PETROVIETNAM GAS CORPORATION

PETROVIETNAM SOUTH-EAST GAS PROJECT


MANAGEMENT BOARD
PROJECT GPP - NAM CON SON 2 GAS PIPELINE PROJECT
PHASE FRONT – END ENGINEERING DESIGN

MATERIAL REQUISITION
FOR
API CENTRIFUGAL PUMP

AC 17/04/13 Issued for Information U.K. Kannan

Rev Date Description TPGM PVE PVGAS CA

PV ENGINEERING J.S.C

Document number:
TECHNIP GEOPRODUCTION NCS2-TPGM-FD-3-00-04-MR-001
(M) Sdn Bhd No. of pages: 17
(Including cover sheets)
PROJECT GPP - NAM CON SON 2 GAS PIPELINE PROJECT
PHASE FRONT – END ENGINEERING DESIGN

MATERIAL REQUISITION
FOR
API CENTRIFUGAL PUMP

AC 17/04/13 Issued for Information PRV DVT G. Verdier U.K. Kannan

1 14/12/12 Issued for Review PRV DVT G. Verdier U.K. Kannan

Rev Date Description Prep. Checked EM PM

PV ENGINEERING J.S.C

Document number:
TECHNIP GEOPRODUCTION NCS2-TPGM-FD-3-00-04-MR-001

(M) Sdn Bhd No. of pages: 17


(Including cover sheets)
NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

TABLE OF CONTENTS

1 INTRODUCTION ............................................................................................ 4

1.1 Project Description ............................................................................................... 4

1.2 Purpose of Document ........................................................................................... 6

1.3 Definitions ........................................................................................................... 6

2 SCOPE OF SUPPLY ......................................................................................... 8

3 APPLICABLE DOCUMENTS ........................................................................... 10

4 DOCUMENTS AND DRAWINGS SUPPLY ...................................................... 12

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 3/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

1 INTRODUCTION

1.1 Project Description


The Nam Con Son 2 Gas Pipeline Project (“NCS2" or "Project") has been initiated to
recover and process the gas reserved from the Hai Thach, Moc Tinh (block 05.2, 05.3),
Thien Ung, Mang Cau (block 04.3), block 04.1 and other gas fields located within the
Nam Con Son Basin. The pipeline project also considers possibilities to transport
import gas from ASEAN countries in the future to provide for the growth in demand at
Southeast Vietnam area.
PetroVietnam Gas Corporation is the Project Owner and has assigned PetroVietnam
South - East Gas Project Management Board (PVGAS SEG) on their behalf to manage
the execution of the Project.
The Project shall be completed in the year 2015.
The NCS2 pipeline system consists of the following items:
- Offshore pipeline is approximately 325.5km to transport 2-phase gas, starts from
the Hai Thach Platform passes the Central Processing Platform of Thien Ung field,
Bach Ho and then runs to a Landfall Point at Long Hai. Facilities on Hai Thach
Platform such as sales gas metering skid, pig launcher, shutdown valve, riser, SSIV
and 3.5km offshore pipeline from SSIV to connection point with Nam Con Son 2
gas pipeline (EPC scope done by Bien Dong POC).

Pipeline Design Capacity


Gas 18.89 MMSCMD
Condensate 349.49 tonne/day
Or Dry gas 20 MMSCMD
- Onshore pipeline is approximately 8.1km from Long Hai Landfall Point (LFP) to Gas
Processing Plant (GPP2) at Dinh Co.
- Gas Processing Plant (GPP2) at Dinh Co.
- Onshore dry gas pipeline is approximately 29.6km from Dinh Co GPP2 to Phu My
Gas Distribution Center (GDC), includes:
o Line block valve station (LBV) at Phuoc Hoa.
o Phu My GDC expansion includes pig receiver, metering skid and tie-ins,
shutdown valves, and modifications to the fire-fighting, SCADA and electrical
systems.
- Two liquid product pipelines (LPG & Condensate) is approximately 25km from
outlet of Dinh Co GPP2 to transport to Thi Vai Terminal and three LBVs.

