Вы находитесь на странице: 1из 10

1 2 3 4 5 6 7 8

A A

B B

GAS CONDENSATE PIT BOQ


OUTLINES AND
C REINFORCEMENT C

Approved Stamp Issuer

DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

D D

B 24-05-19 LPV/JMG REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427)

A 08-02-19 NTA/JMG FIRST ISSUE


Rev. Date Name Note

Employer

Jebel Ali Power Station ‘K’ Phase III


E Engineer Contractor E

Date Name
Scale:
Drawn: 08-02-19 NTA/JMG GAS CONDENSATE PIT BOQ -
Checked: 08-02-19 IAR OUTLINES AND REINFORCEMENT
Approved: 08-02-19 ELB Sheet: 1
COVER
F Supersedes:
of: 10 F
Superseded by: Size: A3 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
REVISION REVISION
DEVICE LOCATION SHEET DESCRIPTION DEVICE LOCATION SHEET DESCRIPTION
A B . . . . . . . . . . . . . . . .
1 COVER. A B . . . . . . . . . . . . . . . .
2 INDEX. A B . . . . . . .
3 PLAN VIEW & SECTIONS A B . . . . . . .
4 PLAN VIEW GRATING AND DETAILS A B . . . . . . .
5 PLAN VIEW REINFORCEMENT A B . . . . . . .
6 PLAN VIEW HORIZONTAL REINFORCEMENT A B . . . . . . .
7 SECTIONS REINFORCEMENT 1 A B . . . . . . .
B 8 SECTIONS REINFORCEMENT 2 A B . . . . . . .
B
9 BAR BENDING SCHEDULE 1 A B . . . . . . .
10 BAR BENDING SCHEDULE 2 A B . . . . . . .

C C

D D

E E

Employer Date Name Scale:


GAS CONDENSATE PIT BOQ -
Drawn: 08-02-19 NTA/JMG
Checked:
OUTLINES AND REINFORCEMENT
B 24-05-19 LPV/JMG REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) 08-02-19 IAR Sheet: 2
Approved: INDEX of: 10
08-02-19 ELB
A 08-02-19 NTA/JMG FIRST ISSUE
F Engineer Contractor Issuer Size: A3 PO No.: 3761700035 File: F
Rev. Date Name Note
Annex: DF Document No: K-III-DFE-EKR-CL-13291
Jebel Ali Power Station ‘K’ Phase III Document No: R-28-C-D-13291 Is: 00 Rev: B
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN
* AS PER VOLUME II, PART G05.4, CHAPTER 5.3 THE SELECTED FILL SHALL BE WELL
FOUNDATION AND CONCRETE SLABS AT GRADED (UNIFORMITY INDEX NOT LESS THAN 5), NON-COHESIVE AND NEARLY SILT
DIFFERENT LEVELS GROUNDING MESH FREE (SILT CONTENT NOT GREATER THAN 5%; UP TO 10% TOLERATED, AND HANDRAIL
CONNECTION POINT WITH UNDERGROUND PLASTICITY INDEX NOT EXCEEDING 6%, LIQUID LIMIT NOT EXCEEDING 40 %, SALT
EARTHING GRID ACCORDING TO DETAIL FREE (CONTENT LESS THAN 3%), SOILS FREE OF ORGANIC MATTER (LIMIT 2%).
"AK" IN DWG: U-56-E-D-11034 DECOMPOSING OR COMPRESSIBLE MATERIALS SHALL NOT BE USED.
AK 350 6500 350
SEE DETAIL 2 SEE DETAIL 2
1300 1300 1300 1300 1190 A
A +0.200 T.O.C. +0.200 T.O.C.

-0.050 -0.050
GROUND GROUND
HANDRAIL LEVEL LEVEL CONDENSATE PIT
GRATING

110 1190 1300 1300 1300 1190 110


350
SEE DETAIL 2
1300 1300
+0.200 T.O.C.

WATERPROOFING SYSTEM ON LATERAL FACE


-0.050 SEE DRAWING R-01-C-D-13088 DETAIL 6
GROUND B
B LEVEL

GRATING
HORIZONTAL CONSTRUCTION JOINT HORIZONTAL CONSTRUCTION JOINT NOTES :
110 1190 1300 IN A WALL SEE DWG: R-01-C-D-13088 IN A WALL SEE DWG: R-01-C-D-13088
1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.

