19.00 100.00 100.00 100.00 100.00 14.00 32.00 51.00 3.00 100.00 100.00 100
13.20 61.11 100.00 100.00 100.00 8.56 32.00 51.00 3.00 94.56 95.00 90
9.50 35.29 77.21 100.00 100.00 4.94 24.71 51.00 3.00 83.65 79.00 70
4.75 0.00 35.90 97.15 100.00 0.00 11.49 49.54 3.00 64.03 62.00 53
2.36 0.00 0.00 90.40 100.00 0.00 0.00 46.10 3.00 49.10 50.00 42
1.18 0.00 0.00 74.67 100.00 0.00 0.00 38.08 3.00 41.08 41.00 34
0.600 0.00 0.00 60.45 100.00 0.00 0.00 30.83 3.00 33.83 32.00 26
0.300 0.00 0.00 41.42 98.60 0.00 0.00 21.13 2.96 24.08 23.00 18
0.150 0.00 0.00 28.39 96.23 0.00 0.00 14.48 2.89 17.37 16.00 12
0.075 0.00 0.00 8.90 87.10 0.00 0.00 4.54 2.61 7.15 7.00 4
120
100
80
60
40
20
0
0.01 0.10 1.00 10.00 100.00
CONTRACTOR Rep. CONSULTANT Rep.
Designation Designation
aved shoulder configuration of Saptagram-Kalna - Katwa-Road (Section
00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Date :-21/03/2015
MORTH LIMIT
TABLE -500-17
Upper limit
100
100
88
71
58
48
38
28
20
10
19 mm to 12 mm 13.20 313.15
12 mm to 6 mm 30.18 715.77
6 mm to 0 mm 48.09 1140.77
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Ka
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRACT
West Bengal Highway Development Egis India Consulting Engineers Pvt.
2(10/40)/Gr-I KCC BUILDCON P
Corporation Limited Ltd.
MIX DESIGN SUMMARY OF BITUMINOUS CONCRETE (G-2)
A)
Aggregate Source :- Pachami Quarry Birbhum
Bitumen Source :- JaHPCL
Bitumen Grade :- VG-30 Grade as per IS: 73
B) MIX Proportion
Aggregate Size Percentage
19 mm to 12 mm mm 14.00
12 mm to 6 mm 32.00
6 mm to 0 mm 51.00
Filler (Lime) 3.00
C) Physical Characteristics of Aggregate
SL NO Description Lab Test Results Specifications
Aggregate Impact Valu (Average % ) 11.50 <24
1
Designation Designation
408.846154
paved shoulder configuration of Saptagram-Kalna - Katwa-Road
0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
KCC BUILDCON PVT. LTD.
Percentage
14.00
32.00
51.00
3.00
Specifications
<24
<35
WA (%)
1.31
As Per Specification
MORTH Table-500-11
MORTH Table-500-12
MORTH Table-500-11
MORTH Table-500-11
MORTH Table-500-11
MORTH Table-500-17
MORTH Table-500-11
MORTH Table-500-11
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of
Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District
CONTRACTOR
Sample No-1
17815
Cumulative % Passing
100.00
61.24
31.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-2
16800
Cumulative % Passing
100.00
57.25
35.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-3
15760
Cumulative % Passing
100.00
63.63
34.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
o 2 lane/2-lane with paved shoulder configuration of Saptagram-
in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Name/Signature Name/Signature
Designation Designation
e with paved shoulder configuration of Saptagram-Kalna -
gal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
n of Aggregate for BC
21.03.2015
ple No-4
13710
Cumulative % Passing
100.00
61.60
36.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ple No-5
13928
Cumulative % Passing
100.00
57.45
39.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ple No-6
16010
Cumulative % Passing
100.00
60.49
38.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
Name/Signature Name/Signature
Designation Designation
-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
ample No-7
18504
Cumulative % Passing
100.00
62.10
31.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ample No-8
18640
Cumulative % Passing
100.00
63.06
32.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ample No-9
17522
Cumulative % Passing
100.00
63.17
38.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT
Name/Signature Name/Signature
Designation Designation
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR
Sample No-1
13750
Cumulative % Passing
100.00
100.00
80.00
37.62
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-2
15380
Cumulative % Passing
100.00
100.00
70.24
34.45
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-3
14440
Cumulative % Passing
100.00
100.00
79.22
34.82
0.00
0.00
0.00
0.00
0.00
0.00
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR
Name/Signature Name/Signature
Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-4
16643
Cumulative % Passing
100.00
100.00
75.64
35.52
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-5
13550
Cumulative % Passing
100.00
100.00
77.03
37.13
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-6
14208
Cumulative % Passing
100.00
100.00
77.69
37.13
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
Name/Signature Name/Signature
Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
ample No-7
15718
Cumulative % Passing
100.00
100.00
77.83
28.76
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-8
14688
Cumulative % Passing
100.00
100.00
78.96
39.21
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-9
16544
Cumulative % Passing
100.00
100.00
78.32
38.93
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sa
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
Name/Signature Name/Signature
Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-4
1000
Cumulative % Passing
100.00
100.00
100.00
98.00
90.80
75.50
65.90
41.20
27.80
8.50
Sample No-5
1000
Cumulative % Passing
100.00
100.00
100.00
95.30
87.20
68.80
55.90
42.60
26.40
6.90
Sample No-6
1000
Cumulative % Passing
100.00
100.00
100.00
95.50
88.30
71.70
57.20
40.21
26.10
8.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
Name/Signature Name/Signature
Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-7
1000
Cumulative % Passing
100.00
100.00
100.00
97.50
90.40
73.70
59.20
39.70
27.30
9.80
Sample No-8
1000
Cumulative % Passing
100.00
100.00
100.00
94.50
87.30
73.10
59.10
40.60
31.80
9.70
Sample No-9
1000
Cumulative % Passing
100.00
100.00
100.00
97.61
93.09
70.50
57.25
40.41
27.58
8.90
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT
Sample No-1
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.56
96.40
86.20
Sample No-2
500
Cumulative %
Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.78
96.38
87.36
Sample No-3
500
Cumulative %
Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.72
96.26
87.22
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR
Name/Signature Name/Signature
Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-4
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.60
96.58
87.34
Sample No-5
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.34
96.06
87.46
Sample No-6
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.54
96.16
86.96
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
Name/Signature Name/Signature
Designation Designation
/2-lane with paved shoulder configuration of Saptagram-Kalna -
t-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-7
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.72
96.16
86.92
Sample No-8
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.50
96.06
87.02
Sample No-9
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.64
96.00
87.38
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-
Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
Passing % 19 to 12 mm Aggregate
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 61.24 57.25 63.63 61.60 57.45 60.49 62.10 63.06 63.17 61.11
9.50 31.37 35.63 34.21 36.84 39.00 38.44 31.31 32.31 38.51 35.29
4.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.600 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Passing % 12 mm to 6 mm Aggregate
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
9.50 80.00 70.24 79.22 75.64 77.03 77.69 77.83 78.96 78.32 77.21
4.75 37.62 34.45 34.82 35.52 37.13 36.65 28.76 39.21 38.93 35.90
2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.600 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Passing % 6 mm to 00 mm
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
9.50 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
4.75 98.70 98.50 98.70 98.00 95.30 95.50 97.50 94.50 97.61 97.15
2.36 92.00 91.30 93.20 90.80 87.20 88.30 90.40 87.30 93.09 90.40
1.18 81.90 81.20 75.60 75.50 68.80 71.70 73.70 73.10 70.50 74.67
0.600 66.00 59.20 64.30 65.90 55.90 57.20 59.20 59.10 57.25 60.45
0.300 44.80 42.30 41.00 41.20 42.60 40.21 39.70 40.60 40.41 41.42
0.150 31.55 28.70 28.30 27.80 26.40 26.10 27.30 31.80 27.58 28.39
0.075 10.95 9.10 7.40 8.50 6.90 8.00 9.80 9.70 9.75 8.90
Sample No-1
1000
Cumulative % Passing
100.00
100.00
100.00
98.70
92.00
81.90
66.00
44.80
31.55
10.95
Sample No-2
1000
Cumulative %
Passing
100.00
100.00
100.00
98.50
91.30
81.20
59.20
42.30
28.70
9.10
Sample No-3
1000
Cumulative %
Passing
100.00
100.00
100.00
98.70
93.20
75.60
64.30
41.00
28.30
7.40
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR
Remarks :-
Remarks :-
Type of Material :- 6 mm to 00 mm
Remarks :-
REMARKS :
Sp. Gr. of 12 mm to 6 mm, 2.746 32% Effective Sp. Gr. of aggt. Gse 2.725
Sp. Gr. of 6 mm to 0 mm 2.643 51% Bulk Sp. Gr. of total aggt. Gsb 2.683
Sr. No Mould No
Gse= (100-
Wa Pba=100 x ((
Pb)/ Pbe=Pb-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww (Wssd- Gmb Gmm Gse-Gsb )/
((100/Gmm)- (PbaxPs)/100
Ww) (GsbxGse)x Gb
(Pb/Gb))
CONTRACTOR Rep.
