Вы находитесь на странице: 1из 100

Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-Road (S

of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway


2(10/40)/Gr-I Development Corporation Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD
Limited

BITUMINOUS CONCRETE BLENDING G-2 Date :-21/03

Percentage for blending


MORTH L
IS Passing To Retained 19mm to 12 12 mm to 6 Total %
6 mm to 0 mm Filler (Lime) MID TABLE -5
SIEVE mm mm of
LIMIT
(mm) Passing
19mm to 12 12 mm to 6
mm mm
6 mm to 0 mm Filler (Lime) 14.0% 32.00% 51% 03.00% Lower Limit

19.00 100.00 100.00 100.00 100.00 14.00 32.00 51.00 3.00 100.00 100.00 100

13.20 61.11 100.00 100.00 100.00 8.56 32.00 51.00 3.00 94.56 95.00 90

9.50 35.29 77.21 100.00 100.00 4.94 24.71 51.00 3.00 83.65 79.00 70

4.75 0.00 35.90 97.15 100.00 0.00 11.49 49.54 3.00 64.03 62.00 53

2.36 0.00 0.00 90.40 100.00 0.00 0.00 46.10 3.00 49.10 50.00 42

1.18 0.00 0.00 74.67 100.00 0.00 0.00 38.08 3.00 41.08 41.00 34

0.600 0.00 0.00 60.45 100.00 0.00 0.00 30.83 3.00 33.83 32.00 26

0.300 0.00 0.00 41.42 98.60 0.00 0.00 21.13 2.96 24.08 23.00 18

0.150 0.00 0.00 28.39 96.23 0.00 0.00 14.48 2.89 17.37 16.00 12

0.075 0.00 0.00 8.90 87.10 0.00 0.00 4.54 2.61 7.15 7.00 4

120

100

80

60

40

20

0
0.01 0.10 1.00 10.00 100.00
CONTRACTOR Rep. CONSULTANT Rep.

Name / Signature Name / Signature

Designation Designation
aved shoulder configuration of Saptagram-Kalna - Katwa-Road (Section
00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

Date :-21/03/2015

MORTH LIMIT
TABLE -500-17

Upper limit

100

100

88

71

58

48

38

28

20

10

1.00 10.00 100.00


Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I KCC BUILDCON PVT. LTD.
Corporation Limited Engineers Pvt. Ltd.

BC WITH LIME & VG-30 (G-2)

CALCULATIONS FOR QUANTITY OF BITUMEN AND AGGREGATE PER


1CUM.OF MIX
Material Size mm JMF %
Aggregate : 94.30 %
19 mm to 12 mm 14.00 % Bitumen Content : 5.70 %
12 mm to 6 mm 32.00 % Total : 100 %
6 mm to 0 mm 51.00 %
Filler( Lime) 3.00 %

Maximum Marshall Density = 2.372 gm/cc

Quantity of mix material per m3 of mix = 2372 Kg

Wt. Of Aggregate per


Material Size (mm) % of Material
m3 (kgs.)

19 mm to 12 mm 13.20 313.15

12 mm to 6 mm 30.18 715.77

6 mm to 0 mm 48.09 1140.77

Filler (Lime) 2.83 67.10

Bitumen 5.70 135.20

Total :-----------------> 100.00 2372.00

CONTRACTOR Rep. CONSULTANT Rep.

Name / Signature Name / Signature

Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Ka
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRACT
West Bengal Highway Development Egis India Consulting Engineers Pvt.
2(10/40)/Gr-I KCC BUILDCON P
Corporation Limited Ltd.
MIX DESIGN SUMMARY OF BITUMINOUS CONCRETE (G-2)
A)
Aggregate Source :- Pachami Quarry Birbhum
Bitumen Source :- JaHPCL
Bitumen Grade :- VG-30 Grade as per IS: 73
B) MIX Proportion
Aggregate Size Percentage
19 mm to 12 mm mm 14.00
12 mm to 6 mm 32.00
6 mm to 0 mm 51.00
Filler (Lime) 3.00
C) Physical Characteristics of Aggregate
SL NO Description Lab Test Results Specifications
Aggregate Impact Valu (Average % ) 11.50 <24
1

Combined Flakiness & Elongation indices (Average) 26.54 <35


2
Coating and Stripping Value of Bitumen with Aggregate
>95 Minumum Reatined Coating
3 Mixture (%)
D) Specific gravity and water absorption of individual aggregate
SL NO Aggregate Size Bulk Specific gravity Apprent specific gravity Water Absorptio
1 19 mm to 12 mm 2.782 2.869 1.09
2 12 mm to 6 mm 2.746 2.841 1.22
3 6 mm to 0 mm 2.653 2.772 1.63
4 Filler (Lime) 2.210 -
E) Properties of Bitumen

SL NO Description As per Lab Test results Reqirement As Per I


1 Penetration in ( 1/10mm ) 57 50 - 70
2 Specific gravity at 27oC 1.03 Min. 0.99 (IS:73
3 Softening point in oC 51.6 47oC Min
4 Ductility cm >100 Minimum 40
5 Absolute Viscosity 2831 2400 - 3600 P
6 Kinematic Viscosity Cst. 482 350 Cst. M
7 Flash Point °C 233.5 220 °C Min
F) As per JMF Limits
IS Sieve Size in mm Persentage of Passing As per Design JMF Limits MORTH Specification
19 100 100 100
13.2 95 89 - 100 90 - 100
9.5 84 78 - 88 70 - 88
4.75 64 59 - 69 53 - 71
2.36 49 45 - 53 42 - 58
1.18 41 37 - 45 34 - 48
600mic 34 30 - 38 26 - 38
300mic 24 21 - 27 18 - 28
150mic 17 14 - 20 12 - 20
75 mic 7 5.6-6.0 4 - 10
G) Specific gravity & Water Absorption of Mix Aggregate As Per Ashpalt insitue MS-2
Gsb Gsa Gse WA (%)
2.683 2.786 2.725 1.31
H) Physical Test Results of BC By Marshall Method
SL NO Description AS Per Results Specification Limit As Per S
1 Compacted Density of Mix (g/cc) 2.372 -
2 Air vods in total Mix (%) 4.78 3-5 MORTH Table
3 Voids in Mineral Aggregate (%) 16.63 Min.13 MORTH Table
4 Voids Filled With Asphalt (%) 71.22 65 - 75 MORTH Table
5 Marshall stability (kg) 1063 Min 900 kg MORTH Table
6 Flow (mm) 2.60 2-4 MORTH Table
7 Bitumen Content (%) 5.70 Min.5.4 MORTH Table
8 Retained stability % 82.47 >80 MORTH Table
9 Marshall Quotient (kg/mm) 409 250 - 500 MORTH Table

CONTRACTOR Rep. CONSULTANT Rep.