4650
4700
WATERPROOFING SYSTEM ON LATERAL FACE 4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
SEE DRAWING R-01-C-D-13088 DETAIL 6 FOR INTERNAL UNDERGROUND SURFACES FINISHES,
SEE NOTE ON DRAWING: R-01-C-D-13088 (SHEET 4) 5.- MATERIALS:

2500 (MAX.)
5150
- CONCRETE:
EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
RATIO (kg/m3) FCK (N/mm2)
HORIZONTAL CONSTRUCTION JOINT (BS EN 1992-1-1)
IN A WALL SEE DWG: R-01-C-D-13088 REINF.
CONCRETE SULPHATE RESISTING PORTLAND
BELLOW XA2 C35/45 0.4 400 35 CEMENT IN ACCORDANCE WITH ASTM
GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C FOR INTERNAL UNDERGROUND SURFACES FINISHES, CONSTRUCTION JOINT
(INCLUDING PILES)
SEE NOTE ON DRAWING: R-01-C-D-13088 (SHEET 4) CONSTRUCTION JOINT EQUIPMENT LEAN SULPHATE RESISTING PORTLAND
(SEE DWG: R-01-C-D-13088) (SEE DWG: R-01-C-D-13088) - C16/20 - 280 16
PLINTHS CONCRETE CEMENT II (36% TO 55% FLY ASH)
4700

- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
2500 (MAX.)

1000 EQUIPMENT -3.975 T.O.C.


5150

-4.000 T.O.C.
HOLD PLINTHS
150 TYPE OF
COMPRESSIVE STRENGTH
(N/mm2)
FLEXURAL STRENGTH
(N/mm2)

150 200
STEEL LADDER CONSISTENCY
SEE DWG: R-01-S-D-13183 SLOPE 0.5% HOLD GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS

SECTION C-C 200


CEMENT TYPE FLOWABLE 45 65 8 10

SCALE: 1:25
- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT

450
500
150 -4.500 T.O.C. -4.450 T.O.C.
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.

150
CONSTRUCTION JOINT - REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.

50

75
(SEE DWG: R-01-C-D-13088) ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
WATERPROOFING SYSTEM

450

450
SOIL UNDER SLAB SHALL BE SHALL BE 250µM.
-4.950 T.O.C. SEE DRAWING R-01-C-D-13088 DETAIL 6 COMPACTED AT MINIMUM 98% AS
- REINFORCED COVER TO BE CONSIDERED: D
D PER MODIFIED AASHTOT-180 METHOD D
150 200

1000 75mm IN CONCRETE ELEMENTS BELLOW GROUND.

75
SLOPE 0.5%
-3.975 T.O.M. -4.000 T.O.C. 50mm IN CONCRETE ELEMENTS ABOVE GROUND.
1936 500 4764 - STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
150 6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
125 7200 125 INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
450

200 -4.450 T.O.C. 7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
SECTION A-A 8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
75

SCALE: 1:25 INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.


500

450 WATERPROOFING SYSTEM 9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
450

-4.950 T.O.C. SEE DRAWING R-01-C-D-13088 DETAIL 6 BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
SOIL UNDER SLAB SHALL BE HANDRAIL GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
75

COMPACTED AT MINIMUM 98% AS INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
PER MODIFIED AASHTOT-180 METHOD D AREAS.
125 1936 500
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E SEE DETAIL 2
LEGEND: ABBREVIATIONS:
E=532.950
D 350 5600 350 SEE DETAIL 2
S=828.860 NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
D
E=478517.447 +0.200 T.O.C.
G T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
N=2772486.256
G ND= DEWA NORTH T.O.M. = TOP OF MORTAR
-0.050
HANDRAIL T.O.C +0.200 -0.050 GROUND REFERENCE DRAWINGS :
GRATING
GROUND LEVEL LEVEL
B 1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
AK
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
350
==

3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
E=540.150
D T.O.C +0.200 4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
S=828.860
D
E=478522.846
G 5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
N=2772481.493
G

6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
C C
WATERPROOFING SYSTEM ON LATERAL FACE F
F SEE DRAWING R-01-C-D-13088 DETAIL 6 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
T.O.C +0.200
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
5% HORIZONTAL CONSTRUCTION JOINT HORIZONTAL CONSTRUCTION JOINT
350 0. 350 IN A WALL SEE DWG: R-01-C-D-13088 IN A WALL SEE DWG: R-01-C-D-13088 10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
EQUIPMENT PE EQUIPMENT
== LO ==
PLINTHS 11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
6300