The overall block diagram of NCS2 Gas Pipeline Project is shown in figure 1:

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 4/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

OVERALL BLOCK DIAGRAM


NCS2 GAS PIPELINE PROJECT

Thi Vai Phu My


Terminal GDC

Liquid (Condensate & LPG)


Pipelines
Length: 24.9 km 3rd LBV Phuoc Hoa
Diameter: 6" & 10" LBV
DP: 49.1 Barg
DT: -10/65º C (LPG)
0/65º C (Condensate)
2nd LBV

Offshore Gas Pipeline 1st LBV


Length: 325.5 km
Diameter: 26'’
Offshore Onshore
Pipeline DP: 160 barg Onshore Sales Gas
DT: -10/70º C Pipeline
26", 0.3 km Length: 29.6 km
Diameter: 30'’
LFP 26", 7.8 km Pipeline DP: 71 barg
GPP2 DT: -10/65ºC

GPP2
Landfall Station
DC: 20.0 MMSCMD
DP: 160 barg
DT: -10/70º C
325. ipeline

TU-NCS2 Pipeline
Length: 5.8 km
5 km

Diameter: 26'’
as P

Pipeline DP: 160 barg


ore G

DT: -10/70º C
26",
Offsh

future
Bach Ho Platform
DP: 139 barg
MOP: 125 barg
DT: 70º C
Bach Ho
Platform
e
op
sc
's

Dai Hung
S2

DP: Design Pressure


NC

op

Hai Thach Platform Platform


sc

DP: 160 barg MOP: Max. Operating Pressure


’s
P

DC: Design Capacity


VS

MOP: 151 barg


DT: -10/70º C SSIV DT: Design Temperature
GDC: Gas Distribution Center

SSIV NCS2's scope


Thien Ung Thien Ung Platform
KP 3.5 Platform DP: 160 barg
BDPOC’s scope MOP: 151 barg
Hai Thach DT: 70ºC
Platform

Figure 1. Overall Block Diagram

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 5/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

The GPP2 shall be located at Dinh Co adjacent to the existing Nam Con Son Pipeline
Terminal. It shall be designed for high propane recovery using a licensed process. The
design shall also be convertible to high ethane recovery in the future with minimal
modifications. The design shall also be flexible enough to be able to revert to
accomplishing the necessary hydrocarbon dew point control in the event the turbo
expander/compressor is unavailable.

Under the scope of work of the GPP2 FEED project, the GPP2 will be designed for
Phase 1 (LPG Recovery Mode).

 Phase 1: Train 1, LPG Recovery Mode, Plant throughput 10 MMSCMD at pipeline


outlet.

1.2 Purpose of Document


The purpose of this Material Requisition is to define the scope of supply and overall
technical requirements for the supply of API Centrifugal Pumps. This document
identifies applicable technical documentation relevant to the design, fabrication,
testing, supply and installation (where identified) and the required documentation to
be submitted by the Supplier for the equipment.

VENDOR also to take note scope of work includes process design; a process operating
guarantee shall form part of the required documentation per the VDRL.

1.3 Definitions
The following definitions shall apply to this document:

PROJECT Gas Processing Plant (GPP) of Nam Con Son 2 Gas Pipeline
Project
CLIENT PETROVIETNAM GAS (PVGAS)
REPRESENTATIVE Of PETROVIETNAM SOUTH-EAST GAS PROJECT
CLIENT MANAGEMENT BOARD (PVGAS SEG)
CONTRACTOR PETROVIETNAM ENGINEERING CONSULTANCTY J.S.C
(PVE)
SUB-CONTRACTOR TECHNIP GEOPRODUCTION (M) SDN BHD
LICENSOR means the enterprises providing Process Licence and PDP
for GPP of Nam Con Son 2 Gas Pipeline Project
CERTIFYING AGENT means the third-party inspection company or classification
society for the purpose of checking, inspecting , confirming
the accuracy and suitability of calculations, procedures,

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 6/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

project documents and activities associated with the


PROJECT in accordance with the scope contained in
Contract Agreement between CLIENT and CERTIFYING
AGENT
VENDOR means a supplier of materials and/or equipment for the
PROJECT including related documentation and services,
where necessary, in connection with the Installation,
Testing, Pre-commissioning, Commissioning and Start-up
support of any such materials or equipment.
EPC CONTRACTOR who is responsible for the detailed design / procurement /
construction / installation / pre-commissioning of the
PROJECT
PURCHASER The CLIENT, ITS REPRESENTATIVE or EPC CONTRACTOR
who have placed the Purchase Order to the VENDOR

