EXPRESSION OF INTEREST:

LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01


Project Management and Implementation Consultant (PMIC)
Project Summary
SN 1
Project Title Consulting Services for Irrigation Development and Flood Mitigation Project in
Banteay Meanchey (EDCF Loan KHM-19)
Country / Region Cambodia/ Banteay Meanchey
Start Date 11-Oct-2018
Completion Date 26-Mar-2023
Continuous / Continuous
Intermittent
Client Ministry of Water Resources and Meteorology (MOWRAM)
Funding Source Economic Development Cooperation Fund (EDCF)/EDCF Loan KHM-19
Description * Brief Narrative Description of Project
The primary objectives for the
Project are to mitigate flood and
drought damages by
rehabilitating irrigation canals
and constructing multi-purpose
reservoirs and to contribute to
stable land use by protecting
flood damages based on the
sufficient understanding of the
Project area. Also it will
contribute to increase in
agriculture income and help
develop local economic condition
by increasing rice yields through
sufficient irrigation water supply
with irrigation canals and
reservoirs constructed in the
Project.
* Project Scope
Classification Zone 1 Zone 2 Zone 3
Reservoir Vang Haeng Pongro Kanseng
Canal Canal 1 Canal 2 Canal 3
Reservoir V=14.3mil.m3 V=8.9mil.m3 V=20.6mil.m3
Canal L=34.66km L=16.28km L=36.02km

* Description of actual services provided by your organization


-Detailed Design;
-Preparation of bidding documents;
-Assistance in the evaluation and negotiation of Contractor contract;
-Construction Supervision;
-Inspection of equipment and facilities to be installed by the Supplier
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 2
Project Title Design-Build for Sustainable Water Resources Management and Flood Prevention
Country / Region Thailand/ Chao Phraya River in Bangkok
Start Date 01-Dec-2012
Completion Date 31-Jul-2013
Continuous / Continuous
Intermittent
Client Water and Flood Management Commission
Funding Source Gov. of Thailand
Description * Brief Narrative Description of Project
Managing risks in water resources of
Thailand is essential to alleviate damage
and the consequences of natural
disasters such as flooding and drought
and to increase agricultural production
to ensure food security for the country.

This project aims to provide consultancy


services for preparation of definitive
design proposal of contractors covering
dam, land use, monkey cheek, river
improvement, floodway for 30 provinces
in Thailand.

1) Dam & Reservoir: 19 Dams


2) Improvement of Land-use: Construction of Embankment in Urban Area
3) Improvement of Farmland: Installation of Water retention
4) River Maintenance: L=736km
5) Floodway: L=250km
6) Water Resources Management System: Flood Forecasting, etc.

* Description of actual services provided by your organization


Service 1 – Data collection on socio-economic profiles for review and analysis
Service 2 – Review of alternative alignment
Service 3 – Site Survey for hydrogeologic analysis and environmental impact.
Service 4 – Review of preliminary FS and Forecast travel demand
Service 5 – Preparation of design drawings, specifications, estimation of quantities
and construction cost.
Service 6 – Economic & Financial Analysis (sensitivity, financial viability and
sustainability, etc.)
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 3
Project Title PMC for Irrigation of Pampas de Padilla in Chuquisaca, Bolivia
Country / Region Bolivia/ Pampas de Padilla, Chuquisaca Province
Start Date 26-Dec-2012
Completion Date 30-Apr-2021
Continuous / Continuous
Intermittent
Client Korea International Cooperation Agency
Funding Source Korea International Cooperation Agency
Description * Brief Narrative Description of Project
The Bolivian government has established a national development plan for irrigation
(2007-2030 / $ 1.2 billion / 5-year implementation plan), aiming to increase the total
irrigation area of 276,000 ha, however it was difficult to achieve the goal due to lack
of financial resources.

The Ministry of Environment and Water Resources and Chuquisaca made the design
drawings of the dam and irrigation water canal construction by the local planners of
Municipio de Padilla in 2004 with assistance from the CAF (Corporacion Andina de
Fomento). In order to build a water management infrastructure for the agricultural
water in the region, KOICA has been requested the assistance of the grant aid
business.