S PLINTHS
4200

12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer


4650

2500 (MAX.)
FOR INTERNAL UNDERGROUND SURFACES FINISHES,
SEE NOTE ON DRAWING: R-01-C-D-13088 (SHEET 4)
DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

A
HOLD A
G
1000

G SLAB
T.O.C -4.500
HOLD B 24-05-19 LPV/JMG REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427)

CONSTRUCTION JOINT CONSTRUCTION JOINT FIRST ISSUE


(SEE DWG: R-01-C-D-13088) A 08-02-19 NTA/JMG
(SEE DWG: R-01-C-D-13088)
Rev. Date Name Note
350

350
==

EQUIPMENT Employer
AK PLINTHS

E=532.950
350 1000
T.O.C +0.200 E=540.150
D
S=835.160
D
HOLD HOLD Jebel Ali Power Station ´k´ Phase III
D B E=478518.678

150 200
S=835.160
D
G
N=2772476.769 150 150
G
E=478513.279
G 7200
N=2772481.532 SLOPE 0.5%
150

Engineer Contractor
450

450
-4.450 B.O.C.
75

Date Name Scale:


SOIL UNDER SLAB SHALL BE Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:50 H
H WATERPROOFING SYSTEM COMPACTED AT MINIMUM 98% AS
SEE DRAWING R-01-C-D-13088 DETAIL 6 PER MODIFIED AASHTOT-180 METHOD D Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
125 6300 125 Approved: 08.02.2019 ELB PLAN VIEW & SECTIONS Sheet: 3

Supersedes: of: 10

PLAN VIEW SECTION B - B Superseded by: Size: A1 PO No.: 3761700035 File:


SCALE: 1:25
SCALE: 1:50 System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

E=540.150
D
E=532.950 S=828.860
D
D
S=828.860 E=478522.846
G
D
E=478517.447 N=2772481.493
G
G
N=2772486.256
G
1300 1233 1300 1300 1190 68
T.O.C +0.200 A
A

350
==
CONDENSATE PIT
L70*6 L70*6 L70*6 L70*6

470

1100
IPE270

B
B

T.O.C +0.200 NOTES :


SLAB
T.O.C -4.000 1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
1 2 3 4 5 5.- MATERIALS:
- CONCRETE:
350 350
== EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
== ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
REINF.
6300

CONCRETE SULPHATE RESISTING PORTLAND


XA2 C35/45 0.4 400 35
IPE270

BELLOW CEMENT IN ACCORDANCE WITH ASTM

IPE270
IPE270

IPE270

IPE270

IPE270
T.O.C +0.200 GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C (INCLUDING PILES)
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
CONCRETE CEMENT II (36% TO 55% FLY ASH)

- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF (N/mm2) (N/mm2)
CONSISTENCY
GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
- REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
SLAB SHALL BE 250µM.
T.O.C -4.500 - REINFORCED COVER TO BE CONSIDERED: D
D TYPICAL EARTHING CONNECTION TO
CJ CJ CJ STEEL BEAMS ACCORD TO DETAIL 75mm IN CONCRETE ELEMENTS BELLOW GROUND.
1000

"CJ" IN DWG: U-56-E-D-11034 50mm IN CONCRETE ELEMENTS ABOVE GROUND.


- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
L70*6 L70*6 L70*6 L70*6 L70*6
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
350

350

INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.


==

9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
350 1000 BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
SEE DETAIL 1 SEE DETAIL 4 AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
T.O.C +0.200 E=540.150
D GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
E=532.950
D S=835.160
D
S=835.160
D E=478518.678 INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
G
E=478513.279 7200 N=2772476.769 AREAS.
G G
N=2772481.532
G
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
E
E PLAN VIEW NOTES AND TYPICAL DETAILS.
ESCALA: 1:25 LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
ND= DEWA NORTH T.O.M. = TOP OF MORTAR

REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
F
F 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer

DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G


G B 24-05-19 LPV/JMG
FIRST ISSUE
A 08-02-19 NTA/JMG
Rev. Date Name Note
Employer

Jebel Ali Power Station ´k´ Phase III

Engineer Contractor

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:25 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB PLAN VIEW GRATING AND DETAILS Sheet: 4