Name / Signature Name / Signature

Designation Designation

408.846154
paved shoulder configuration of Saptagram-Kalna - Katwa-Road
0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
KCC BUILDCON PVT. LTD.

BITUMINOUS CONCRETE (G-2)

Percentage
14.00
32.00
51.00
3.00

Specifications
<24

<35

Minumum Reatined Coating 95%

Water Absorption (%)


1.09
1.22
1.63
-

Reqirement As Per IS 73 : 2013


50 - 70
Min. 0.99 (IS:73-2013)
47oC Min.
Minimum 40 mm
2400 - 3600 Poises
350 Cst. Min.
220 °C Min.

MORTH Specification Limits G-2


100
90 - 100
70 - 88
53 - 71
42 - 58
34 - 48
26 - 38
18 - 28
12 - 20
4 - 10

WA (%)
1.31

As Per Specification

MORTH Table-500-11
MORTH Table-500-12
MORTH Table-500-11
MORTH Table-500-11
MORTH Table-500-11
MORTH Table-500-17
MORTH Table-500-11
MORTH Table-500-11
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of
Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 19 mm to 12 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-1
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 6905 6905 38.76
9.50 5321 12226 68.63
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-2
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 7182 7182 42.75
9.50 3632 10814 64.37
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-3
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 5732 5732 36.37
9.50 4637 10369 65.79
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of
Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 19 mm to 12 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
o 2 lane/2-lane with paved shoulder configuration of Saptagram-
in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015

Sample No-1
17815
Cumulative % Passing

100.00
61.24
31.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-2
16800
Cumulative % Passing
100.00
57.25
35.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-3
15760
Cumulative % Passing
100.00
63.63
34.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
o 2 lane/2-lane with paved shoulder configuration of Saptagram-
in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu
PACKAGE NO. CLIENT CONSULTANT
West Bengal Highway Development Corporation Egis India Consulting
2(10/40)/Gr-I Limited Engineers Pvt. Ltd.
Individual Gradation of Aggregate for BC
Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 19 mm to 12 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-4
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 5265 5265 38.40
9.50 3395 8659 63.16
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-5
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 5926 5926 42.55
9.50 2570 8496 61.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-6
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 6326 6326 39.51
9.50 3530 9856 61.56
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
e with paved shoulder configuration of Saptagram-Kalna -
gal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

n of Aggregate for BC
21.03.2015

ple No-4
13710
Cumulative % Passing
100.00
61.60
36.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ple No-5
13928
Cumulative % Passing
100.00
57.45
39.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ple No-6
16010
Cumulative % Passing
100.00
60.49
38.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Corporation Egis India Consulting


2(10/40)/Gr-I Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 19 mm to 12 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-7
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 7013 7013 37.90
9.50 5697 12710 68.69
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-8
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 6886 6886 36.94
9.50 5732 12617 67.69
4.75 6022.584 18640 100.00
2.36 0 18640 100.00
1.18 0 18640 100.00
600mic 0 18640 100.00
300mic 0 18640 100.00
150mic 0 18640 100.00
75mic 0 18640 100.00
Sample No-9
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 6453 6453 36.83
9.50 4321 10774 61.49
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

ation of Aggregate for BC


21.03.2015

ample No-7
18504
Cumulative % Passing
100.00
62.10
31.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ample No-8
18640
Cumulative % Passing
100.00
63.06
32.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ample No-9
17522
Cumulative % Passing
100.00
63.17
38.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 12 mm to 6 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-1
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 2750 2750 20.00
4.75 5827 8577 62.38
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-2
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 4577 4577 29.76
4.75 5505 10082 65.55
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-3
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3001 3001 20.78
4.75 6411 9412 65.18
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 12 mm to 6 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015

Sample No-1
13750
Cumulative % Passing

100.00
100.00
80.00
37.62
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-2
15380
Cumulative % Passing

100.00
100.00
70.24
34.45
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-3
14440
Cumulative % Passing

100.00
100.00
79.22
34.82
0.00
0.00
0.00
0.00
0.00
0.00
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 12 mm to 6 mm Sample at :-

Source of Material :- Pachami Quarry Birbhum Weast Bengal


Sample No-4
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 4054 4054 24.36
4.75 6677 10731 64.48
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-5
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3112 3112 22.97
4.75 5406 8519 62.87
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-6
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3170 3170 22.31
4.75 5763 8933 62.87
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

dation of Aggregate for BC


21.03.2015
Hot bin

Sample No-4
16643
Cumulative % Passing
100.00
100.00
75.64
35.52
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-5
13550
Cumulative % Passing
100.00
100.00
77.03
37.13
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-6
14208
Cumulative % Passing
100.00
100.00
77.69
37.13
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Corporation Egis India Consulting


2(10/40)/Gr-I Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 12 mm to 6 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-7
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3485 3485 22.17
4.75 7713 11198 71.24
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-8
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3090 3090 21.04
4.75 5838 8929 60.79
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
Sample No-9
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 3587 3587 21.68
4.75 6517 10103 61.07
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 0 0 0.00
150mic 0 0 0.00
75mic 0 0 0.00
CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

ation of Aggregate for BC


21.03.2015

ample No-7
15718
Cumulative % Passing
100.00
100.00
77.83
28.76
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-8
14688
Cumulative % Passing
100.00
100.00
78.96
39.21
0.00
0.00
0.00
0.00
0.00
0.00
Sample No-9
16544
Cumulative % Passing
100.00
100.00
78.32
38.93
0.00
0.00
0.00
0.00
0.00
0.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sa
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Corporation Egis India Consulting


2(10/40)/Gr-I Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 6 mm to 0 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-4
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 20.0 20.0 2.00
2.36 72.0 92.0 9.20
1.18 153.0 245.0 24.50
600mic 96.0 341.0 34.10
300mic 247.0 588.0 58.80
150mic 134.0 722.0 72.20
75mic 193.0 915.0 91.50
Sample No-5
Total Weight(gms)
Wt. Of
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
Retained (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 47.0 47.0 4.70
2.36 81.0 128.0 12.80
1.18 184.0 312.0 31.20
600mic 129.0 441.0 44.10
300mic 133.0 574.0 57.40
150mic 162.0 736.0 73.60
75mic 195.0 931.0 93.10
Sample No-6
Total Weight(gms)
Wt. Of
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
Retained (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 45.0 45.0 4.50
2.36 72.0 117.0 11.70
1.18 166.0 283.0 28.30
600mic 145.0 428.0 42.80
300mic 169.9 597.9 59.79
150mic 141.1 739.0 73.90
75mic 181.0 920.0 92.00