Name/Signature
Designation
d shoulder configuration of Saptagram-Kalna - Katwa-Road (Section of
Ch to Km 34.00 Ch (District-Hugli)
CONSULTANT CONTRACTOR
Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.
Dial Average
Voids in Mineral Voids filled with Correlatio Av. Flow
Air Voids Guage Stability (kg) Stability Flow (mm)
Aggregate Bitumen n factor (mm)
Reading (kg)
Va=100x
VMA=100- VFB= Stability =
(Gmm-
(GmbxPs )/ 100 x (VMA-Va) DGR CF ( DGR*CF*P
Gmb) /
Gsb / VMA RF)
Gmm
CONSULTANT Rep.
Name/Signature
Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of S
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-H
PACKAGE NO. CLIENT CONSULTANT
West Bengal Highway Development
2(10/40)/Gr-I Egis India Consulting Engineers Pvt. Ltd.
Corporation Limited
85.00
%of VFB
80.00
75.00
70.00
65.00
2.400
60.00
55.00
2.350 50.00
45.00
4.25 4.50 4.75 5.00 5.2
2.300
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75
% of
% of Bitumen Content
9.50 5.0
% Air Voids
Flow in mm
8.50 4.5
7.50 4.0
6.50 3.5
5.50 3.0
4.50 2.5
2.0
3.50
1.5
2.50
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75 1.0
4.25 4.50 4.75 5.00 5.2
% Of Bitumen Content
% Of B
Stability In( kn)
1200.00
17.70
% VMA
1100.00
17.20
1000.00
16.70
900.00
16.70
900.00
16.20
800.00
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75
4.25 4.50 4.75 5.00 5.
% Of Bitumen Content % of
Name/Signature Name/Signature
Designation Designation
tion of Saptagram-Kalna - Katwa-Road
District-Hugli)
CONTRACTOR
% of Bitumen Content
Max. sp.Gr.of
Bulk Sp. Avg. Sp. Effective
Weight in Weight in Weight in air Sample Effective Sp. Asphalt
% of Bitumen % of Agg Bulk Volume Gr. of Gr. Of Bitumen
air water SSD (loose) (GMM) Gravity of Mix Absorption
Specimen Specimen Content
Practical
Sr. No Mould No
Pba=100 x
Wa Gse= (100- Pbe=Pb-
(( Gse-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww (Wssd- Gmb Gmm Pb)/((100/Gmm)- (PbaxPs)/1
Gsb )/
Ww) (Pb/Gb)) 00
(GsbxGse)x Gb
1 4.73 95.27 2 1247.9 755.1 1252.4 497.3 2.509 2.498 2.610 2.825 0.592 4.166
CONTRACTOR Rep.
Name/Signature
Designation
ed shoulder configuration of Saptagram-Kalna - Katwa-Road (Section
0 Ch to Km 34.00 Ch (District-Hugli)
CONSULTANT CONTRACTOR
Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.
877
Retained stability = X 100 82.47 %
1063
CONSULTANT Rep.
Name/Signature
Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kaln
in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
2(10/40)/Gr-I West Bengal Highway Development Corporation Limited Egis India Consulting Engineers Pvt. Ltd.
Passing
Too Low
5.60 % to 6.05 %
% of Bitumen Content
Note:- As per graph all criteria belongs on Bitumen contents 5.60% to 6.05 %
Graph of Narrow range of acceptable ashpalt contents
CONSULTANT CONTRACTOR
Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.
