Power Plant Capacity 25 MW 1100

Estimated Steam consumption 4 t per MW 200


Total Water Requirement 100 TPH 20
Re-circulation water quantity 450 Cu.m

Eff. to EWT to STP


13.09

95% Clarifier 0.65

12.44

95% MGF 0.62

11.82

90% UF 1.18

10.63

70% RO 3.19

7.44

75% RO 1.11

3.33

90% MB 0.33

3.00

Boiler Blowdown 3.00


Cooling Tower Losses 6.75 3.00
Cooling Tower Blowdown 2.25

Total Effluent CPP 8.50

Total Effluent Cement Plant 4.50

Eff. Reject
13.00

95% Clarifier 0.65

12.35
11.73

90% UF 1.17

10.56

60% RO 4.22

6.33
TDS 3200

TDS 1280
TDS 2900