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A
A

CONDENSATE PIT

C D
B
B

38 16 @ 150
31 NOTES :
TRANSVERSAL REINF. 1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
9 16 @ 150
33
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
TRANSVERSAL REINF.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
5.- MATERIALS:
B B
- CONCRETE:
33 16 @ 150 3 EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
LONGITUDINAL REINF. ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
REINF.
CONCRETE SULPHATE RESISTING PORTLAND
XA2 C35/45 0.4 400 35
12 16 @ 150
28 BELLOW CEMENT IN ACCORDANCE WITH ASTM
GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C TRANSVERSAL REINF. (INCLUDING PILES)
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
CONCRETE CEMENT II (36% TO 55% FLY ASH)
DETAIL 1 - CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:

A 9 16 @ 150 2 A TYPE OF
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
CONSISTENCY (N/mm2) (N/mm2)
LONGITUDINAL REINF. GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
- REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
C D ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
12 16 @ 150
30 AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
LONGITUDINAL REINF. SHALL BE 250µM.
- REINFORCED COVER TO BE CONSIDERED: D
D
75mm IN CONCRETE ELEMENTS BELLOW GROUND.
50mm IN CONCRETE ELEMENTS ABOVE GROUND.
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
PLAN VIEW BOTTON REINFORCEMENT INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
ESCALA: 1:50 7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
ND= DEWA NORTH T.O.M. = TOP OF MORTAR

REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010

C D 2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
1 16
20 6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
9 16 @ 150
32 1050 F
F 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
TRANSVERSAL REINF. OVERLAP LENGHT
1 16
22
31 8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
38 16 @ 150
TRANSVERSAL REINF. 24 9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
B B 1 16
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
33 16 @ 150 3
LONGITUDINAL REINF. 1 16
26 11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
1 16
19
12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

1 16
21 Approved Stamp Issuer

1 16
23
DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B
9 16 @ 150
27 25
1 16
TRANSVERSAL REINF.
A A REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G
G B 24-05-19 LPV/JMG
9 16 @ 150 4 FIRST ISSUE
A 08-02-19 NTA/JMG
LONGITUDINAL REINF.
Rev. Date Name Note
Employer

9 16 @ 150
29 D
Jebel Ali Power Station ´k´ Phase III
C
LONGITUDINAL REINF.
1050
Engineer Contractor
OVERLAP LENGHT

PLAN VIEW TOP REINFORCEMENT DETAIL 1


ESCALA: 1:50
ESCALA: 1:25 Date Name Scale:
Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:50 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB PLAN VIEW REINFORCEMENT Sheet: 5

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A
A

CONDENSATE PIT

21 16 @ 200
11
21 16 @ 200
15
HORIZONTAL REINF.
HORIZONTAL ADD. REINF. B
B 15
21 16 @ 200
HORIZONTAL ADD. REINF.
NOTES :
1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
28 16 @ 150
11
5.- MATERIALS:
HORIZONTAL REINF. - CONCRETE:
EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
REINF.
CONCRETE SULPHATE RESISTING PORTLAND
BELLOW XA2 C35/45 0.4 400 35 CEMENT IN ACCORDANCE WITH ASTM
GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C (INCLUDING PILES)
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
CONCRETE CEMENT II (36% TO 55% FLY ASH)

- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF (N/mm2) (N/mm2)
CONSISTENCY
GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
- REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
21 16 @ 200
10 10 AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
28 16 @ 150
HORIZONTAL REINF. HORIZONTAL REINF. SHALL BE 250µM.
10 D
28 16 @ 150 10 - REINFORCED COVER TO BE CONSIDERED:
D HORIZONTAL REINF.
21 16 @ 200
HORIZONTAL REINF. 75mm IN CONCRETE ELEMENTS BELLOW GROUND.
50mm IN CONCRETE ELEMENTS ABOVE GROUND.
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
21 16 @ 200
15
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
HORIZONTAL ADD. REINF. NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:

21 16 @ 200
15 NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
11 T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
HORIZONTAL ADD. REINF. 28 16 @ 150 ND= DEWA NORTH T.O.M. = TOP OF MORTAR
HORIZONTAL REINF.
REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
21 16 @ 200
11
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
HORIZONTAL REINF.
6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
F
F 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
PLAN VIEW HORIZONTAL REINFORCEMENT 9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
ESCALA: 1:25
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer

DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G


G B 24-05-19 LPV/JMG
FIRST ISSUE
A 08-02-19 NTA/JMG
Rev. Date Name Note
Employer

Jebel Ali Power Station ´k´ Phase III

Engineer Contractor

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:25 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB PLAN VIEW HORIZONTAL REINFORCEMEN Sheet: 6

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A
A

CONDENSATE PIT

29 16 @ 200
18
29 16 @ 200
18 VERTICAL REINF.
VERTICAL REINF.
29 16 @ 200
18
29 16 @ 200
18
VERTICAL REINF. B
B VERTICAL REINF.