1) Irrigation Canal:
- Slope canal: 0.7m*0.7m*2 Nos.
- Transition canal: 1.4m*2m/L= 1km
- Tunnel: Diameter: 1.4m*2m/ L=980m
- Irrigation canal: L=77km
2) Dam
- Dam crest: Elevation: 2,126.75m/ H=29.75m
- Spillway elevation: 2,124m
- Capacity: 6.21mil.㎥

* Description of actual services provided by your organization


- Dispatch of Korean experts to Bolivia
- Training of Bolivian officials and staff
- Design and Work Supervision
- Project management, etc.
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 4
Project Title Consulting Services for Detailed Design and Construction Supervision for Jalaur River
Multi-Purpose Project Stage II (EDCF Loan PHL-15)
Country / Region Philippines / Jaro, Tacas, Iloilo Province
Start Date 25-Nov-2013
Completion Date 31-Oct-2021
Continuous / Continuous
Intermittent
Client National Irrigation Administration
Funding Source Economic Development Cooperation Fund (EDCF)/ EDCF Loan PHL-15
Description * Brief Narrative Description of Project
he Government of Philippines, through the National Irrigation Administration (NIA)
intends to carry out the Jalaur River Multi-purpose Project Stage II in order to relieve
poverty and generate employment opportunities with increased agricultural
production.
The project objectives have been defined as follows:
- To provide year-round irrigation for increased agricultural production to the 22,340
ha of 5 existing irrigation systems and 9,500 ha of currently rain fed areas;
- To build a penstock that is ready for a 6.6MW Hydroelectric Power Plant to
supplement the power supply in the province;
- To augment supply of good quality and potable water for domestic and industrial
consumption in the nearby municipalities including Iloilo City;
- To realize other intangible benefits including flood mitigation and promotion of eco-
tourism in selected dam/reservoir areas.

I. Dam
1 Jalaur High Dam(H=109m, Gravity type, RCC)
2 Jalaur Afterbay Dam(H=40m, Gravity type, RCC)
3 Alibunan Catch Dam(H=10m, Gravity type)
4 Appurtenant Structures

II. Highline Canal: L=80.74km, Concrete type,


- Appurtenant Structures (siphon, conduit, drainage culvert, wasteway, service road,
check gate, head gate, etc.)

III. Spillway
1 Jalaur High Dam
- Type: Non-gate Spillway with Flip Bucket
- Crest elevation of weir: Elev. 189.00m
- Net length of weir: 98.00m
- Pier width & number: 1.0mX6
- Width of approach channel: 104.00m
- Type of dissipator and Width: Flip bucket/ 40.0m

IV. Diversion Tunnel


1 Jalaur High Dam
- Type: Concrete lined circular type/ - Number: 1
- Inside diameter: 5.50m/ - Length: 290.00m
- Closure gates: 2 sets of slide gate, Clear span 2.75m, Clear height 5.50m
2 Jalaur Afterbay Dam
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
-Type: Concrete lined circular type/ - Number: 1/ - Inside diameter: 5.50m/ - Length:
130.0m
- Closure gates: 2 sets of slide gate, Clear span 2.75m, Clear height 5.50m

V. Existing Irrigation Areas


- Service Area: 22,340ha
- Main Canal: L=65.6km, concrete lined, trapezoidal, open canal
- Lateral Canal: L=8.6km, concrete lined, trapezoidal, open canal
- Appurtenant Structures
VI. Access Road: L=6.15km, B=6.0~8.1m, 1-2 lanes

* Description of actual services provided by your organization

I. Detailed Design Stage:


- Detailed engineering design, surveys and design for 3 dams, new highline canal;
- Preparation of technical specification, contract documents, detailed quantity/cost
estimates and evaluation of civil works proposals;