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

ation of Aggregate for BC


21.03.2015

Sample No-4
1000
Cumulative % Passing
100.00
100.00
100.00
98.00
90.80
75.50
65.90
41.20
27.80
8.50
Sample No-5
1000
Cumulative % Passing
100.00
100.00
100.00
95.30
87.20
68.80
55.90
42.60
26.40
6.90
Sample No-6
1000
Cumulative % Passing
100.00
100.00
100.00
95.50
88.30
71.70
57.20
40.21
26.10
8.00
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 6 mm to 0 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-7
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 25.0 25.0 2.50
2.36 71.0 96.0 9.60
1.18 167.0 263.0 26.30
600mic 145.0 408.0 40.80
300mic 195.0 603.0 60.30
150mic 124.0 727.0 72.70
75mic 175.0 902.0 90.20
Sample No-8
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 55.0 55.0 5.50
2.36 72.0 127.0 12.70
1.18 142.0 269.0 26.90
600mic 140.0 409.0 40.90
300mic 185.0 594.0 59.40
150mic 88.0 682.0 68.20
75mic 221.0 903.0 90.30
Sample No-9
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 23.9 23.9 2.39
2.36 45.2 69.1 6.91
1.18 225.9 295.0 29.50
600mic 132.5 427.5 42.75
300mic 168.4 595.9 59.59
150mic 128.3 724.2 72.42
75mic 186.8 911.0 91.10

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

dation of Aggregate for BC


21.03.2015

Sample No-7
1000
Cumulative % Passing
100.00
100.00
100.00
97.50
90.40
73.70
59.20
39.70
27.30
9.80
Sample No-8
1000
Cumulative % Passing
100.00
100.00
100.00
94.50
87.30
73.10
59.10
40.60
31.80
9.70
Sample No-9
1000
Cumulative % Passing
100.00
100.00
100.00
97.61
93.09
70.50
57.25
40.41
27.58
8.90
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- Filler (Lime )
Source of Material :- Alwar (Rajsthan)
Sample No-1
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 7.2 7.2 1.44
150mic 10.8 18 3.60
75mic 51 69 13.80
Sample No-2
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 6.1 6.1 1.22
150mic 12 18.1 3.62
75mic 45.1 63.2 12.64
Sample No-3
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 6.4 6.4 1.28
150mic 12.3 18.7 3.74
75mic 45.2 63.9 12.78
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- Filler (Lime )
Source of Material :- Alwar (Rajsthan)

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015

Sample No-1
500
Cumulative % Passing

100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.56
96.40
86.20
Sample No-2
500
Cumulative %
Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.78
96.38
87.36
Sample No-3
500
Cumulative %
Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.72
96.26
87.22
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- Filler (Lime )
Source of Material :- Alwar (Rajsthan)
Sample No-4
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 7 7 1.40
150mic 10.1 17.1 3.42
75mic 46.2 63.3 12.66
Sample No-5
Total Weight(gms)
Wt. Of
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
Retained (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 8.3 8.3 1.66
150mic 11.4 19.7 3.94
75mic 43 62.7 12.54
Sample No-6
Total Weight(gms)
Wt. Of
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
Retained (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 7.3 7.3 1.46
150mic 11.9 19.2 3.84
75mic 46 65.2 13.04

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
2-lane with paved shoulder configuration of Saptagram-Kalna -
-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

ation of Aggregate for BC


21.03.2015

Sample No-4
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.60
96.58
87.34
Sample No-5
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.34
96.06
87.46
Sample No-6
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.54
96.16
86.96
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Sap
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hu

PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- Filler (Lime )
Source of Material :- Alwar (Rajsthan)
Sample No-7
Total Weight(gms)
Wt. Of Retained
IS SIEVE Cumulative Weight Retained (gm) Cumulative % Retained
(gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 6.4 6.4 1.28
150mic 12.8 19.2 3.84
75mic 46.2 65.4 13.08
Sample No-8
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 7.5 7.5 1.50
150mic 12.2 19.7 3.94
75mic 45.2 64.9 12.98
Sample No-9
Total Weight(gms)
Wt. Of Cumulative %
IS SIEVE Cumulative Weight Retained (gm)
Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 0 0 0.00
2.36 0 0 0.00
1.18 0 0 0.00
600mic 0 0 0.00
300mic 6.8 6.8 1.36
150mic 13.2 20 4.00
75mic 43.1 63.1 12.62

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
/2-lane with paved shoulder configuration of Saptagram-Kalna -
t-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

dation of Aggregate for BC


21.03.2015

Sample No-7
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.72
96.16
86.92
Sample No-8
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.50
96.06
87.02
Sample No-9
500
Cumulative % Passing
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.64
96.00
87.38
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-
Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR


West Bengal Highway Development Egis India Consulting Engineers Pvt.
2(10/40)/Gr-I KCC BUILDCON PVT. LTD.
Corporation Limited Ltd.

Passing % 19 to 12 mm Aggregate
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 61.24 57.25 63.63 61.60 57.45 60.49 62.10 63.06 63.17 61.11
9.50 31.37 35.63 34.21 36.84 39.00 38.44 31.31 32.31 38.51 35.29
4.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.600 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Passing % 12 mm to 6 mm Aggregate
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
9.50 80.00 70.24 79.22 75.64 77.03 77.69 77.83 78.96 78.32 77.21
4.75 37.62 34.45 34.82 35.52 37.13 36.65 28.76 39.21 38.93 35.90
2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.600 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.300 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.150 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.075 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Passing % 6 mm to 00 mm
IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
9.50 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
4.75 98.70 98.50 98.70 98.00 95.30 95.50 97.50 94.50 97.61 97.15
2.36 92.00 91.30 93.20 90.80 87.20 88.30 90.40 87.30 93.09 90.40
1.18 81.90 81.20 75.60 75.50 68.80 71.70 73.70 73.10 70.50 74.67
0.600 66.00 59.20 64.30 65.90 55.90 57.20 59.20 59.10 57.25 60.45
0.300 44.80 42.30 41.00 41.20 42.60 40.21 39.70 40.60 40.41 41.42
0.150 31.55 28.70 28.30 27.80 26.40 26.10 27.30 31.80 27.58 28.39
0.075 10.95 9.10 7.40 8.50 6.90 8.00 9.80 9.70 9.75 8.90

Passing % Filler (Lime )


IS Sieve 1 2 3 4 5 6 7 8 9 Avg. Passing %
19.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
13.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
9.50 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
4.75 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
2.36 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
1.18 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
0.600 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
0.300 98.56 98.78 98.72 98.60 98.34 98.54 98.72 98.50 98.64 98.60
0.150 96.40 96.38 96.26 96.58 96.06 96.16 96.16 96.06 96.00 96.23
0.075 86.20 87.36 87.22 87.34 87.46 86.96 86.92 87.02 87.38 87.10

