 2560.02
24 6.00 cum Cost of 40mm size IRC metal 919.67 1.00 5518.02
24 TOTAL B= 8078.04
24 (C ) Machinery
24 0.06 hour Water tanker 6 KL capacity 624.00 1.00 37.44
24 TOTAL C= 37.44
24 (A + B +C) 11154.36
24
24 5.00 % (D) Over Head Charges on (A+B+C) 11154.36 557.72
24
24 10.00 % (E) Contractors Profit on (A+B+C+D) 11712.08 1171.21
24
24 (F ) Seigniorage charges
24 12.00 cum METAL 0.00 1.00 0.00
24
24 10.00 cum TOTAL Cost for 10 cum = (A+B+C+D+E+F) 12883.29
24 Rate per 1 cum 1288.33
24 Rate per 1 cum 1288.00
24
1 2 3 4 5 6 7
Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all
diameters including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the directions of the
Engineer-in-Charge and as per MoRT&H specification 1600 & 2200, 2300 (5th revision) and
as per I.S.1786 of 1985 for Super structure of R.C.C items.

0 Page 489,490 of MoRT&H SDB


0 Unit = MT
0 Taking output = 1 MT
0 (A) Labour
0 0.44 no Mate 370.00 1.00 162.80
0 3.00 no Black smith 415.00 1.00 1245.00
0 8.00 no Mazdoor 310.00 1.00 2480.00
0 3887.80
0 20.0 % Municipal Area Allowance 3887.80 777.56
0 TOTAL A= 4665.36
0 TOTAL
0 (B) Material
0 1.05 MT HYSD bars including overlaps 33000.00 1.00 34650.00
0 8.00 Kg Binding wire ( Building SSR item no.757 ) 70.00 1.00 560.00
0 TOTAL B= 35210.00
0 (A + B ) 39875.36
0
0 5.00 % (C) Over Head Charges on (A+B) 39875.36 1993.77
0
0 10.00 % (D) Contractors Profit on (A+B+C) 41869.13 4186.91
0
0 1.00 MT TOTAL Cost for 1 MT = (A+B+C+D) 46056.04
0 Rate per 1 MT 46056.04
0 Rate per 1 MT 46056.00
0
7 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, seigniorage conveyance of all materials to site and labour charges,
centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per MoRT&H
specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-
Charge for Cover slabs over Side drains

7 Page 472,457 of MoRT&H SDB


7 Unit = cum
7 Taking output = 15 cum
7 (A) Labour
7 0.86 no Mate 370.00 1.00 318.20
7 1.50 no Mason 383.50 1.00 575.25
7 20.00 no Mazdoor 310.00 1.00 6200.00
7 7093.45
1 2 3 4 5 6 7
7 20.0 % Municipal Area Allowance 7093.45 1418.69
7 TOTAL A= 8512.14
7 (B) Material
7 8.10 cum Cost of 20mm HBG metal 1537.60 1.00 12454.56
7 5.40 cum Cost of 10mm HBG metal 1107.60 1.00 5981.04
7 6.75 cum Sand at site 872.29 1.00 5887.96
7 5.12 MT Cement at site 4300.00 1.00 22016.00
7 TOTAL B= 46339.56
7 (C ) Machinery
7 6.00 hour Concrete mixer 0.4/0.28 cum 459.30 1.00 2755.80
7 6.00 hour Generator set 35 KVA 838.40 1.00 5030.40
7 TOTAL C= 7786.20
7 (A + B +C) 62637.90
7
7 4.00 % (D) Form Work on (A+B+C) 62637.90 2505.52
7
7 5.00 % (E) Over Head Charges on (A+B+C+D) 65143.42 3257.17
7
7 10.00 % (F) Contractors Profit on (A+B+C+D+E) 68400.59 6840.06
7
7 (G ) (excluding seigniorage) charges
7 13.5000 cum METAL 0.00 1.00 0.00
7 6.750 cum SAND 0.00 1.00 0.00
7
7 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 75240.65
7 Rate per 1 cum 5016.04
7 Rate per 1 cum 5016.00
7
8
19
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
10
1 2 3 4 5 6 7
10
10
OTHER MATERIA
LABOUR
204-15

DETAILS
2014-15
GRAVEL
MSAND
DETAILS RATE
CSAND
MASONI 385.00 FSAND
MASONII 345.00 CRS
Mate 345.00 ROUGH
Mazdoor skilled 357.00 BOND600
Mazdoor unskilled 295.00 SS150
SS225
SS300
QS25
QS40

BITUMEN LEADS & RATES


2008-09
RATE
MATERIAL
km/ MT
PACKED BITUMEN 1.75 Preamble 7
BULK BITUMEN 1.50

ADDITIONS
OH 5.00
OH1 15.00
CP 10.00
VAT 0.00
LALI 13.00
IS:458-1988
Dia of Pipes Shell Quantity of
Outer Dia
S.No NP3 class Thick ness Concrete
(mm)
( mm ) (mm) ( cum )
1 2 3 4 5
1 600 85 770 0.1829
2 800 95 990 0.2671
3 1000 115 1230 0.4028
4 1200 120 1440 0.4976

MACHINERY
AT PLANT
Dozer 80 HP for spreading @
Motor Graders for Grading

Front end loader 1 Cu


Tipper
Vibratory roller 8 Tones for GSB, EAR
Finish rolling with 6-8 Tones smooth whe

Trac
Air C
Wet mix plant of 60
Mechanical broom @
Bitumen pressure distrib
Emulsion pressure distributor
Hot M
Hot M
Hot
Hot Mix P
Sensor Paver f
Mechanical Paver f
Smooth wheeled roller 8-10 Tones for initial b
Vibratory roller 8 Tones for
Pne
Hire charges of bitume

Electric gen

Tipper 5 cum capacity for Soil, GS


Tipper 5.50 cum capacity per
Plate compactor/Power r
Hydraulic self propelled chip spre
Mini hot mix plant (SDB of MOST
Hire charges of bitumen bo
Road Marking Machine
Hot Applide Thermoplastic Compound( Item
Reflectorising g
Concrete

Tractor with ripper attachment

Ge

Batch Mix Plant (Hot mix Plant –


HER MATERIALS SS5 HBG METAL IRC HBG METAL
2014-15
204-15 (Excluding blasting 2014-15
Charges)
RATE SIZES RATE SIZES RATE

103.00 SS6 532.00 IRC2.36 308.00


606.00 SS10 692.00 IRC5 504.00
462.00 SS12 822.00 IRC9 656.00
342.00 SS20 1036.00 IRC12 780.00
262.00 SS25 994.00 IRC19 984.00
252.00 SS40 620.00 IRC25 944.00
30.00 SS50 456.00 IRC40 588.00
95.00 SS60 419.00 IRC50 456.00
144.00 SS65 379.00 IRC60 419.00
164.00 SS75 304.00 IRC65 379.00
42.00 Metals BLAST 70.00 IRC75 304.00
48.00 CRS BLAST3 74.00 DUST 340.00
RR BLAST2 70.00