arrow range
5.60 % To 6.50 %
5.00 % To 6.50 %
To 6.50 %
5.05% To 6.50%
6.20 6.25 6.30 6.35 6.40 6.45 6.50
Content
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-K
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
Source of Material : Pachami Quarry Birbhum West Bengal Date of Sampling : 25.03.2015
F Average 2.554
Remarks :
Name/Signature Name/Signature
Designation Designation
ane with paved shoulder configuration of Saptagram-Kalna -
engal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
25.03.2015
25.03.2015
5
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kal
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
MAXIMUM SPECIFIC GRAVITY OF BC MIX (GMM) ON @ 5.50% Bitumen Content By Vacuum Pump
Source of Material : Pachami Quarry Birbhum West Bengal Date of Sampling : 25.03.2015
Remarks :
Name/Signature Name/Signature
Designation Designation
ane with paved shoulder configuration of Saptagram-Kalna -
ngal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
25.03.2015
25.03.2015
5
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRACTOR
Description 1 2 3
Weight of aggregates(12.5mm passing and 10mm retained), (gm) A 364.6 364.1 365.2
Weight of aggregate passing 2.36 mm sieve after impact test, (gm) B 41.2 42.8 41.8
Weight of aggregate retained on 2.36 mm sieve after impact test, (gm) A-B 323.4 321.3 323.4
Remarks:
63 0 0 0 0
50 0 0 0 0
40 0 0 0 0
31.5 0 0 0 0
25 0 0 0 0
20 414 29 385 34
Flakiness Index (w2 / w1) x 100 :12.93 Elongation Index (w4 / w3) x 100 : 13.60
1) 19 mm to 12 mm 14.00%
2) 12 mm to 6 mm 32.00%
3) 6 mm to 00 mm 51.00%
4) Bitumen (VG-30) 5.70%
5) Filler (Lime) 3.00%
120
100
80
60
40
20
120
100
80
60
40
20
0
0.01 0.1 1 10
JMF Lower Limit JMF Upper Limit MORTH Lower Limit Morth Upper Limit
Name/Signature Name/Signature
Designation Designation
th paved shoulder configuration of Saptagram-Kalna - Katwa-
Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
2) Proportion of materias:-
a) 19 mm to 12 mm 14.0%
b) 12 mm to 6 mm 32.0%
c) 6 mm to 00 mm 51.0%
d) Bitumen(Gb) 5.7%(by wt of total mix)
e) Hydrated lime 3%
Gmm = 2.499
Gse = [100-5.5)/((100/2.499)-(5.5/1.03))
Gse = 2.725
Sp. Gr. 0f 12 mm to 6 mm, 2.746 32% Effective Sp. Gr. of aggt. Gse 2.725
Sp. Gr. of 6 mm to 00 mm, 2.643 51% Bulk Sp. Gr. of total aggt. Gsb 2.683
Max.
sp.Gr.of
Bulk Sp. Avg. Sp. Effective Effective
% of Weight in Weight in Weight in Sample Asphalt
% of Agg Bulk Volume Gr. of Gr. Of Sp. Gravity Bitumen
Bitumen air water air SSD (loose) Absorption
Specimen Specimen of MIX Content
(GMM)
Practical
Mould
Sr. No
No
Pba=100 x
Gse=
Pbe=Pb-
Wa (100-Pb)/ (( Gse-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww Gmb Gmm (PbaxPs)/
(Wssd-Ww) ((100/Gmm Gsb )/
100
)-(Pb/Gb)) (GsbxGse)
x Gb
1 5.70 94.30 2 1372.3 804.1 1372.9 568.8 2.413 2.416 2.491 2.725 0.592 5.142
Name/Signature Name/Signature
Designation Designation
guration of Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to
Ch (District-Hugli)
CONSULTANT CONTRACTOR
Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.
Va=100x VFB=
VMA=100- Stability =
(Gmm- 100 x
(GmbxPs )/ DGR CF ( DGR*CF
Gmb) / (VMA-Va)
Gsb *PRF)
Gmm / VMA
IS SIEVE
( MM ) 4.75 2.36 1.18 0.6 0.3 0.15 0.075
% PASSING 64.03 49.10 41.08 33.83 24.08 17.37 7.15
Where a,b,c,d,e,f,g,are % passing of 4.75 2.36 1.18 0.600 0.300 0.150 0.075
S = Density of Binder
A= 6.675
B= 5.70
Be = 5.14
S = 1.030
F= 7.93 MIC.
West Bengal Highway Development Egis India Consulting Engineers Pvt. KCC BUILDCON PVT. LTD.
2(10/40)/Gr-I
Corporation Limited Ltd.
B. BLENDING OF AGGREGATES.
Individual gradation of coarse aggregate and fine aggregate, were carried out as per IS 2386 Part -1 ( Wet Sieving
method ). Individual aggregate were blended by trial & error method to obtain suitable gradation complying
with Table 500-17, Grading -2 of MORT&H Specification.
For determining the designed Bitumen content,Specimens of compacted paving mixture were prepared as per
ASTM D1559. The bulk specific gravitty of compacted paving mixture were measured as per ASTM D2726. The
following graphs are plotted.
2852 2852
248.12946 592.266478
Kinematic Viscosity
1.1616
observation 1 observation 2
Time 368 364
viscosity 427 423
average 425
425
365.87466