II. Construction Supervision Stage:


- Undertake construction supervision including materials and quality control in full
compliance with NIA approved plans and drawings, technical spec. and other
international standards;
- Conduct transfer of technology trainings
- Prepare O&M Manuals for operation phase
- Provide necessary technical assistance for initial O&M activities.
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 5
Project Title Consultancy Service for Design Review, Contract Management and Construction
Supervision of DB Contract of Torrington and New Mutwal Tunnel Project
(IBRD Loan No. 8145-LK)
Country / Region Sri Lanka/ Colombo
Start Date 25-Nov-2013
Completion Date 31-Oct-2021
Continuous / Continuous
Intermittent
Client Ministry of Megapolis and Western Development, Sri Lanka
Funding Source IBRD Loan No. 8145-LK
Description * Brief Narrative Description of Project
There are five main storm water drainage outlets in the Colombo drainage basin,
namely Wellawatte, Dehiwala, Old Mutwal Tunnel, North Lock and Ambatale. Of
these, the first three are outlets directly to the sea and the last two transfer water
into the Kelani river. With the increasing intensity of the peak flow, conveyance
capacity of main canals and outfalls are found to be inadequate to cope with the
extreme flood peaks. It is difficult to acquire more retention area due to rapid
urbanization and development of infrastructure and thus the improvement of the
outfalls with enhanced outflow capacity, is considered to be the most feasible
solution, in order to minimize the flood impacts.
To cope with the infrastructure development needs, it has been proposed to
incorporate two new diversion tunnels, into the canal system, with the discharges
eventually conveyed to the sea.
- Tunnel: New Mutwal Tunnel: D=3m, L=740m
- Torrington Tunnel: D=3m, L=1,100m/ D=2~3m, L=5,700m

* Description of actual services provided by your organization


i) Review the technical proposals submitted by the bidders, assist in evaluation of
tender documents;
ii) Review & approve the detailed designs submitted by the Contractor;
iii) Provide Construction Supervision, Contract Administration and Project
Management services to support project implementation of the Works Contracts;
iv) Play the role of Project Manager to ensure high quality construction is achieved in
conformity with international standards and all work is carried out in full compliance
with the Engineering Design, Technical Specifications, relevant safety regulations,
including environmental and social management plans
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 6
Project Title Construction Supervision for Regional Water Supply System of Juam Dam
Country / Korea/ Hwasun County
Region
Start Date 21-Nov-1992
Completion 07-Jan-2000
Date
Continuous / Continuous
Intermittent
Client Korea Water Resources Corp.
Funding Gov. of Korea
Source
Description * Brief Narrative Description of Project
1) Phase I
- Pump Station: Q=520,000 ㎥/day
- WTP: Q=60,000 ㎥/day
- Conveyance Pipeline: D1200~2800mm, L=39.680km
- Conveyance Tunnel: D2600~2800mm, L=14.571km
- Transmission Pipeline: D800~1200mm, L=25.336km
2) Mokpo Water Supply Project
- Pump Station: Q=120,000 ㎥/day
- Conveyance Pipeline: D1200mm, L=36.00km
3) Phase II
- Pump Station: Q=360,000 ㎥/day
- WTP: Q=40,000 ㎥/day
- Conveyance Pipeline: D1650~2200mm, L=20.071km

* Description of actual services provided by your organization


- Setting out of works
- Contract document
- Checking contractor's documents, construction program & method, quantity & quality
- Monitoring and controlling progress
- Environmental monitoring
- Carrying out testing
- Preparation of operation and maintenance manuals
- Preparation of completion report
- Acceptance of works and final balance
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 7
Project Title Construction Supervision for Regional Water Supply System of Keumho River
Country / Region Korea/ Busan Metropolitan City
Start Date 29-Dec-1986
Completion Date 20-Apr-1996
Continuous / Continuous
Intermittent
Client Busan Regional Construction Management Administration
Funding Source Gov. of Korea
Description * Brief Narrative Description of Project
1) Dam
- Type: Rockfill Dam
- H=55m, L=407m/ - Reservoir Capacity: 135,344,000 ㎥/day
2) Road
- National & Regional Road: L=23km
- Bridge: PC, L=680m, B=10.0m
3) Tunnel
- Diversion waterway: D6.0m, L=220m
- Water Conveyance: D2.5m, L=4,486m
- Water Transmission: D2.0m
4) Water Transmission and Conveyance Pipeline
- Water Supply: Q=461,000 ton/day
- Steel Pipeline: D800~2,000mm, L=20.314km
- Ductile Pipeline: D600~700mm, L=40.438km
5) Water Treatment Plant
- Capacity: 40,000ton/day 1 No. and 16,000ton/day 1 No.
- Electric Facility
- Monitoring and Inspection Facility