SEIGNIORAGES-RMR SEIGNIORAGES-DATA WORKS

2014-15 2014-15

MATERIAL RATE MATERIAL RATE WORKS

SGMETAL 0.00 METAL_D 0.00 EWBULK


SGSTONE 0.00 STONE_D 0.00 EW20A
SGSAND 0.00 SAND_D 0.00 ES20B
SGEARTH 0.00 EARTH_D 0.00
SGGRAVEL 0.00 GRAVEL_D 0.00
NP3 CLASS PIPES

2014-15
Cement
Cement Content
Content rate
( kg)
( kg/ cum) DETAILS First 5 km Next 1 km
RATE
Lead Lead
6 7
360 65.844 600 mm 2099.00 89.000 4.13
360 96.156 800 mm 3447.00 119.000 4.80
360 145.008 1000 mm 5379.00 188.000 9.05
360 179.136 1200 mm 7477.00 228.000 9.85

2014-15 RATE 2007-08

or spreading @ 200 cum per hour 2575.60 2400.00


for Grading @ 100 cum per hour 3216.00 2260.00
Hydraulic Excavator 2848.00 1950.00
nd loader 1 Cum. bucket capacity 1646.00 1150.00
Tippers 5.50 cum capacity 922.00 500.00
for GSB, EARTH/ WMM rolling 2678.30 1350.00
es smooth wheeled tandem roller. 1146.70 1150.00
Water tanker 6 KL 624.00 300.00
Tractor with Rotavator 422.00 300.00
Air Compressor 250 cfm 507.50 320.00
mix plant of 60 tonne hr. capacity 1646.00 1150.00
anical broom @ 1250 Sqm./Hour 357.00 250.00
ressure distributor @1750 sqm/hr 1498.00 820.00
re distributor @ 1750 Sqm./Hour 860.00 600.00
Hot Mix Plant 120 TPH 28175.00
Hot Mix Plant 100 TPH 24171.00
Hot Mix Plant 60 TPH 21668.00
Hot Mix Plant 40 to 60 TPH 19120.00 13500.00
Sensor Paver finisher @ 100 TPH 3059.51
hanical Paver finisher @ 100 TPH 2249.00 950.00
nes for initial break down rolling 1146.70 470.00
r 8 Tones for intermediate rolling 1646.00 1350.00
Pneumatic road Roller 1283.00 900.00
es of bitumen boiler 40mm metal 209.00
GSB Plant 50 cum 1143.00 800.00
Generator 250 KVA 1850.00 1350.00
Electric generating set 125 KVA 1320.00 950.00
Generator 100 KVA 1126.00 800.00
ty for Soil, GSB, WMM, Hot mix. 922.00 7.22 Derived from previous data and 3.90
m capacity per 10 Tonnes per t.km 922.00 7.22 present rate 3.90
pactor/Power rammer/road roller 48.00 32.00
led chip spreader @ 1500 sqm/hr. 2567.00 1800.00
SDB of MOST 1994-95 page 131 ) 1268.00 1268.00
of bitumen boiler 10-12mm metal 209.00 150.00
rking Machine@ 80sqm per hour 111.00 1268.00
mpound( Item no. 353)( per Liter) 200.00
Reflectorising glass beads (Per kg) 80.30
Concrete mixer 0.4/0.28 cum 453.00 300.00
Tractor 415.00 300.00
er attachment @ 60 cum per hour 422.00 300.00

Generator set 30 KVA 861.70 540.00

ot mix Plant – 100 TPH capacity) 24171.00


BUILDINGS SSR-2014-15

MASTIC PADS
25.4 mm 991.00 BMS-W.20

12.7 mm 568.00 BMS-W.21

PAINTS 240.00

SCRAP from SCARIFYING


2014-15
LEAD NOTATION RATE
MLOAD 32.00
MUNLOAD 16.00

WORKS

RATE
CEMENT & STEEL

BASIC
CURRENT
MATERIAL PRICE
PRICE
FOR PIPES

CEMENT 4000.00 4300.00


HYSD 33000.00
MS6 41000.00 36000.00
MS 375000.00
BWIRE 70.00

2008-09

2760.00
2600.00
2250.00
1320.00
575.00
1550.00
1320.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00

15525.00

1090.00
540.00
1320.00
1035.00

920.00
1550.00
1090.00
920.00 To be Checked
4.50
4.50
40.00
2070.00
1268.00
170.00 Rate as per
local
90.00 competitive
200.00 quotations
65.00
345.00
345.00
345.00

620.00
From To Data
data Entry Entry
HMP 22.00 261.67 298.3 E/W

Crusher 22.00 261.67 298.3 Gravel

Metal/
22.00 261.67 298.3 Sand
Stone Qry

METAL LEADS & RATES SAND/ E


2014-15
From
LEAD NOTATION RATE LEAD
SSR
MLOAD 105.00
MUNLOAD 15.90
MSTACK

RIFYING
0.00 0 0.00 0.00
From
SSR 1 MT1 30.40 30.40 1
2 MT2 42.60 42.60 2
3 MT3 58.90 58.90 3
4 MT4 71.50 71.50 4
5 MT5 84.10 84.10 5
6 MT6 96.70 12.60 6-30 6
7 MT7 109.30 10.50 >30 7
8 MT8 121.90 162.00 8
9 MT9 134.50 168.00 9
10 MT10 147.10 174.00 10
11 MT11 159.70 180.00 11
12 MT12 172.30 186.00 12
13 MT13 184.90 192.00 13
14 MT14 197.50 198.00 14
15 MT15 210.10 204.00 15
16 MT16 222.70 210.00 16
17 MT17 235.30 216.00 17
18 MT18 247.90 222.00 18
19 MT19 260.50 228.00 19
20 MT20 273.10 234.00 20
21 MT21 285.70 5.7500 21
22 MT22 298.30 5.5000 22
23 MT23 310.90 5.0000 23
24 MT24 323.50 4.7500 24
25 MT25 336.10 4.5000 25
26 MT26 348.70 26
27 MT27 361.30 27
28 MT28 373.90 28
29 MT29 386.50 29
30 MT30 399.10 30
31 MT31 409.60 31
32 MT32 420.10 32
33 MT33 430.60 33
34 MT34 441.10 34
35 MT35 451.60 35
36 MT36 462.10 36
37 MT37 472.60 37
38 MT38 483.10 38
39 MT39 493.60 39
40 MT40 504.10 40
41 MT41 514.60 41
42 MT42 525.10 42
43 MT43 535.60 43
44 MT44 546.10 44
45 MT45 556.60 45
46 MT46 567.10 46
47 MT47 577.60 47
48 MT48 588.10 48
49 MT49 598.60 49
50 MT50 609.10 50
51 MT51 619.60 51
52 MT52 630.10 52
53 MT53 640.60 53
54 MT54 651.10 54
55 MT55 661.60 55
56 MT56 672.10 56
57 MT57 682.60 57
58 MT58 693.10 58
59 MT59 703.60 59
60 MT60 714.10 60
61 MT61 724.60 61
62 MT62 735.10 62
63 MT63 745.60 63
64 MT64 756.10 64
65 MT65 766.60 65
66 MT66 777.10 66
67 MT67 787.60 67
68 MT68 798.10 68
69 MT69 808.60 69
70 MT70 819.10 70
71 MT71 829.60 71
72 MT72 840.10 72
73 MT73 850.60 73
74 MT74 861.10 74
75 MT75 871.60 75
76 MT76 882.10 76
77 MT77 892.60 77
78 MT78 903.10 78
79 MT79 913.60 79
80 MT80 924.10 80
81 MT81 934.60 81
82 MT82 945.10 82
83 MT83 955.60 83
84 MT84 966.10 84
85 MT85 976.60 85

