1. Concrete fiber
2. Paints and coats
3. Polyurethane spray foam for insulated panels and composite structures.
The shortage of these materials is attributable to the recent design change in the
construction project. The project has increased by approximately 25% in terms of work
and materials.
I formally request for the purchase of the enumerated materials and that these materials
be delivered to the project site on or before [DATE]. These materials are necessary in
order for the construction work to move forward. The delay in the delivery of these
materials will delay the turnover of the project. Kindly find the enclosed summary on the
quantity of the materials needed as well as the supplier list for these materials.
In case you have any questions, you may contact me directly at [CONTACT NUMBERS]
[EMAIL ADDRESS].
Respectfully,