NOTES :
1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
8 16 @ 200 7 2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
ADD. VERTICAL REINF. EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
5.- MATERIALS:
28 16 @ 200 8 - CONCRETE:
ADD. VERTICAL REINF. EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
8 16 @ 200 7
REINF.
8 16 @ 200 7 CONCRETE
XA2 C35/45 0.4 400 35
SULPHATE RESISTING PORTLAND
VERTICAL REINF. BELLOW CEMENT IN ACCORDANCE WITH ASTM
VERTICAL REINF.
29 29 16 @ 200 8 GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C 9 16 @ 150
9 16 @ 150 4 VERTICAL REINF.
(INCLUDING PILES)

LONGITUDINAL REINF. LEAN SULPHATE RESISTING PORTLAND


- C16/20 - 280 16
LONGITUDINAL REINF. CONCRETE CEMENT II (36% TO 55% FLY ASH)
29 16 @ 200 8
- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
VERTICAL REINF.
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF (N/mm2) (N/mm2)
CONSISTENCY
GROUT
37 16 @ 150
34 7 DAYS 28 DAYS 7 DAYS 28 DAYS
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
9 16 @ 150 2
LONGITUDINAL REINF. - REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
SHALL BE 250µM.
9 16 @ 150
34 D
30 - REINFORCED COVER TO BE CONSIDERED:
D 12 16 @ 150
75mm IN CONCRETE ELEMENTS BELLOW GROUND.
LONGITUDINAL REINF.
50mm IN CONCRETE ELEMENTS ABOVE GROUND.
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
SECTION A-A INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
SCALE: 1:25 9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
ND= DEWA NORTH T.O.M. = TOP OF MORTAR

REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
29 16 @ 200
18
3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
VERTICAL REINF.
4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034

18 5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
18 29 16 @ 200 29 16 @ 200
18
29 16 @ 200 VERTICAL REINF. 6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
VERTICAL REINF.
VERTICAL REINF. F
F 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer


23 16 @ 200 8
ADD. VERTICAL REINF. 28 16 @ 200 8
ADD. VERTICAL REINF.
29 16 @ 200 8
VERTICAL REINF. DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B
19 16 @ 200 8
VERTICAL REINF. 19 16 @ 200 8
VERTICAL REINF. 29 16 @ 200 8 G
REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427)
G VERTICAL REINF. B 24-05-19 LPV/JMG
33 16 @ 150 3 FIRST ISSUE
LONGITUDINAL REINF. A 08-02-19 NTA/JMG
Rev. Date Name Note
Employer

Jebel Ali Power Station ´k´ Phase III

37 16 @ 150
34 Engineer Contractor
34
30 16 @ 150 33 16 @ 150 3
LONGITUDINAL REINF.

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:25 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Sheet: 7
SECTION B-B Approved: 08.02.2019 ELB SECTIONS REINFORCEMENT 1
SCALE: 1:25 Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A
A

CONDENSATE PIT

36 16 @ 200
18 36 16 @ 200
18
36 16 @ 200
18 18
36 16 @ 200 VERTICAL REINF. VERTICAL REINF.
VERTICAL REINF. VERTICAL REINF.