86 MT86 987.10 86

87 MT87 997.60 87

88 MT88 1008.10 88
89 MT89 1018.60 89
90 MT90 1029.10 90
91 MT91 1039.60 91
92 MT92 1050.10 92
93 MT93 1060.60 93
94 MT94 1071.10 94
95 MT95 1081.60 95
96 MT96 1092.10 96
97 MT97 1102.60 97
98 MT98 1113.10 98
99 MT99 1123.60 99
100 MT100 1134.10 100
101 MT101 1144.60 101
102 MT102 1155.10 102
103 MT103 1165.60 103
104 MT104 1176.10 104
105 MT105 1186.60 105
106 MT106 1197.10 106
107 MT107 1207.60 107
108 MT108 1218.10 108
109 MT109 1228.60 109
110 MT110 1239.10 110
111 MT111 1249.60 111
112 MT112 1260.10 112
113 MT113 1270.60 113
114 MT114 1281.10 114
115 MT115 1291.60 115
116 MT116 1302.10 116
117 MT117 1312.60 117
118 MT118 1323.10 118
119 MT119 1333.60 119
120 MT120 1344.10 120
121 MT121 1354.60 121
122 MT122 1365.10 122
123 MT123 1375.60 123
124 MT124 1386.10 124
125 MT125 1396.60 125
126 MT126 1407.10 126
127 MT127 1417.60 127
128 MT128 1428.10 128
129 MT129 1438.60 129
130 MT130 1449.10 130
131 MT131 1459.60 131
132 MT132 1470.10 132
133 MT133 1480.60 133
134 MT134 1491.10 134
135 MT135 1501.60 135
136 MT136 1512.10 136
137 MT137 1522.60 137
138 MT138 1533.10 138
139 MT139 1543.60 139
140 MT140 1554.10 140
141 MT141 1564.60 141
142 MT142 1575.10 142
143 MT143 1585.60 143
144 MT144 1596.10 144
145 MT145 1606.60 145
146 MT146 1617.10 146
147 MT147 1627.60 147
148 MT148 1638.10 148
149 MT149 1648.60 149
150 MT150 1659.10 150
151 MT151 1669.60 151
152 MT152 1680.10 152
153 MT153 1690.60 153
154 MT154 1701.10 154
155 MT155 1711.60 155
156 MT156 1722.10 156
157 MT157 1732.60 157
158 MT158 1743.10 158
159 MT159 1753.60 159
160 MT160 1764.10 160
161 MT161 1774.60 161
162 MT162 1785.10 162
163 MT163 1795.60 163
164 MT164 1806.10 164
165 MT165 1816.60 165
166 MT166 1827.10 166
167 MT167 1837.60 167
168 MT168 1848.10 168
169 MT169 1858.60 169
170 MT170 1869.10 170
171 MT171 1879.60 171
172 MT172 1890.10 172
173 MT173 1900.60 173
174 MT174 1911.10 174
175 MT175 1921.60 175
176 MT176 1932.10 176
177 MT177 1942.60 177
178 MT178 1953.10 178
179 MT179 1963.60 179
180 MT180 1974.10 180
181 MT181 1984.60 181
182 MT182 1995.10 182
183 MT183 2005.60 183
184 MT184 2016.10 184
185 MT185 2026.60 185
186 MT186 2037.10 186
187 MT187 2047.60 187
188 MT188 2058.10 188
189 MT189 2068.60 189
190 MT190 2079.10 190
191 MT191 2089.60 191
192 MT192 2100.10 192
193 MT193 2110.60 193
194 MT194 2121.10 194
195 MT195 2131.60 195
196 MT196 2142.10 196
197 MT197 2152.60 197
198 MT198 2163.10 198
199 MT199 2173.60 199
200 MT200 2184.10 200
201 MT201 2194.60 201
202 MT202 2205.10 202
203 MT203 2215.60 203
204 MT204 2226.10 204
205 MT205 2236.60 205
206 MT206 2247.10 206
207 MT207 2257.60 207
208 MT208 2268.10 208
209 MT209 2278.60 209
210 MT210 2289.10 210
211 MT211 2299.60 211
212 MT212 2310.10 212
213 MT213 2320.60 213
214 MT214 2331.10 214
215 MT215 2341.60 215
216 MT216 2352.10 216
217 MT217 2362.60 217
218 MT218 2373.10 218
219 MT219 2383.60 219
220 MT220 2394.10 220
221 MT221 2404.60 221
222 MT222 2415.10 222
223 MT223 2425.60 223
224 MT224 2436.10 224
225 MT225 2446.60 225
226 MT226 2457.10 226
227 MT227 2467.60 227
228 MT228 2478.10 228
229 MT229 2488.60 229
230 MT230 2499.10 230
231 MT231 2509.60 231
232 MT232 2520.10 232
233 MT233 2530.60 233
234 MT234 2541.10 234
235 MT235 2551.60 235
236 MT236 2562.10 236
237 MT237 2572.60 237
238 MT238 2583.10 238
239 MT239 2593.60 239
240 MT240 2604.10 240
241 MT241 2614.60 241
242 MT242 2625.10 242
243 MT243 2635.60 243
244 MT244 2646.10 244
245 MT245 2656.60 245
246 MT246 2667.10 246
247 MT247 2677.60 247
248 MT248 2688.10 248
249 MT249 2698.60 249
250 MT250 2709.10 250
251 MT251 2719.60 251
252 MT252 2730.10 252
253 MT253 2740.60 253
254 MT254 2751.10 254
255 MT255 2761.60 255
256 MT256 2772.10 256
257 MT257 2782.60 257
258 MT258 2793.10 258
259 MT259 2803.60 259
260 MT260 2814.10 260
261 MT261 2824.60 261
262 MT262 2835.10 262
263 MT263 2845.60 263
264 MT264 2856.10 264
265 MT265 2866.60 265
266 MT266 2877.10 266
267 MT267 2887.60 267
268 MT268 2898.10 268
269 MT269 2908.60 269
270 MT270 2919.10 270
271 MT271 2929.60 271
272 MT272 2940.10 272
273 MT273 2950.60 273
274 MT274 2961.10 274
275 MT275 2971.60 275
276 MT276 2982.10 276
277 MT277 2992.60 277
278 MT278 3003.10 278
279 MT279 3013.60 279
280 MT280 3024.10 280
281 MT281 3034.60 281
282 MT282 3045.10 282
283 MT283 3055.60 283
284 MT284 3066.10 284
285 MT285 3076.60 285
286 MT286 3087.10 286
287 MT287 3097.60 287
288 MT288 3108.10 288
289 MT289 3118.60 289
290 MT290 3129.10 290
291 MT291 3139.60 291
292 MT292 3150.10 292
293 MT293 3160.60 293
294 MT294 3171.10 294
295 MT295 3181.60 295
