EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
All surfaces are clean, dry & free from oil, grease, weld slag & mill scale SAES-N-110,
B1
prior to installation of refractory. Para. 8.1
Prior to application of refractory, all metallic surfaces have been grit SAES-N-110,
B2
blasted in accordance with SSPC SP 6, "Commercial Blast Clean". Para. 8.2
Surfaces previously coated with a vapor barrier or that are heavily
SAES-N-110,
B3 corroded (such as tie-ins to existing equipment or repairs) are brush
Para. 8.3
blasted in accordance with SSPC SP 7, "Brush Blasting".
Application of hydraulic-setting refractory is by gunning, casting, or SAES-N-110,
B4
vibration casting (as previously qualified by test sample). Para. 9.1.1
Page 1 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Water used to mix refractory (certificate) complies with the following:
A) The pH is within a range of 5.8-8.6. SAES-N-110,
B11
B) Water quality (All Impurities < 1000 ppm, Iron < 500 ppm, Calcium & Para. 9.1.9
Magnesium, both < 300 ppm, Chlorine & Sulfur, both < 200 ppm).
SAES-N-110,
B12 Admixtures are not used during refractory mixing operations.
Para. 9.1.10
Water ratios specified by Refractory Manufacturer are available & mixing SAES-N-110,
B13
containers used have accurate level markings to assure mix accuracy. Para. 9.1.11
Temperature Controls (water & refractory) exist to keep mixed refractory SAES-N-110,
B14
between 10°C and 32°C. Para. 9.1.12
Additives to linings have been approved by Saudi Aramco Engineer SAES-N-110,
B15
(Supervisor, Piping & Valves Unit, Consulting Services Dept, Dhahran). Para. 9.1.13
SAES-N-110,
B16 Piping & equipment is supported to prevent distortion during lining.
Para. 9.1.14
Threaded attachments on equipment are protected from lining during SAES-N-110,
B17
application & Protection does not interfere with the application of lining. Para. 9.1.15
Equipment nozzle extensions were properly coated with grease to SAES-N-110,
B18
prevent refractory from bonding to them. Para. 9.1.16
All openings in equipment are closed & tapered hardwood plugs & sheet SAES-N-110,
B19
metal sleeves extend beyond the final thickness of the lining. Para. 9.1.17
These plugs or sleeves are coated with grease, fit snugly into openings, SAES-N-110,
B20
& shall remain in place until the refractory has set. Para. 9.1.17
Refractory Manufacturer's recommended time limits are available. The SAES-N-110,
B21
application is well-planned to ensure use within specified time limits. Para. 9.1.18
Refractory installed in piping or vessel sections prior to connection by SAES-N-110,
B22
welding allows a minimum gap of 100 mm at the ends of each section. Para. 9.1.19
Double-layer linings allow a first layer 24 hour minimum cure & first layer SAES-N-110,
B23
thorough wetting (quality water is used) just before 2nd layer application. Para. 9.1.20
Linings of each type of refractory are installed to full thickness in a single SAES-N-110,
B24
application & are not built up in layers. Para. 9.1.21
When necessary to apply lining in sections to achieve full thickness in a
SAES-N-110,
B25 single application, edge forms are beveled 10° for keying of adjoining
Para. 9.1.21
sections. Construction Joint provisions exist. (Detailed Drawings).
SAES-N-110,
B26 Anchors were installed per SASD AC-036397. See Attachment 1.
Para. 9.2.1
Nozzle & manway opening details in refractory lined pressure vessels SAES-N-110,
B27
& piping were installed per SASD AB-036914. See Attachment 2. Para. 9.2.2
SAES-N-110,
B28 Hexsteel was installed per SASD AB-036396. See Attachment 3.
Para. 9.2.3
Inspector reviews the following procedure before production work: SAES-N-110,
B29
"Mixing Refractory for Pneumatic Applications" . See Note 6. Section 9.3
Page 2 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
C. SAES-N-110 Procedure Figure 1 – Checklist for Castable Refractory (Section A, Prior to Installation)
SAES-N-120,
D1 Material is unopened & within expiry date (Or material is rejected).
Para. 10.1.1
Water used to mix refractory (certificate) complies with the following:
A) The pH is within a range of 5.8-8.6. SAES-N-120,
D2
B) Water quality (All Impurities < 1000 ppm, Iron < 500 ppm, Calcium & Para. 10.1.3
Magnesium, both < 300 ppm, Chlorine & Sulfur, both < 200 ppm).
SAES-N-120,
D3 Admixtures are not used unless approved by Saudi Aramco Engineer.
Para. 10.1.4
SAES-N-120,
D4 Linings will be installed indoors except for in-situ patching & repairs.
Para. 10.1.5
SAES-N-120,
D5 Lining backing surface temperatures will not exceed 32°C on application
Para. 10.1.6
Page 3 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Protective Steps are taken are maintain a maximum temperature of 32°C
SAES-N-120,
D6 for a minimum of 24 hours after installation. Linings are protected from
Para. 10.1.7
heat-induced accelerated setting by protective measures. Note 5.