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 6 mm to 0 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal
Sample No-1
Total Weight(gms)
Wt. Of Retained Cumulative Weight Retained
IS SIEVE Cumulative % Retained
(gm) (gm)
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 13.0 13.0 1.30
2.36 67.0 80.0 8.00
1.18 101.0 181.0 18.10
600mic 159.0 340.0 34.00
300mic 212.0 552.0 55.20
150mic 132.5 684.5 68.45
75mic 206.0 890.5 89.05
Sample No-2
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 15.0 15.0 1.50
2.36 72.0 87.0 8.70
1.18 101.0 188.0 18.80
600mic 220.0 408.0 40.80
300mic 169.0 577.0 57.70
150mic 136.0 713.0 71.30
75mic 196.0 909.0 90.90
Sample No-3
Total Weight(gms)
Wt. Of Cumulative Weight Cumulative %
IS SIEVE
Retained (gm) Retained (gm) Retained
19.00 0 0 0.00
13.2 0 0 0.00
9.50 0 0 0.00
4.75 13.0 13.0 1.30
2.36 55.0 68.0 6.80
1.18 176.0 244.0 24.40
600mic 113.0 357.0 35.70
300mic 233.0 590.0 59.00
150mic 127.0 717.0 71.70
75mic 209.0 926.0 92.60
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configurati
Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
Hugli)
PACKAGE NO. CLIENT CONSULTANT

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd.

Individual Gradation of Aggregate for BC


Date of Sampling :- 20.03.2015 Date of Testing :-
Type Of Material :- 6 mm to 0 mm
Source of Material :- Pachami Quarry Birbhum Weast Bengal

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015

Sample No-1
1000
Cumulative % Passing

100.00
100.00
100.00
98.70
92.00
81.90
66.00
44.80
31.55
10.95
Sample No-2
1000
Cumulative %
Passing
100.00
100.00
100.00
98.50
91.30
81.20
59.20
42.30
28.70
9.10
Sample No-3
1000
Cumulative %
Passing
100.00
100.00
100.00
98.70
93.20
75.60
64.30
41.00
28.30
7.40
ning to 2 lane/2-lane with paved shoulder configuration of
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-
Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

Gradation of Aggregate for BC


21.03.2015
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-
Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

SPECIFIC GRAVITY AND ABSORPTION TEST


(IS 2386 - PART III )
Date of Sampling :- 20.03.2015 Date of Testing :- 23.03.2015

Sample No. :- 1 Source of Material :- Pachami Quarry Birbhum

Type of Material :- 19 mm to 12 mm Aggregate

Sl No. Description Trial - 1 Trial - 2 Trial - 3

1 Weight of Sample in Water W1 ( gms ) 1470.1 1524.3 1959.3

2 Weight of SSD Sample W2 ( gms ) 2280.3 2365.2 3042.5

Wt of Oven dry sample,


5 W3 ( gms ) 2255.5 2340.3 3009.4

6 Bulk Specific Gravity, = W3/[ (W2-W1) 2.784 2.783 2.778

7 Apparent Specific Gravity, = W3/(W3-W1) 2.872 2.868 2.866

8 Water Absorption ( % ) = 100 x (W2-W3)/W3 1.10 1.06 1.10

9 Average Bulk Specific Gravity 2.782

10 Average Apparent Specific Gravity, 2.869

11 Average Water Absorption % 1.09

Remarks :-

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-Road
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

SPECIFIC GRAVITY AND ABSORPTION TEST


(IS 2386 - PART III )

Date of Sampling :- 20.03.2015 Date of Testing :- 23.03.2015

Sample No. :- 1 Source of Material :- Pachami Quarry Birbhum

Type of Material :- 12 mm to 6 mmAggregate

Sl. No. Description Trial - 1 Trial - 2 Trial - 3

1 Weight Of Pycnometer ( gms ) 623 623 623


Wt. of SSD sample,
2 W1 ( gms ) 1050.3 1045.8 1150.6
Wt of Pycnometer + Water +
3 W2 ( gms ) 2191.4 2188.5 2255.6
Sample,
Wt of Pycnometer + Water,
4 W3 ( gms 1519 1519 1519

5 Wt of Oven dry sample, W4 ( gms ) 1037.2 1033.7 1136.6

6 Bulck Specific Gravity, = W4/[W1-(W2-W3)] 2.745 2.747 2.745

7 Apparent Specific Gravity, = W4/[W4-(W2-W3)] 2.843 2.838 2.842

8 Water Absorption ( % ) =100 x (W1-W4)/W4 1.26 1.17 1.23

9 Average Bluck Specific Gravity 2.746

10 Average Apparent Specific Gravity, 2.841

11 Average Water Absorption % 1.22

Remarks :-

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-Road
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I Corporation Limited Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

SPECIFIC GRAVITY AND ABSORPTION TEST


(IS 2386 - PART III )

Date of Sampling :- 20.03.2015 Date of Testing :- 23.03.2015

Sample No. :- 1 Source of Material :- Pachami Quarry Birbhum

Type of Material :- 6 mm to 00 mm

Sl. No. Description Trial - 1 Trial - 2 Trial - 3

1 Weight Of Pycnometer ( gms ) 623 623 623


Wt. of SSD sample,
2 W1 ( gms ) 1010.4 720.4 695.6

3 Wt of Pycnometer + Water + Sample, W2 ( gms ) 2155.4 1972.3 1955.9


Wt of Pycnometer + Water,
4 W3 ( gms 1519 1519 1519

5 Wt of Oven dry sample, W4 ( gms ) 994.3 708.8 684.5

6 Bulck Specific Gravity, = W4/[W1-(W2-W3)] 2.659 2.654 2.646

7 Apparent Specific Gravity, = W4/[W4-(W2-W3)] 2.778 2.774 2.765

8 Water Absorption ( % ) =100 x (W1-W4)/W4 1.62 1.64 1.62

9 Average Bluck Specific Gravity 2.653

10 Average Apparent Specific Gravity, 2.772

11 Average Water Absorption % 1.63

Remarks :-

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-
Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR


West Bengal Highway
Egis India Consulting
2(10/40)/Gr-I Development KCC BUILDCON PVT. LTD.
Engineers Pvt. Ltd.
Corporation Limited

SPECIFIC GRAVITY FOR FILLER


IS 2386 (PART-3)