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 7/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

2 SCOPE OF SUPPLY

No Item / Tag Quantity Description


1 1P1201A/B/C 3 HP Semi - Lean Solution Pump
2 1P1202A/B/C 3 LP Semi - Lean Solution Pump
3 1P1205A/B 2 Amine Sump Pump
4 1P1206A/B 2 Solution Transfer Pump
5 1P1207A/B 2 Pure Amine Pump
6 1P1401A/B 2 Demethanizer Reflux Pump
7 1P1502A/B 2 LPG Column Reflux Pump
8 1P2202A/B 2 LPG Transfer Pump
9 1P2302A/B 2 Condensate Transfer Pump
10 1P2422A/B 2 Offspec Pump
11 1 per EA Pump assembly
12 1 per EA Electric Motor
13 1 per EA Drive Coupling
14 1 per EA Mechanical Seal Assembly
15 1 per EA Bearing Lubrication
16 1 lot per EA On-Skid Piping & Valves
17 1 lot per EA All required instruments
18 1 lot per EA On-Skid Electrical and Control Cabling
19 1 lot per EA Cable Terminal Box and Cable Gland for Motor
20 1 lot per EA Package and Equipment Lifting Lugs
21 1 per EA Base Plate / Mounting Plate
22 1 lot per EA Earthing Lugs
23 1 lot per EA Nameplate
24 1 lot per EA First fill of lubricants
1 lot per EA Lifting accessories including pad eyes, slings, shackles and
25
attachment, spreader bars, etc., necessary for single point lift
26 1 lot per EA Commissioning and start up spare parts
1 lot per EA Spare parts for 2 years operation (Itemized price list shall be
27
submitted to CLIENT/PURCHASER for approval)
28 1 lot Special tool (if any)
29 1 lot External surface preparation and painting
30 1 lot Inspection and Testing
31 1 lot Third Party Certification

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 8/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

No Item / Tag Quantity Description


32 1 lot Export sea-worthy packing and provisions for long term storage
33 1 lot Transport/lading as per the Purchase Order requirements
34 1 lot Field service for installation and commissioning support
35 1 lot Guarantee and Warranty

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 9/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

3 APPLICABLE DOCUMENTS

Description Reference Rev. Date of Date of


Attachment Cancellation
A) Equipment Datasheets
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-04-04- 2 17/04/13
Pumps - HP Semi - Lean Solution Pump DS-018
(1P1201A/B/C)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-04-04- 2 17/04/13
Pumps - LP Semi - Lean Solution Pump DS-020
(1P1202A/B/C)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-04-04- 2 17/04/13
Pumps - Amine Sump Pump (1P1205A/B) DS-021

Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-04-04- 2 17/04/13


Pumps - Solution Transfer Pump DS-022
(1P1206A/B)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-04-04- 2 17/04/13
Pumps - Pure Amine Pump (1P1207A/B) DS-023

Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-06-04- 2 17/04/13


Pumps - Demethanizer Reflux Pump DS-024
(1P1401A/B)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-07-04- 2 17/04/13
Pumps - LPG Column Reflux Pump DS-025
(1P1502A/B)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-09-04- 1 17/04/13
Pumps - LPG Transfer Pump (1P2202A/B) DS-028

Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-09-04- 1 17/04/13


Pumps - Condensate Transfer Pump DS-029
(1P2302A/B)
Mechanical Datasheet for API Centrifugal NCS2-TPGM-FD-3-09-04- 1 17/04/13
Pumps - Offspec Pump (1P2422A/B) DS-029

B) Project Specifications
Specification for API Centrifugal Pump NCS2-TPGM-FD-3-00-04- AC 17/04/13
SP-003
Electrical Specification for Package NCS2-TPGM-FD-3-00-05- AC 17/04/13
Equipment SP-006
Specification for Electric Motor NCS2-TPGM-FD-3-00-05- AC 17/04/13
SP-010
Specification for Electrical Cables NCS2-TPGM-FD-3-00-05- AC 17/04/13
SP-008

