WEEKLY PROGRESS REPORT

Student Name BABIJIS, RODRIGO JR. O.


Organization/Company Name RP ALFONSO CONSTRUCTION SERVICES
Supervisor’s Name ENGR. LOUZELLE MIKELLA ALBAO

Directions: Accomplish in computerized format. Submit to your assigned OJT Coordinator’s e-mail
address at the end of the week.

Inclusive Day Time Time Location Activities


Dates In Out
APRIL Monday -- -- PLV - Complying initial documents to start OJT.
22

APRIL Tuesday 7 AM 4 PM 60 MLD - Toolbox


23 VALENZUELA - Introduction to people and colleagues.
STP- - Overall tour with Engr. Albao
F.Bautista St., - Inspection of activities of Electrical and
Marulas, Mechanical Department.
Valenzuela
City
APRIL Wednesday 7 AM 4 PM 60 MLD - Safety Orientation at WABAG Office.
24 VALENZUELA - Site Visitation and introduction of works.
STP-
F.Bautista St.,
Marulas,
Valenzuela
City
APRIL Thursday 7 AM 4 PM 60 MLD - Viewing the AutoCad files of the electrical
25 VALENZUELA plans.
STP- - Cable Tray Support introduced by Sir
F.Bautista St., Joseph.
Marulas, - Viewed a gigantic Diesel Generator that has
Valenzuela huge capacity.
City
APRIL Friday 7AM 4PM 60 MLD - Testing of Lights and its relays with Sir
26 VALENZUELA Edward and Sir Edison.
STP- - Read Load Schedules of particular areas.
F.Bautista St., - Went to Warehous to withdraw 185 mm2 bare
Marulas, copper wire.
Valenzuela
City

APRIL Saturday 7 AM 4 PM 60 MLD - Read Overall Earthing Layout of the site.


27 VALENZUELA - CadWelded interconnecting grounding wires
STP- for Earthing puposes.
F.Bautista St.,
2

Marulas, - Went to Dewatered Sludge Building (DSB) to


Valenzuela plaan the orientation of proposed lights as per
City plan.