296 MT296 3192.10 296
297 MT297 3202.60 297
298 MT298 3213.10 298
299 MT299 3223.60 299
300 MT300 3234.10 300
301 MT301 3244.60 301
302 MT302 3255.10 302
303 MT303 3265.60 303
304 MT304 3276.10 304
305 MT305 3286.60 305
306 MT306 3297.10 306
307 MT307 3307.60 307
308 MT308 3318.10 308
309 MT309 3328.60 309
310 MT310 3339.10 310
311 MT311 3349.60 311
312 MT312 3360.10 312
313 MT313 3370.60 313
314 MT314 3381.10 314
315 MT315 3391.60 315
316 MT316 3402.10 316
317 MT317 3412.60 317
318 MT318 3423.10 318
319 MT319 3433.60 319
320 MT320 3444.10 320
321 MT321 3454.60 321
322 MT322 3465.10 322
323 MT323 3475.60 323
324 MT324 3486.10 324
325 MT325 3496.60 325
326 MT326 3507.10 326
327 MT327 3517.60 327
328 MT328 3528.10 328
329 MT329 3538.60 329
330 MT330 3549.10 330
331 MT331 3559.60 331
332 MT332 3570.10 332
333 MT333 3580.60 333
334 MT334 3591.10 334
335 MT335 3601.60 335
336 MT336 3612.10 336
337 MT337 3622.60 337
338 MT338 3633.10 338
339 MT339 3643.60 339
340 MT340 3654.10 340
341 MT341 3664.60 341
342 MT342 3675.10 342
343 MT343 3685.60 343
344 MT344 3696.10 344
345 MT345 3706.60 345
346 MT346 3717.10 346
347 MT347 3727.60 347
348 MT348 3738.10 348
349 MT349 3748.60 349
350 MT350 3759.10 350
351 MT351 3769.60 351
352 MT352 3780.10 352
353 MT353 3790.60 353
354 MT354 3801.10 354
355 MT355 3811.60 355
356 MT356 3822.10 356
357 MT357 3832.60 357
358 MT358 3843.10 358
359 MT359 3853.60 359
360 MT360 3864.10 360
361 MT361 3874.60 361
362 MT362 3885.10 362
363 MT363 3895.60 363
364 MT364 3906.10 364
365 MT365 3916.60 365
366 MT366 3927.10 366
367 MT367 3937.60 367
368 MT368 3948.10 368
369 MT369 3958.60 369
370 MT370 3969.10 370
371 MT371 3979.60 371
372 MT372 3990.10 372
373 MT373 4000.60 373
374 MT374 4011.10 374
375 MT375 4021.60 375
376 MT376 4032.10 376
377 MT377 4042.60 377
378 MT378 4053.10 378
379 MT379 4063.60 379
380 MT380 4074.10 380
381 MT381 4084.60 381
382 MT382 4095.10 382
383 MT383 4105.60 383
384 MT384 4116.10 384
385 MT385 4126.60 385
386 MT386 4137.10 386
387 MT387 4147.60 387
388 MT388 4158.10 388
389 MT389 4168.60 389
390 MT390 4179.10 390
391 MT391 4189.60 391
392 MT392 4200.10 392
393 MT393 4210.60 393
394 MT394 4221.10 394
395 MT395 4231.60 395
396 MT396 4242.10 396
397 MT397 4252.60 397
398 MT398 4263.10 398
399 MT399 4273.60 399
400 MT400 4284.10 400
401 MT401 4294.60 401
402 MT402 4305.10 402
403 MT403 4315.60 403
404 MT404 4326.10 404
405 MT405 4336.60 405
406 MT406 4347.10 406
407 MT407 4357.60 407
408 MT408 4368.10 408
409 MT409 4378.60 409
410 MT410 4389.10 410
411 MT411 4399.60 411
412 MT412 4410.10 412
413 MT413 4420.60 413
414 MT414 4431.10 414
415 MT415 4441.60 415
416 MT416 4452.10 416
417 MT417 4462.60 417
418 MT418 4473.10 418
419 MT419 4483.60 419
420 MT420 4494.10 420
421 MT421 4504.60 421
422 MT422 4515.10 422
423 MT423 4525.60 423
424 MT424 4536.10 424
425 MT425 4546.60 425
426 MT426 4557.10 426
427 MT427 4567.60 427
428 MT428 4578.10 428
429 MT429 4588.60 429
430 MT430 4599.10 430
431 MT431 4609.60 431
432 MT432 4620.10 432
433 MT433 4630.60 433
434 MT434 4641.10 434
435 MT435 4651.60 435
436 MT436 4662.10 436
437 MT437 4672.60 437
438 MT438 4683.10 438
439 MT439 4693.60 439
440 MT440 4704.10 440
441 MT441 4714.60 441
442 MT442 4725.10 442
443 MT443 4735.60 443
444 MT444 4746.10 444
445 MT445 4756.60 445
446 MT446 4767.10 446
447 MT447 4777.60 447
448 MT448 4788.10 448
449 MT449 4798.60 449
450 MT450 4809.10 450
451 MT451 4819.60 451
452 MT452 4830.10 452
453 MT453 4840.60 453
454 MT454 4851.10 454
455 MT455 4861.60 455
456 MT456 4872.10 456
457 MT457 4882.60 457
458 MT458 4893.10 458
459 MT459 4903.60 459
460 MT460 4914.10 460
461 MT461 4924.60 461
462 MT462 4935.10 462
463 MT463 4945.60 463
464 MT464 4956.10 464
465 MT465 4966.60 465
466 MT466 4977.10 466
467 MT467 4987.60 467
468 MT468 4998.10 468
469 MT469 5008.60 469
470 MT470 5019.10 470
471 MT471 5029.60 471
472 MT472 5040.10 472
473 MT473 5050.60 473
474 MT474 5061.10 474
475 MT475 5071.60 475
476 MT476 5082.10 476
477 MT477 5092.60 477
478 MT478 5103.10 478
479 MT479 5113.60 479
480 MT480 5124.10 480
481 MT481 5134.60 481
482 MT482 5145.10 482
483 MT483 5155.60 483
484 MT484 5166.10 484
485 MT485 5176.60 485
486 MT486 5187.10 486
487 MT487 5197.60 487
488 MT488 5208.10 488
489 MT489 5218.60 489
490 MT490 5229.10 490
491 MT491 5239.60 491
492 MT492 5250.10 492
493 MT493 5260.60 493
494 MT494 5271.10 494
495 MT495 5281.60 495
496 MT496 5292.10 496
497 MT497 5302.60 497
498 MT498 5313.10 498
499 MT499 5323.60 499
500 MT500 5334.10 500
From To Data
data Entry Entry
5.00 73.77 84.1 METAL L