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 10/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Description Reference Rev. Date of Date of


Attachment Cancellation
B) Project Specifications (Cont’)
General Instrument Design/Specification NCS2-TPGM-FD-3-00-07- AC 17/04/13
SP-004
Piping & Valve Material Specification NCS2-TPGM-FD-3-00-03- 1 17/04/13
SP-006
Specification for Painting and Protective NCS2-TPGM-FD-3-00-03- AC 17/04/13
Coating SP-005

C) Drawings

Piping and Instrument Diagram – Legend NCS2-TPGM-FD-3-01-D-P- A1 17/04/13


and Symbol 0901/0902/0903

Piping and Instrument Diagram – LP Semi NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Lean Solution Pumps (1P1202A/B/C) 1216

Piping and Instrument Diagram – HP Semi NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Lean Solution Pump (1P1201A/B/C) 1219

Piping and Instrument Diagram – Amine NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Sump Pump (1P1205A/B) 1224

Piping and Instrument Diagram – Solution NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Transfer Pump (1P1206A/B) 1225

Piping and Instrument Diagram – Pure NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Amine Pump (1P1207A/B) 1226

Piping and Instrument Diagram – BUPRO NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Transfer Pump (1P2202A/B) 2202

Piping and Instrument Diagram – NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Condensate Transfer Pump (1P2302A/B) 2302

Piping and Instrument Diagram – Offspec NCS2-TPGM-FD-3-01-D-P- 1 14/12/12


Pump (1P2422A/B) 2402

Piping and Instrument Diagram – NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Demethanizer Reflux Pump (1P1401A/B) 1412

Piping and Instrument Diagram – LPG NCS2-TPGM-FD-3-01-D-P- 1 17/04/13


Column Reflux Pump (1P1502A/B) 2402

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 11/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

4 DOCUMENTS AND DRAWINGS SUPPLY


The following Vendor Data Requirement List (VDRL) outlines the minimum
requirement on the documents and drawings that VENDOR shall provide.

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
A0001 List of Vendor's documents and drawings X +2W Info 1E 6C+E

A0101 Process Description

A0102* Process Diagram with heat and material balance

A0103* Piping & Instrument diagrams

A0105 Noise Data Sheets +12W IFR 1E 6C+E

A0106 Painting specification +12W IFR 1E 6C+E

A0108 Weight Data-sheet +12W IFR 1E 6C+E

A0401 Vendor Data Book at delivery IFR 1E 6C+E

A0401A Vendor Data Book Summary +20W IFR 1E

A1001* Equipment filled-in data sheets X +4W IFR 1E 6C+E

A1002* Performance curves (including auxiliaries) X +6W IFR 1E 6C+E

A1003 Calculation notes

A1007 Lateral critical speed analysis +10W IFR 1E 6C+E

A1008 Torsional critical speed analysis +10W IFR 1E 6C+E

A1012 Thermal Rating for Heat Exchangers

A1013 Acoustic Pulsation Study

A1014* Utility Balance

A1015 Completed Lubricant Charts +12W IFR 1E 6C+E

A1101 Cross sectional and assembly drawings (with part +12W IFR 1E 6C+E
list)
A1102* Drawings of auxiliaries and itemized equipment +12W IFR 1E 6C+E
supplied loose
A1103 Pressure vessel construction drawings

A1105 Piping, insulation, ladder and platform support


drawing
A1106 Packing box drawings (with material list)

A1109 Detailed drawing +12W IFR 1E 6C+E

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 12/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
A1112 Nameplate drawing +12W IFR 1E 6C+E

A1113 Heat Exchanger Construction Drawing

A1304 Pressure parts calculation notes

A2001* General arrangement drawings X +4W IFR 1E 6C+E

A2002* Outline drawings for off base equipment

A2003 Flushing auxiliaries piping drawings +8W IFR 1E 6C+E

A2004 Major piping layouts and drawings

A2005 Isometric drawings

A2006 Foundation layout and loading plan X +8W IFR 1E 6C+E

A2007 Structural Steel drawing

A2008 Stairs, ladders and platform drawing (with material


list)
A2011 Civil Work guide drawings (base frame and cable +8W IFR 1E 6C+E
holes)
A2101 Line List

