DESIGN OF HVAC

SYSTEM

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

A 1 A
A 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.
INTERNAL LOAD DATA:

Internal loads involve components of cooling loads which arises from sources internal to the
conditioned space. The following components shall be dealt with in the proceeding items :
LIGHTING :
The details of the lighting loads in each room is taken from actual lighting load calculation.
The Summary of lighting load is enclosed for reference.

Formula
Qs = 3.41 x qw x Fu x Fs x CLF
Where :
Qs = Sensible cooling load in BTU/Hr.

qw = Total Lamp Wattage (As shown in the detailed calculation enclosed)

Fu = Usage factor (%)


= Wattage in use x 100
Total Installed Wattage

Fs = Special Balast allowance refer to Table 4.1 ASHRAE GRP-158


= Use 1.20

CLF = 1, Since lights will be turned on more than 16 Hrs. per day.

Summary of lighting load is as below:

Zone Name Lighting load


in Watts
Control Room 23,328
AC/DC AUX. ROOM 2,074
WORK SHOP 691
RELAY TEST ROOM 518
OFFICE 691
STORE 346
TOILET 173
CORRIDOR 778
BATTERY ROOM 1,382
TELE COMMUNICATION ROOM 1,037
PUMP HOUSE 778
CABLE BASEMENT 8,381
34.5kV SWGR 3,370
SWGR CABLE BASMENT 1,814
230kV GIS BUILDING 16,730
GIS CABLE BASEMENT 5,875
MECHANICAL ROOM CTRL 1,728
MECHANICAL ROOM SWGR 1,382
MECHANICAL ROOM GIS 1,469

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM

JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0


PEOPLE :

Sensible Heat gain from people (Qs) :

Qs = qs x No. of people x CLF

Where :
qs = Sensible heat gain per person
= Table 4.5 ASHRAE GRP - 158

CLF = Cooling Load Factor


= Table 4.6 ASHRAE GRP - 158

Number of people considered in each room are as below:

Number of Sensible Heat /person Latent Heat /person in


Zone Name People in BTUH BTUH
CLF (for QS only)

Control Room 2 315 325 0.25


AC/DC AUX. ROOM 1 315 325 0.25
WORK SHOP 0 315 325 0.25
RELAY TEST ROOM 1 315 325 0.25
OFFICE 1 315 325 0.25
STORE 1 315 325 0.25
TOILET 0 315 325 0.25
CORRIDOR 0 315 325 0.25
BATTERY ROOM 1 315 325 0.25
TELE COMMUNICATION R 0 315 325 0.25
PUMP HOUSE 0 315 325 0.25
CABLE BASEMENT 0 315 325 0.25
34.5kV SWGR 2 315 325 0.25
SWGR CABLE BASMENT 2 315 325 0.25
230kV GIS BUILDING 3 315 325 0.25
GIS CABLE BASEMENT 2 315 325 0.25
TOTAL 16

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 2 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Latent Heat gain from people (Ql) :

Where :
qL = Latent heat gain per person
= Table 4.5 ASHRAE GRP - 158

Number of people in each room will be same as indicated above.

EQUIPMENT HEAT GAIN :

The heat gain are due to the heat dissipated by equipment's inside the building.
The actual load dissipation from the each panel is taken from the each equipment
manufacturer & as summarized by the Design Engineer - Electrical.

The summery of equipment heat dissipation loads are as below:

Zone Name Load in watts


Control Room 17,144
AC/DC AUX. ROOM 25,903
WORK SHOP 0
RELAY TEST ROOM 0
OFFICE 0
STORE 0
TOILET 0
CORRIDOR 0
BATTERY ROOM 1,410
TELE COMMUNICATION ROOM 7,583
PUMP HOUSE 1500 (ASSUMED)
CABLE BASEMENT (Control Building) 16
34.5kV SWGR 22,510
SWGR CABLE BASMENT 11,670
230kV GIS BUILDING 183,015
GIS CABLE BASEMENT 8,619
MECHANICAL ROOM CTRL BUILDING 774
MECHANICAL ROOM SWGR BUILDING 774
MECHANICAL ROOM GIS 774

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 3 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M ) 2 People
NW NE SE SW Watts Watts
Area of room = D6,D7 Size(single) = 2.4 0.9 D6 Size(Single) = 2.4 0.9 NW = 9.6x5.235
54.6 X 22.1 = 1206.7 M2 Area of the door 4.5 M2 Area of the door 2.2 M2 51.12 sq.mt
Area of the door 48.0 Ft2 Area of the door 24.0 Ft2 550.2 sq.ft
179.1 X 72.5 = 12988.3 FT 2
D3 Size(Double) = 2.4 2.4
Area of the door 6.0 M2
1 Control Room FC.HT = 3.0 M Area of the door 64.1 Ft2 NE = 7.31 x 5.23 23328.0 17144.0 2.0
FC.HT = 9.8 Ft Total area of the door 112.1 Ft2 Total area of the door 24.0 Ft2 38.267 sq.mt
Avg. Height of wall 17.7 FT Avg. Height of wall 19.1 FT Avg. Height of wall 21.6 FT 411.8 sq.ft
RF.HT = 5.8 M Width of the wall 155.8 FT Width of the wall 49.4 FT Width of the wall 84.5 FT
RF.HT = 19.1 Ft Area of the wall 2757.7 Ft2 Area of the wall 944.1 Ft2 Area of the wall 1821.3 Ft2
Net area of the wall 2645.6 Ft2 Net area of the wall 920.1 Ft2 Net area of the wall 1821.3 Ft2
Area of room =
15.0 X 8.8 = 131.8 M2

49.1 X 28.9 = 1418.9 FT2

2 AC/DC AUX. ROOM FC.HT = 3.0 M 2074.1 25903.2 1.0


FC.HT = 9.8 Ft
Avg. Height of wall 15.7 FT
RF.HT = 4.8 M Width of the wall 28.9 FT
RF.HT = 15.7 Ft Area of the wall 454.7 Ft2
Net area of the wall 454.7 Ft2
Area of room =
6.8 X 3.4 = 23.1 M2