B
B
NOTES :
1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
33 16 @ 200 8 EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
ADD. VERTICAL REINF. 3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
36 16 @ 200 8
VERTICAL REINF. 5.- MATERIALS:
10 16 @ 200 9 - CONCRETE:
36 16 @ 200 8
VERTICAL REINF. 10 16 @ 200 9 VERTICAL REINF. EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
VERTICAL REINF. ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
32 REINF.
9 16 @ 150 CONCRETE SULPHATE RESISTING PORTLAND
BELLOW XA2 C35/45 0.4 400 35 CEMENT IN ACCORDANCE WITH ASTM
TRANSVERSAL REINF. 27
9 16 @ 150 GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C TRANSVERSAL REINF.
(INCLUDING PILES)
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
CONCRETE CEMENT II (36% TO 55% FLY ASH)
8 16 @ 200 9 - CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
ADD. VERTICAL REINF.
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF (N/mm2) (N/mm2)
CONSISTENCY
GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
43 16 @ 150
35 33
9 16 @ 150 CEMENT TYPE FLOWABLE 45 65 8 10
TRANSVERSAL REINF.
- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
9 16 @ 150
35 - REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
12 16 @ 150
28 ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
TRANSVERSAL REINF. AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
SHALL BE 250µM.
D SECTION C - C - REINFORCED COVER TO BE CONSIDERED: D
SCALE: 1:25 75mm IN CONCRETE ELEMENTS BELLOW GROUND.
50mm IN CONCRETE ELEMENTS ABOVE GROUND.
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
ND= DEWA NORTH T.O.M. = TOP OF MORTAR
18
36 16 @ 200
18 36 16 @ 200
36 16 @ 200
18
VERTICAL REINF. REFERENCE DRAWINGS :
VERTICAL REINF. VERTICAL REINF.
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088

36 16 @ 200
18 3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
VERTICAL REINF. 4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006 F
F 7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.

33 16 @ 200 8 9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
ADD. VERTICAL REINF.
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
36 16 @ 200 8 24 16 @ 200 8 27 16 @ 200 8
VERTICAL REINF. VERTICAL REINF. ADD. VERTICAL REINF. 12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer


36 16 @ 200 8 38 16 @ 150
31
VERTICAL REINF.
TRANSVERSAL REINF.
DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B
24 16 @ 200 8
VERTICAL REINF.

REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G


G B 24-05-19 LPV/JMG
FIRST ISSUE
A 08-02-19 NTA/JMG
Rev. Date Name Note
36 16 @ 150
35
43 16 @ 150
35 38 16 @ 150
31 Employer
TRANSVERSAL REINF.
Jebel Ali Power Station ´k´ Phase III

Engineer Contractor
SECTION D-D
SCALE: 1:25

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:25 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB SECTIONS REINFORCEMENT 2 Sheet: 8

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

LIST OF REINFORCEMENT WITH SHAPES


BAR SIZE No. OF No. OF BARS TOTAL LENGHT OF EACH UNIT WEIGHT TOTAL WEIGHT BAR SIZE No. OF No. OF BARS TOTAL LENGHT OF EACH UNIT WEIGHT TOTAL WEIGHT
MARK Ø MEMBERS IN EACH MEMBER No. MARK (mm) PER MARK (kg) (kg) SHAPE CODE MARK Ø MEMBERS IN EACH MEMBER No. MARK (mm) PER MARK (kg) (kg) SHAPE CODE

A
A

1474
271

251
2 16 1 9 9 6167 9.74 87.7 21 26 16 1 1 1 4582 7.24 7.2 21
5725
1713 CONDENSATE PIT

45°

271
21 48

251
3 16 1 66 66 7492 11.84 781.3 27 16 1 9 9 2416 3.82 34.4

2
230

33
7050 1904

45°

787
5725 567

271
4 16 1 9 9 7271 11.49 103.4 32 28 16 1 12 12 3536 5.59 67.0 34
45° B

10

258
B 609

67
1703
NOTES :

45° 1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2050 11 48
7 16 1 24 24 2259 3.57 85.7 29 16 1 9 9 2587 4.09 36.8 2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO

249

26

277
2096

4
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
45° 5.- MATERIALS:
1550 553 - CONCRETE:
8 16 1 327 327 1759 2.78 908.8 11 30 16 1 12 12 3707 5.86 70.3 34

249
EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
45°

10

289
ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE

93
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
1830 REINF.
CONCRETE SULPHATE RESISTING PORTLAND
BELLOW XA2 C35/45 0.4 400 35 CEMENT IN ACCORDANCE WITH ASTM
GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C

249
(INCLUDING PILES)
9 16 1 28 28 2278 3.60 100.8 11 31 16 1 76 76 6586 10.41 790.8 6144 21

251
271
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
2069 CONCRETE CEMENT II (36% TO 55% FLY ASH)

- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:

749
4819 COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF

271
(N/mm2) (N/mm2)
6119 21 32 CONSISTENCY

147
10 16 1 102 102 6332 10.00 1020.5 32 16 1 9 9 6327 10.00 90.0 GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
609
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.

271
251
7038 21 21 - REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.

