Вы находитесь на странице: 1из 4

Curriculum Vitae

1. PROPOSED POSITION : Piping Designer

2. NAME : AMRUL MUTAQIN

3. DATE OF BIRTH : August 11th, 1987

4. NATIONALITY : Indonesian

5. MOBILE : 0856 8711 473

6. EMAIL ADDRESS : amrul.mutaqin@gmail.com

7. EDUCATION : Vocational High School (Mechanical Engineering)

8. OTHER QUALIFICATIONS / : 1. Piping and Autocad (YPST), Cilacap - juli 2009


TRAININGS 2.Training software PDMS design,TRIPATRA,
Jakarta, January 2012
3. Training Piping Designer (TRIPATRA),
Jakarta,January 2012
4. Safety induction for banyu urip project plant,
PT. EXXON MOBIL, bojonegoro – jawa timur,
Sept 2014
5. Training H2S level 1 dan 2, for banyu urip project
plant, PT. EXXON MOBIL, bojonegoro- jawa timur,
sept 2014
6. Training WMS for banyu urip project plant,
PT.EXXON MOBIL, bojonegoro- jawa timur,
sept 2014
7. Training software SP3D design, Tripatra
October,2016

9. LANGUAGE AND
PROFICIENCY IN EACH : Language Speaking Writing Reading
Indonesian: Fluent Fluent Fluent
English: Medium Medium Medium

10. COUNTRIES OF WORK : Indonesia

11. SKILL : - SP3D


- PDMS
- Auto Cad
- MDS support
- Microsoft office

Amrul Mutaqin
12. EMPLOYMENT RECORD :
Have more than (11) years of experience works with various jobs, 9 years in oil and gas
business, such as piping designer from detail engineering activity and construction phase in
oil and gas industry .The rest of work experiences were non-oil and gas business.

2019– Present : PT. REKAYASA INDUSTRI

a. Jambaran Tiung Biru Project


Client : PT. Pertamina-Cepu-Central Java
Position : Piping SP3D designer
Duration : April 2019- Present

Responsibilities :
 Design layout and piping arrangement as per PID
 Ensure that designs comply with standards and procedure
 Ensure all support and Special pipe support as per stress calculation
 Material take off
 Design platform and nozzle orientation
 Isometric Production

b. Proposal Dieng Small Scale Gheothermal Power (1x10MW) Project


Client : PT. Geo Dipa Energy-Dieng-Central Java
Position : Piping designer
Duration : February 2019- March 2019

Responsibilities :
 Prepare Plot Plan
 Prepare Piping Layout for steam and venting
 Prepare design with isometric sketch
 Material take off

2010– 2019 : PT. TRIPATRA ENGINEERS & CONSTRUCTORS

c. Tangguh Expansion Project (Train-3)


Client : PT. BP – Papua-Indonesia
Position : Piping 3D designer (cold area)
Duration : November 2016- Januari 2019

Responsibilities :
 As PIC area and responsible for an area (especially cold area)
 Preparation of plant layout and piping arrangement and detail drawings using
software SP3D.
 Ensure that designs comply with the relevant standards and procedure
 Ensure all support and Special Pipe Support as per stress calculation
 Material take off
 Preparation drawing loading data for information to civil team
 Preparation drawing platform and nozzle orientation around equipment
 Preparation for isometric production

Amrul Mutaqin
d. Banyu Urip Project EPC-1 (At Site EPC-1)
Client : PT. Exxon Mobil – Cepu-Bojonegoro-Indonesia
Position : Field Engineering
Duration : September 2014 – October 2016

Responsibilities :
 Handling responsibility for system test package
 Verification between actual site with engineering
 Walkdown with client
 Problem solving and advise to supervisor about case at site
 line check
 Stress sketch verification

e. Onshore Pigging Facility Upgrade Batch-2 (Engineering Service)


Client : PT. Conocophilips – South Sumatera
Position : PDMS Piping Designer
Duration : June 2014 – September 2014

Responsibilities :
 As PIC area and responsible for an area
 Ensure that designs comply with the relevant standards and procedure
 Ensure all support and Special Pipe Support as per stress calculation

f. Senoro Gas Development Project


Client : PT. Pertamina – Medco Energy, Tomory Sulawesi
Position : PDMS Piping Designer
Duration : December 2012 – June 2014

Responsibilities :
 As PIC area and responsible for an area
 Preparation of plant layout and piping arrangement and detail drawings using
software PDMS.
 Ensure that designs comply with the relevant standards and procedure
 Ensure all support and Special Pipe Support as per stress calculation

g. Banyu Urip Project


Client : PT. Exxon Mobil – Cepu-Bojonegoro-Indonesia
Position : Piping design and drafting
Duration : July 2011 – December 2012

Responsibilities :
 Prepare drawing piping info around equipment.
 Prepare GA drawing mechanical as per data sheet
 Modeling equipment with PDMS
 Modeling routing pipe as per PID with PDMS

Amrul Mutaqin
h. South Sumatera NGL Project
Client : Perta Samtan Gas – Palembang-Indonesia
Position : Piping drafter
Duration : June 2010 – July 2011

Responsibilities :
 Prepare drawing piping info around equipment.
 Prepare drawing plot plan,equipment layout
 Prepare drawing piping plan

I, the undersigned, certify that to the best of my knowledge and belief, the biodata contained in
this CV correctly describes myself, my qualifications and my expertise. I, hereby agree and
commit to be assigned during the contract period to perform the Work within the specified time
frame as defined in each Service Order.

Best Regards,
Amrul Mutaqin

Amrul Mutaqin

Вам также может понравиться