Linings & lining materials will be kept above 10°C during the lining SAES-N-120,
D7
application and for a period 48 hours after the lining application. Para. 10.1.9
SAES-N-120,
D8 Surfaces shall be kept dry before, during and after installation.
Para. 10.1.10
Refractory Manufacturer's mixing instructions, installation instructions, & SAES-N-120,
D9
precautions are available (to be strictly followed during applications). Para. 10.2.1
Mandatory mixing equipment (all Stainless Steel) is available as follows:
A) Hobart, Model #D-33 commercial mixer (or approved equal). SAES-N-120,
D10
B) Two, 30-quart mixing bowls Para. 10.2.2
C) A beater and a wire whip
Applicators understand the following mandatory requirements:
A) The Mixed quantity is only what can be applied within 15 mins after
the addition of water.
SAES-N-120,
D11 B) Any mixed refractory not used within 15 minutes is discarded.
Para. 10.2.3
C) Mixing does not continue after the plastic stage occurs.
D) All equipment, mixing bowls & tools must be kept clean & free of
foreign material & must be cleaned thoroughly after each mix.
SAES-N-120,
D12 SAMPLE TESTING PROCEDURE (9 Steps) has been completed.
Section 10.3
(1) Select three packages at random from each batch or lot, then take 5 SAES-N-120,
D13
lbs of dry and damp material from each batch or lot. Para. 10.3.1 (1)
(2) Reseal the packages that the samples were taken from and mark SAES-N-120,
D14
them "Package Opened for Sampling". Para. 10.3.1 (2)
(3) Mix the three samples of the dry material together to give a uniform SAES-N-120,
D15
mixture. Repeat this procedure with the damp material. Para. 10.3.1 (3)
(4) Take enough of the sample mix to prepare five 50 mm cubes for the SAES-N-120,
D16
cold crushing strength tests. Para. 10.3.1 (4)
SAES-N-120,
D17 (5) Seal the remainder for possible re-test.
Para. 10.3.1 (5)
(6) Mix the two materials together & add required amount of water (refer SAES-N-120,
D18
to mixing instructions in paragraph 10.2.3 above) & cast five cubes. Para. 10.3.1 (6)
SAES-N-120,
D19 (7) Air cure and dryout the samples in accordance with Chapter 11.
Para. 10.3.1 (7)
(8) Perform cold-crushing strength and bulk density tests in accordance
SAES-N-120,
D20 with ASTM C133 and ASTM C134. The cold-crushing strength and bulk
Para. 10.3.1 (8)
density values are the average result obtained for the five test cubes.
(9) Any sample that does not meet the minimum published strength or SAES-N-120,
D21
density will be cause for rejection of the complete batch. Para. 10.3.1 (9)
Hand packing tools (Plastic or wooden mallets) are available to
SAES-N-120,
D22 hammer refractory into hexsteel to eliminate voids or air pockets &
Para. 10.4.1
increase the installed density of the material.
Extreme care prevents overlaying of lining material over hexsteel. Form
for screeding is checked for levelness (screed board, line, straightedge)
SAES-N-120,
D23 & securement. No hexsteel protrusions or depressions exist.
Para. 10.4.2
Smooth screeding is flush to the face of the hexsteel & hexsteel
pattern must be visibly distinguishable after screeding of lining.
Air curing & Dryout equipment (Ventilation equipment, furnace, SAES-N-120,
D24
auxilliary burners, temperature measuring devices, etc) is available. Section 11.1
SAES-N-120,
D25 A 1-pound hammer (head weight as stamped) is available for testing.
Section 12.2.6
Page 4 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Preparations for Sample Testing before Application are as follows:
A) Enough (64-80) sample forms of 50 mm cube size exist on jobsite.
SAES-N-120,
D26 B) A chart is available (Sample number, date & time taken, location).
Section 10.5
C) Sketch & log exists to show each batch location & samples location.
D) Approved test laboratory has been determined for sample testing.
E. SAES-N-120 Procedure Figure 1 – Checklist for Extreme Erosion-Resistant Refractory (Section A, Prior to Installation)
ATTACHMENTS: None
NOTES: 1. This checklist applies to Pre-Application inspection for castable refractory systems detailed in procedures SAES-N-110 & SAES-N-120.
2. This is a requirement for both SAES-N-110 & SAES-N-120.
3. Use Table 3 – Mandatory Refractory Systems of SAES-N-100 (Not Attached) for Pre-installation inspection checks of materials.
4. The standard refers to Paragraph 11. This is an error. Testing requirements are in Section 11. This will be revised upon the next standard review.
5. To achieve temperature limitations specified (Maximum 32°C for 24 hours minimum), the backing surface may be shaded from direct sunlight,
the refractory lining may be applied indoors, or apply refractory lining at night with proper illumination. Cooling by water spraying is prohibited.
6. Inspector reviews a Field Copy of SAES-N-110, Section 9, Installation. (This is not attached to this checklist & a field copy will be needed). The
Inspector uses the procedure as a checklist for equipment (mixing, application), consummables (air, water, materials), & set-up (formwork) checks.
Page 5 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 TESTING MECH-
Page 6 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 TESTING MECH-
Page 7 of 8
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Application Inspection of Castable Refractory SAIC-N-2024 TESTING MECH-
Page 8 of 8