22.3 X 11.2 = 248.9 FT2

3 WORK SHOP FC.HT = 3.0 M 691.2 0.0 0.0


FC.HT = 9.8 Ft

RF.HT = 4.8 M
RF.HT = 15.8 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )
2 People
NW NE SE SW Watts Watts
Area of room =
8.0 X 3.4 = 27.0 M2

26.1 X 11.2 = 290.9 FT2

4 RELAY TEST ROOM FC.HT = 3.0 M 518.4 0.0 1.0


FC.HT = 9.8 Ft
Avg. Height of wall 15.8 FT
RF.HT = 4.8 M Width of the wall 11.2 FT
RF.HT = 15.8 Ft Area of the wall 175.8 Ft2
Net area of the wall 175.8 Ft2
Area of room =
4.9 X 4.2 = 20.3 M2

16.1 X 13.6 = 218.9 FT2

5 OFFICE FC.HT = 3.0 M 691.2 1.0


FC.HT = 9.8 Ft

RF.HT = 5.0 M
RF.HT = 16.4 Ft

Area of room =
5.5 X 4.2 = 22.7 M2

17.9 X 13.6 = 244.3 FT2

6 STORE FC.HT = 0.0 M 345.6 0.0 1.0


FC.HT = 0.0 Ft

RF.HT = 4.8 M
RF.HT = 15.8 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room =
3.9 X 4.2 = 16.3 M2

12.9 X 13.6 = 175.3 FT2

7 TOILET FC.HT = 3.0 M 172.8 0.0 0.0


FC.HT = 9.8 Ft
Avg. Height of wall 9.8 FT
RF.HT = 4.6 M Width of the wall 13.6 FT
RF.HT = 15.1 Ft Area of the wall 133.4 Ft2
Net area of the wall 133.4 Ft2
Area of room = D3 Size(Single) = 2.4 2.4
35.0 X 2.8 = 97.9 M2 Area of the door 6.0 M2
Area of the door 64.1 Ft2
114.8 X 9.2 = 1054.3 FT2
width of wall 2.8 m
8 CORRIDOR FC.HT = 3.0 M wall HT 5.1 m 777.6 0.0 0.0
FC.HT = 9.8 Ft wall area 14.3 M2
wall area 153.6 FT2
RF.HT = 5.1 M Net wall Area 89.5 FT2
RF.HT = 16.6 Ft

Area of room = D5 Size(Single) = 2.4 1.1


10.1 X 9.9 = 99.5 M2 Area of the door 2.6 M2
Area of the door 28.0 Ft2
33.1 X 32.3 = 1070.8 FT2

9 BATTERY ROOM FC.HT = 0.0 M 1382.4 1410.0 1.0


FC.HT = 0.0 Ft Total area of the door 28.0 Ft2
Avg. Height of wall 15.4 FT Avg. Height of wall 15.4 FT
RF.HT = 4.7 M Width of the wall 32.3 FT Width of the wall 33.1 FT
RF.HT = 15.4 Ft Area of the wall 499.3 Ft2 Area of the wall 511.9 Ft2
Net area of the wall 499.3 Ft 2
Net area of the wall 483.9 Ft2
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room =
7.7 X 9.9 = 75.6 M2

25.2 X 32.3 = 814.3 FT2


TELE
10 COMMUNICATION FC.HT = 3.0 M 1036.8 7583.0 0.0
ROOM FC.HT = 9.8 Ft
Avg. Height of wall 16.2 FT
RF.HT = 5.0 M Width of the wall 25.2 FT
RF.HT = 16.2 Ft Area of the wall 409.2 Ft2
Net area of the wall 409.2 Ft2
Area of room = D1 Size(Single) = 3.5 4.0
10.0 X 9.9 = 98.5 M2 Area of the door 14.0 M2
Area of the door 150.7 Ft2
32.8 X 32.3 = 1060.2 FT2 D7 Size(Single) = 2.4 0.9
Area of the door 2.2 M2 1500
11 PUMP HOUSE FC.HT = 0.0 M Area of the door 24.0 Ft2 777.6 (ASSUME 0.0
FC.HT = 0.0 Ft Total area of the door 174.7 Ft2 D)
Avg. Height of wall 15.7 FT Avg. Height of wall 15.7 FT
RF.HT = 4.8 M Width of the wall 32.8 FT Width of the wall 32.3 FT
RF.HT = 15.7 Ft Area of the wall 516.7 Ft2 Area of the wall 508.9 Ft2
Net area of the wall 342.0 Ft2
Net area of the wall 508.9 Ft2
Area of room =
54.6 X 24.9 = 1359.0 M2 46.58X10.7 FT2

179.1 X 81.7 = 14628.5 FT2


CABLE BASEMENT
12 for Control Building FC.HT = 0.0 M 8380.8 16.0 0.0
FC.HT = 0.0 Ft

RF.HT = 3.3 M
RF.HT = 10.7 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room = D4 Size(single) = 2.0 0.9 D1 Size(Double) = 3.1 2.5
37.2 X 8.7 = 325.1 M 2
Area of the door 1.9 M 2
Area of the door 7.7 M2 SE =7.2 x 4.986
Area of the door 20.0 Ft 2
Area of the door 83.4 Ft2 36 sq.mt
122.0 X 28.7 = 3499.6 FT2 D5 Size(Single) = 2.0 1.1 387.3 sq.ft
Area of the door 2.1 M2
13 34.5kV SWGR FC.HT = 0.0 M Area of the door 22.9 Ft2 3369.6 22510.0 2.0
FC.HT = 0.0 Ft Total area of the door 42.9 Ft2 Total area of the door 83.4 Ft2 Total area of the door 0.0 Ft2
Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT
RF.HT = 5.0 M Width of the wall 98.4 FT Width of the wall 28.7 FT Width of the wall 75.3 FT
RF.HT = 16.4 Ft Area of the wall 1609.6 Ft2 Area of the wall 469.1 Ft2 Area of the wall 1231.8 Ft2
Net area of the wall 1566.7 Ft2 Net area of the wall 385.7 Ft2 Net area of the wall 1231.8 Ft2
Area of room =
37.3 X 8.8 = 329.1 M2
14.4X4.986
122.4 X 28.9 = 3542.6 FT2 71.798 M2
772.4 FT2
SWGR CABLE
14 FC.HT = 0.0 M 1814.4 11670.0 2.0
BASMENT
FC.HT = 0.0 Ft

