PLUMBING NEED CLARIFICATION

BASEMENT 4

1. Laundry collection sump drain pipe (upvc 50 sch 40) height not mentioned in near STP tank.

2. All ceiling level 75mm pvc pipe connection not mentioned in car parking drain pipe line.

3. Car parking drain drop do not mentioned (grid no A, 2)

4. DWS 100mm UPVC SCH80 to typical floor taping in BOH DWS pipe lines.

5. ST-1 PHE shaft DWS pipes dimensions mismatched.

6. As per civil drawing two FFL is available but you are consider only one level.

7. B3 ramp drain pipe fouling with capital beam.

BASEMENT 3

1.Tanker inlet UPVC 100 sch40 pipe fouling with beam pipe drop rising level not mention in drawing(Grid
no D4 near)

2. CPD vertical and horizontal lines not highlighted in drawing.(Grid no:


C4,C3,A3,E4,E5,F4,F5,G2,A’5,A5,A’3)

3. Drawing mentioned grease trap outlet 160mm but as per BOQ upvc sch40 pipe up to 100mm.

4. STP overflow and STP effluent drain pipes BOP not mentioned in drawing.

5. CPD pipe level not mentioned in ST-2 area.

6. FWS and collection sump outlet fouling with same level.

7. ST-1 shaft FWS pipe location mismatched and taping also mismatched.

BASEMENT-2

1. CPD pipe conversion not correct in drawing(Grid no:K5,J5,G5)

2. CPD 75mm pipe ceiling level connection not showing in drawing(Grid no: J4,G4)

3. Driver toilet soil and waste pipe specification mentioned higher and pipes level not mentioned.

4. CI kitchen drain level not mentioned ST-1 shaft.


BASEMENT-1

1. Soil waste pvc pipe BOP level not mentioned in heat plant and HVAC plant room.

2. Heat plant water supply line not showing in drawing.

3. Heat room HWS, HWR showing in drawing 80mm UPVC sch40 but PRV and ball valve available
size up to 50mm.

4. HWS, HWR, DWS, FWS hit with RCC wall for ST-1 ramp area.

5. 150mm pvc waste line fouling with HVAC duct (Grid no: K2,E2)

6. STP overflow and effluent drain pipe location mismatched in shaft.

7. Ground floor toilet water supply taping not correct in shaft.

8. Soil and waste line mentioned names not correct in lift lobby PHE shaft.

GROUND FLOOR

1. Female toilet DWS 20mm cpvc pipe lines hit with HVAC duct in washbasin area.

2. Ceiling level soil and waste line fouling with electrical tray and HVAC chilled water pipes in male
toilet area.
3. GI pipe level not mentioned in receiving area.

4. GI pipe not showing in receiving area Grid no: C4

5. DRWS fouling with RCC wall in all crossing areas

6. CI pipe lines not mentioned trap location in meeting room area.

7. PVC waste branch pipe size not correct in meeting room area.

8. GF CI pipe branches have 3nos in drawing but available 2nos trap provision in FF drawing.

9. Male female toilet area soil and waste pipe line level not available in drawing.
FIRST FLOOR

1. EWC FWS drop not correct in toilet areas.

2. Kitchen area CI traps size mentioned 150mm but grating available up to 100mm only.

3. Bar drain header pipe hit with HVAC duct.

4. Bar drain pipe specification not available in R5 drawing but mentioned PP pipe in R1
drawing.

5. Beverage room water supply line not showing in drawing.

6. Sunken area approved FT only but mentioned in drawing P trap.

7. Male female locker room toilet IWC mentioned but IWC not available in BOQ.

8. Shower area mentioned in drawing floor grating but TDS approved linear grating only.

9. Day care toilet FWS drop not correct.

10. Water supply branches level not available in drawing.

11. GI pipe level not available in kitchen areas.

12. Bar drain branch core size not clear in drawing.

SECOND FLOOR

1. Water supply branch level not in line.

2. GI pipe level not available in kitchen area.

3. Trap type not mentioned in kitchen area and service corridor

4. AHU drain line not connecting in right way.(connecting with RWP)

5. 3rd floor refuge area drain line connecting location not mentioned in drawing

6. Banquet hall ceiling level soil and waste line header shaft entry not in line.
THIRD FLOOR

1. Saloon shop ceiling level pipe lines routing and level mismatched 4&3 floor
drawings.
2. 150mm CI pipe fouling with FPS pipe lines in ST-2 shaft entry.
3. Fourth floor female toilet soil and waste pipes fouling with banquet store.
4. CI pipe 150mm dia fouling with banquet store room door.

FOURTH FLOOR

1. CI pipe fouling with duct near J3 Colum


2. 100mm CI pipe core cut fouling with beam Grid no: J2,H2 center area.
3. EWC area soil and waste core cut fouling with beam Grid no: E4, D4 center area.
4. Shower area to be mentioned linear grating.
5. Shower area core cut fouling with beam Grid no: D3,D1 center area.
6. Duct fouling with PHE lines Grid no: D2, D3, C2, C3 center area.
7. Toilet area trap mentioned floor trap but TDS approving PT only for suspended
areas.
8. GI pipe level not available in drawing for kitchen area.
9. Water supply branch pipe levels not available in drawing.

FIFTH FLOOR

1. Water supply not mentioned in drawing for dress changing room.

2. ST-1 area CI pipes laying location required.

3. GI pipe level not available in drawing for kitchen area.

4. CI pipe header fouling with beam in shaft entry.

5. Balcony drain lines required traps.

6. Water supply branch pipe level not available in drawing.

7. AHU drain line grating not available in 6th floor drawing.


SIXTH FLOOR

1. Shower area drain pipes not mentioned in drawing.

2. Maid room kitchen 50mm pipe connection not mentioned in drawing.

3. MFT level very low.

4. CI branch pipe connection not in line.

5. AHU drain connected in RWP for typical floors to be conforming.

6. Typical maid kitchen room water supply drop level and waste pipe level
not available in drawing.

SEVENTH FLOOR TYPICAL

1. Dish wash area HWS,HWR pipe lines not mentioned in TWIN rooms

2. Shower area elevation drawing required as per JPA.

3. Required sufficient space for air vent pipe line in shaft.

4. Shaft no: 9 MFT locations to be conforming.

5. Refuge areas drain line routing to be conforming.

6. Shaft no: 5A RWP line to be conforming.

7. EWC drain level not mentioned in drawing.

FOURTEENTH FLOOR

1. 32mm DWS and soft water supply pipe line level not available in drawing.

2. DWS and soft water supply location mismatched in shaft.


FIFTEENTH FLOOR

1. OHT filling pipe dia mismatched.

2. OHT over flow end connection detail required.

3. FPS tank filling pipe dia variation schematic and floor drawing.