147
11 16 1 98 98 7251 11.46 1122.7 33 16 1 9 9 5261 8.31 74.8 4819 ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
SHALL BE 250µM.
- REINFORCED COVER TO BE CONSIDERED: D
D
75mm IN CONCRETE ELEMENTS BELLOW GROUND.
21 99 50mm IN CONCRETE ELEMENTS ABOVE GROUND.

147
12 16 1 2 2 7194 11.37 22.7 34 16 1 76 76 1948 3.08 233.9 3
55

55
6981

4
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
46° 860 44° 6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
7007 21 55 99 INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
13 16 1 2 2 7220 11.41 22.8 147 35 16 1 88 88 1922 3.04 267.2 3

4
55
9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
44° 834 46° BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
1784 Total: 8150 INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
15 16 1 84 84 3500 5.53 464.5 11
1756

10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
4000 11 ND= DEWA NORTH T.O.M. = TOP OF MORTAR
18 16 1 260 260 4137 6.54 1699.5
177

REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2180 2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088

19 16 1 1 1 5896 9.32 9.3 21 3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
1898

4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006
F
F
1474

7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
20 16 1 1 1 5029 7.95 7.9 21
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.

2161 9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.

2030 10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
21 16 1 1 1 5366 8.48 8.5 21
1708

12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer


1474

22 16 1 1 1 4879 7.71 7.7 21 DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

2011
REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G
G 1882 B 24-05-19 LPV/JMG
FIRST ISSUE
A 08-02-19 NTA/JMG
23 16 1 1 1 5018 7.93 7.9 21
1608

Rev. Date Name Note


Employer

Jebel Ali Power Station ´k´ Phase III


1474

24 16 1 1 1 4732 7.48 7.5 21


Engineer Contractor
1863
1732

25 16 1 1 1 4568 7.22 7.2 21


1458

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:25 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB BAR BENDING SCHEDULE 1 Sheet: 9

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A
A

CONDENSATE PIT

B
B
NOTES :
1.- PLANT LEVEL ±0.000m CORRESPONDS TO ABSOLUTE LEVEL OF +4.200 m DMD.
2.- ED=0.000 m S D=0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO
EG=478666.201 m N G=2773460.380 m IN DLTM COORDINATE SYSTEM.
3.- ALL DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTED.
4.- ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
5.- MATERIALS:
- CONCRETE:
EXPOSURE MAX w/c MIN. CEMENT CYLINDER CHARACT.
ELEMENT CLASS TYPE CONTENT COMPR. STRENGHT CEMENT TYPE
(BS EN 1992-1-1) RATIO (kg/m3) FCK (N/mm2)
REINF.
CONCRETE SULPHATE RESISTING PORTLAND
BELLOW XA2 C35/45 0.4 400 35 CEMENT IN ACCORDANCE WITH ASTM
GROUND C150 TYPE II (36% TO 55% FLY ASH) C
C (INCLUDING PILES)
LEAN SULPHATE RESISTING PORTLAND
- C16/20 - 280 16
CONCRETE CEMENT II (36% TO 55% FLY ASH)

- CONCRETE MIXES FOR SUBSTRUCTURES SHALL CONTAIN MICRO SILICA (8% BY WEIGHT)
- COMPRESSIVE AND FLEXURAL STRENGTHS OF THE NON-SHRINK GROUTS SHALL BE AS FOLLOWS:
COMPRESSIVE STRENGTH FLEXURAL STRENGTH
TYPE OF (N/mm2) (N/mm2)
CONSISTENCY
GROUT
7 DAYS 28 DAYS 7 DAYS 28 DAYS
CEMENT TYPE FLOWABLE 45 65 8 10