RF.HT = 3.3 M
RF.HT = 10.8 Ft

Area of room = D1 Size(Double) = 3.1 2.5


85.0 X 14.6 = 1240.4 M2 Area of the door 7.7 M2 NW=21.77X4.6
Area of the door 83.4 Ft2 100.14 M2
278.7 X 47.9 = 13351.6 FT2 D4 Size(single) = 1.2 2.5 1077.37 FT2
Area of the door 2.9 M2
15 230kV GIS BUILDING FC.HT = 0.0 M Area of the door 31.3 Ft2 16729.6 183015.0 3.0
FC.HT = 0.0 Ft Total area of the door 114.6 Ft2
Avg. Height of wall 29.9 FT Avg. Height of wall 10.8 FT Avg. Height of wall 29.9 FT Avg. Height of wall 29.9 FT
RF.HT = 9.1 M Width of the wall 247.3 FT Width of the wall 47.9 FT Width of the wall 246.8 FT Width of the wall 48.2 FT
RF.HT = 29.9 Ft Area of the wall 7381.8 Ft2 Area of the wall 518.2 Ft2 Area of the wall 7369.5 Ft2 Area of the wall 1437.5 Ft2
Net area of the wall 7381.8 Ft2 Net area of the wall 518.2 Ft2
Net area of the wall 7369.5 Ft2
Net area of the wall 1322.9 Ft2
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room =
85.3 X 14.7 = 1252.1 M2 NW=21.77X4.6
100.14 M2
279.8 X 48.2 = 13477.0 FT2 1077.37 FT2

GIS CABLE
16 FC.HT = 0.0 M 5875.2 8619.0 2.0
BASEMENT
FC.HT = 0.0 Ft

RF.HT = 3.0 M
RF.HT = 9.8 Ft

Area of room = D1 Size(Double) = 3.1 2.5


10.0 X 18.8 = 188.0 M2 Area of the door 7.7 M2
Area of the door 83.4 Ft2
32.8 X 61.7 = 2023.6 FT2 D7 Size(single) = 1.0 2.5
Area of the door 2.5 M2
ControlBuilding FC.HT = 0.0 M Area of the door 27.2 Ft2
15 1728.0 774.0 0.0
Mechanical Room
FC.HT = 0.0 Ft Total area of the door 110.6 Ft2
Avg. Height of wall 16.4 FT
RF.HT = 5.0 M Width of the wall 61.7 FT
RF.HT = 16.4 Ft Area of the wall 1012.1 Ft2
Net area of the wall 901.6 Ft2
Area of room = D2 Size(Double) = 3.1 2.5
14.2 X 9.9 = 140.8 M2 Area of the door 7.7 M2
Area of the door 83.4 Ft2
46.7 X 32.5 = 1515.3 FT2 D5 Size(single) = 1.0 2.5
Area of the door 2.5 M2
SWGR
16 FC.HT = 0.0 M Area of the door 27.2 Ft2 1382.0 774.0 0.0
Mechanical Room
FC.HT = 0.0 Ft Total area of the door 110.6 Ft2
Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT
RF.HT = 5.0 M Width of the wall 32.5 FT Width of the wall 46.7 FT Width of the wall 32.5 FT
RF.HT = 16.4 Ft Area of the wall 533.1 Ft2 Area of the wall 766.1 Ft2 Area of the wall 533.1 Ft2
Net area of the wall 533.1 Ft2
Net area of the wall 655.5 Ft2
Net area of the wall 533.1 Ft2
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room = D2 Size(Double) = 3.1 2.5
17.7 X 10.4 = 184.5 M2 Area of the door 7.7 M2
Area of the door 83.4 Ft2
57.9 X 34.3 = 1985.5 FT2 D4 Size(single) = 1.0 2.5
Area of the door 2.5 M2 xsa
230 KV GIS
16 FC.HT = 0.0 M Area of the door 27.2 Ft2 1469.0 774.0 0.0
Mechanical Room
FC.HT = 0.0 Ft Total area of the door 110.6 Ft2
Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT
RF.HT = 5.0 M Width of the wall 19.5 FT Width of the wall 57.9 FT Width of the wall 34.3 FT
RF.HT = 16.4 Ft Area of the wall 319.9 Ft2 Area of the wall 949.8 Ft2 Area of the wall 562.7 Ft2
Net area of the wall 319.9 Ft2 Net area of the wall 839.2 Ft2 Net area of the wall 562.7 Ft2

Plenum Area 17034.4 54.6 x 5.235 = 285.83 3076.6 2.76x5.235 = 14.45 155.54
3.4 x 4.804 = 16.33 175.77
8.8 x 4.804 = 42.28 455.1
2.8 x 5.05 = 14.14 152.2
938.61
VENTILATION, EXHAUST AND PRESSURIZATION FOR GIS BUILDING :
(AHU 1&2)
EXHAUST AND VENTILATION CALCULATION:
Ventilation
We shall design the system in such a way that a positive pressurization is achieved.
Introduction of Outdoor air into the system through a fresh air opening / grilles into the
machine room shall eventually produce heat both sensible and latent in nature.

Qs = 1.1 x (To - TR) x CFM ------------------------ (1 )

QL = 4840 x (Wo - Wi ) x CFM ------------------------ (2 )

Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o

TR = Room design temperature. 77 F


o

Wo = Outside Air Humidity ratio # W.V / # water


Wi = Room air humidity ratio # W.V / # Water.
CFM = Ventilation rate requirement.

Please refer to the Computer Generated Calculation Sheets enclosed with this document for
the details.