5.00 73.77 84.1

18.00 217.46 247.9 LEAD

SAND/ EARTH LEADS & RATES


2014-15
From
NOTATION RATE 0.00
SSR
SLOAD 52.50 0.25
SUNLOAD 15.90 0.50
SSTACK 1
2
3
0 0.00 4
SD1 31.50 31.50 5
SD2 44.10 44.10 6
SD3 58.90 58.90 7
SD4 71.50 71.50 8
SD5 84.10 84.10 9
SD6 96.70 12.60 6-30 10
SD7 109.30 10.50 >30 11
SD8 121.90 12
SD9 134.50 13
SD10 147.10 14
SD11 159.70 15
SD12 172.30 16
SD13 184.90 17
SD14 197.50 18
SD15 210.10 19
SD16 222.70 20
SD17 235.30 21
SD18 247.90 22
SD19 260.50 23
SD20 273.10 24
SD21 285.70 25
SD22 298.30 26
SD23 310.90 27
SD24 323.50 28
SD25 336.10 29
SD26 348.70 30
SD27 361.30 31
SD28 373.90 32
SD29 386.50 33
SD30 399.10 34
SD31 409.60 35
SD32 420.10 36
SD33 430.60 37
SD34 441.10 38
SD35 451.60 39
SD36 462.10 40
SD37 472.60 41
SD38 483.10 42
SD39 493.60 43
SD40 504.10 44
SD41 514.60 45
SD42 525.10 46
SD43 535.60 47
SD44 546.10 48
SD45 556.60 49
SD46 567.10 50
SD47 577.60 51
SD48 588.10 52
SD49 598.60 53
SD50 609.10 54
SD51 619.60 55
SD52 630.10 56
SD53 640.60 57
SD54 651.10 58
SD55 661.60 59
SD56 672.10 60
SD57 682.60 61
SD58 693.10 62
SD59 703.60 63
SD60 714.10 64
SD61 724.60 65
SD62 735.10 66
SD63 745.60 67
SD64 756.10 68
SD65 766.60 69
SD66 777.10 70
SD67 787.60 71
SD68 798.10 72
SD69 808.60 73
SD70 819.10 74
SD71 829.60 75
SD72 840.10 76
SD73 850.60 77
SD74 861.10 78
SD75 871.60 79
SD76 882.10 80
SD77 892.60 81
SD78 903.10 82
SD79 913.60 83
SD80 924.10 84
SD81 934.60 85
SD82 945.10 86
SD83 955.60 87
SD84 966.10 88
SD85 976.60 89

