Вы находитесь на странице: 1из 23

PT TIMUR BAHARI

PT TIMUR BAHARI
Construction of new breakwater
The Urgent Rehabilitation Project of Tanjung Priok Port
Sandkey dredging
Pluit City Project
Jakarta, Indonesia
Breakwater installation
The Urgent Rehabilitation Project of Tanjung Priok Port
Jakarta, Indonesia
Sandkey dredging
The Urgent Rehabilitation Project of Tanjung Priok Port
Jakarta, Indonesia
Sheet pile breakwater removal
North Kalibaru Container Terminal Phase I
Tanjung Priok, Jakarta, Indonesia
Bamboo mattress installation
The Urgent Rehabilitation Project of Tanjung Priok Port
Jakarta, Indonesia
PROJECTS UNDERTAKEN BY PT TIMUR BAHARI
No Project Name Scope of Work Project Amount Client Period
1 • Dredging Work for • Dredging of soft material Rp 5,173,415,025 PT Pembangunan 2004 - 2005
Bojonegara Port (Ph-1) • Dredging of coral and hard Perumahan
Banten, Indonesia material
• Dredging Work for
Bojonegara Port (Ph-2)
Banten, Indonesia

2 Dredging of Navigational Dredging of navigational channel Rp 13,396,189,981 PT McConnell 2005


Channel for Bengalon Port Dowell Indonesia
Development, Lubuk Tutung,
East Kalimantan

3 Dredging At Terminal Basin Dredging and chiseling work Rp 138,525,849,736 PT Saipem 2009 - 2012
Phase 3 and 4, Karimun, Indonesia
Indonesia

4 Dredging Work for Proposed Dredging of soft material Rp 23,121,359,144 PT Hutama Karya 2009 - 2010
New Jetty for PT Sarana Chiseling and dredging of hard
Citranusa Kabil, Batam material

5 Floating LNG Terminal West • Dredging work for Floating LNG Rp 68,776,000,000 Golar LNG Energy 2011 - 2012
Java – Dredging and Gravel dolphin foundation
Placement Works • Gravel placement for seabed
reinforcement of floating LNG
dolphin foundation
Sandkey dredging
Pluit City Project
Jakarta, Indonesia
PROJECTS UNDERTAKEN BY PT TIMUR BAHARI
No Project Name Scope of Work Project Amount Client Period
6 The Urgent  Demolition and excavation of existing breakwater Rp 538,000,043,100 Toyo - Adhi 2012 - 2014
Rehabilitation  Dredging for inner channel and turning basin Joint
Project of 3,000,000 mᶟ East Marine Pte Ltd: Venture
Tanjung Priok  Construction of new dam that involves : Rp 434,952,420,000
Port 1. Trench excavation
2. Driving of bamboo piles PT Timur Bahari:
3. Installation of bamboo mattress Rp 103,047,623,100
4. Placing and trimming of reuse material
5. Supply stone materials :
 Stone materials 50-100 kg Grade D
133,000 mᶟ
 Stone material 100-200 kg Grade C
27,000 mᶟ
 Stone material 250-500 kg Grade B
24,600 mᶟ
 Stone material 500-1000 kg Grade A
15,800 mᶟ
6. Placing and trimming of rubble stone
grade D
7. Placing stone grade C for foot protection
8. Placing and trimming of armour stone
grade B
9. Installation concrete block
10. Installation of coping block
11. Placing and trimming of reuse concrete
block
Sheet pile breakwater removal
North Kalibaru Container Terminal Phase I, Tanjung Priok
Jakarta, Indonesia
PROJECTS UNDERTAKEN BY PT TIMUR BAHARI
No Project Name Scope of Work Project Amount Client Period

7 North Kalibaru • Dredging trench Jetty 1A 1,200,000 mᶟ Rp 270,618,005,700 Van Oord 2013 -
Container Terminal • Dredging trench Jetty 1B 2,700,000 mᶟ Indonesia present
Phase I, Tanjung • Dredging at sheet pile area 1,700,000 mᶟ
Priok, Jakarta, • Dredging access channel 200,000 mᶟ
Indonesia • Dredging existing dam (Dam Tommy
and Dam Tengah) 700,000 mᶟ
• Sheet pile breakwater removal 3200 m
• Oil receiving jetty removal 500 m

8 Surabaya Western Dredging and chiseling Rp 27,357,120,000 Van Oord 2014 - 2015
Access Channel, Indonesia
Tanjung Perak,
Surabaya

9 Dredging of Trench for Dredging and chiseling of a trench for 16” Rp 12,894,200,000 Hafar Marine 2014
Pipeline Foundation pipeline route Pte Ltd
Tetrapod installation
The Urgent Rehabilitation Project of Tanjung Priok Port
Jakarta, Indonesia
PROJECTS UNDERTAKEN BY PT TIMUR BAHARI
No Project Name Scope of Work Project Amount Client Period

10 Pluit City : Dredging • Sand key dredging 3,000,000 mᶟ (70% Dredging Works Joint 2015 -
and Land dredging works were performed by East East Marine Pte Operation present
Ltd :
Development Marine Pte Ltd and 30% was done by PT Rp 95,592,480,480 Boskalis Van
Timur Bahari) Oord
PT Timur Bahari :
• Access channel dredging 50,000 mᶟ Rp 40,968,205,920
• Chiseling breakwater concrete slab core
BW Removal
1,200 m
Rp 23,681,797,000
• Removal of existing breakwater 1,200 m

11 Central Java 2x1000 1. Dredging Work Rp 182,511,440,200 Mitsui 2016 -


MW Coal Fired Power • Dredging at Jetty Area 540,000 mᶟ Engineering present
• Dredging at Intake Pipeline Area
Plant Project 500,000 mᶟ &
• Dredging at Outfall Pipeline Area Shipbuilding
400,000 mᶟ
• Chiseling Works
• Silt Curtain Installation

2. Pipelaying Work Rp 528,000,000,000


Dumping Activity
North Kalibaru Container Terminal Phase I
Tanjung Priok, Jakarta, Indonesia
Sandkey dredging
North Kalibaru Container Terminal Phase I
Tanjung Priok, Jakarta, Indonesia
Dredging at Coal Jetty Area
Central Java 2x1000MW Power Plant Project
Dredging at Intake Pipeline Area
Central Java 2x1000MW Power Plant Project

Вам также может понравиться