Exhaust

a) Battery room

From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12.
Hence No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of
the Battery room exhaust system is enclosed.

b) Toilet room

From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10.
Hence No. of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of
the toilet room exhaust system is enclosed.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION

Site Condition
Outside temperature : 120 o
F 49 o
C
Prevailing wind direction : 22 N
o

Wind speed : 22 mph ( KMPH )


Building pressure : 50 Pa (in.w.g)

Wind pressure (Ref. ASHRAE Fundamental 1997 Chapter 25)


Wind static pressure: Pv = 1/2 (C1*C2*p*V2) - Equation No.6 Chapter 23 of
ASHRAE Fundamental.
Where :
Pv = Surface pressure relative to static pressure in
Undistributed flow : in of water.

C1 = 0.0129 Unit conversion factor


C2 = wind surface pressure co-efficient
= 1 for the undistributed area

p = Air density in lb/ft3


= 0.07 at120Deg.F

V = Wind speed in MPH


= 22 MPH (Taken from SES-K-100)
Hence
Pv = 1/2*(0.0129x1x0.07x22^2)
= 0.218526 inches of W.G.
= 0.218526 inches of W.G.

Ex-filtration shall be calculated as below:


Qp = Qexh+Po/Pi Qexh+Po/PiQx+Qx
Where :
Qexh = Exhaust air in CFM
Qx = Ex-Filtration in CFM

P0=Pv = Outside Static Pressure on building wall


= 0.218526 (Ref. To above calculation)

Pi = Inside Static pressure of the space.


= P0 + 0.2 in W.G
= 0.218526 + 0.2 in W.G
= 0.419

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
#REF! SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = 0.0
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.22 in of W.G
Qexh = 0 CFM
Qx = 134 CFM
Qp = {0+(0.218526/0.418526)x0}+{(0.218526/0.418526) x134+ 134}
Qp = 204.0
Qp = 204.0 cfm
Note:
As per SES-K-100, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.

Percent of outside air = Outside Air x 100


Supply air

Percent of Press. Air = (Outside Air - Exhaust air ) x 100


Supply air

Fresh Air is considering as follows :

1. Fresh Air = 5% of Supply Air + Exhaust air + Exfiltration Air


= (46347X5/100)+0+134 = ###
Say = 2,451CFM
2. Fresh Air = Pressurization Air + Exhaust Air + Exfiltration Air
= 204 CFM
3. Fresh Air = 10% Supply Air
= 4635 CFM

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 3 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area Air - CFM Air CFM CFM - -
230KV GIS 46,347 4,635 0 10.00% 9.74%

AIR BALANCING:
Supply Air Return Air Exhaust Air Press. Air Ex.A
SL# Zone Name
CFM CFM CFM CFM CFM
1 230kV GIS BUILDING 42,558 38,336 0.0 4137 85
2 CABLE BASEMENT 2,767 2,498 0.0 269 0
3 MECH. ROOM 1,022 879 0.0 95 49
TOTAL 46,347 41,712 0 4501 134

Total Supply air =


46,347 CFM
Return Air =
41,712 CFM
Exhaust air = 0 CFM
Press. Air =
4501 CFM
Exf. Air =134 CFM
Outside air =
Exhaust air + Press. Air + Exfiltration Air
=
0+4,501+134 CFM
=
4,635 CFM
Adopt outside air= 4,635 CFM
Supply air = Return Air + Outside air.
= 41,712+4,635
= 46,347 CFM
Total Tonnage required with outside air = 128.48 Tons.

Total Static Pressure = Internal Static Pressure + External Static Pressure

5.60 = 2.75 +2.85" w.g.

Say = 1400 Pa

ISP Details: 1 Casing = 0.15 inch of w.g.


2 Cooling Coil = 0.87 inch of w.g.
3 Filters = 1.50 inch of w.g.
4 Mixing Box = 0.13 inch of w.g.
5 Elem = 0.10 inch of w.g.
2.75 inch of w.g.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM

JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0


Exfiltration (Qx)
PW = Wind surface pressure relative to static pressure, in undisturbed flow, in, water.
QX = Ex-filtration in CFM
QX/L = Stack co-efficient, (CFM)2 (Sq. in )-2 (F)-1 = (( Ax DT) + (BxV2)1/2
A = Stack co-efficient
= 0.0156 (Ref. ASHRAE fundamentals 1997 chapter 25, Table 6
DT = Indoor temp. - Outdoor temp. = 77-120 = -43OF
B = Wind co-efficient, (CFM)2 (Sq. in)-2 (mph)-2
= 0.0119 (shielding class-1) ASHRAE fundamentals 1977,
= chapter 25 table 7
V = Wind speed = 22 mph
L = Leakage area In2
QX/L = ((0.0156 x -43) + (0.0119 x 222))1/2 CFM/In2
= 2.256 2.26 CFM/In2

Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.

Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
230kV GIS BUILDING D1+ 6 D3 29.28 315.17 37.82 85.32
MECH. ROOM D2 + D4 16.67 179.43 21.53 48.58
Total CFM = 134

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
VENTILATION, EXHAUST AND PRESSURIZATION FOR CONTROL BUILDING :

EXHAUST AND VENTILATION CALCULATION:


Ventilation
We shall design the system in such a way that a positive pressurization is achieved. Introduction of
Outdoor air into the system through a fresh air opening / grilles into the machine room shall eventually
produce heat both sensible and latent in nature.

Qs = 1.1 x (To - TR) x CFM ------------------------ (1 )

QL = 4840 x (Wo - Wi ) x CFM ------------------------ (2 )

Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o

TR = Room design temperature. 77 F


o

Wo = Outside Air Humidity ratio # W.V / # water


Wi = Room air humidity ratio # W.V / # Water.
CFM = Ventilation rate requirement.

Please refer to the Computer Generated Calculation Sheets enclosed with this document for the
details.

Exhaust

a) Battery room

From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12. Hence
No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of the Battery
room exhaust system is enclosed.

b) Toilet room

From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10. Hence No.
of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of the toilet room
exhaust system is enclosed.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION

Site Condition
Outside temperature : 120 F
o
49 o
C
Prevailing wind direction : 22 N
o

Wind speed : 22 mph ( KMPH )


Building pressure : 50 Pa (in.w.g)

Wind pressure (Ref. ASHRAE Fundamental 1997 Chapter 25)


Pv = 1/2 (C1*C2*p*V ) - Equation No.6 Chapter 23 of
2
Wind static pressure:
ASHRAE Fundamental.
Where :
Pv = Surface pressure relative to static pressure in
Undistributed flow : in of water.