SD86 987.10 90

SD87 997.60 91

SD88 1008.10 92
SD89 1018.60 93
SD90 1029.10 94
SD91 1039.60 95
SD92 1050.10 96
SD93 1060.60 97
SD94 1071.10 98
SD95 1081.60 99
SD96 1092.10 100
SD97 1102.60 101
SD98 1113.10 102
SD99 1123.60 103
SD100 1134.10 104
SD101 1144.60 105
SD102 1155.10 106
SD103 1165.60 107
SD104 1176.10 108
SD105 1186.60 109
SD106 1197.10 110
SD107 1207.60 111
SD108 1218.10 112
SD109 1228.60 113
SD110 1239.10 114
SD111 1249.60 115
SD112 1260.10 116
SD113 1270.60 117
SD114 1281.10 118
SD115 1291.60 119
SD116 1302.10 120
SD117 1312.60 121
SD118 1323.10 122
SD119 1333.60 123
SD120 1344.10 124
SD121 1354.60 125
SD122 1365.10 126
SD123 1375.60 127
SD124 1386.10 128
SD125 1396.60 129
SD126 1407.10 130
SD127 1417.60 131
SD128 1428.10 132
SD129 1438.60 133
SD130 1449.10 134
SD131 1459.60 135
SD132 1470.10 136
SD133 1480.60 137
SD134 1491.10 138
SD135 1501.60 139
SD136 1512.10 140
SD137 1522.60 141
SD138 1533.10 142
SD139 1543.60 143
SD140 1554.10 144
SD141 1564.60 145
SD142 1575.10 146
SD143 1585.60 147
SD144 1596.10 148
SD145 1606.60 149
SD146 1617.10 150
SD147 1627.60 151
SD148 1638.10 152
SD149 1648.60 153
SD150 1659.10 154
SD151 1669.60 155
SD152 1680.10 156
SD153 1690.60 157
SD154 1701.10 158
SD155 1711.60 159
SD156 1722.10 160
SD157 1732.60 161
SD158 1743.10 162
SD159 1753.60 163
SD160 1764.10 164
SD161 1774.60 165
SD162 1785.10 166
SD163 1795.60 167
SD164 1806.10 168
SD165 1816.60 169
SD166 1827.10 170
SD167 1837.60 171
SD168 1848.10 172
SD169 1858.60 173
SD170 1869.10 174
SD171 1879.60 175
SD172 1890.10 176
SD173 1900.60 177
SD174 1911.10 178
SD175 1921.60 179
SD176 1932.10 180
SD177 1942.60 181
SD178 1953.10 182
SD179 1963.60 183
SD180 1974.10 184
SD181 1984.60 185
SD182 1995.10 186
SD183 2005.60 187
SD184 2016.10 188
SD185 2026.60 189
SD186 2037.10 190
SD187 2047.60 191
SD188 2058.10 192
SD189 2068.60 193
SD190 2079.10 194
SD191 2089.60 195
SD192 2100.10 196
SD193 2110.60 197
SD194 2121.10 198
SD195 2131.60 199
SD196 2142.10 200
SD197 2152.60 201
SD198 2163.10 202
SD199 2173.60 203
SD200 2184.10 204
SD201 2194.60 205
SD202 2205.10 206
SD203 2215.60 207
SD204 2226.10 208
SD205 2236.60 209
SD206 2247.10 210
SD207 2257.60 211
SD208 2268.10 212
SD209 2278.60 213
SD210 2289.10 214
SD211 2299.60 215
SD212 2310.10 216
SD213 2320.60 217
SD214 2331.10 218
SD215 2341.60 219
SD216 2352.10 220
SD217 2362.60 221
SD218 2373.10 222
SD219 2383.60 223
SD220 2394.10 224
SD221 2404.60 225
SD222 2415.10 226
SD223 2425.60 227
SD224 2436.10 228
SD225 2446.60 229
SD226 2457.10 230
SD227 2467.60 231
SD228 2478.10 232
SD229 2488.60 233
SD230 2499.10 234
SD231 2509.60 235
SD232 2520.10 236
SD233 2530.60 237
SD234 2541.10 238
SD235 2551.60 239
SD236 2562.10 240
SD237 2572.60 241
SD238 2583.10 242
SD239 2593.60 243
SD240 2604.10 244
SD241 2614.60 245
SD242 2625.10 246
SD243 2635.60 247
SD244 2646.10 248
SD245 2656.60 249
SD246 2667.10 250
SD247 2677.60 251
SD248 2688.10 252
SD249 2698.60 253
SD250 2709.10 254
SD251 2719.60 255
SD252 2730.10 256
SD253 2740.60 257
SD254 2751.10 258
SD255 2761.60 259
SD256 2772.10 260
SD257 2782.60 261
SD258 2793.10 262
SD259 2803.60 263
SD260 2814.10 264
SD261 2824.60 265
SD262 2835.10 266
SD263 2845.60 267
SD264 2856.10 268
SD265 2866.60 269
SD266 2877.10 270
SD267 2887.60 271
SD268 2898.10 272
SD269 2908.60 273
SD270 2919.10 274
SD271 2929.60 275
SD272 2940.10 276
SD273 2950.60 277
SD274 2961.10 278
SD275 2971.60 279
SD276 2982.10 280
SD277 2992.60 281
SD278 3003.10 282
SD279 3013.60 283
SD280 3024.10 284
SD281 3034.60 285
SD282 3045.10 286
SD283 3055.60 287
SD284 3066.10 288
SD285 3076.60 289
SD286 3087.10 290
SD287 3097.60 291
SD288 3108.10 292
SD289 3118.60 293
SD290 3129.10 294
SD291 3139.60 295
SD292 3150.10 296
SD293 3160.60 297
SD294 3171.10 298
SD295 3181.60 299
SD296 3192.10 300
SD297 3202.60
SD298 3213.10
SD299 3223.60
SD300 3234.10
SD301 3244.60
SD302 3255.10
SD303 3265.60
SD304 3276.10
SD305 3286.60
SD306 3297.10
SD307 3307.60
SD308 3318.10
SD309 3328.60
SD310 3339.10
SD311 3349.60
SD312 3360.10
SD313 3370.60
SD314 3381.10
SD315 3391.60
SD316 3402.10
SD317 3412.60
SD318 3423.10
SD319 3433.60
SD320 3444.10
SD321 3454.60
SD322 3465.10
SD323 3475.60
SD324 3486.10
SD325 3496.60
SD326 3507.10
SD327 3517.60
SD328 3528.10
SD329 3538.60
SD330 3549.10
SD331 3559.60
SD332 3570.10
SD333 3580.60
SD334 3591.10
SD335 3601.60
SD336 3612.10
SD337 3622.60
SD338 3633.10
SD339 3643.60
SD340 3654.10
SD341 3664.60
SD342 3675.10
SD343 3685.60
SD344 3696.10
SD345 3706.60
SD346 3717.10
SD347 3727.60
SD348 3738.10
SD349 3748.60
SD350 3759.10
SD351 3769.60
SD352 3780.10
SD353 3790.60
SD354 3801.10
SD355 3811.60
SD356 3822.10
SD357 3832.60
SD358 3843.10
SD359 3853.60
SD360 3864.10
SD361 3874.60
SD362 3885.10
SD363 3895.60
SD364 3906.10
SD365 3916.60
SD366 3927.10
SD367 3937.60
SD368 3948.10
SD369 3958.60
SD370 3969.10
SD371 3979.60
SD372 3990.10
SD373 4000.60
SD374 4011.10
SD375 4021.60
SD376 4032.10
SD377 4042.60
SD378 4053.10
SD379 4063.60
SD380 4074.10
SD381 4084.60
SD382 4095.10
SD383 4105.60
SD384 4116.10
SD385 4126.60
SD386 4137.10
SD387 4147.60
SD388 4158.10
SD389 4168.60
SD390 4179.10
SD391 4189.60
SD392 4200.10
SD393 4210.60
SD394 4221.10
SD395 4231.60
SD396 4242.10
SD397 4252.60
SD398 4263.10
SD399 4273.60
SD400 4284.10
SD401 4294.60
SD402 4305.10
SD403 4315.60
SD404 4326.10
SD405 4336.60
SD406 4347.10
SD407 4357.60
SD408 4368.10
SD409 4378.60
SD410 4389.10
SD411 4399.60
SD412 4410.10
SD413 4420.60
SD414 4431.10
SD415 4441.60
SD416 4452.10
SD417 4462.60
SD418 4473.10
SD419 4483.60
SD420 4494.10
SD421 4504.60
SD422 4515.10
SD423 4525.60
SD424 4536.10
SD425 4546.60
SD426 4557.10
SD427 4567.60
SD428 4578.10
SD429 4588.60
SD430 4599.10
SD431 4609.60
SD432 4620.10
SD433 4630.60
SD434 4641.10
SD435 4651.60
SD436 4662.10
SD437 4672.60
SD438 4683.10
SD439 4693.60
SD440 4704.10
SD441 4714.60
SD442 4725.10
SD443 4735.60
SD444 4746.10
SD445 4756.60
SD446 4767.10
SD447 4777.60
SD448 4788.10
SD449 4798.60
SD450 4809.10
SD451 4819.60
SD452 4830.10
SD453 4840.60
SD454 4851.10
SD455 4861.60
SD456 4872.10
SD457 4882.60
SD458 4893.10
SD459 4903.60
SD460 4914.10
SD461 4924.60
SD462 4935.10
SD463 4945.60
SD464 4956.10
SD465 4966.60
SD466 4977.10
SD467 4987.60
SD468 4998.10
SD469 5008.60
SD470 5019.10
SD471 5029.60
SD472 5040.10
SD473 5050.60
SD474 5061.10
SD475 5071.60
SD476 5082.10
SD477 5092.60
SD478 5103.10
SD479 5113.60
SD480 5124.10
SD481 5134.60
SD482 5145.10
SD483 5155.60
SD484 5166.10
SD485 5176.60
SD486 5187.10
SD487 5197.60
SD488 5208.10
SD489 5218.60
SD490 5229.10
SD491 5239.60
SD492 5250.10
SD493 5260.60
SD494 5271.10
SD495 5281.60
SD496 5292.10
SD497 5302.60
SD498 5313.10
SD499 5323.60
SD500 5334.10
METAL LEADS & RATES SAND/ EARTH LEADS & RATES

