29-00-00-210-001-A - Check for Air in the Green/Blue/Yellow Hydraulic System

** ON A/C ALL

TASK 29-00-00-210-001-A
Check for Air in the Green/Blue/Yellow Hydraulic System

WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN
CAUSE DAMAGE TO THE EQUIPMENT.

WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR. MOVE-
MENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.

1. Reason for the Job


Self explanatory
2 Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment

REFERENCE QTY DESIGNATION


No specific 1 ACCESS PLATFORM 2M (6 FT)

B. Work Zones and Access Panels

ZONE/ACCESS ZONE DESCRIPTION


195BB, 196BB,
197CB

C. Referenced Information

REFERENCE DESIGNATION
12-12-29-611-001-A Fill the Hydraulic Fluid Reservoir with a Hand Pump
12-12-29-611-002-A Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
29-00-00-870-001-A Bleeding Procedure of the Green Hydraulic System Upstream of the
Engine Pump
29-00-00-870-002-A Bleeding Procedure of the Green Hydraulic System Upstream of the
PTU
29-00-00-870-003-A Bleeding Procedure of the Green Hydraulic System Downstream of the
Engine Pump
29-00-00-870-004-A Bleeding Procedure of the Yellow Hydraulic System Upstream of the
Engine Pump
29-00-00-870-005-A Bleeding Procedure of the Yellow Hydraulic System Upstream of the
PTU
29-00-00-870-006-A Bleeding Procedure of the Yellow Hydraulic System Upstream of the
Yellow E-Pump

Print Date: April 06, 2017 Page 1 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : AXM Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 104-104
Rev. Date : Feb 01, 2017
29-00-00-210-001-A - Check for Air in the Green/Blue/Yellow Hydraulic System

REFERENCE DESIGNATION
29-00-00-870-007-A Bleeding Procedure of the Yellow Hydraulic System Downstream of
the Engine Pump
29-00-00-870-008-A Bleeding Procedure of the Blue Hydraulic System Upstream of the
Blue E-Pump
29-00-00-870-009-A Bleeding Procedure of the Blue Hydraulic System Downstream of the
Blue E-Pump
29-00-00-910-002-A Safety Procedures of the Hydraulic System
29-10-00-863-001-A Pressurize the Green Hydraulic System with a Hydraulic Ground
Power-Cart
29-10-00-863-002-A Pressurize the Yellow Hydraulic System with a Hydraulic Ground
Power-Cart
29-10-00-863-003-A Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-
Cart
29-10-00-863-003-A-01 Pressurize the Blue Hydraulic System with the Blue Electric Pump
29-10-00-864-001-A Depressurize the Green Hydraulic System
29-10-00-864-002-A Depressurize the Yellow Hydraulic System
29-10-00-864-003-A Depressurize the Blue Hydraulic System
29-14-00-614-001-A Depressurization of the Hydraulic Reservoirs
29-14-00-614-002-A Pressurization of the Hydraulic Reservoirs through the Ground Con-
nector
29-14-00-614-002-A-01 Pressurization of the Hydraulic Reservoirs with the Auxiliary Power
Unit (APU)
32-12-00-010-001-A Open the Main Gear Doors for Access
32-12-00-410-001-A Close the Main Gear Doors after Access

3. Job Set-up
Subtask 29-00-00-860-089-A
A. Aircraft Maintenance Configuration

WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.

(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002) .
(2) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001) .
(3) Put the ACCESS PLATFORM 2M (6 FT) in position.
(4) Open the access panels 197CB, 195BB, 196BB.
(5) Make sure that the hydraulic reservoir of the applicable hydraulic system is pressurized to a minimum
of 50 psi (3.4474 bar). If necessary pressurize it (Ref. AMM TASK 29-14-00-614-002) .
(6) Do a check of the fluid level of the applicable hydraulic reservoir. If necessary fill the reservoir
(Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002) .
Subtask 29-00-00-865-081-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:

PANEL DESIGNATION FIN LOCATION


49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU 1801GL N34
121VU HYDRAULIC/HYD POWER/Y 3803GX N30
123VU B HYD/ELEC PUMP 2701GJ AB09

Print Date: April 06, 2017 Page 2 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : AXM Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 104-104
Rev. Date : Feb 01, 2017
29-00-00-210-001-A - Check for Air in the Green/Blue/Yellow Hydraulic System

