HYDRAULIC POWER PACK (STACK CAP & KILN TRANSFER CHUTE) SERVICING
REQUIRED. (SERVICE ENGINEER REQUIRED)
KILN BED DRAIN OUT PROCESS FROM SHUTDOWN DECLARED TIME 12 HOURS
MINIMUM TIME REQUIRED FOR REPAIRING WORKS OF AIRTUBES, FEED TUBE AND
BEARINGS LUBRICATION/REPLACEMENT INCLUDING BOXUP THE KILN, COOLER
ALIGNMENT OF CB AND COAL THROUGH PIPE 7 – 8 DAYS
ALL AIRTUBES, FEED TUBE AND THERMOWELLS ARE IN BADLY DAMAGED
CONDITION
REFRACTORY PATCHUP WORKS AT KILN INLET AREA, TRANSFERCHUTE,
COOLER TYRE AND AIRTUBE BASES AND COOLER INLET CONE AREA TO BE
DONE.
GENERAL MAINTENANCE WORKS
FEEDING CIRCUIT
30. All weigh feeder’s maintenance work.
31. All conveyors (C13, C14 & C15) Gearboxes, Pulley bearings, Idlers and Rollers checking,
lubrication and maintenance work.
RAW MATERIAL PROCESSING CIRCUIT
ESP Cleaning and checking work. (Insulators, plates and electrodes, rappers and Tr. sets)
PCC, MCC and All Drive panels cleaning, checking and terminals tightening work.
All RMP, Stock house Weigh feeders motors blowering and maintenance work.
OPERATIONAL VIEWS
All Thermo wells, Air tubes and Swirlers checking
DSC, ABC, Backflow chute and Stack cleaning.
GCT and ducts cleaning
Refractory Patch up works
CB and Coal through pipe alignment
URGENT REQUIREMENT LIST