A2201 Structural Steel calculation note

A2202 Thermal stress calculation (including allowable forces


and moments on nozzles
A2301 Piping interconnecting drawing at battery limits +8W IFR 1E 6C+E
(including nozzle thermal growth)
A2402 Foundation Calculation

A3001 List of instruments +8W IFR 1E 6C+E

A3002 List of instrument and system cables

A3003 List of junction boxes, control boxes, cabinets and +16W IFR 1E 6C+E
panels
A3004 List of control, monitoring, safety systems +16W IFR 1E 6C+E
input/output signals (inc. vibration monitoring)
A3005 List of instrument ranges, set points and setting of +16W IFR 1E 6C+E
alarms and trips
A3101 Instrument data sheets +8W IFR 1E 6C+E

A3201* Outline dimensional drawings for cabinets, junction +16W IFR 1E 6C+E
boxes
A3206 Control boxes, cabinets and panels arrangement
drawings (front, rear, internal view)

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 13/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
A3301* Utility consumption list (power, instrument air, X +4W IFR 1E 6C+E
water, etc.)
A3302 Electrical power supply distribution diagram

A3303 Electrical, pneumatic, hydraulic connection block


diagrams
A3304 System cabinets, peripherals, interconnection block
diagrams
A3305 Earthing diagram

A3403 Junction boxes, terminal blocks, plugs, connectors +16W IFR 1E 6C+E
wiring drawings
A3404 Junction boxes, control boxes, cabinets and panel
location drawings
A3406 Instrument hook-up drawings +16W IFR 1E 6C+E

A3407 Loop diagrams (or typical + I/O database or


electronic file)
A3501 Control system description, Operating principles,
Functional design specification
A3505 Logic diagrams (interlock and safety), sequence
diagrams, Cause and Effect charts
A3602 Instrument cables schedule

A3701 Vibration cut-out switch drawings

A4001 Electrical consumers list

A4002 Cable list (electrical/power cable) +16W IFR 1E 6C+E

A4003 Bill of materials (supplied as loose)

A4102* Electric motor data sheets X +8W IFR 1E 6C+E

A4104 Torque versus speed / current / power factor curves +16W IFR 1E 6C+E

A4108 One line diagrams +16W IFR 1E 6C+E

A4110 Schematic Diagrams +16W IFR 1E 6C+E

A4112 Auxiliaries circuits P&I (lube oil, cooling water, etc)

A4203 Electrical tracing layout and typical details

A4206 Terminal box detail drawing with termination details +16W IFR 1E 6C+E

A4207 Electric motor drawings +16W IFR 1E 6C+E

A4209 Terminal block diagrams

A5001 Special precautions for handling prior erection +20W Info 1E 6C+E

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 14/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
A5002 Recommendations for storage prior and during +20W Info 1E 6C+E
erection
A5003 List of components to be erected/installed on site +20W Info 1E 6C+E

A5004 List of operations to be implemented on site +20W Info 1E 6C+E

A5005 List of verifications and tests to be performed on site +20W Info 1E 6C+E

A5006 List of consumables for erection, commissioning and +20W Info 1E 6C+E
start-up
A5007 List of spare parts for erection, commissioning and X +20W Info 1E 6C+E
start-up
A5008 List of special tools for erection and assembly X +20W Info 1E 6C+E

A5009 Detailed schedule for site erection

A5010 Procedure for erection and installation of the +20W Info 1E 6C+E
equipment
A5011 Procedure for site assembly, levelling and welding

A5012 Details of site assembly and field welds (if any)

A5013 Welding procedure specification for field welds

A5014 Procedure of preparation of equipment for +20W Info 1E 6C+E


commissioning
A5015 Installation, start-up and commissioning manuals +20W Info 1E 6C+E

A5016 Operation and maintenance manuals +20W Info 1E 6C+E

A5017 Trouble shooting check list and diagrams

A5019 Procedure for test-run (Including site testing, +20W Info 1E 6C+E
performance test)
A5020 List of special tools for maintenance (if any) X +16W IFR 1E 6C+E