C1 = 0.0129 Unit conversion factor


C2 = wind surface pressure co-efficient
= 1 for the undistributed area

p = Air density in lb/ft3


= 0.07 at120Deg.F

V = Wind speed in MPH


= 22 MPH (Taken from SES-K-100)
Hence
Pv = 1/2*(0.0129x1x0.07x22^2)
= 0.218526 inches of W.G.
= 0.218526 inches of W.G.

Ex-filtration shall be calculated as below:


Qp = Qexh+Po/Pi Qexh+Po/PiQx+Qx
Where :
Qexh = Exhaust air in CFM
Qx = Ex-Filtration in CFM

P0=Pv = Outside Static Pressure on building wall


= 0.218526 (Ref. To above calculation)

Pi = Inside Static pressure of the space.


= P0 + 0.2 in W.G
= 0.218526 + 0.2 in W.G
= 0.4185

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = Exhaust air in Battery room +Exhaust air Toilet room

= 3,320 + 289
(Ref. To detailed calculation of Battery room and
toilet room exhaust fan sizing)
= 3609 CFM
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.2185 in of W.G
Qexh = 3609 cfm(Exhaust in Battery room&Toilet room)
Qx = 65 cfm
Qp = {3609+(0.218526/0.418526)x3609}+{(0.218526/0.418526) x 65+ 65}
Qp = 5592 cfm
Note: As per TES-K-100.01, REV.0, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.

Fresh Air is considering as follows :

1. Fresh Air = 5% of Supply Air + Exhaust air + Exfiltration Air


= 0.05X28645+3609+65 = 5106.25 CFM
. Say = 5,106CFM
2. Fresh Air = Pressurization Air + Exhaust Air + Exfiltration Air
= 5592 CFM
3. Fresh Air = 10% Supply Air
= 2865 CFM

Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area
Air - CFM Air CFM CFM - -
28,645 5,592 3,609 19.52% 7.68%
Percent of outside air = Outside Air x 100
Supply air

Percent of Press. Air = (Outside Air - Exhaust air ) x 100


Supply air
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 3 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
AIR BALANCING:

Supply Air Return Air Exhaust Air Press. Air Ex.A


SL# Zone Name
CFM CFM CFM CFM CFM
1 CONTROL ROOM 11799 10,867 904 28
2 AC/DC AUX. ROOM 6,090 5,622 468
3 WORK SHOP 196 176 15 5
4 RELAY ROOM 213 197 16
5 OFFICE 208 192 16
6 STORE 171 158 13
7 TOLIET 289 0 289 0
8 CORRIDOR 412 364 30 17
9 BATTERY ROOM 3,320 0 3320 0
10 COMMUNICATION 1,991 1,838 153
11 PUMP HOUSE 805 730 61 14
12 Mechanical Room 1,441 1,330 111
13 CABLE BASEMENT 1,710 1,579 131
TOTAL 28,645 23,053 3,609 1918 65

Total Supply air = 28,645 CFM


Return Air = 23,053 CFM
Exhaust air = 3609 CFM
Press. Air = 1918 CFM
Exf. Air = 65 CFM
Outside air = Exhaust air + Press. Air + Exfiltration Air
= 3,609+1,918+65 CFM
= 5,592 CFM
Adopt outside air= 5,592 CFM
Supply air = Return Air + Outside air.
= 23,053+5,592
= 28,645 CFM
Total Tonnage required with outside air = 103.64 Tons.

Total Static Pressure = Internal Static Pressure + External Static Pressure

6.83 = 2.75 + 4.08" w.g.

Say = 1708 Pa.

ISP Details: 1 Casing = 0.15 inch of w.g.


2 Cooling Coil = 0.87 inch of w.g.
3 Filters = 1.50 inch of w.g.
4 Mixing Box = 0.13 inch of w.g.
5 Elem = 0.10 inch of w.g.
2.75 inch of w.g.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM

JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0


Exfiltration (Qx)
PW = Wind surface pressure relative to static pressure, in undisturbed flow, in, water.
QX = Ex-filtration in CFM
QX/L = Stack co-efficient, (CFM)2 (Sq. in )-2 (F)-1 = (( Ax DT) + (BxV2)1/2
A = Stack co-efficient
= 0.0156 (Ref. ASHRAE fundamentals 1997 chapter 25, Table 6
DT = Indoor temp. - Outdoor temp. = 77-120 = -43OF
B = Wind co-efficient, (CFM)2 (Sq. in)-2 (mph)-2
= 0.0119 (shielding class-1) ASHRAE fundamentals 1977,
= chapter 25 table 7
V = Wind speed = 22 mph
L = Leakage area In2
QX/L = ((0.0156 x -43) + (0.0119 x 222))1/2 CFM/In2
= 2.256 2.26 CFM/In2

Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.

Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
PUMP ROOM Dd 4.88 52.53 6.30 14.22
CORRIDOR Dd 5.9536 64.08 7.69 17.35
WORK SHOP Ds 1.8572 19.99 2.40 5.41
Control Room Dd+2Ds 9.6681 104.07 12.49 28.17

Total CFM = 65

Note: Ds - Single Door


Dd - Double Door

Fresh Air is considering as follows :

1. Fresh Air = 5% of Supply Air + Exhaust air + Exfiltration Air


(28645.0768076336X5/100)+3609.22666666667+65
= = 5107
say = 5,107CFM
2. Fresh Air = Pressurization Air + Exhaust Air + Exfiltration Air
= 5592 CFM
3. Fresh Air = 10% Supply Air
= 2865 CFM

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
VENTILATION, EXHAUST AND PRESSURIZATION SWGR Building :

EXHAUST AND VENTILATION CALCULATION:


Ventilation
We shall design the system in such a way that a positive pressurization is achieved. Introduction
of Outdoor air into the system through a fresh air opening / grilles into the machine room shall
eventually produce heat both sensible and latent in nature.

