BASEMENT 4
1. Laundry collection sump drain pipe (upvc 50 sch 40) height not mentioned in near STP tank.
2. All ceiling level 75mm pvc pipe connection not mentioned in car parking drain pipe line.
4. DWS 100mm UPVC SCH80 to typical floor taping in BOH DWS pipe lines.
6. As per civil drawing two FFL is available but you are consider only one level.
BASEMENT 3
1.Tanker inlet UPVC 100 sch40 pipe fouling with beam pipe drop rising level not mention in drawing(Grid
no D4 near)
3. Drawing mentioned grease trap outlet 160mm but as per BOQ upvc sch40 pipe up to 100mm.
4. STP overflow and STP effluent drain pipes BOP not mentioned in drawing.
7. ST-1 shaft FWS pipe location mismatched and taping also mismatched.
BASEMENT-2
2. CPD 75mm pipe ceiling level connection not showing in drawing(Grid no: J4,G4)
3. Driver toilet soil and waste pipe specification mentioned higher and pipes level not mentioned.
1. Soil waste pvc pipe BOP level not mentioned in heat plant and HVAC plant room.
3. Heat room HWS, HWR showing in drawing 80mm UPVC sch40 but PRV and ball valve available
size up to 50mm.
4. HWS, HWR, DWS, FWS hit with RCC wall for ST-1 ramp area.
5. 150mm pvc waste line fouling with HVAC duct (Grid no: K2,E2)
8. Soil and waste line mentioned names not correct in lift lobby PHE shaft.
GROUND FLOOR
1. Female toilet DWS 20mm cpvc pipe lines hit with HVAC duct in washbasin area.
2. Ceiling level soil and waste line fouling with electrical tray and HVAC chilled water pipes in male
toilet area.
3. GI pipe level not mentioned in receiving area.
7. PVC waste branch pipe size not correct in meeting room area.
8. GF CI pipe branches have 3nos in drawing but available 2nos trap provision in FF drawing.
9. Male female toilet area soil and waste pipe line level not available in drawing.
FIRST FLOOR
2. Kitchen area CI traps size mentioned 150mm but grating available up to 100mm only.
4. Bar drain pipe specification not available in R5 drawing but mentioned PP pipe in R1
drawing.
7. Male female locker room toilet IWC mentioned but IWC not available in BOQ.
8. Shower area mentioned in drawing floor grating but TDS approved linear grating only.
SECOND FLOOR
5. 3rd floor refuge area drain line connecting location not mentioned in drawing
6. Banquet hall ceiling level soil and waste line header shaft entry not in line.
THIRD FLOOR
1. Saloon shop ceiling level pipe lines routing and level mismatched 4&3 floor
drawings.
2. 150mm CI pipe fouling with FPS pipe lines in ST-2 shaft entry.
3. Fourth floor female toilet soil and waste pipes fouling with banquet store.
4. CI pipe 150mm dia fouling with banquet store room door.
FOURTH FLOOR
FIFTH FLOOR
6. Typical maid kitchen room water supply drop level and waste pipe level
not available in drawing.
1. Dish wash area HWS,HWR pipe lines not mentioned in TWIN rooms
FOURTEENTH FLOOR
1. 32mm DWS and soft water supply pipe line level not available in drawing.
3. FPS tank filling pipe dia variation schematic and floor drawing.