2008-09 2008-09

From From
NOTATION RATE LEAD NOTATION RATE
SSR SSR
MLOAD 12.80 12.80 SLOAD 10.00 10.00
MUNLOAD 8.70 8.70 SUNLOAD 8.50 8.50
MSTACK 8.70 8.70 SSTACK 5.50 5.50
0.00 0 0.00
110.00 0.25 SD250 50.00 50.00
MT500 110.00 110.00 0.50 SD500 75.00 75.00
MT1 120.00 120.00 1 SD1 100.00 100.00
MT2 126.00 126.00 2 SD2 106.00 106.00
MT3 132.00 132.00 3 SD3 112.00 112.00
MT4 138.00 138.00 4 SD4 118.00 118.00
MT5 144.00 144.00 5 SD5 124.00 124.00
MT6 150.00 150.00 6 SD6 130.00 130.00
MT7 156.00 156.00 7 SD7 136.00 136.00
MT8 162.00 162.00 8 SD8 142.00 142.00
MT9 168.00 168.00 9 SD9 148.00 148.00
MT10 174.00 174.00 10 SD10 154.00 154.00
MT11 180.00 180.00 11 SD11 160.00 160.00
MT12 186.00 186.00 12 SD12 166.00 166.00
MT13 192.00 192.00 13 SD13 172.00 172.00
MT14 198.00 198.00 14 SD14 178.00 178.00
MT15 204.00 204.00 15 SD15 184.00 184.00
MT16 210.00 210.00 16 SD16 190.00 190.00
MT17 216.00 216.00 17 SD17 196.00 196.00
MT18 222.00 222.00 18 SD18 202.00 202.00
MT19 228.00 228.00 19 SD19 208.00 208.00
MT20 234.00 234.00 20 SD20 214.00 214.00
MT21 239.75 5.7500 21 SD21 219.00 5.0000
MT22 245.50 5.5000 22 SD22 224.00 4.8000
MT23 251.25 5.0000 23 SD23 229.00 4.6000
MT24 257.00 4.7500 24 SD24 234.00 4.4000
MT25 262.75 4.5000 25 SD25 239.00 4.2000
MT26 268.50 26 SD26 244.00
MT27 274.25 27 SD27 249.00
MT28 280.00 28 SD28 254.00
MT29 285.75 29 SD29 259.00
MT30 291.50 30 SD30 264.00
MT31 297.00 31 SD31 268.80
MT32 302.50 32 SD32 273.60
MT33 308.00 33 SD33 278.40
MT34 313.50 34 SD34 283.20
MT35 319.00 35 SD35 288.00
MT36 324.50 36 SD36 292.80
MT37 330.00 37 SD37 297.60
MT38 335.50 38 SD38 302.40
MT39 341.00 39 SD39 307.20
MT40 346.50 40 SD40 312.00
MT41 352.00 41 SD41 316.80
MT42 357.50 42 SD42 321.60
MT43 363.00 43 SD43 326.40
MT44 368.50 44 SD44 331.20
MT45 374.00 45 SD45 336.00
MT46 379.50 46 SD46 340.80
MT47 385.00 47 SD47 345.60
MT48 390.50 48 SD48 350.40
MT49 396.00 49 SD49 355.20
MT50 401.50 50 SD50 360.00
MT51 406.50 51 SD51 364.60
MT52 411.50 52 SD52 369.20
MT53 416.50 53 SD53 373.80
MT54 421.50 54 SD54 378.40
MT55 426.50 55 SD55 383.00
MT56 431.50 56 SD56 387.60
MT57 436.50 57 SD57 392.20
MT58 441.50 58 SD58 396.80
MT59 446.50 59 SD59 401.40
MT60 451.50 60 SD60 406.00
MT61 456.50 61 SD61 410.60
MT62 461.50 62 SD62 415.20
MT63 466.50 63 SD63 419.80
MT64 471.50 64 SD64 424.40
MT65 476.50 65 SD65 429.00
MT66 481.50 66 SD66 433.60
MT67 486.50 67 SD67 438.20
MT68 491.50 68 SD68 442.80
MT69 496.50 69 SD69 447.40
MT70 501.50 70 SD70 452.00
MT71 506.50 71 SD71 456.60
MT72 511.50 72 SD72 461.20
MT73 516.50 73 SD73 465.80
MT74 521.50 74 SD74 470.40
MT75 526.50 75 SD75 475.00
MT76 531.50 76 SD76 479.60
MT77 536.50 77 SD77 484.20
MT78 541.50 78 SD78 488.80
MT79 546.50 79 SD79 493.40
MT80 551.50 80 SD80 498.00
MT81 556.25 81 SD81 502.40
MT82 561.00 82 SD82 506.80
MT83 565.75 83 SD83 511.20
MT84 570.50 84 SD84 515.60
MT85 575.25 85 SD85 520.00
MT86 580.00 86 SD86 524.40
MT87 584.75 87 SD87 528.80
MT88 589.50 88 SD88 533.20
MT89 594.25 89 SD89 537.60

