Академический Документы
Профессиональный Документы
Культура Документы
Mu/bd2 = 0.722
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.171 %
Ast = Pt/100*b*d
= 0.171/100*1000*200
= 342 mm2
Assumed diameter of the slab reinft = 10 mm
Minimum % of reinforcement = 0.35 %
Minimum area of reinforcement = 350 mm2
Spacing of 10mm dia bars = Af/Ast.*1000
= 224.40 mm
= 200 mm
Minimum area of reinforcement = 0.35 %
Rounding off to = 450
= 150 mm
Required 10mm dia @150mm c/c
Eh = (D-x)/(d-x)*es = 1.97E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.23E-03
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 5 mm
Spacing of bar = 150 mm
am=(p^2+(x/2))^2)^0.5-y] = 85.14 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.208 mm
Unsafe
SLAB RESULT:
Eh = (D-x)/(d-x)*es = 4.85E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 2.23E-04
Calculating crack width at critical positions
Effective Cover p = 40 mm
Bar dia /2 y = 10 mm
Project Construction of Sewage Treatmeny Plant of Capacity 37 MLD on DBO Basis for UGSS in
Tiruchirappalli City Corporation
Prepared Checked Approved Rev
Doc.No., 19-TCC-STP-SBR-06-STR-001
RKK VJ MGK 0
Title Structural Design calculation of SBR Tank (C-Tech Basin)
Spacing of bar = 140 mm
am=(p^2+(x/2))^2)^0.5-y] = 70.62 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.037 mm Safe
Project Construction of Sewage Treatmeny Plant of Capacity 37 MLD on DBO Basis for UGSS in
Tiruchirappalli City Corporation
Prepared Checked Approved Rev
Doc.No., 19-TCC-STP-SBR-06-STR-001
RKK VJ MGK 0
Title Structural Design calculation of SBR Tank (C-Tech Basin)
DESIGN OF COLUMN C7
Provided:
Eh = (D-x)/(d-x)*es = 1.15E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 7.55E-04
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 10 mm
Spacing of bar = 200 mm
Project Construction of Sewage Treatmeny Plant of Capacity 37 MLD on DBO Basis for UGSS in
Tiruchirappalli City Corporation
Prepared Checked Approved Rev
Doc.No., 19-TCC-STP-SBR-06-STR-001
RKK VJ MGK 0
Title Structural Design calculation of SBR Tank (C-Tech Basin)
am=(p^2+(x/2))^2)^0.5-y] = 101.80 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.191 mm Safe