Sample No : 1 Date of Sampling : 20.03.2015

Source/Location : Alwar (Rajsthan) Date of Testing : 21.03.2015

Type of Material : Filler (Lime) Proposed Use : BC Mix

Sl No Determination Trial - 01 Trial - 02 Trial - 03

1 Wt. of Specific gravity bottle (W1)gms 34.89 34.89 34.89

2 Wt. of Specific gravity bottle + Filler (W2)gms 51.21 49.69 50.63

3 Wt. of Specific gravity bottle + Filler+Kerosene (W 3)gms 86.79 87.01 85.38

4 Wt. of Specific gravity bottle + Water (W4)gms 85.99 100.1 78.2

5 Wt. of Specific gravity bottle +Kerosene (W5)gms 76.48 76.48 76.48

6 Specific Gravity of Kerosene (W6)=(W5 -W1)/(W4-W1) 0.8138943249 0.6377856157 0.9602863080


Specific Gravity of Filler=(W2 -W1)/(W2-W1)-(W3-W5) x Specific
7 Gravity of Kerosene 2.210 2.211 2.210

8 Average Specific Gravity of Filler w.r.t Kerosene 2.210

REMARKS :

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configur
SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch
PACKAGE NO. CLIENT

2(10/40)/Gr-I West Bengal Highway Development Corporation Limited

Analysis of BC Compacted Paving Mixture (By Marshall


Proving Ring Factor : 7.921 kg

Sp. Gr. of 19 mm to 12 mm, 2.782 14%

Sp. Gr. of 12 mm to 6 mm, 2.746 32% Effective Sp. Gr. of aggt. Gse 2.725

Sp. Gr. of 6 mm to 0 mm 2.643 51% Bulk Sp. Gr. of total aggt. Gsb 2.683

Sp. Gr. of Lime 2.210 3% Apperent sp Gravity Gsa 2.786

Sp. Gr. of Bitumen, Gb 1.03 Asphaltic Absorption Pba 0.59

Bulk Sp. Avg. Sp. Max. sp.Gr.of Effective


% of Weight in Weight in air Effective Sp. Asphalt
% of Agg Weight in air Bulk Volume Gr. of Gr. Of Sample Bitumen
Bitumen water SSD Gravity of Mix Absorption
Specimen Specimen (loose) (GMM) Content

Sr. No Mould No
Gse= (100-
Wa Pba=100 x ((
Pb)/ Pbe=Pb-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww (Wssd- Gmb Gmm Gse-Gsb )/
((100/Gmm)- (PbaxPs)/100
Ww) (GsbxGse)x Gb
(Pb/Gb))

1 1251.2 744.8 1258.7 513.9 2.435


1 3.88 96.12 2 1254.3 745.1 1259.1 514.0 2.440 2.436 2.604 2.775 0.59 3.31
3 1248.9 741.8 1254.8 513.0 2.435
4 1349.0 778.5 1355.6 577.1 2.338
2 5.00 95.00 5 1347.8 778.0 1354.8 576.8 2.337 2.338 2.518 2.725 0.59 4.44
6 1352.0 782.0 1359.9 577.9 2.340
7 1352.0 785.1 1356.2 571.1 2.367
3 5.50 94.50 8 1353.8 788.6 1360.2 571.6 2.368 2.367 2.499 2.725 0.59 4.94
9 1361.5 791.7 1367.5 575.8 2.365
10 1365.0 795.2 1368.9 573.7 2.379
4 6.00 94.00 11 1358.5 792.0 1363.2 571.2 2.378 2.376 2.480 2.725 0.59 5.44
12 1362.8 792.2 1367.2 575.0 2.370
13 1368.0 798.0 1371.2 573.2 2.387
5 6.50 93.50 14 1370.5 801.0 1375.9 574.9 2.384 2.386 2.462 2.725 0.59 5.95
15 1374.0 803.6 1378.8 575.2 2.389
Average Gse= 2.735 0.59

CONTRACTOR Rep.

Name/Signature

Designation
d shoulder configuration of Saptagram-Kalna - Katwa-Road (Section of
Ch to Km 34.00 Ch (District-Hugli)
CONSULTANT CONTRACTOR

Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

ng Mixture (By Marshall Method) G-2


Date of Casting
25.03.2015
Date of Testing
26.03.2015
Aggregate Source Pachami Quarry Birbhum West Bengal

Dial Average
Voids in Mineral Voids filled with Correlatio Av. Flow
Air Voids Guage Stability (kg) Stability Flow (mm)
Aggregate Bitumen n factor (mm)
Reading (kg)

Va=100x
VMA=100- VFB= Stability =
(Gmm-
(GmbxPs )/ 100 x (VMA-Va) DGR CF ( DGR*CF*P
Gmb) /
Gsb / VMA RF)
Gmm

120 0.83 789 1.8


12.71 6.43 49.39 125 0.83 822 822 1.7 1.8
130 0.83 855 1.8
140 0.83 920 1.9
17.22 7.15 58.50 135 0.83 888 909 2.0 1.9
140 0.83 920 1.9
155 0.86 1056 2.4
16.64 5.28 68.24 165 0.86 1124 1077 2.3 2.3
160 0.83 1052 2.3
170 0.86 1158 2.7
16.76 4.20 74.93 165 0.86 1124 1111 2.9 2.8
160 0.83 1052 2.8
130 0.86 886 3.1
16.84 3.06 81.84 140 0.83 920 931 3.3 3.3
150 0.83 986 3.4

CONSULTANT Rep.

Name/Signature

Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of S
(Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-H
PACKAGE NO. CLIENT CONSULTANT
West Bengal Highway Development
2(10/40)/Gr-I Egis India Consulting Engineers Pvt. Ltd.
Corporation Limited

Summary of BC By Marshall Method


Bitumen
Content % Density % Air Voids %VMA %VFB Flow Stability (Kg)

4.50 2.436 6.43 12.71 49.39 1.8 821.80


5.00 2.338 7.15 17.22 58.50 1.9 909.46
5.50 2.367 5.28 16.64 68.24 2.3 1077.26
C o m p a c t e d o f M ix D e n s it y ( g m /c c )

6.00 2.354 4.20 16.76 74.93 2.8 1111.32


6.50 2.302 3.06 16.84 81.84 3.3 930.72

85.00

%of VFB
80.00
75.00
70.00
65.00
2.400
60.00
55.00
2.350 50.00
45.00
4.25 4.50 4.75 5.00 5.2
2.300
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75
% of
% of Bitumen Content

9.50 5.0
% Air Voids

Flow in mm

8.50 4.5

7.50 4.0

6.50 3.5

5.50 3.0

4.50 2.5

2.0
3.50
1.5
2.50
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75 1.0
4.25 4.50 4.75 5.00 5.2
% Of Bitumen Content
% Of B
Stability In( kn)

1200.00
17.70
% VMA

1100.00

17.20

1000.00

16.70
900.00
16.70
900.00

16.20
800.00
4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75
4.25 4.50 4.75 5.00 5.
% Of Bitumen Content % of

