BTS INSPECTION REPORT - 2018

NAME OF CIRCLE KERALA


NAME OF STATION SITE ID
INSPECTED BY DATE 30-10-2018

SL
NO PARTICULARS CHECKING POINTS : OBSERVATION & ACTION TO BE TAKEN
2G Node B
1 BTS Date of commissioning 20-03-2010 21-04-2010
Nokia/Ericsson-2202-
a BTS Make & Model
2206-2964/Huawei/ZTE
ZTE ZTE
b BTS Type & Site Type INDOOR / OUTDOOR OUTDOOR OUTDOOR
BSNL/NBSNL/IP/USO NBSNL
Room / Shelter / Open
c Place of Instlln of BTS
space
Shelter shelter
ZTE Outdoor 4/4/4
Configuration degradation / upgradation
d BTS Configuration (A+B+C)
as per traffic
No change inExisting
configuration required
BTS Cabinet should be fully packed and
e BTS Cabinet there should be no entrance for entry of BTS cabilnet fully packed
rats etc to the cabinet
f Cabling & Wiring Proper & Clamps are fixed Proper and clamps are fixed
Sectro - 1
Sector - 2
g Tx Power Sector - 3
Sector - 4
Sector - 5
Sector - 1
Sector - 2
h VSWR Sector - 3
Sector - 4
Sector - 5

i DG PMI due Date

Site is shared with other


Whether the site is shared by Infra as PP , BB & DG are of sufficient
j other operators? capacity, considering total load
TSP’s.Total Load -90A,one
more 600AH required
Faulty cards lying
Reason for delay in repairing faulty cards No faulty cards lying at the
k (inside/outside the cabinet)
and to be sent for repairing
should be mentioned site
Shortage/Extra cards Reason for shortage of cards may be
l No shortage of cards
according to confgn in record mentioned
Other BTS co-located as Only ZTE 2G and Node B are
m NO WLL ,WIMAX BTS Co-located
Node-B, WLL,WiMAX co-located

2
Extended / Not External Alarms Extended Working
extended :
1 AC Main Fail YES YES
Whether all extl. Infra alarms Working / Not
a Working 2 DG on Load YES YES
are extended & working
3 BTS Battery low YES YES
4 Fuel Low
5 High Temp.
6 Cabin Door Open
7 DG Battery Low
8 Fire and Smoke
Action taken for long-pending internal
b Internal Alarms as per BSC No pending Internal Alarms
alarms may also be mentioned

3
RTT/ RTP/ GBT-NBT/BBT-Angle/Tubular
a Type of Tower & height
pipi - 3 leg/ 4 leg height
GBT/4Leg/40M
Whether tower height is sufficient in case of
b Height in case of RTT/RTP RTT/RTP due to change in height of NA
surrounding buildings
c Tower Earthing All legs are connected to earth YES
Tower aviation lamp not
Tower aviation light /
d Lightning arrestors
Working / Not Working working/lightning arresters
available
Tower legs have started rusting due to
Whether any rusting found in
e any part of tower
accumulation of sand & water in tower-legs NO
structure
f Status of tower fixtures All fixtures are proper All fixtures are Proper
Bottom-most portion of ladder to be
Bottom most ladder not
g Tower Ladder removed to avoid climbing of outsiders on
the tower removable.

h Boundary wall / fencing of Fencing is provided


tower premises
Cleanliness in the tower Tower campus should be free from burning
i campus things as grass/bushes etc
Tower campus is clean

4
a Feeder cable fixtures All fixtures are proper All fixtures are proper
Antenna height / orientation Antenna hight 36/36/38
/ tilt (sector-wise) Proper height / orientation / tilt for better Orientation 2G: 90-230-330
b coverage 3G:120-240-330
Tilt 2-2-2
Whether all Antenna fixtures
c are available & properly Yes
fixed
Platform availabilityat
d antenna(sector-wise) Yes / No Yes
location
e Media type OFC / MW / ML OFC(Direct Fibre)
f No. of E1 equipped / faulty No E1 Equipped
F(a 2G Node B Wimax WLL
Media Connectivity OF -IP
) IP IP NA NA
Platform availability for MW
g /ML
Yes / No NA
Whether media required any
change to reduce
h interruption of site due to No change is required No change is required
power supply problem at
built-up stations
5
Delta/225A/10-10-2017
PP (Make / Capacity / DOI)
a (Rjio supplied)
Module, Control panel, Mother board/back
b PP related fault
panel/BLD functioning
All functioning OK
6
Amararaja/600A/
a BB (Make/Capacity/DOI) 12-12-2014(Rjio supplied)
Swelling/leakage/break/internal short
b
BB related fault
circuit
No BB related fault
c BB Backup time 5 Hours
7
a AC(Make /Capacity /DOI) NA(OUTDOOR SITE) NA
b AC related fault NA NA
Justification for AC
c requirement
Requirement is justified or not NA
d Natural cooling status Good Good
8
a DG( Make/Capacity) EICHER-15KVA
Auto mode
Auto mode /self start/12 V DG BTY / 12 V
DG related fault
BTY CHARGER
b
1. Problem of under-voltage / over- Three phase supply
Issue related to Electric
9 voltage available. No issue related to
supply
2. 3-Phase supply availability Electric supply
RJIO: 27-04-205,
AIRTEL-2G: 19-08-2012
AIRTEL-3G: 25-05-2017
Other Operators at the Airtel/TTSL/Aircel/MTS/Idea/Vodafone/Re AIRTEL 4G:25-03-2016
10 station ( for rural area sites) liance Total Revenue from sharing
Rs 118353(Rent)
OPEX collected from sharing
TSP’s Rs22434/-

11
EMF sign boards / signage Caution and Danger boards
a 3 types of sign boards displayed properly
displayed at proper location are displayed
EMF Radiation norms
EMF Radiation norms are followed & no
followed and no issue of
issue of penalty imposed by the TERM Cell
b penalty
Contract House Keeper
12 Security Guard available
13 Tower Building & land issue Whether there is any issue related to rent? NO
14
LT site.
Voice traffic (in terms of
Average daily Voice Traffic in last six Average Voice Revenue
a Erlang or MOU) in last 6
months
Months 2G-169E 3G-25E-Total-194E perMonth-Rs 40740/-

Site is mainly for covering


Reason for low voice traffic Railway route and located in
b low populated area.
c Congestion in voice traffic NO
Average Data Revenue
perMonth-Rs 15120/-
Data traffic(in terms of Average daily Data Traffic in last six
d Gbytes) in last 6 months Months 2G-1GB 3G-35GB-Total-36GB
Total Revenue per Month
from 2g-3g services
Rs 55860/-
Reason for low Whether channels are sufficient to carry
e upload/download data speed traffic as well as for better speed
Channels are sufficient
BTS downtime in last 6
f months (in hrs)
51:52:49

g GPRS / Call testing Tested ok


Date of last drive test / Date of Drive test- 14-06-2018
h optimisation conducted w.r.t Date of optimization 16-06-
this BTS 2018
Log Book Maintained
Maintaining of various
15 registers
Inspection Register Maintained
Any Other Diesel fill Register Maintained
Last date of measurement of 07-08-2018 Earth Value =0.3
16
earth resistance & value ohm
TCH Block CDR CSSR
17
OK OK OK
Remarks / Suggestions for
improvement in services of
18 Introduction of 4G services by BSNL
this site

Particulars of Sender