Академический Документы
Профессиональный Документы
Культура Документы
Monojit Banerjee
Asst. Professor, School of Management Studies, Techno India
3) help in reaching
a) Air transport b) Water transport
c) Road transport d) Rail transport
7) If goods are sent at the railway authorities can be made liable for
any delay, loss, or damage in the respect of the goods except when it is
due to
natural causes which are beyond the control of railway.
a) R.R. b) O.R.
c) R/R d) none of these
9) If the consignee does not arrange to receive the goods on arrival, he is charged an
amount per day of delay, which is known as
a) leverage b) demurrage
c) both (a) and (b) d) none of these
Ans: (a) 12
24) Which of the following is the key factor for accelerated road development in India?
a) Low cost capital & Government management
b) Low cost capital & Private participation
c) Outsourcing
d) Participation of World Bank in road construction.
Ans: (c) 3
Ans: a) provides opportunity to trained pilots to achieve higher standards in flying &
ground training.
30) Who of the following is responsible for creation of trained personnel for merchant
fleet of India?
a) DG Shipping
b) West Bengal University of Technology
c) IIT, Kanpur
d) Naval Headquarters, New Delhi
31) The first Indian railway train rolled on track in the year
a) 1835
b) 1858
c) 1853
d) 1855
Ans: a) 1835 or c) 1853 [ see explanation below]
On 16th April, 1853, the first train service was started from Bombay to Thane.
But this was first passenger service, even though this is credited with being the start
of Railways in India. The actual facts are quite surprising.
39) In case of loss of Railway Receipt, the consignee can take the delivery of goods
by
a) Indemnity bond
b) Forwarding note
c) Consignment note
d) none of these
Ans: a) Indemnity bond
Ans: (b)
Ans: (a)
Ans: (b)
Ans: (b)
Ans: (c)
Ans: (d)
Ans: (d)