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature
Designation Designation
tion of Saptagram-Kalna - Katwa-Road
District-Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

5 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75

% of Bitumen Content

5 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75


% Of Bitumen Content
5 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75
% of Bitumen content
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configura
of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (
PACKAGE NO. CLIENT

2(10/40)/Gr-I West Bengal Highway Development Corporation Limited

Analysis of DBM Compacted Paving Mixture (By Marshall M


Proving Ring Factor : 7.921 kg

Sp. Gr. of 19 mm to 12 mm, 2.782 14%


Sp. Gr. of 12 mm to 6 mm, 2.746 32% Effective Sp. Gr. Of aggt. Gse 2.725
Sp. Gr. of 6 mm to 0 mm, 2.643 51% Bulk Sp. Gr. Of total aggt. Gsb 2.683
sp. Gr. of Lime 2.210 3% Apperent sp Gravity Gsa 2.786
Sp. Gr. of Bitumen, Gb 1.03 Asphaltic Absorption Pba 0.59

Max. sp.Gr.of
Bulk Sp. Avg. Sp. Effective
Weight in Weight in Weight in air Sample Effective Sp. Asphalt
% of Bitumen % of Agg Bulk Volume Gr. of Gr. Of Bitumen
air water SSD (loose) (GMM) Gravity of Mix Absorption
Specimen Specimen Content
Practical
Sr. No Mould No
Pba=100 x
Wa Gse= (100- Pbe=Pb-
(( Gse-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww (Wssd- Gmb Gmm Pb)/((100/Gmm)- (PbaxPs)/1
Gsb )/
Ww) (Pb/Gb)) 00
(GsbxGse)x Gb

Stability Test Data at 60°c after 35 minutes

1 1240.9 749.7 1249.5 499.8 2.483

1 4.73 95.27 2 1247.9 755.1 1252.4 497.3 2.509 2.498 2.610 2.825 0.592 4.166

3 1239.6 748.6 1244.2 495.6 2.501


Stabi
lity
Test
Data
at
60°c
after
24 4 1363.8 793.3 1368.0 574.7 2.373
hour
s
2 5.70 94.30 5 1362.0 791.2 1365.4 574.2 2.372 2.372 2.491 2.725 0.592 5.142

6 1364.2 792.1 1367.4 575.3 2.371

stability at 60°c after 24 hours


Retained stability = ×100
stability at 60°c after 35 minutes

CONTRACTOR Rep.

Name/Signature

Designation
ed shoulder configuration of Saptagram-Kalna - Katwa-Road (Section
0 Ch to Km 34.00 Ch (District-Hugli)
CONSULTANT CONTRACTOR

Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

ing Mixture (By Marshall Method) G-2


Date of Casting 26.03.2015
Date of Testing 27.03.2015
Aggregate Source Pachami Quarry Birbhum West Bengal

Voids in Dial Average


Voids filled Correlatio Stability Av. Flow
Mineral Air Voids Guage Stability Flow (mm)
with Bitumen n factor (kg) (mm)
Aggregate Reading (kg)

VMA=100- Va=100x VFB= Stability = (


(GmbxPs )/ (Gmm-Gmb) / 100 x (VMA- DGR CF DGR*CF*P
Gsb Gmm Va) / VMA RF)

at 60°c after 35 minutes

165 0.83 1085 2.5

11.31 4.30 61.97 155 0.83 1019 1063 2.7 2.6

165 0.83 1085 2.6


140 0.83 920 3.8

16.63 4.78 71.22 135 0.83 888 877 3.9 3.9

125 0.83 822 4.0

877
Retained stability = X 100 82.47 %
1063

CONSULTANT Rep.

Name/Signature

Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kaln
in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT

2(10/40)/Gr-I West Bengal Highway Development Corporation Limited Egis India Consulting Engineers Pvt. Ltd.

Graph of Narrow range

Passing Ceretria 5.60 % to 6.05%


Too High

Passing

Too Low

5.60 % to 6.05 %

AIR VOIDS 5.60 % To 6.50 %

STABILITY 5.00 % To 6.50 %

VMA 4.50 % To 6.50 %


VFB 5.30 % To 6.05 %

FLOW 5.05% To 6.50%


4.50 4.55 4.60 4.65 4.70 4.75 4.80 4.85 4.90 4.95 5.00 5.05 5.10 5.15 5.20 5.25 5.30 5.35 5.40 5.45 5.50 5.55 5.60 5.65 5.70 5.75 5.80 5.85 5.90 5.95 6.00 6.05 6.10 6.15

% of Bitumen Content

Note:- As per graph all criteria belongs on Bitumen contents 5.60% to 6.05 %
Graph of Narrow range of acceptable ashpalt contents

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
oulder configuration of Saptagram-Kalna - Katwa-Road (Section of SH-6)
o Km 34.00 Ch (District-Hugli)

CONSULTANT CONTRACTOR

Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

arrow range

5.60 % To 6.50 %

5.00 % To 6.50 %

To 6.50 %
5.05% To 6.50%
6.20 6.25 6.30 6.35 6.40 6.45 6.50

Content
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-K
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACT

West Bengal Highway Development


2(10/40)/Gr-I Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PV
Corporation Limited

MAXIMUM SPECIFIC GRAVITY OF BC MIX (GMM) Theoretical

Source of Material : Pachami Quarry Birbhum West Bengal Date of Sampling : 25.03.2015

Kind of Material : BC G-2 Date of testing : 25.03.2015

Description Trial No. 1 2 3 4

B wt of sample ( gm ) 1500.0 1500.0

C flask+water 3212.5 3212.5

D flask+sample+water 4123.5 4126.8

E Gmm 2.547 2.561

F Average 2.554

Remarks :

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
ane with paved shoulder configuration of Saptagram-Kalna -
engal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

BC MIX (GMM) Theoretical

25.03.2015

25.03.2015

5
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kal
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTO

West Bengal Highway Development


2(10/40)/Gr-I Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT
Corporation Limited

MAXIMUM SPECIFIC GRAVITY OF BC MIX (GMM) ON @ 5.50% Bitumen Content By Vacuum Pump

Source of Material : Pachami Quarry Birbhum West Bengal Date of Sampling : 25.03.2015

Kind of Material : BC Mix G-2 Date of testing : 25.03.2015

Description Trial No. 1 2 3 4

A % Binder Content 5.50

B Weight of Flask + Corks ( gm ) 2663.0

C Weight of Flask + Corks + Water ( gm ) 9978.0

D Weight of Sample in Air ( gm ) 1597.0

E Weight of Flask + Corks + Water + Sample ( gm ) 10936.00

F Temperature of Water 0C 27.00

G Weight of Replaced water ( gm ) = (D-(E-C)) 639.00

H Maximum Specific Gravity of Mix =D/G 2.499

Remarks :

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
ane with paved shoulder configuration of Saptagram-Kalna -
ngal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

CONTRACTOR

KCC BUILDCON PVT. LTD.