* Description of actual services provided by your organization


- Setting out of works
- Contract document
- Checking contractor's documents, construction program & method, quantity &
quality
- Monitoring and controlling progress
- Environmental monitoring
- Carrying out testing
- Preparation of operation and maintenance manuals
- Preparation of completion report
- Acceptance of works and final balance
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 8
Project Title Luong Son and Cao Phong Town Water Supply Project - Hoa Binh: Consulting Services
for Design, Construction Preparation and Construction Supervision (EDCF Loan VNM-
13)
Country / Region Viet Nam/ Hoa Binh City, Hoa Binh Province
Start Date 01-Mar-2011
Completion Date 31-Dec-2015
Continuous / Continuous
Intermittent
Client Hoa Binh Clean Water JSC, Viet Nam
Funding Source EDCF Loan VNM-13
Description * Brief Narrative Description of Project
1. Luong Son Towns Water Supply System
- Population: 20,077 person
- Raw water pumping station: Q=140 m3 /h, H=20m, 3 sets (Standby 1 set)
- Water Treatment Plant Capacity: Q=6,000 m3 /day
- Clean Water Pumping Station: Q=194 m3 /h, H=50m, 3 sets (Standby 1 set)
- Clean Water Transmission and Distribution Pipeline Network
1) D400mm, L=303m / 2) D300mm, L=1,095m
3) D250mm, L=2,527m/ 4) D200mm, L=3,559m
5) D150mm, L=5,641m/ 6) D100mm, L=5,871m
7) D90mm, L=7,858m
8) Flow meter DN159,000 psc
- Architectural, Mechanical, Electricity, Measuring Instrument Detailed Design – 1 sys.
2. Cao Phong Towns Water Supply System
- Population: 11,348 person
- Conveying Water Pipeline (Intake → Treatment Plant): D300mm, L=7,446m
- Water Treatment Plant Capacity: Q=4,000 m3 /day
- Clean Water Transmission and Distribution Pipeline Network
1) D400mm, L=1,428m/ 2) D350mm, L=19m
3) D300mm, L=3,081m/ 4) D250mm, L=2,743m
5) D200mm, L=6,252m/ 6) D150mm, L=3,914m
7) D100mm, L=4,184m/ 8) D90mm, L=3,862m
9) Flow meter DN155,000 psc

* Description of actual services provided by your organization

- Review of FS and Topographic and Geological Survey


- Basic & Detailed design and Bid preparation
- Construction supervision
- Commissioning and training
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 9
Project Title Construction Supervision for Agricultural Water Development Project in Hyungyeong
District
Country / Region Korea/ Muan County
Start Date 01-Mar-2011
Completion Date 31-Dec-2015
Continuous / Continuous
Intermittent
Client Muan County Office
Funding Source Government of Korea
Description * Brief Narrative Description of Project

1) Hyungyeong District
- Water Distribution Network: D80mm~D200mm, L=37.4km
- Water Supply Network: D25mm~D50mm, L=51.3km
2) Mongtan District
- Water Distribution Network: D80mm~D150mm, L=43.8km
- Water Supply Network: D25mm~D50mm, L=34.5km

* Description of actual services provided by your organization

- Setting out of works


- Contract document
- Checking contractor's documents, construction program & method, quantity &
quality
- Monitoring and controlling progress
- Environmental monitoring
- Carrying out testing
- Preparation of operation and maintenance manuals
- Preparation of completion report
- Acceptance of works and final balance
EXPRESSION OF INTEREST:
LOAN 51159-002 CAM: Irrigated Agriculture Improvement Project – CS01
Project Management and Implementation Consultant (PMIC)
Project Summary
SN 10
Project Title Detailed Design for Multi-purpose Agricultural Water Development Project in Wangseung
District
Country / Korea/ Chungcheongnam-do Province
Region
Start Date 23-Jun-2014
Completion 30-Nov-2015
Date
Continuous / Continuous
Intermittent
Client Korea Rural Community Corporation
Funding Government of Korea
Source
Description * Brief Narrative Description of Project

1) Development Area: A=293ha


2) Reservoir: L=200.9m, H43.0m
3) Discharge Channel & Spillway: B=5.0~12.0m, Spillway L=55m, Distribution canal L=233.6m

* Description of actual services provided by your organization

- Advisory & Review of Services


- Detailed Design
- Technical Services & Special Studies