- GROUTING OF BASE PLATES TO STRUCTURAL STEEL AND PLANT SHALL BE CARRIED OUT
USING PROPRIETARY HIGH STRENGTH NON-SHRINK CEMENTITIOUS GROUT.
- REINFORCEMENT: DEFORMED HIGH YIELD BARS GRADE 460 ACCORDING TO BS4449:2005.
ALL REINFORCING BARS USED IN FOUNDATION SHALL BE EPOXY COATED
AS PER ASTM A775. THE AVERAGE THICKNESS OF THE COATING
SHALL BE 250µM.
- REINFORCED COVER TO BE CONSIDERED: D
D
75mm IN CONCRETE ELEMENTS BELLOW GROUND.
50mm IN CONCRETE ELEMENTS ABOVE GROUND.
- STEEL STRUCTURE: S275JR UNLESS OTHERWISE NOTED.
6.- THE STEEL STRUCTURE SHALL BE CONNECTED TO MAIN UNDERGROUND EARTHING GRID
INCLUDED IN DWG: U-56-E-D-11034 BURIED GROUNDING GRID TYPICAL INSTALLATION DETAILS.
7.- EXPOSED CORNERS SHALL HAVE A 25mm BY 25mm CHAMFER.
8.- THE REQUIREMENTS FOR SCHEDULING FABRICATED REINFORCING STEELS,
INCLUDING STANDARD BENT SHAPES ARE ACCORDING TO BS 8666:2005.
9.- THE FOUNDATION SHALL INCLUDE A 2x2m FOUNDATION GROUND MESH TO BE LAID 30mm
BELOW THE TOP OF THE UPPEST REINFORCEMENT BAR LAYER OF FOUNDATION AS PER DETAIL
AK. THIS MESH SHALL BE CONNECTED IN TWO (2) POINTS TO MAIN UNDERGROUND EARTHING
GRID, SEE DETAIL “AK” INCLUDED IN DWG: U-56-E-D-11034 EARTHING GRID TYPICAL
INSTALLATION DETAILS, AND IN DWG: U-56-E-D-11033 BURIED GROUNDING GRID LAYOUT BY
AREAS.
10.- FOR WATERPROOFING DETAILS SEE DRAWING R-01-C-D-13088 CONCRETE WORKS - GENERAL
NOTES AND TYPICAL DETAILS. E
E
LEGEND: ABBREVIATIONS:
NG= GEOGRAPHICAL NORTH B.O.C. = BOTTOM OF CONCRETE T.O.S. = TOP OF STEEL
T.O.C. = TOP OF CONCRETE T.O.G. = TOP OF GRATING
ND= DEWA NORTH T.O.M. = TOP OF MORTAR

REFERENCE DRAWINGS :
1.- FOR PLANT LAYOUT SEE DWG: U-01-G-D-00010
2.- FOR CONCRETE WORKS GENERAL NOTES AND TYPICAL DETAILS SEE DWG: R-01-C-D-13088
3.- FOR BURIED GROUNDING GRID LAYOUT DRAWINGS BY AREAS SEE DWG: U-56-E-D-11033
4.- FOR BURIED GROUNDING GRID INSTALLATION DETAILS DRAWINGS SEE DWG: U-56-E-D-11034
5.- FOR GAS CONDENSATE PIT BOP CALCULATION REPORT SEE DOC: R28-C-C-13292
6.- FOR GENERAL ARRANGEMENT BY AREAS KEY PLAN SEE DWG: U-00-G-D-10006 F
F
7.- ALLOWABLE BEARING PRESSURE ON SOIL=150 kPa, SEE SOIL REPORT: R-01-G-E-60002.
8.- FOR CIVIL AND ARCHITECTURAL DESIGN CRITERIA SEE DWG: R-01-G-E-13087.
9.- FOR STAIRS, HANDRAILS, GRATING AND CHEQUERED PLATES STANDARDS SEE DWG: R-01-S-D-13184.
10.- FOR UNDERGROUND NETWORK / EARTH WORK STORM WATER DRAINAGE SEE DWG: R-48-C-D-13021.
11.- E-08-M-S-14032 P&ID FUEL GAS SYSTEM.
12.- FOR GAS TURBINE BUILDING GENERAL ARRANGEMENT BY AREAS SEE DWG: U-00-G-D-10008

Approved Stamp Issuer

DF Document No: K-III-DFE-EKR-CL-13291 Is: 00 Rev: B

REVISED AS PER E/E COMMENTS (ILF REF. No.: PO-3761700035-T-ILF-DF-01427) G


G B 24-05-19 LPV/JMG
FIRST ISSUE
A 08-02-19 NTA/JMG
Rev. Date Name Note
Employer

Jebel Ali Power Station ´k´ Phase III

Engineer Contractor

Date Name Scale:


Drawn: 08.02.2019 NTA/JMG GAS CONDENSATE PIT BOP 1:0 H
H
Checked: 08.02.2019 IAR OUTLINES AND REINFORCEMENT
Approved: 08.02.2019 ELB BAR BENDING SCHEDULE 2 Sheet: 10

Supersedes: of: 10
Superseded by: Size: A1 PO No.: 3761700035 File:
System: Annex: Document No: R-28-C-D-13291 Rev: B
1 2 3 4 5 6 7 8 9 10 11 12