MM) ON @ 5.50% Bitumen Content By Vacuum Pump

25.03.2015

25.03.2015

5
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I KCC BUILDCON PVT. LTD.
Corporation Limited Engineers Pvt. Ltd.

Aggregate Impact Value


IS:2386 (Part-4)
Source of material : Pachami Quarry Birbhum West Bengal Sample no: 1

Location of material : Date of sampling: 20.03.2015


Stock Yard
Sample description: Coarse aggregate 12.5 mm passing and 10.0 mm retained Date of testing : 21.03.2015

Description 1 2 3

Weight of aggregates(12.5mm passing and 10mm retained), (gm) A 364.6 364.1 365.2

Weight of aggregate passing 2.36 mm sieve after impact test, (gm) B 41.2 42.8 41.8

Weight of aggregate retained on 2.36 mm sieve after impact test, (gm) A-B 323.4 321.3 323.4

Aggregate Impact value, (%) B/A x 100 11.30 11.76 11.45

Average aggregate impact value (1,2,3) 11.50

Specified Limits For BC = 24% Max

Remarks:

CONTRACTOR Rep. CONSULTANT Rep.


Name / Signature Name / Signature
Designatue Designatue
Project : Four Lanning of various roads in Rewari Town & construction of new
roads in Rewari District
PACKAGE NO. CLIENT CONSULTANT CONTRACTOR
West Bengal Highway Egis India Consulting
2(10/40)/Gr-I Development KCC BUILDCON PVT. LTD.
Engineers Pvt. Ltd.
Corporation Limited
Flakiness & Elongation Index
IS:2386 (Part-1)
Source of material : Pachami Quarry West Bengal Sample no: 1

Location of material : QC Lab Date of Sampling: 20.03.2015

Sample Description: BC Mix G-2 Date of Testing: 23.03.2015

IS Sieve Flakiness index Elongation index

Material wt retained Wt of non flaky Wt of elongated


Wt. of flaky material, material, w3
Passing (mm) on individual sieve, material, w4
w2 (gm)
w1 (gm) =(w1 - w2) (gm) (gm)

63 0 0 0 0

50 0 0 0 0

40 0 0 0 0

31.5 0 0 0 0

25 0 0 0 0

20 414 29 385 34

16 1710 141 1569 121

12.5 2241 285 1956 241

10 2710 460 2250 442

Total 7075 915 6160 838

Flakiness Index (w2 / w1) x 100 :12.93 Elongation Index (w4 / w3) x 100 : 13.60

Combined Flakiness & Elong 26.54 Specified Limit : Max-35%


*Flaky material means fraction passing from ** Elongated material means fraction of non flaky
thickness gauge. material retained on length gauge.

CONTRACTOR Rep. CONSULTANT Rep.


Name / Signature Name / Signature
Designatue Designatue
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagra
Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRA

West Bengal Highway Development Egis India Consulting Engineers


2(10/40)/Gr-I KCC BUILDCO
Corporation Limited Pvt. Ltd.

JOB MIX FORMULA FOR BITUMINOUS CONCRETE (G-2)


Source of aggregate :- Pachami Quarry Birbhum West Bengal
Source of Bitumen :- HPCL
Proportion of Aggregete :-

1) 19 mm to 12 mm 14.00%
2) 12 mm to 6 mm 32.00%
3) 6 mm to 00 mm 51.00%
4) Bitumen (VG-30) 5.70%
5) Filler (Lime) 3.00%

IS Sieve in Permissable JMF MORTH LIM


% Passing JMF
mm Varation Lower Uper Lower
19 100 +/-7% 100 100 100
13.2 95 +/-6% 89 100 90
9.5 84 +/-6% 78 88 70
4.75 64 +/-5% 59 69 53
2.36 49 +/-4% 45 53 42
1.18 41 +/-4% 37 45 34
0.600 34 +/-4% 30 38 26
0.300 24 +/-3% 21 27 18
0.150 17 +/-3% 14 20 12
0.075 7 +/-1.5% 5.5 8.5 4
Bitumen
Content % 5.7 +/-.3% 5.6 6.0 5.4

120

100

80

60

40

20
120

100

80

60

40

20

0
0.01 0.1 1 10

JMF Lower Limit JMF Upper Limit MORTH Lower Limit Morth Upper Limit

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
th paved shoulder configuration of Saptagram-Kalna - Katwa-
Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR

KCC BUILDCON PVT. LTD.

ITUMINOUS CONCRETE (G-2)

MORTH LIMIT -500-17


Upper
100
100
88
71
58
48
38
28
20
10
-
1 10 100

MORTH Lower Limit Morth Upper Limit


Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development


2(10/40)/Gr-I Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.
Corporation Limited

Calculation of Specific gravity of Materials and Mix

1) Specific gravity of individual materials:-


Apparent specific
Material Description Bulk specific gravity Water absorption
gravity
a) 19 mm to 12 mm 2.782 2.869 1.09
b) 12 mm to 6 mm 2.746 2.841 1.22
c) 6 mm to 00 mm 2.653 2.772 1.63
d) Bitumen(Gb) 1.03
e) Hydrated lime 2.210

2) Proportion of materias:-
a) 19 mm to 12 mm 14.0%
b) 12 mm to 6 mm 32.0%
c) 6 mm to 00 mm 51.0%
d) Bitumen(Gb) 5.7%(by wt of total mix)
e) Hydrated lime 3%

3) Bulk specific gravity of aggregate mix(Gsb):-

Gsb = [100/(25/2.597+ 18/2.590 +54/2.484+3/2.210)]


Gsb = 2.683

4) Apparent specific gravity of aggregate mix(Gsa):-

Gsa = [100/(18/2.627 + 18/2.633 + 54/2.606+3/2.210)]


Gsa = 2.786

5) Maximum specific gravity of Mix at 5.5% bitumen content(Gmm):-

Gmm = 2.499

6) Effective specific gravity of mix(Gse):-

Gse = [100-5.5)/((100/2.499)-(5.5/1.03))
Gse = 2.725

Where, Gmm = Maximum specific gravity of paving mix


Gsb = Bulk specific gravity of aggregate mix
Gse = Effective specific gravity of mix
Pb = %Bitumen content by wt of total mix
Gb = Specific gravity of bitumen

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
2.544
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kal
Km 34.00 Ch (District-Hugli)
PACKAGE NO. CLIENT