Qs = 1.1 x (To - TR) x CFM ------------------------ (1 )

QL = 4840 x (Wo - Wi ) x CFM ------------------------ (2 )

Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o

TR = Room design temperature. 77 F


o

Wo = Outside Air Humidity ratio # W.V / # water


Wi = Room air humidity ratio # W.V / # Water.
CFM = Ventilation rate requirement.

Please refer to the Computer Generated Calculation Sheets enclosed with this document for the
details.

Exhaust

a) Battery room

From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12.
Hence No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of the
Battery room exhaust system is enclosed.

b) Toilet room

From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10. Hence
No. of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of the toilet
room exhaust system is enclosed.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION

Site Condition
Outside temperature : 120 o
F 49 o
C
Prevailing wind direction : 22 N
o

Wind speed : 22 mph ( KMPH )


Building pressure : 50 Pa (in.w.g)

Wind pressure (Ref. ASHRAE Fundamental 1997 Chapter 25)


Wind static pressure: Pv = 1/2 (C1*C2*p*V2) - Equation No.6 Chapter 23 of
ASHRAE Fundamental.
Where :
Pv = Surface pressure relative to static pressure in
Undistributed flow : in of water.

C1 = 0.0129 Unit conversion factor


C2 = wind surface pressure co-efficient
= 1 for the undistributed area

p = Air density in lb/ft3


= 0.07 at120Deg.F

V = Wind speed in MPH


= 22 MPH (Taken from SES-K-100)
Hence
Pv = 1/2*(0.0129x1x0.07x22^2)
= 0.218526 inches of W.G.
= 0.218526 inches of W.G.

Ex-filtration shall be calculated as below:


Qp = Qexh+Po/Pi Qexh+Po/PiQx+Qx
Where :
Qexh = Exhaust air in CFM
Qx = Ex-Filtration in CFM

P0=Pv = Outside Static Pressure on building wall


= 0.218526 (Ref. To above calculation)

Pi = Inside Static pressure of the space.


= P0 + 0.2 in W.G
= 0.218526 + 0.2 in W.G
= 0.4185

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
#REF! SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = 0.0 CFM
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.2185 in of W.G
Qexh = 0 cfm(Exhaust in Battery room&Toilet room)
Qx = 57 cfm
Qp = {0.0+(0.218526/0.418526)x0.0}+{(0.218526/0.418526) x 58+ 58}
Qp = 88.3
Qp = 88 cfm

Note:
As per SES-K-100, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.

Percent of outside air = Outside Air x 100


Supply air

Percent of Press. Air = (Outside Air - Exhaust air ) x 100


Supply air

Fresh Air is considering as follows :

1. Fresh Air = 5% of Supply Air + Exhaust air + Exfiltration Air


= (10177X5/100)+0.0+57 = 566.6
Say = 567CFM
2. Fresh Air = Pressurization Air + Exhaust Air + Exfiltration Air
= 88.2837 CFM
3. Fresh Air = 10% Supply Air
= 1017.7 CFM ← MAX

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 3 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area Air - CFM Air CFM CFM - -
10,177 1,018 0.0 10.00% 9.49%

AIR BALANCING:
Supply Air Return Air Exhaust Air Press. Air Ex.A
SL# Zone Name
CFM CFM CFM CFM CFM
1 34.5kV SWGR Building 6,410 5,776 0.0 605 29
2 CABLE BASEMENT 2,754 2,493 0.0 261 0
3 MECH. ROOM 1,013 891 0.0 93 29
TOTAL 10,177 9,159 0.0 960 58

Total Supply air = 10,177 CFM


Return Air = 9,159 CFM
Exhaust air = 0.0 CFM
Press. Air = 960 CFM
Exf. Air = 58 CFM
Outside air =
Exhaust air + Press. Air + Exfiltration Air
=
0+960+58 CFM
= 1,018 CFM
Adopt outside air= 1,018 CFM
Supply air = Return Air + Outside air.
= 9,159+1,018
= 10,177 CFM
Total Tonnage required with outside air = 35.24 Tons.

Total Static Pressure = Internal Static Pressure + External Static Pressure

3.61 = 2.75 + 3.76" w.g.

Say = 1628 Pa.

ISP Details: 1 Casing = 0.15 inch of w.g.


2 Cooling Coil = 0.87 inch of w.g.
3 Filters = 1.50 inch of w.g.
4 Mixing Box = 0.13 inch of w.g.
5 Elem = 0.10 inch of w.g.
2.75 inch of w.g.

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM

JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0


Exfiltration (Qx)
PW = Wind surface pressure relative to static pressure, in undisturbed flow, in, water.
QX = Ex-filtration in CFM
QX/L = Stack co-efficient, (CFM)2 (Sq. in )-2 (F)-1 = (( Ax DT) + (BxV2)1/2
A = Stack co-efficient
= 0.0156 (Ref. ASHRAE fundamentals 1997 chapter 25, Table 6
DT = Indoor temp. - Outdoor temp. = 77-120 = -43OF
B = Wind co-efficient, (CFM) (Sq. in) (mph)
2 -2 -2

= 0.0119 (shielding class-1) ASHRAE fundamentals 1977,


= chapter 25 table 7
V = Wind speed = 22 mph
L = Leakage area In2
QX/L = ((0.0156 x -43) + (0.0119 x 222))1/2 CFM/In2
= 2.256 2.26 CFM/In2

Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.

Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
34.5kV SWGR Building D1 + D5 9.86 106.13 12.74 28.73
MECH. ROOM D2 + D5 9.83 105.81 12.70 28.64
Total CFM = 57

Note: Ds - Single Door


Dd - Double Door

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
SUMMARY OF COOLING LOAD:

Sensible Latent Supply Air Return Air P. A Exfil.