PANEL DESIGNATION FIN LOCATION


123VU Y HYD/ELEC/PUMP 3802GX AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
4. Procedure
Subtask 29-00-00-210-053-A
A. Check for Air in the Green Hydraulic System.
(1) Do the subsequent steps to make sure that there is no air in the hydraulic system.
(a) Pressurize the Green hydraulic system until the hydraulic pressure is stable
(Ref. AMM TASK 29-10-00-863-001) .
(b) Depressurize the Green hydraulic system and let the hydraulic reservoir level become stable in 1
minute (Ref. AMM TASK 29-10-00-864-001) .
(c) Make sure that the reservoir is pressurized to a minimum of 50 psi (3.4474 bar). If necessary
pressurize it (Ref. AMM TASK 29-14-00-614-002) .
(d) Read the gage of the Green reservoir and record the fluid level.
(e) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001)
(f) After 5 minutes read the gage of the Green reservoir again and record the fluid level.
(g) Compare the two levels.
1 If the difference between the two levels is more than 2 l (0.5283 USgal),
do the related bleeding procedure: (Ref. AMM TASK 29-00-00-870-001) ,
(Ref. AMM TASK 29-00-00-870-002) , (Ref. AMM TASK 29-00-00-870-003) .
2 If the difference is not more than 2 l (0.5283 USgal) , no bleeding operation is necessary.
Subtask 29-00-00-210-054-B
B. Check for Air in the Blue Hydraulic System.
(1) Do the subsequent steps to make sure that there is no air in the hydraulic system.
(a) Pressurize the Blue hydraulic system until the hydraulic pressure is stable
(Ref. AMM TASK 29-10-00-863-003) .
(b) Depressurize the Blue hydraulic system and let the hydraulic reservoir level become stable in 1
minute (Ref. AMM TASK 29-10-00-864-003) .
(c) Make sure that the reservoir is pressurized to a minimum of 50 psi (3.4474 bar). If necessary
pressurize it (Ref. AMM TASK 29-14-00-614-002) .
(d) Read the gage of the Blue reservoir and record the fluid level.
(e) Depressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-001)
(f) After 5 minutes read the gage of the Blue reservoir again and record the fluid level.
(g) Compare the two levels.
1 If the difference between the two levels is more than 1 l (0.2642 USgal), do
the related bleeding procedure: (Ref. AMM TASK 29-00-00-870-008) and/or
(Ref. AMM TASK 29-00-00-870-009) .
2 If the difference is not more than 1 l (0.2642 USgal), no bleeding operation is necessary.
Subtask 29-00-00-210-055-A
C. Check for Air in the Yellow Hydraulic System.
(1) Do the subsequent steps to make sure that there is no air in the hydraulic system.

Print Date: April 06, 2017 Page 3 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : AXM Manual : AMM
Type : A318/A319/A320/A321 Selected applicability : 104-104
Rev. Date : Feb 01, 2017
29-00-00-210-001-A - Check for Air in the Green/Blue/Yellow Hydraulic System

(a) Pressurize the Yellow hydraulic system until the hydraulic pressure is stable
(Ref. AMM TASK 29-10-00-863-002) .
(b) Depressurize the Yellow hydraulic system and let the hydraulic reservoir level become stable in 1
minute (Ref. AMM TASK 29-10-00-864-002) .
(c) Make sure that the reservoir is pressurized to a minimum of 50 psi (3.4474 bar). If necessary
pressurize it (Ref. AMM TASK 29-14-00-614-002) .
(d) Read the gage of the Yellow reservoir and record the fluid level.
(e) Depressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-001) .
(f) After 5 minutes read the gage of the Yellow reservoir again and record the fluid level.
(g) Compare the two levels.
1 If the difference between the two levels is more than 1.5 l (0.3963 USgal),
do the related bleeding procedure (Ref. AMM TASK 29-00-00-870-004) ,
(Ref. AMM TASK 29-00-00-870-005) , (Ref. AMM TASK 29-00-00-870-006)
(Ref. AMM TASK 29-00-00-870-007) .
2 If the difference is not more than 1.5 l (0.3963 USgal), no bleeding operation is necessary.
5. Close-up
Subtask 29-00-00-860-090-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the hydraulic reservoir of the applicable hydraulic system is pressurized. If necessary
pressurize it (Ref. AMM TASK 29-14-00-614-002) .
(2) Make sure that the level of the hydraulic fluid in the reservoir of the Yellow hydraulic
system is correct. Add fluid if necessary (Ref. AMM TASK 12-12-29-611-001) or
(Ref. AMM TASK 12-12-29-611-002) .
(3) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001) .
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Remove the access platform(s).
(6) Close the access panels 197CB, 195BB, 196BB.

End of document

Print Date: April 06, 2017 Page 4 of 4


© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

Вам также может понравиться