West Bengal Highway Development


2(10/40)/Gr-I Egis India
Corporation Limited

Analysis of BC Compacted Paving Mixture (By Marshall Method) on @


Proving Ring Factor : 7.921 kg

Sp. Gr. of 19 mm to 12 mm, 2.782 14%

Sp. Gr. 0f 12 mm to 6 mm, 2.746 32% Effective Sp. Gr. of aggt. Gse 2.725

Sp. Gr. of 6 mm to 00 mm, 2.643 51% Bulk Sp. Gr. of total aggt. Gsb 2.683

sp. Gr. of Lime 2.210 3% Apperent sp Gravity Gsa 2.786

Sp. Gr. of Bitumen, Gb 1.03 Asphaltic Absorption Pba 0.59

Max.
sp.Gr.of
Bulk Sp. Avg. Sp. Effective Effective
% of Weight in Weight in Weight in Sample Asphalt
% of Agg Bulk Volume Gr. of Gr. Of Sp. Gravity Bitumen
Bitumen air water air SSD (loose) Absorption
Specimen Specimen of MIX Content
(GMM)
Practical
Mould
Sr. No
No
Pba=100 x
Gse=
Pbe=Pb-
Wa (100-Pb)/ (( Gse-
Pb Ps=100-Pb Wa Ww Wssd Wssd - Ww Gmb Gmm (PbaxPs)/
(Wssd-Ww) ((100/Gmm Gsb )/
100
)-(Pb/Gb)) (GsbxGse)
x Gb

Refusal Density Test @ 400 Blows


1 1370.2 805.3 1371.2 565.9 2.421

1 5.70 94.30 2 1372.3 804.1 1372.9 568.8 2.413 2.416 2.491 2.725 0.592 5.142

3 1370.8 803.2 1371.2 568.0 2.413

CONTRACTOR Rep. CONSULTANT Rep.

Name/Signature Name/Signature

Designation Designation
guration of Saptagram-Kalna - Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to
Ch (District-Hugli)
CONSULTANT CONTRACTOR

Egis India Consulting Engineers Pvt. Ltd. KCC BUILDCON PVT. LTD.

By Marshall Method) on @ 5.70% Bitumen Contrnt


Date of Casting 27.03.2015

Date of Testing 28.03.2015

Aggregate Source Pachami Quarry Birbhum West Bengal

Voids in Voids filled Dial Average


Correlatio Stability Av. Flow
Mineral Air Voids with Guage Stability Flow (mm)
n factor (kg) (mm)
Aggregate Bitumen Reading (kg)

Va=100x VFB=
VMA=100- Stability =
(Gmm- 100 x
(GmbxPs )/ DGR CF ( DGR*CF
Gmb) / (VMA-Va)
Gsb *PRF)
Gmm / VMA

ty Test @ 400 Blows


230 0.86 1567 2.4

15.09 3.03 79.91 220 0.86 1499 1521 2.5 2.5

220 0.86 1499 2.5


Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
Katwa-Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting


2(10/40)/Gr-I KCC BUILDCON PVT. LTD.
Corporation Limited Engineers Pvt. Ltd.

BINDER FILM THICKNESS

IS SIEVE
( MM ) 4.75 2.36 1.18 0.6 0.3 0.15 0.075
% PASSING 64.03 49.10 41.08 33.83 24.08 17.37 7.15

A = SURFACE AREA OF AGGREGATE

A = ( 2 + 0.02 a + 0.04b +0.08c +0.14d + 0.30 e +0.60 f +1.60 g ) 0.20482

Where a,b,c,d,e,f,g,are % passing of 4.75 2.36 1.18 0.600 0.300 0.150 0.075

Be = Effective Binder content of asphalts mixture by wt. of mix (%)

B = Total Binder content of asphalts mixture by wt. of mix (%)

S = Density of Binder

Be = Effective Binder content of asphalts mixture by wt. of mix (%)

A= 6.675
B= 5.70
Be = 5.14

S = 1.030

FILM THICKNESS OF BINDER , F (µm) = Be 1 10 6


100 - B A S

F= 7.93 MIC.

CONTRACTOR Rep. CONSULTANT Rep.


Name/Signature Name/Signature
Designation Designation
Name of Work : Strengthening, widening to 2 lane/2-lane with paved shoulder configuration of Saptagram-Kalna - Katwa-
Road (Section of SH-6) in West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)

PACKAGE NO. CLIENT CONSULTANT CONTRACTOR

West Bengal Highway Development Egis India Consulting Engineers Pvt. KCC BUILDCON PVT. LTD.
2(10/40)/Gr-I
Corporation Limited Ltd.

METHODOLOGY OF MIX DESIGN

A. SELECTION OF AGGREGATE & BITUMEN


Aggregate complying with Table 500-17, Grading - 2 of MORTH Specification & Bitumen Complying with VG-30
grade of IS 73 were used for conducting the mix design.

B. BLENDING OF AGGREGATES.

Individual gradation of coarse aggregate and fine aggregate, were carried out as per IS 2386 Part -1 ( Wet Sieving
method ). Individual aggregate were blended by trial & error method to obtain suitable gradation complying
with Table 500-17, Grading -2 of MORT&H Specification.

C. SPECIFIC GRAVITY OF INDIVIDUAL INGREDIENTS.


1. Specific gravity of coarse aggregate carried out as per AASHTO T85/IS 2386 Part-3
2. Specific gravity of fine aggregate carried out as per AASHTO T84/IS 2386 Part-3
3. Specific gravity of Bitumen carried out as per AASHTO T228 /IS 1202-1978
4.Maximum Specific gravity of Loose paving mixture carried out as per ASTM 2041

D. MARSHALL METHOD OF MIX DESIGN

For determining the designed Bitumen content,Specimens of compacted paving mixture were prepared as per
ASTM D1559. The bulk specific gravitty of compacted paving mixture were measured as per ASTM D2726. The
following graphs are plotted.

1. Percentage air voids Vs Bitumen content


2. Voids filled with Bitumen content Vs Bitumen Content
3. Stability Vs Bitumen content
4. Voids in mineral aggregate Vs Bitumen content
5. Density Vs Bitumen content
6. Flow Vs Bitumen content.

E. DETERMINATION OF OPTIMUM BITUMEN CONTENT


A bar chart has been plotted to determine the range of bitumen passing all criteria. The optimum bitumen
content is determined as guideline given in MS - 2.
Absolute viscosity
11.494 4.8154

bulb B bulb C bulbB bulb C


Time 250 592 245 596
viscosity 2874 2851 2816 2868
2852

2852 2852
248.12946 592.266478

Kinematic Viscosity
1.1616
observation 1 observation 2
Time 368 364
viscosity 427 423
average 425

425
365.87466