A5021 List of spare parts for 2 years operation X +16W IFR 1E 6C+E

A5027 Safety management plan

A5028 Environmental management plan

B1001 Job Quality Assurance Plan (Critical Equipment)

B1002 Fabrication and quality control plan +8W IFR 1E 6C+E

B1103 Test procedures +16W IFR 1E 6C+E

B1104 Factory Acceptance Tests procedure (FAT) +16W IFR 1E 6C+E

B1105 FAT report After Test IFR 1E 6C+E

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 15/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
B1106 Site acceptance test procedure +16W IFR 1E 6C+E

B1201 PWHT Procedure +8W IFR 1E 6C+E

B1202 NDT Procedure +8W IFR 1E 6C+E

B1204 Welder qualification certificates In Info 1C+E 6C+E


Workshop
B1205 Weld radiographs, dye penetration test reports In IFR 1C+E 6C+E
Workshop
B1206 NDT Operators Certificates In Info 1C+E 6C+E
Workshop
B1207 NDT Record Certificates for Location of Sketches of In Info 1C+E 6C+E
Radiograph and others NDT Workshop
B1208 Test certificates In IFR 1C+E 6C+E
Workshop
B1209 Hydraulic and other shop test reports In Info 1C+E 6C+E
Workshop
B1210 Material certificates In IFR 1C+E 6C+E
Workshop
B1211 Heat treatment record certificates In Info 1C+E 6C+E
Workshop
B1213 Fabrication Reports In IFR 1C+E 6C+E
Workshop
B1214 Certificates for use of electrical apparatus in In IFR 1C+E 6C+E
hazardous area Workshop
B1215 Calibration reports In IFR 1C+E 6C+E
Workshop
B1216 Third party approval certificates In IFR 1C+E 6C+E
Workshop
B1217 Legal and conformity certificates In IFR 1C+E 6C+E
Workshop
B1304 Welding Book (Welding Map, Welding Procedure
Specification Procedure Qualification Report)
C1001 Engineering, procurement, manufacturing and test X +4W Info 1E -
schedule
C1002 Progress Report +4W Info 1E -

C1003 Sub-Vendor's and main Suppliers' list X +4W IFR 1E -

C1004 Vendor's procurement status (monthly) +4W Info 1E -

C1005 Unpriced copy of main sub-orders +8W Info 1E -

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 16/17


NAM CON SON 2 GAS PIPELINE PROJECT
FRONT – END ENGINEERING DESIGN
MATERIAL REQUISITION FOR API CENTRIFUGAL PUMP

Final issue
First issue
Doc. (5)
Code With
Description Issue Purpose Quantity Quantity
Bid
(1) date type type
(2) (3) (4) (4)
C1006 List of spare parts for (2) years operation/E-SPIR X 3M before IFR 1E 6C+1E
Form delivery
C1008 Recommendations for protection during 2M before Info 1E 6C+1E
transportation delivery
C1009 Heavy and/or large equipment drawings with weight,
transportation drawings
C1011 Packing list Before Info 1E 6C+1E
delivery
C1012 Shipping documents, Transport authorization At delivery Info 1E 6C+1E

C1013 Original Certificates of Equipments At delivery Info 1E 6C+1E

C1014 Recommendation for sea fastening 1Mth IFR 1E 6C+1E


before
shipment
C1016 Certificates of Insurance 1Mth IFR 1E 6C+1E
before
shipment

NOTES :
(1) * = Priority documents subject to penalization or term of payment
(2) ISSUE DATE : number of D = Days / W = Weeks / M = Months after purchase order effective date (unless otherwise specified)
(3) PURPOSE : IFR = Issue for review and comments, INFO = Issue for information
(4) QUANTITY : per type TYPE : C = Copy T = Transparency P = Polyester M = Microfilm E = Electronic file CD = CD ROM
(5) FINAL ISSUE : Document without comments (with document status = 3) . Required No. of copies shall be issued after document is approved
to Code 3. These copies are separate from the copies required in Final Vendor data book.

A = Added M = Modified X = Cancelled D = Cancelled on a previous revision

NCS2-TPGM-FD-3-00-04-MR-001 Rev. AC Page 17/17

Вам также может понравиться