MT90 599.00 90 SD90 542.00

MT91 603.75 91 SD91 546.40

MT92 608.50 92 SD92 550.80


MT93 613.25 93 SD93 555.20
MT94 618.00 94 SD94 559.60

MT95 622.75 95 SD95 564.00

MT96 627.50 96 SD96 568.40

MT97 632.25 97 SD97 572.80

MT98 637.00 98 SD98 577.20

MT99 641.75 99 SD99 581.60

MT100 646.50 100 SD100 586.00


MT101 651.00 101 SD101 590.20
MT102 655.50 102 SD102 594.40
MT103 660.00 103 SD103 598.60
MT104 664.50 104 SD104 602.80
MT105 669.00 105 SD105 607.00
MT106 673.50 106 SD106 611.20
MT107 678.00 107 SD107 615.40
MT108 682.50 108 SD108 619.60
MT109 687.00 109 SD109 623.80
MT110 691.50 110 SD110 628.00
MT111 696.00 111 SD111 632.20
MT112 700.50 112 SD112 636.40
MT113 705.00 113 SD113 640.60
MT114 709.50 114 SD114 644.80
MT115 714.00 115 SD115 649.00
MT116 718.50 116 SD116 653.20
MT117 723.00 117 SD117 657.40
MT118 727.50 118 SD118 661.60
MT119 732.00 119 SD119 665.80
MT120 736.50 120 SD120 670.00
MT121 741.00 121 SD121 674.20
MT122 745.50 122 SD122 678.40
MT123 750.00 123 SD123 682.60
MT124 754.50 124 SD124 686.80
MT125 759.00 125 SD125 691.00
MT126 763.50 126 SD126 695.20
MT127 768.00 127 SD127 699.40
MT128 772.50 128 SD128 703.60
MT129 777.00 129 SD129 707.80
MT130 781.50 130 SD130 712.00
MT131 786.00 131 SD131 716.20
MT132 790.50 132 SD132 720.40
MT133 795.00 133 SD133 724.60
MT134 799.50 134 SD134 728.80
MT135 804.00 135 SD135 733.00
MT136 808.50 136 SD136 737.20
MT137 813.00 137 SD137 741.40
MT138 817.50 138 SD138 745.60
MT139 822.00 139 SD139 749.80
MT140 826.50 140 SD140 754.00
MT141 831.00 141 SD141 758.20
MT142 835.50 142 SD142 762.40
MT143 840.00 143 SD143 766.60
MT144 844.50 144 SD144 770.80
MT145 849.00 145 SD145 775.00
MT146 853.50 146 SD146 779.20
MT147 858.00 147 SD147 783.40
MT148 862.50 148 SD148 787.60
MT149 867.00 149 SD149 791.80
MT150 871.50 150 SD150 796.00
MT151 876.00 151 SD151 800.20
MT152 880.50 152 SD152 804.40
MT153 885.00 153 SD153 808.60
MT154 889.50 154 SD154 812.80
MT155 894.00 155 SD155 817.00
MT156 898.50 156 SD156 821.20
MT157 903.00 157 SD157 825.40
MT158 907.50 158 SD158 829.60
MT159 912.00 159 SD159 833.80
MT160 916.50 160 SD160 838.00
MT161 921.00 161 SD161 842.20
MT162 925.50 162 SD162 846.40
MT163 930.00 163 SD163 850.60
MT164 934.50 164 SD164 854.80
MT165 939.00 165 SD165 859.00
MT166 943.50 166 SD166 863.20
MT167 948.00 167 SD167 867.40
MT168 952.50 168 SD168 871.60
MT169 957.00 169 SD169 875.80
MT170 961.50 170 SD170 880.00
MT171 966.00 171 SD171 884.20
MT172 970.50 172 SD172 888.40
MT173 975.00 173 SD173 892.60
MT174 979.50 174 SD174 896.80
MT175 984.00 175 SD175 901.00
MT176 988.50 176 SD176 905.20
MT177 993.00 177 SD177 909.40
MT178 997.50 178 SD178 913.60
MT179 1002.00 179 SD179 917.80
MT180 1006.50 180 SD180 922.00
MT181 1011.00 181 SD181 926.20
MT182 1015.50 182 SD182 930.40
MT183 1020.00 183 SD183 934.60
MT184 1024.50 184 SD184 938.80
MT185 1029.00 185 SD185 943.00
MT186 1033.50 186 SD186 947.20
MT187 1038.00 187 SD187 951.40
MT188 1042.50 188 SD188 955.60
MT189 1047.00 189 SD189 959.80
MT190 1051.50 190 SD190 964.00
MT191 1056.00 191 SD191 968.20
MT192 1060.50 192 SD192 972.40
MT193 1065.00 193 SD193 976.60
MT194 1069.50 194 SD194 980.80
MT195 1074.00 195 SD195 985.00
MT196 1078.50 196 SD196 989.20
MT197 1083.00 197 SD197 993.40
MT198 1087.50 198 SD198 997.60
MT199 1092.00 199 SD199 1001.80
MT200 1096.50 200 SD200 1006.00
MT201 1101.00 201 SD201 1010.20
MT202 1105.50 202 SD202 1014.40
MT203 1110.00 203 SD203 1018.60
MT204 1114.50 204 SD204 1022.80
MT205 1119.00 205 SD205 1027.00
MT206 1123.50 206 SD206 1031.20
MT207 1128.00 207 SD207 1035.40
MT208 1132.50 208 SD208 1039.60
MT209 1137.00 209 SD209 1043.80
MT210 1141.50 210 SD210 1048.00
MT211 1146.00 211 SD211 1052.20
MT212 1150.50 212 SD212 1056.40
MT213 1155.00 213 SD213 1060.60
MT214 1159.50 214 SD214 1064.80
MT215 1164.00 215 SD215 1069.00
MT216 1168.50 216 SD216 1073.20
MT217 1173.00 217 SD217 1077.40
MT218 1177.50 218 SD218 1081.60
MT219 1182.00 219 SD219 1085.80
MT220 1186.50 220 SD220 1090.00
MT221 1191.00 221 SD221 1094.20
MT222 1195.50 222 SD222 1098.40
MT223 1200.00 223 SD223 1102.60
MT224 1204.50 224 SD224 1106.80
MT225 1209.00 225 SD225 1111.00
MT226 1213.50 226 SD226 1115.20
MT227 1218.00 227 SD227 1119.40
MT228 1222.50 228 SD228 1123.60
MT229 1227.00 229 SD229 1127.80
MT230 1231.50 230 SD230 1132.00
MT231 1236.00 231 SD231 1136.20
MT232 1240.50 232 SD232 1140.40
MT233 1245.00 233 SD233 1144.60
MT234 1249.50 234 SD234 1148.80
MT235 1254.00 235 SD235 1153.00
MT236 1258.50 236 SD236 1157.20
MT237 1263.00 237 SD237 1161.40
MT238 1267.50 238 SD238 1165.60
MT239 1272.00 239 SD239 1169.80
MT240 1276.50 240 SD240 1174.00
MT241 1281.00 241 SD241 1178.20
MT242 1285.50 242 SD242 1182.40
MT243 1290.00 243 SD243 1186.60
MT244 1294.50 244 SD244 1190.80
MT245 1299.00 245 SD245 1195.00
MT246 1303.50 246 SD246 1199.20
MT247 1308.00 247 SD247 1203.40
MT248 1312.50 248 SD248 1207.60
MT249 1317.00 249 SD249 1211.80
MT250 1321.50 250 SD250 1216.00
MT251 1326.00 251 SD251 1220.20
MT252 1330.50 252 SD252 1224.40
MT253 1335.00 253 SD253 1228.60
MT254 1339.50 254 SD254 1232.80
MT255 1344.00 255 SD255 1237.00
MT256 1348.50 256 SD256 1241.20
MT257 1353.00 257 SD257 1245.40
MT258 1357.50 258 SD258 1249.60
MT259 1362.00 259 SD259 1253.80
MT260 1366.50 260 SD260 1258.00
MT261 1371.00 261 SD261 1262.20
MT262 1375.50 262 SD262 1266.40
MT263 1380.00 263 SD263 1270.60
MT264 1384.50 264 SD264 1274.80
MT265 1389.00 265 SD265 1279.00
MT266 1393.50 266 SD266 1283.20
MT267 1398.00 267 SD267 1287.40
MT268 1402.50 268 SD268 1291.60
MT269 1407.00 269 SD269 1295.80
MT270 1411.50 270 SD270 1300.00
MT271 1416.00 271 SD271 1304.20
MT272 1420.50 272 SD272 1308.40
MT273 1425.00 273 SD273 1312.60
MT274 1429.50 274 SD274 1316.80
MT275 1434.00 275 SD275 1321.00
MT276 1438.50 276 SD276 1325.20
MT277 1443.00 277 SD277 1329.40
MT278 1447.50 278 SD278 1333.60
MT279 1452.00 279 SD279 1337.80
MT280 1456.50 280 SD280 1342.00
MT281 1461.00 281 SD281 1346.20
MT282 1465.50 282 SD282 1350.40
MT283 1470.00 283 SD283 1354.60
MT284 1474.50 284 SD284 1358.80
MT285 1479.00 285 SD285 1363.00
MT286 1483.50 286 SD286 1367.20
MT287 1488.00 287 SD287 1371.40
MT288 1492.50 288 SD288 1375.60
MT289 1497.00 289 SD289 1379.80
MT290 1501.50 290 SD290 1384.00
MT291 1506.00 291 SD291 1388.20
MT292 1510.50 292 SD292 1392.40
MT293 1515.00 293 SD293 1396.60
MT294 1519.50 294 SD294 1400.80
MT295 1524.00 295 SD295 1405.00
MT296 1528.50 296 SD296 1409.20
MT297 1533.00 297 SD297 1413.40
MT298 1537.50 298 SD298 1417.60
MT299 1542.00 299 SD299 1421.80
MT300 1546.50 300 SD300 1426.00

Вам также может понравиться