SL# Zone Name
BTUH BTUH CFM CFM CFM CFM
1 Control Room 207,622 682 11,799 10,867 904 28
2 AC/DC AUX. ROOM 107,168 341 6,090 5,622 468 0
3 WORK SHOP 3,449 0 196 176 15 5
4 RELAY TEST ROOM 3,745 341 213 197 16 0
5 OFFICE 3,665 341 208 192 16 0
6 STORE 3,015 341 171 158 13 0
7 TOILET 1,756 0 289 0 0 0
8 CORRIDOR 7,249 0 412 364 30 17
9 BATTERY ROOM 14,182 341 3,320 0 0 0
10 COMMUNICATION ROOM 35,032 0 1,991 1,838 153 0
11 PUMP HOUSE 14,157 0 805 730 61 14
12 CABLE BASEMENT 30,084 0 1,710 1,579 131 0
13 Ctrl bldg Mech Room 25,362 1,441 1,330 111 29
14 34.5kV SWGR 113,978 682 6,410 5,776 605 29
15 SWGR CABLE BASMENT 48,971 682 2,754 2,493 261 0
16 SWGR bldg Mechanical Room 62,591 1,013 891 93
17 230kV GIS BUILDING 808,845 1,024 42,558 38,336 4137 85
18 GIS CABLE BASEMENT 52,590 682 2,767 2,498 269 0
19 GIS Mechanical Room 19,430 1,022 879 95 49
TOTAL OF CONTROL BUILDING 456,486 2,387 27,204 21,722 1,807 65
TOTAL OF SWGR BUILDING 225,540 1,364 9,164 8,269 867 29
TOTAL OF GIS BUILDING 880,865 1,706 45,325 40,834 4,406 85

Sensible Latent Supply Air Return Air P. A Exfil.


SL# Zone Name
BTUH BTUH CFM CFM CFM CFM
1 Control Room 708,614 2,328 20,052 18,468 1,536 48
2 AC/DC AUX. ROOM 365,764 1,164 10,350 9,555 795 0
3 WORK SHOP 11,771 0 333 299 25 9
4 RELAY TEST ROOM 12,782 1,164 362 334 28 0
5 OFFICE 12,509 1,164 353 326 27 0
6 STORE 10,290 1,164 291 268 22 0
7 TOILET 5,993 0 491 0 0 0
8 CORRIDOR 24,741 0 700 619 52 29
9 BATTERY ROOM 48,403 1,164 5,642 0 0 0
10 COMMUNICATION ROOM 119,564 0 3,384 3,124 260 0
11 PUMP HOUSE 48,318 0 1,368 1,241 103 24
12 CABLE BASEMENT 102,677 0 2,906 2,683 223 0
13 Ctrl bldg Mech Room 86,561 0 2,449 2,261 188 49
14 34.5kV SWGR 389,007 2,328 10,894 9,816 1,029 49
15 SWGR CABLE BASMENT 167,138 2,328 4,680 4,236 444 0
16 SWGR bldg Mechanical Room 213,623 0 1,722 1,514 159 0
17 230kV GIS BUILDING 2,760,588 3,495 72,327 65,152 7,030 145
18 GIS CABLE BASEMENT 179,490 2,328 4,703 4,245 458 0
19 GIS Mechanical Room 66,315 0 1,737 1,493 161 83
TOTAL OF CONTROL BUILDING 1,557,987 8,147 46,233 36,917 3,071 111
TOTAL OF SWGR BUILDING 769,768 4,655 15,574 14,053 1,473 49
TOTAL OF GIS BUILDING 3,006,392 5,823 77,030 69,397 7,488 145

REV
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO.
NO.

A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
DWG. CONT.
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 SHT.
0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING 230 GIS BUILDING:

15.1 DATA
15.1.1 Required Fresh Air 4,635 CFM
2187 L/s

15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM

15.1.3 Required face area to


keep above velocity= 2284/1000 =2.284/1.52
1.44 M2 = 15.5
15.2 From the GCC catalogue Selected size =
L= 90 in
W= 84 in
FROM GGC Actual Area = 16.72 Sq.Ft
15.3 Actual face velocity 4634.7 /(16.72)
289.50 FPM

15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.

15.5 Efficiency of sand trap louver 53 %

15.6 Selected model is WST5 - X , Make : GGC

15.7 Sizing of fresh air Aluminum panel filter

15.7.1 Select a 2" thick panel filter for fresh air intake.

Make : FARR PANEL FILTER

15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING CONTROL BUILDING :

15.1 DATA
15.1.1 Required Fresh Air 5,592 CFM
2639 L/s

15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM

15.1.3 Required face area to


keep above velocity= 2805/1000 = 2.805/1.52
1.74 M2
15.2 From the GCC catalogue Selected size =
2 L= 84 in
2W= 54 in

15.3 Actual face velocity 5592.3913782935 /[(84/12)x(54/12)]


177.54 FPM

15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.

15.5 Efficiency of sand trap louver 53 %

15.6 Selected model is WST5 - X , Make : GGC

15.7 Sizing of fresh air Aluminum panel filter

15.7.1 Select a 2" thick panel filter for fresh air intake.

Make : FARR PANEL FILTER

15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING SWGR BUILDING :

15.1 DATA
15.1.1 Required Fresh Air 1,018 CFM
480 L/s

15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM

15.1.3 Required face area to


keep above velocity= 484/1000 = 0.484/1.52
0.32 M2 = 3.44 Sq.Ft
15.2 From the GCC catalogue Selected size =
L= 42 in
W= 36 in
From GGC Actual Area = 3.43
15.3 Actual face velocity 1017.7 /[(3.43)]
296.71 FPM

15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.

15.5 Efficiency of sand trap louver 53 %

15.6 Selected model is WST5 - X , Make : GGC

15.7 Sizing of fresh air Aluminum panel filter

15.7.1 Select a 2" thick panel filter for fresh air intake.

Make : FARR PANEL FILTER

15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR GIS BUILDING :

Data:

Total air flow = 46347 cfm From Load calculation


Air Flow rate required at heater = 46347 cfm Total air flow
Total heating required = 276766 Btuh. From Load Calculation

Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 81.09 kW

Eguipment heat load =191.6Kw


consider50% from equipment heat load = 191.6x0.50=95.8 KW
Net Desired heating capacity =81.09-95.8= -14.71 KW

so EDH not required

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR CONTROL BUILDING :
EDH-1
Data:

Total air flow = 28645 cfm From Load calculation


Air Flow rate required at heater = 28645 cfm Total air flow
Total heating required = 309931 Btuh. From Load Calculation

Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 90.81 kW

Eguipment heat load =52.2Kw


consider50% from equipment heat load = 52.2x0.5=26.1 KW
Net Desired heating capacity =90.81-26.1= 64.73 KW
taking safty factor 10%
Net Desired heating capacity = 64.73 KW x 1.1= 71.2 KW
Take Heating Coil =72 Kw

Size on location of Elec. heater : 2000 x 7000mm


7.5' x2.17'
15.1Sqft.
Watt per square in 72000/2240 =32.14 watt/sq.in.
Maximum element heating density shall be 55 watts/sq.inch
As per SEC-EOA Std.(73-TMSS-1, Rev.4, page 19 of 32)
So the heater is safe
ELECTRICAL DATA OF UNIT MOUNTED HEATER
From the manufacturer's catalogue the
required line current for 3 phase system = Wattage /{√3 (Voltage) X (power factor)}
required line current for 1 phase system = Wattage /(Voltage) X (power factor)}

= 72000 /(√3{ 380 X 1})


= 109 Amp
s
Considered number of step control = 3
Hence the ampere per step = 36.47 amps

The maximum ampere rating per step = 48.00 amps. (As per TEC-EOA Std.)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR SWGR :
EDH-2
Data:

Total air flow = 12684 cfm From Load calculation


Air Flow rate required at heater = 12684 cfm Total air flow
Total heating required = 83663 Btuh. From Load Calculation

Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 24.51 kW

Eguipment heat load =34.2 Kw


consider50% from equipment heat load = 34.2x0.5=17.1 KW
Net Desired heating capacity =24.5-17.1= 7.4 KW
taking safty factor 10%
Net Desired heating capacity = 7.4 KW x 1.1= 8.1KW
Take Heating Coil =8.5 Kw

Size on location of Elec. heater : 1400 x 500mm


56"X20"
1120 sq in.
Watt per square in 8500/1120 =7.6 watt/sq.in.
Maximum element heating density shall be 55 watts/sq.inch
As per SEC-EOA Std.(73-TMSS-1, Rev.4, page 19 of 32)
So the heater is safe
ELECTRICAL DATA OF UNIT MOUNTED HEATER
From the manufacturer's catalogue the
required line current for 3 phase system = Wattage /{√3 (Voltage) X (power factor)}
required line current for 1 phase system = Wattage /(Voltage) X (power factor)}

= 8500 /(√3{ 380 X 1})


= 12.9 Amp
s
Considered number of step control = 1
Hence the ampere per step = 12.90 amps

The maximum ampere rating per step = 48.00 amps. (As per TEC-EOA Std.)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
BATTERY ROOM EXHAUST FAN SIZING:

DATA

Battery room length 10.1 M


Battery room width 9.9 M
Battery room height 4.70 M
No. of Air changes considered 12 Nos./Hr.

Notes
Number of Air changes required for the battery room is 12 as per the clause
No.4.1.10 of SES-P-119-19 & clause No.10.9 of SES-K-100. Hence 12 air changes
per hour is considered in calculation.

Calculation
Volume of Battery room V= 10.1x9.9x4.7 M3
= 469.953 M3
= 16596.23 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 16596.23x12 / 60
= 3319 CFM

Use fan capacity of = 3320 CFM


= 5642 CMH

Pressure loss through the exhaust duct = 0.332 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.332 IN W.G (83 Pa)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
TOILET EXHAUST FAN SIZING :

DATA

Toilet length 3.90 M


Toilet width 4.20 M
Toilet height 3.00 M
Air change 10 AC/Hr.

Notes:
Number of Air changes required for the toilet is 6-10 as per the clause No.4.1.11 of SES-P-119-19
& clause No.10.11 of SES-K-100. Hence 10 air changes per hour is considered in calculation.

Calculation
Volume of Toilet Room V= 3.9x4.2x3 M3
= 49.14 M3
= 1735.36 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 1735.36x10 / 60
Use fan capacity of = 289 CFM

= 492 CMH

Pressure loss through the exhaust duct = 0.225 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.225 IN W.G (56.5 Pa)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
GATE HOUSE EXHAUST FAN SIZING :

DATA

Toilet length 1.60 M


Toilet width 2.10 M
Toilet height 2.30 M
Air change 10 AC/Hr.

Notes:
Number of Air changes required for the toilet is 6-10 as per the clause No.4.1.11 of SES-P-119-19
& clause No.10.11 of SES-K-100. Hence 10 air changes per hour is considered in calculation.

Calculation
Volume of Toilet Room V= 1.6x2.1x2.3 M3
= 7.728 M3
= 272.91 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 272.91x10 / 60
Use fan capacity of = 45 CFM

= 77 CMH

Pressure loss through the exhaust duct = 0.202 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.20 IN W.G (50 Pa)

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
GATE HOUSE ACCU/AHU :

* As per attached Standard drawing No. SE1191935.000 ,


and as per note No. 5 in that drawing
AHU shall be ceiling suspended type, 240V, 1ph & 60 HZ with a cooling & Heating
capacity of 19800 BTUH & 3.6 KW Respectively condenser, fan motor shall be at least 1/8 HP and
shall also be 240V 1ph & 60HZ

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Pressure Relife Damper Sizing Critiria:

Selected Zones

1- 13.8kV SWGR Room


2- 115kV GIS Room
3- Toilet

10% Of System Air will be considered for (SWGR & GIS) and Total air for toilet

Q= V X A

Where

Q Volume Flow Rate

V Velocity

A Area

ZONE ZONE Q CFM H (mm) W (mm) V (FPM) ΔP Pa

CTRL BLDG Control Room 1180 400 800 343 16

CTRL BLDG Pump House 81 100 200 374 20

34.5KV SWGR SWGR Room 1018 350 700 386 17

230kV GIS GIS Room 4256 800 1300 380 18

SHEET
DRAWING TITLE INDEX PLANT DRAWING NO. REV NO.
NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 1 A
DWG. CONT.
JUBAIL SAUDI ARABIA PROJECT NO. 0 SHT.
0